Construction_IEQ_Management_Plan.pdf

PDF 336 KB Posted

Attached to
Design Build Chiller Plant, Monroe Federal Courthouse
Solicitation number
47PH1119R0002
Issued by

About this file

Construction IEQ Management Plan

View the file

Other files

File Type Posted
Amendment_007_Form.pdf PDF
MON-16-Chiller-02FEB19_HVAC-Spec_update.pdf PDF
Equipment_Must_Have_Requirements_update.pdf PDF
Amendment_006_SF_30.pdf PDF
Amendment_005_SF_30.pdf PDF
Amendment_004_Form.pdf PDF
Proposal_Price_Breakout.docx DOCX document
RFIs_and_Answers.xlsx XLSX spreadsheet
Amendment_003_Form.pdf PDF
Sign_in_sheet_1.pdf PDF
Sign_in_Sheet_2.pdf PDF
Amendment_002.pdf PDF
MON-16-Chiller-02FEB19-HVAC_M1-M5.pdf PDF
MON-16-Chiller-02FEB19-HVAC_M11-M14.pdf PDF
MON-16-Chiller-02FEB19-HVAC_M6-M10.pdf PDF
MON-16-Chiller-02FEB19-HVAC-Spec.pdf PDF
47PH1119R0002__Form.pdf PDF
MON-18-Phasing-01JAN14-Drawings.pdf PDF
MON-16-Chiller-02FEB19-TableContents.pdf PDF
Equipment_Must_Have_Requirements.pdf PDF
Div_23_GSA__Object_Point_Naming_and_Tagging_Standard.pdf PDF
Exhibit_A_-_GSA_R7_N4_Mechanical_Project_DDC_Controls_Requirements_vers_Monroe20181031.pdf PDF
DB_Agreement.pdf PDF
Wage_Rate_LA42_4_Solicitation_attachment_Jan_19.pdf PDF
Flow_Diagram_and_Schedule_from_MON-18-100_Drawings-01JAN17.pdf PDF
Exhibit_B_-_Building_point_Histories_to_be_mapped_into_and_configured_for_Region_7_AMS.pdf PDF
Scope_of_Work_Design_Build__Monroe_Chiller_12-11-18.docx DOCX document
MON-16-Chiller-02FEB19-Elec-Spec.pdf PDF
MON-16-Chiller-02FEB19-Div-1.pdf PDF
MON-16-Chiller-02FEB19-Electrical.pdf PDF
47PH1119R0002_solicitation.pdf PDF
Exhibit_C_-_Graphic_Format_Bid_Document_20180125.pdf PDF
MON-16-Chiller-02FEB19-CoverSheet.pdf PDF
Exhibit_D-_Visio-RiserDiagramSample_31512.pdf PDF
Reps_and_Certs.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3

A. Indoor Air Quality (IAQ):

1. Construction Indoor Air Quality (IAQ) Management Plan

a) The General Contractor or other qualified party shall prepare and submit a

Construction IAQ Management Plan to the Owner and Architect for approval. For any construction project(s) involving:

1) Heating, ventilation, and air-conditioning (HVAC) modifications

2) Demolition

3) Paints, sealants, adhesives, etc. (commonly referred to as "wet work")

4) Anything else affecting indoor air quality

5) The Construction IAQ Management Plan shall meet the following criteria:

b) Construction activities shall be planned to meet or exceed the standards included in Chapter 3 of the Sheet Metal and Air Conditioning National Contractors’ Association (SMACNA) “IAQ Guidelines for Occupied Buildings under Construction”, 2nd Edition

1) Control pollution sources

2) Isolate areas of work to prevent contamination

3) Pressure differentials shall be used where feasible to prevent migration of dust/contaminants

c) Protect existing building HVAC systems including

1) Shutting down systems where possible AND

2) Protecting supply and return ducts within the work area by covering or filtering

3) Filtration media shall be installed to protect ductwork and/or equipment used during the construction process using a minimum efficiency reporting value (MERV) of 8 must be used at each return air grille, as determined by ASHRAE Standard 52.2-1999

4) Replace all filtration media immediately prior to occupancy

d) Suppress dust

1) Apply wetting agents or sweeping compounds

2) Interrupt dust pathways via dust curtains or temporary enclosures

3) Pre-clean any dust-covered materials that will be disturbed during demo using an effective dust-collecting method (such as damp cloth, wet mop, etc.) and immediately bag, seal and remove this refuse from the project area

e) Protect materials

1) Develop a Sequence of Finish Installation Plan highlighting measures to reduce the absorption of VOCs by materials that act as ‘sinks’

2) Protect absorptive materials from moisture damage both when stored on-site prior to install and after installation

f) Immediately prior to occupancy, perform:

1) An outside air flush out of the building (or of the immediate project area) OR

2) Pre-occupancy air-quality testing

2. Every reasonable effort should be taken to protect tenants and visitors to federal facilities from air contaminants and dust created by a project. The Contractor shall consider the following areas during construction in order to protect indoor air quality (IAQ):

a) HVAC Protection

b) Source control

c) Pathway interruption

d) Housekeeping

e) Scheduling

3. For more information:

a) https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_build ings_associated_instructions.pdf

b) https://www.gsa.gov/cdnstatic/Indoor_Air_Quality_Management_Desk_Guide_Final_

9.22.16.pdf https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings_associated_instructions.pdf https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings_associated_instructions.pdf https://www.gsa.gov/cdnstatic/Indoor_Air_Quality_Management_Desk_Guide_Final_9.22.16.pdf https://www.gsa.gov/cdnstatic/Indoor_Air_Quality_Management_Desk_Guide_Final_9.22.16.pdf