Exhibit JM8 - Smart Buildings 1pg.pdf

PDF 112 KB Posted

Attached to
Full Maintenance Service for East Texas Federal Buildings
Solicitation number
47PH0218R0001
Issued by

About this file

SECTION J ATTACHMENTS OF EAST TX FULL MAINTENANCE SERVICES

View the file

Other files

File Type Posted
Solicitation_Amendment_47PH0218R0001_0001.pdf PDF
Attachment 3-WD2015-5257_REV 5_DATE 11018- Tyler.pdf PDF
Building Library 6- Time Standard Comparison.pdf PDF
FIGURE L-2 Management Plan Baseline.pdf PDF
Exhibit JM7 - Bldg Op Plan Template 1pg.pdf PDF
Building Library 4 - East Texas Elevator Count FY2018.pdf PDF
Building Library 5-East Texas Roofing Systems FY2018.pdf PDF
Exhibit JM4 - Environmental Sustainable Products 1pg.pdf PDF
Exhibit JC2 - Custodial QASP 29 pg.pdf PDF
47PH0218R0001_Generated_PDF_with_TOC.pdf PDF
FIGURE B-1 Contractor Staffing Declaration for Union and Non Union Contracts.xlsx XLSX spreadsheet
Exhibit JM2 - Green Purchasing Report 2pg.pdf PDF
Exhibit JC4 - Building Exterior and Hardscape Plan 1pg.pdf PDF
Building Library 2 Building Inventory TX0182.pdf PDF
Exhibit JM15 - Misc Best Practices Shave Energy 10 pg.pdf PDF
Building Library 7 - Marshall _ Lufkin W-O list May .pdf PDF
Exhibit JC7 - PBS Waste Audits 1pg.pdf PDF
Exhibit JC6 - Recycle, Solid Wate, Trash Report 2pg.pdf PDF
Exhibit JC5 - Erosion and Sediment Control 1pg.pdf PDF
Building Library 2 Building Inventory TX0130.pdf PDF
Exhibit JM1 - O_M QASP 3pg.pdf PDF
Building Library 2 Building Inventory TX0126.pdf PDF
Exhibit JM9 - Water Treatment 19pg.pdf PDF
Figure L-3 Past Performance Questionnaire.pdf PDF
FIGURE L-1 COMBO CBA DOL MGMT PLAN IGE.xlsx XLSX spreadsheet
Building Library 3 - Location General Information.pdf PDF
Building Library 2 Building Inventory TX0262.pdf PDF
Attachment 1 - WW Contractors CBA 10-31-2018.pdf PDF
Exhibit C1 - BUILDING INFORMATION SHEET.pdf PDF
Attachment 3-WD2015-5279_REV 8_DATE 11018 - LUFKIN.pdf PDF
Building Library 1 - Extinguisher Report.pdf PDF
SECTION J APPENDIX.pdf PDF
Exhibit JM14 - Qualificaiton of Electrical Testing Technicians 1pg.pdf PDF
Attachment 2- WD CBA_ 2018-0069_REV 1_DATED 426.18 —
Exhibit JC3 - Surveillance Forms 4pg.pdf PDF
Building Library 7 - Marshall _ Lufkin W-O list May 1 _18.xlsx XLSX spreadsheet
Attachment 3-WD2015-5277_REV 8_DATE 11018- Marshall.pdf PDF
Figure B-3 Pricing of Services.xlsx XLSX spreadsheet
Exhibit JM17 - Preventative Maintenance Guide.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT JM8

Smart Buildings

GSA Smart and Sustainable Buildings

SMART TECHNOLOGIES - BACKGROUND AND PURPOSE

Background Because of current Government energy reduction executive orders and regulatory mandates, GSA

Public Buildings Service has several programs in development and at various stages of implementation that O&M Contractors should be aware of. One of these programs includes Smart Building technologies. Currently, approximately 250 buildings in the GSA portfolio are undergoing Smart Technologies design and implementation enhancements. Some facility projects involve complete detailed design-built from the infrastructure to completed project designs. Others involve modest retrofits to update key building controls systems. A key objective of implementing Smart Technologies in GSA buildings is to capture and make available more real-time performance data about the individual building systems (HVAC/BAS, Lighting, and Advanced Meters). This data will be made available to O&M Contractors and building support personnel and will increase in significance over time as more details are learned as GSA analyzes this new trend of monitoring building performance at a detailed level. O&M Contractors should be aware that if they are involved in operational support of one of GSA’s newer Smart Buildings, that tools, processes, data, and some procedures may need to be modified to meet GSA requirements for long-term improved operational efficiencies as a result of the investment the Government is making in these new technologies. O&M Contractors should continue to monitor developments in this area as more buildings in the GSA portfolio deploy Smart Technologies.

1.0 Trend Toward Integrated Building System Technologies

New building technologies, and their convergence with traditional information technology, have altered the way in which facilities can be monitored, maintained, and operated. Trends in building systems technology have provided opportunities in the market place to alter the way facilities managers use real time data to operate their facilities more efficiently. Building Systems are getting increasingly more dependent on software, IT networks (physical and wireless), servers, internet access, and cloud-based/hosted solutions. This shift in domain expertise has outpaced traditional design and construction practices. As a result, building operations and maintenance staff need to adapt, be more proactive, and leverage the availability of real-time data to help them perform building systems support more effectively. This may involve more thorough planning and redefining some processes, procedures, and job roles in order to better operate the facilities that have these newer technology based systems.

File details come from the government source that posted it.