Exhibit JC4 - Building Exterior and Hardscape Plan 1pg.pdf

PDF 124 KB Posted

Attached to
Full Maintenance Service for East Texas Federal Buildings
Solicitation number
47PH0218R0001
Issued by

About this file

SECTION J ATTACHMENTS OF EAST TX FULL MAINTENANCE SERVICES

View the file

Other files

File Type Posted
Solicitation_Amendment_47PH0218R0001_0001.pdf PDF
Attachment 3-WD2015-5257_REV 5_DATE 11018- Tyler.pdf PDF
Building Library 6- Time Standard Comparison.pdf PDF
FIGURE L-2 Management Plan Baseline.pdf PDF
Exhibit JM7 - Bldg Op Plan Template 1pg.pdf PDF
Building Library 4 - East Texas Elevator Count FY2018.pdf PDF
Building Library 5-East Texas Roofing Systems FY2018.pdf PDF
Exhibit JM4 - Environmental Sustainable Products 1pg.pdf PDF
Exhibit JC2 - Custodial QASP 29 pg.pdf PDF
47PH0218R0001_Generated_PDF_with_TOC.pdf PDF
FIGURE B-1 Contractor Staffing Declaration for Union and Non Union Contracts.xlsx XLSX spreadsheet
Exhibit JM2 - Green Purchasing Report 2pg.pdf PDF
Building Library 2 Building Inventory TX0182.pdf PDF
Exhibit JM15 - Misc Best Practices Shave Energy 10 pg.pdf PDF
Building Library 7 - Marshall _ Lufkin W-O list May .pdf PDF
Exhibit JC7 - PBS Waste Audits 1pg.pdf PDF
Exhibit JC6 - Recycle, Solid Wate, Trash Report 2pg.pdf PDF
Exhibit JC5 - Erosion and Sediment Control 1pg.pdf PDF
Building Library 2 Building Inventory TX0130.pdf PDF
Exhibit JM1 - O_M QASP 3pg.pdf PDF
Building Library 2 Building Inventory TX0126.pdf PDF
Exhibit JM8 - Smart Buildings 1pg.pdf PDF
Exhibit JM9 - Water Treatment 19pg.pdf PDF
Figure L-3 Past Performance Questionnaire.pdf PDF
FIGURE L-1 COMBO CBA DOL MGMT PLAN IGE.xlsx XLSX spreadsheet
Building Library 3 - Location General Information.pdf PDF
Building Library 2 Building Inventory TX0262.pdf PDF
Attachment 1 - WW Contractors CBA 10-31-2018.pdf PDF
Exhibit C1 - BUILDING INFORMATION SHEET.pdf PDF
Attachment 3-WD2015-5279_REV 8_DATE 11018 - LUFKIN.pdf PDF
Building Library 1 - Extinguisher Report.pdf PDF
SECTION J APPENDIX.pdf PDF
Exhibit JM14 - Qualificaiton of Electrical Testing Technicians 1pg.pdf PDF
Attachment 2- WD CBA_ 2018-0069_REV 1_DATED 426.18 —
Exhibit JC3 - Surveillance Forms 4pg.pdf PDF
Building Library 7 - Marshall _ Lufkin W-O list May 1 _18.xlsx XLSX spreadsheet
Attachment 3-WD2015-5277_REV 8_DATE 11018- Marshall.pdf PDF
Figure B-3 Pricing of Services.xlsx XLSX spreadsheet
Exhibit JM17 - Preventative Maintenance Guide.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT JC4

BUILDING EXTERIOR AND HARDSCAPE PLAN

Used only when Contractor is required to provide pressure washing services

The Contractor shall submit to the CO a detailed Building Exterior and Hardscape Plan that addresses the listed work items. The plan helps ensure that grounds/site/building exterior management practices have the lowest environmental impact possible and that these practices preserve ecological integrity, enhance diversity and protect wildlife, while supporting building performance and integration into surrounding landscapes. At a minimum, the custodial and related services portion of the plan shall address the following items:

Goals and Scope

Responsible Party

Guidance for Resources and Implementation

Performance Measurement

Training

Maintenance Equipment

Use of Chemical Concentrates and Dilution Systems

Sustainable Building Exterior, Sidewalks, and Pavement Cleaning

Paints and Sealants Used on the Building Exterior

Snow and Ice removal (Snow and Ice Removal Plan can be substituted for this item)

Cleaning of building exterior

Cleaning equipment

Cleaning of sidewalks, pavement, and other Hardscape

Animal and vegetation pest control

Landscape waste

Fertilizer use

Quality Assurance/Quality Control Processes

File details come from the government source that posted it.