Exhibit_B_-_Building_point_Histories_to_be_mapped_into_and_configured_for_Region_7_AMS.pdf

PDF 109 KB Posted

Attached to
Design Build Chiller Plant, Monroe Federal Courthouse
Solicitation number
47PH1119R0002
Issued by

About this file

Exhibit B

View the file

Other files

File Type Posted
Amendment_007_Form.pdf PDF
MON-16-Chiller-02FEB19_HVAC-Spec_update.pdf PDF
Equipment_Must_Have_Requirements_update.pdf PDF
Amendment_006_SF_30.pdf PDF
Amendment_005_SF_30.pdf PDF
Amendment_004_Form.pdf PDF
Proposal_Price_Breakout.docx DOCX document
RFIs_and_Answers.xlsx XLSX spreadsheet
Amendment_003_Form.pdf PDF
Sign_in_sheet_1.pdf PDF
Sign_in_Sheet_2.pdf PDF
Amendment_002.pdf PDF
MON-16-Chiller-02FEB19-HVAC_M1-M5.pdf PDF
MON-16-Chiller-02FEB19-HVAC_M11-M14.pdf PDF
MON-16-Chiller-02FEB19-HVAC_M6-M10.pdf PDF
MON-16-Chiller-02FEB19-HVAC-Spec.pdf PDF
47PH1119R0002__Form.pdf PDF
MON-18-Phasing-01JAN14-Drawings.pdf PDF
MON-16-Chiller-02FEB19-TableContents.pdf PDF
Construction_IEQ_Management_Plan.pdf PDF
Equipment_Must_Have_Requirements.pdf PDF
Div_23_GSA__Object_Point_Naming_and_Tagging_Standard.pdf PDF
Exhibit_A_-_GSA_R7_N4_Mechanical_Project_DDC_Controls_Requirements_vers_Monroe20181031.pdf PDF
DB_Agreement.pdf PDF
Wage_Rate_LA42_4_Solicitation_attachment_Jan_19.pdf PDF
Flow_Diagram_and_Schedule_from_MON-18-100_Drawings-01JAN17.pdf PDF
Scope_of_Work_Design_Build__Monroe_Chiller_12-11-18.docx DOCX document
MON-16-Chiller-02FEB19-Elec-Spec.pdf PDF
MON-16-Chiller-02FEB19-Div-1.pdf PDF
MON-16-Chiller-02FEB19-Electrical.pdf PDF
47PH1119R0002_solicitation.pdf PDF
Exhibit_C_-_Graphic_Format_Bid_Document_20180125.pdf PDF
MON-16-Chiller-02FEB19-CoverSheet.pdf PDF
Exhibit_D-_Visio-RiserDiagramSample_31512.pdf PDF
Reps_and_Certs.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building point Histories to be mapped into and configured for

Region 7 AMS (Advanced Metering System)

The points listed below shall be configured as a 14 day FIFO history within the Building JACE Controller.

These listed points shall then be archived to the BAS Server hosting the building as a non expiring, unlimited size history. Configure these histories then to be copied to and archived as a non expiring, unlimited size history in the AMS Server #3.

Note, the histories listed below is not the complete list of 14 day FIFO histories that are to be stored within the

JACE controller. This list only describes those histories that are to be archived to the AMS Server for display by the energy monitoring applications.

kW Demand from all electrical meters serving and within the building.

o If there is a direct communication link by Modbus, BACnet or Lon to the meters monitoring the building electrical demand, map the Watt values into the Building JACE controller and program the calculations within the JACE to provide the kW Demand to the Building BAS and AMS History databases.

kWh Consumption from all electrical meters serving and within the building. Configured as an ever increasing value with no data resets configured.

o If there is a direct communication link by Modbus, BACnet or Lon to the meters monitoring the building electrical consumption, map the Watt values into the Building JACE controller and program the calculations within the JACE to provide the kWh Consumption to the Building BAS and AMS History databases.

Gas Meter Consumption in Cubic feet for all Gas Meters serving the building. Configured as an ever increasing value with no data resets configured

Water Meter Consumption in Cubic feet for all Water Meters serving the building. This includes Irrigation Water Meters, Cooling Tower Makeup and Blowdown meters. Configured as an ever increasing value with no data resets configured

Solar PV and or Wind Generators kW Demand from all electrical meters serving and within the generating equipment.

o If there is a direct communication link by Modbus, BACnet or Lon to the meters monitoring the PV System electrical demand, map the Watt values into the Building JACE controller and program the calculations within the JACE to provide the PV kW Generated to the Building BAS and AMS History databases.

Solar PV and or Wind Generators kWh Generation from all electrical meters serving and within the generating equipment. Configured as an ever increasing value with no data resets configured o If there is a direct communication link by Modbus, BACnet or Lon to the meters monitoring the PV System electrical Generation Capacity, map the Watt values into the Building JACE controller and program the calculations within the JACE to provide the PV power kWh Generated to the Building BAS and AMS History databases.

Solar Thermal systems GPM, Entering and Leaving fluid temperature

Chilled Water Supply and Return for each Chiller

Primary Chilled Water Loop Supply and Return Temperature

Building/Secondary Loop Supply and Return Temperature

Condenser Water Supply and Return Temperature for each Chiller

Condenser Water Loop Supply and Return Temperature

Plate and Frame Heat Exchanger Condenser Water Supply and Return Temperature

Plate and Frame Heat Exchanger Chilled Water Supply and Return Temperature

Plate and Frame Heat Exchanger Hot Water Supply and Return Temperature

Plate and Frame Heat Exchanger Domestic Water Supply and Return Temperature

Hot Water Supply and Return Temperature for each Boiler

Building Loop Hot Water Supply and Return Temperature

Building Chilled, Condenser and Hot Water Flow Meter in gpm

Building Consumption in Tons of Chilled, Condenser and Heating Systems

Steam Pressure for each Boiler

Domestic Hot Water Supply and Return Temperature

Chiller Status of each Chiller o Amp draw of each Chiller

Boiler Status of each Boiler

Chilled Water Pump Status of each pump – Primary and Secondary o Amp draw of each pump

Condenser Water Pump status of each pump o Amp draw of each pump

Cooling Tower Fan Status of each fan o Amp draw of each fan

Domestic Water Pump Status of each pump

Solar Thermal Pump status of each pump

Condenser Water o System- pH o System- Conductivity o System- M. Conductivity o System- ORP o System- S. Temp o System- M. Temp o Water Meter- Total Value o System- M. Cycles o Flow Meter- Flow Rate (per MIN) o System- Conductivity Set point o System- Calibration

Note – All Status histories are to have both a history configured in a 15 minute interval as well as a history configured to record on a Change of State (COV History). Both history types are to be archived to the BAS Server and to the AMS Server.