Equipment_Must_Have_Requirements_update.pdf

PDF 202 KB Posted

Attached to
Design Build Chiller Plant, Monroe Federal Courthouse
Solicitation number
47PH1119R0002
Issued by

About this file

Equipment Must Haves

View the file

Other files

File Type Posted
Amendment_007_Form.pdf PDF
MON-16-Chiller-02FEB19_HVAC-Spec_update.pdf PDF
Amendment_006_SF_30.pdf PDF
Amendment_005_SF_30.pdf PDF
Amendment_004_Form.pdf PDF
Proposal_Price_Breakout.docx DOCX document
RFIs_and_Answers.xlsx XLSX spreadsheet
Amendment_003_Form.pdf PDF
Sign_in_sheet_1.pdf PDF
Sign_in_Sheet_2.pdf PDF
Amendment_002.pdf PDF
MON-16-Chiller-02FEB19-HVAC_M1-M5.pdf PDF
MON-16-Chiller-02FEB19-HVAC_M11-M14.pdf PDF
MON-16-Chiller-02FEB19-HVAC_M6-M10.pdf PDF
MON-16-Chiller-02FEB19-HVAC-Spec.pdf PDF
47PH1119R0002__Form.pdf PDF
MON-18-Phasing-01JAN14-Drawings.pdf PDF
MON-16-Chiller-02FEB19-TableContents.pdf PDF
Construction_IEQ_Management_Plan.pdf PDF
Equipment_Must_Have_Requirements.pdf PDF
Div_23_GSA__Object_Point_Naming_and_Tagging_Standard.pdf PDF
Exhibit_A_-_GSA_R7_N4_Mechanical_Project_DDC_Controls_Requirements_vers_Monroe20181031.pdf PDF
DB_Agreement.pdf PDF
Wage_Rate_LA42_4_Solicitation_attachment_Jan_19.pdf PDF
Flow_Diagram_and_Schedule_from_MON-18-100_Drawings-01JAN17.pdf PDF
Exhibit_B_-_Building_point_Histories_to_be_mapped_into_and_configured_for_Region_7_AMS.pdf PDF
Scope_of_Work_Design_Build__Monroe_Chiller_12-11-18.docx DOCX document
MON-16-Chiller-02FEB19-Elec-Spec.pdf PDF
MON-16-Chiller-02FEB19-Div-1.pdf PDF
MON-16-Chiller-02FEB19-Electrical.pdf PDF
47PH1119R0002_solicitation.pdf PDF
Exhibit_C_-_Graphic_Format_Bid_Document_20180125.pdf PDF
MON-16-Chiller-02FEB19-CoverSheet.pdf PDF
Exhibit_D-_Visio-RiserDiagramSample_31512.pdf PDF
Reps_and_Certs.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Chiller:

-Minimum 2 compressors centrifugal Magnetic Bearing (oil less) -With the following options: 5 year warranty entire chiller including labor & refrigerant -Marine water boxes on the condenser & Evaporator tube and shell heat exchanger -1.5 inch insulation -Partial Knockdown Kit to give access to chiller maintenance areas -Factory start up by the manufacture's authorized service company -Corrosion resistant tube sheet, end plate & marine water boxes (Condenser only) -IPLV .355 or better -Full load KW/Ton .58 -2 pass condenser, 2 pass evaporator -NTE 5.5psi pressure drop Evaporator @ 286 GPM 45/55 degf -NTE 5.5 psi pressure drop Condenser @ 360 GPM 85/95 degf

Pumps - vertical inline split coupled with suction strainer/inlet guide vanes & triple duty valve on discharge side of pumps (shut off/check/flow control) -One liquid filled gauge connected in a manifold configuration to allow measuring pressure on inlet of strainer, outlet of strainer & discharge side of pump.

-Inverter duty motor. Pumps shall be piped in a common manifold configuration so that either pump can flow to either chiller. This applies to the condenser and chilled water pumps.

Cooling Tower - shall be 316 stainless steel construction for upper and lower section.

-One each motor davit per tower fan motor.

-Vibration switches and sump heater per sump.

-OSHA approved ladder & platform to service each tower motor.

-Two sump configuration with a side mounted equalizer line connected each sump. This will allow for maintenance of each sump for servicing while one half of the tower is still operational or to allow one sump with the equalizer line in open position. Each inlet and outlet shall have a DDC automated valve incorporated into the BAS and SOO. Each actuator shall have feedback signal.

-The tower manufacturer's authorized service firm shall perform the tower startup. Tower shall be installed in accordance with the manufacture's installation manual.

-Install new insulation material with metal jacketing on the entire water makeup water line that is located on the roof.

-No basin sweeper systems allowed -Add a condenser water bypass line with an automated valve -VFD’s for cooling tower fans Plant Sequence of operation (SOO) will be needed.

FrankECampagna Highlight

FrankECampagna Highlight

FrankECampagna Highlight

File details come from the government source that posted it.