PAGE 1 OF 8 FIELD OFFICE: BUILDING NUMBER: BUILDING ADDRESS:
ANNUAL MAN-HOUR TX0019, TX0182, TX0262
PREVENTIVE MAINTENANCE
REQUIREMENTS REGION: PREPARED BY: SHOP: DATE:
ALL 9/23/2017
SECTION 1 - PM MAN-HOUR REQUIREMENTS
PM MAN-HOURS
GUIDE ITEM QUANTITY FREQUENCY STANDARD TOTAL
NO. ALLOWED
A-1 AIR DRYER, REFRIGERATED OR REFRIGERATIVE DESICCANT TYPE 6 1 0.5 3
A-2 UNITARY, HEATING AND COOLING UNIT 0 1 2 0
A-3 HUMIDIFICATION SYSTEM 0 2 1 0
A-4 AIR COMPRESSOR 9 1 1.5 13.5
A-5 AIR CONDITIONING MACHINE, SPLIT SYSTEM
COMFORT COOLING
10 TONS AND UNDER 0 1 3 0
OVER 10 TONS 0 1 6 0
SPECIAL PURPOSE
10 TONS AND UNDER 6 12 3 216
OVER 10 TONS 0 12 6 0
A-6 AIR CONDITIONING MACHINE PACKAGE UNIT
COMFORT COOLING
10 TONS AND UNDER 0 1 3 0
OVER 10 TONS 1 1 6 6
A-7 AIR CONDITIONING MACHINE, PACKAGE UNIT
SPECIAL PURPOSE
10 TONS AND UNDER 3 12 3 108
OVER 10 TONS 0 12 6 0
A-8 AIR CONDITIONING, WINDOW UNIT 3 0 0 0
A-9 AIR-COOLED CONDENSER
20 TONS AND UNDER 0 1 4 0
OVER 20 TONS 2 1 5 10
A-10 HEAT PUMPS, OVER 10 TONS
5 TONS AND UNDER 1 1 2 2
6 to 10 TONS 0 1 4 0
OVER 10 TONS 0 1 6 0
A-11 AIR HANDLER UNIT
UNDER 5,000 CFM 5 1 2 10
5,001 TO 15,000 CFM 37 1 4 148
15,001 TO 30,000 CFM 2 1 4 8
30,001 TO 50,000 CFM 0 1 12 0
50,001 TO 75,000 CFM 0 1 16 0
OVER 75,000 CFM 0 1 20 0
A-12 GLYCOL DRY COOLER
(COMFORT COOLING)
20 TONS OR LESS 0 1 3.5 0
OVER 20 TONS TO 40 TONS 0 1 4.5 0
OVER 40 TONS 0 1 9 0
(SPECIAL PURPOSE)
20 TONS OR LESS 0 2 7 0
OVER 20 TONS TO 40 TONS 0 2 9 0
OVER 40 TONS 0 2 12 0
A-13 AIR CONDITIONING UNIT, CEILING/WALL MOUNTED
COMFORT COOLING 0 1 3 0
SPECIAL PURPOSE 6 1 3 18
* ADDITIONAL P.M.'S SUBTOTAL 542.5
TOTAL 4225.4
GENERAL SERVICES ADMINISTRATION GSA FORM 2105 (REV 3/10)
PAGE 2 OF 8 FIELD OFFICE: BUILDING NUMBER: BUILDING:
ANNUAL MAN-HOUR
PREVENTIVE MAINTENANCE TX126, TX130
REQUIREMENTS REGION: PREPARED BY: SHOP DATE
ALL 9/23/2017
SECTION 1 - PM MAN-HOUR REQUIREMENTS
TX126, TX130 Tyler, 75702
Tyler, 75702East Texas Contract
211 W. Ferguson East Texas Contract
Sonny Kopech
Sonny Kopech
PM MAN-HOURS
GUIDE ITEM QUANTITY FREQUENCY STANDARD TOTAL
NO. ALLOWED
A-14 AIR WASHER OR WET COIL SYSTEM
(AIR WASHER)
20,000 CFM OR LESS 0 1 4 0
20,001 TO 50,000 CFM 0 1 5 0
50,001 TO 75,000 CFM 0 1 6 0
OVER 75,000 CFM 0 1 8 0
(WET COIL)
20,000 CFM OR LESS 0 1 1.5 0
20,001 TO 40,000 CFM 0 1 2 0
OVER 40,000 CFM 0 1 3 0
A-15 AFTER-COOLER/SEPARATOR 0 2 6 0
A-24 ASH CONVEYOR TUBE (PNEUMATIC AND HYDRAULIC), 0 0.33 4 0
PER TUBE SECTION
B-1 BATTERY CHARGER 0 4 0.25 0
B-2 BOILER, (COAL, OIL, AND GAS)
120 MBTU'S OR LESS 0 1 2.5 0
120 TO 300 MBTU'S 1 1 5 5
300 TO 500 MBTU'S 0 1 8 0
500 TO 700 MBTU'S 0 1 24 0
700 TO 1,000 MBTU'S 2 1 32 64
OVER 1,000 MBTU'S 4 1 40 160
B-3 BURNER, GAS 8 1 2 16
B-4 BURNER, OIL 0 1 3 0
B-5 ELECTRIC BOILERS 0 1 2 0
B-6 BOILER INSTRUMENTS/CONTROLS 0 1 1 0
C-1 CLOCKS, CENTRAL SYSTEM 0 2 4 0
C-2 REMOTE AIR INTAKE DAMPERS 12 2 0.5 12
C-3 COILS, PREHEAT, REHEAT, ETC. (REMOTE LOCATIONS) 12 1 0.75 9
C-4 CENTRAL MINI-COMPUTER - HVAC SYSTEMS 17 2 0 0
C-5 AUTOMATIC MIXING BOX, PNEUMATIC OR ELECTRIC 24 1 1 24
C-6 CONTROLS, CENTRAL SYSTEM, HVAC 55 1 0.5 27.5
C-7 CONDENSATE OR VACUUM PUMP 0 1 3 0
C-8 CENTRAL CONTROL PANEL 0 1 0 0
C-9 COOLING TOWER, MAINTENANCE
50 TONS AND UNDER 0 1 6 0
OVER 50 TO 500 TONS 0 1 15 0
OVER 500 TO 1,000 TONS 6 1 25 150
OVER 1,000 TONS 0 1 35 0
C-10 COOLING TOWER, CLEANING
50 TONS AND UNDER 0 4 15 0
OVER 50 TO 500 TONS 0 4 20 0
OVER 500 TO 1,000 TONS 0 4 30 0
OVER 1,000 TONS 0 4 40 0
C-11 EVAPORATIVE CONDENSER
50 TONS AND UNDER 0 1 7.5 0
OVER 50 TONS 6 1 10 60
C-13 CRANE, ELECTRIC 0 4 8 0
C-14 CHAIN HOIST AND TROLLEY 0 2 5 0
C-16 COOLING POND (SUITLAND, MD, HEATING AND 0 1 320 0
COOLING PLANT ONLY)
C-21 CARTS AND SCOOTERS, ENGINE OR BATTERY POWERED 0 52 0.3 0
ENGINE POWERED 0 1 3 0
BATTERY POWERED 0 1 1 0
C-24 CONDENSING UNIT, REFRIGERATION
COMFORT
20 TONS AND UNDER 1 1 1 1
OVER 20 TONS 0 1 3.5 0
CRITICAL
20 TONS AND UNDER 0 12 1 0
OVER 20 TONS 2 12 2 48
* ADDITIONAL P.M.'S SUBTOTAL 576.5
GENERAL SERVICES ADMINISTRATION GSA FORM 2105 (REV 3/10)
PAGE 3 OF 8 FIELD OFFICE: BUILDING NUMBER: BUILDING:
ANNUAL MAN-HOUR
PREVENTIVE MAINTENANCE
REQUIREMENTS REGION: PREPARED BY: SHOP DATE
ALL 9/23/2017
SECTION 1 - PM MAN-HOUR REQUIREMENTS
PM MAN-HOURS
GUIDE ITEM QUANTITY FREQUENCYSTANDARD TOTAL
NO. ALLOWED
D-1 DOOR, POWER OPERATED 8 2 1.25 20
D-2 DUMBWAITER 0 4 3.75 0
D-3 DRAINS, ROOF, GUTTER (PER 100') 48 1 0.5 24
D-4 DOOR, HYDRAULIC, ELECTRIC OR PNEUMATIC OPERATED 8 4 1.25 40
D-5 DOOR, MAIN ENTRANCE 15 2 1 30
D-6 DRAINS, AREAWAY, DRIVEWAY, STORM 31 1 0.5 15.5
D-7 SEDIMENT BASIN 0 2 0.5 0
D-9 DISTILLER, WATER, (LABORATORY USE ONLY) 0 1 1 0
D-10 DOOR, MANUAL, OVERHEAD 0 1 1 0
E-17 EXPANSION JOINTS IN PIPING 0 1 1.25 0
E-18 EMERGENCY LIGHTS (WET CELL) 0 4 0.4 0
E-19 EMERGENCY LIGHTS (CLOSED SYSTEM) 106 4 0.2 84.8
E-20 INDUCTION DISC OVER CURRENT RELAY 0 1 1.5 0
E-21 OVER AND/OR UNDER VOLTAGE RELAY 9 1 1.6 14.4
E-22 THERMAL OVER CURRENT RELAY 0 1 0.8 0
E-23 INDUCTION DISC-DIRECTIONAL OVER CURRENT RELAY 0 1 0.5 0
E-24 POWER FACTOR REVERSE CURRENT OR WATT TYPE RELAY 1 1 1.2 1.2
E-25 GROUND FAULT TYPE TRANSFORMER OR DIFFERENTIAL RELAY 5 1 1.5 7.5
E-25A BOLTED PRESSURE CONTRACT SWITCH (LOW VOLTAGE) 0 1 1.5 0
E-26 LOW VOLTAGE MOLDED CASE CIRCUIT BREAKER 19 0.33 3.9 24.453
E-27 LOW VOLTAGE POWER CIRCUIT BREAKER (OVER 50 AMPS) 11 0.33 4.2 15.246
E-28 MOTOR STARTERS 100 HP AND UP 0 0.33 6 0
E-29 HIGH VOLTAGE OIL CIRCUIT BREAKER 0 1 6 0
E-30 SWITCHBOARD (PER CUBICLE), MEDIUM VOLTAGE 0 0.33 2 0
E-30A SWITCHBOARDS (PER CUBICLE), LOW VOLTAGE 5 0.33 2 3.3
E-31 NETWORK PROTECTORS 0 1 2.5 0
E-32 HIGH VOLTAGE NETWORK AND POWER
TYPE TRANSFORMER (OIL FILLED)
POWER TYPE 0 1 3 0
NETWORK TYPE 0 1 0.5 0
E-33 HIGH VOLTAGE NETWORK AND POWER DRY TYPE TRANSFORMER
POWER TYPE 1 3.5 0
NETWORK TYPE 0 1 4 0
E-34 DISCONNECTS (ISOLATING SWITCH; PER SWITCH) 0 1 2 0
E-34A DISCONNECT OR ISOLATING SWITCH, LOW VOLTAGE
(FUSED/NON-FUSED, 200 AMPS AND UP)
200 TO 500 AMPS 26 1 1 26
OVER 500 AMPS 0 1 3 0
E-35 MOTOR CONTROL CENTER 12 2 3 72
(INCLUDES MOTOR STARTERS UNDER 100 HP)
E-36 AUTOMATIC TRANSFER SWITCH 1 2 1.5 3
E-37 ALUMINUM BUS DUCT AND CONNECTORS
PER DISCONNECT OR 0 2 1 0
PER 10 FOOT BUST DUCT SECTION 0 2 0.2 0
E-37A ALUMINUM BUS DUCT AND CONNECTORS 0 2 0.08 0
E-38 HIGH VOLTAGE AIR CIRCUIT BREAKER 0 1 6.2 0
E-39 SUPERVISION SET 0 1 0.15 0
E-40 EMERGENCY GENERATOR; ELECTRIC, GASOLINE, OR NATURAL GAS 0 1 4 0
E-41 EMERGENCY GENERATOR, ELECTRIC DIESEL POWER 1 1 4 4
E-42 EMERGENCY GENERATOR ELECTRIC 0 12 1.25 0
E-42A EMERGENCY GENERATOR 0 12 2 0
E-43 LEAD ACID BATTERY (PER CELL) 0 4 0.03 0
E-44 EDISON NICKEL-IRON-ALKALINE BATTERY (PER CELL) 0 4 0.02 0
E-45 EMERGENCY GENERATOR, STEAM TURBINE DRIVER 0 1 6 0
E-49 EMERGENCY PUMP OR VENTILATOR 0 1 3 0
E-50 EMERGENCY PUMP OR VENTILATO 0 4 0.5 0
E-51 MOTOR STARTER, 26 1 1 26
5 HP TO LESS THAN 100 HP
AND LESS THAN 600 VOLTS (FORMERLY E-35A)
E-52 AUXILIARY PROTECTIVE RELAY 0 1 0.25 0
Tyler, 75702TX126, TX130East Texas Contract
7 Sonny Kopech
* ADDITIONAL P.M.'S SUBTOTAL 411.399
GENERAL SERVICES ADMINISTRATION GSA FORM 2105 (REV 3/10)
PAGE 4 OF 8 FIELD OFFICE: BUILDING NUMBER: BUILDING:
ANNUAL MAN-HOUR
PREVENTIVE MAINTENANCE
REQUIREMENTS REGION: PREPARED BY: SHOP DATE
ALL 9/23/2017
SECTION 1 - PM MAN-HOUR REQUIREMENTS
PM MAN-HOURS
GUIDE ITEM QUANTITY FREQUENCYSTANDARD TOTAL
NO. ALLOWED
E-56 DIMMER AND CONTROL, STAGE AND GENERAL LIGHTING 1 4 2 8
E-57 LOW VOLTAGE DRY TYPE TRANSFORMER 2 0.33 3 1.98
(30 KVA AND UP, 600 VOLTS OR LESS)
F-1 ALARM CHECK VALVES & ACCESSORIES 4 2 1.25 10
F-2 DRY PIPE, DELUGE AND PREACTION VALVES 4 12 0.15 7.2
F-2A DRY PIPE, DELUGE AND PREACTION VALVES 0 4 0.4 0
F-2B DRY PIPE, DELUGE AND PREACTION VALVES 0 1 2 0
F-3 FIRE POST INDICATOR VALVE 0 1 0.75 0
F-4 FIRE CONTROL VALVES (4 IN. OR OVER) 17 1 0.2 3.4
FOR INTERIOR WATER DISTRIBUTION SYSTEMS
F-5 FIRE PUMP (MOTOR OR ENGINE DRIVEN 0 52 0.6 0
F-6 FIRE PUMP (MOTOR OR ENGINE DRIVEN 0 12 0.2 0
F-7 FIRE PUMP
MOTOR DRIVEN 2 1 1.6 3.2
ENGINE DRIVEN 0 1 3.4 0
F-8 FIRE HOSE (1 IN. RACKED IN BUILDINGS) 0 1 0.2 0
F-9 FIRE DEPARTMENT HOSE CONNECTIONS (STANDPIPE OUTLETS) 18 1 0.15 2.7
F-10 FIRE DEPARTMENT PUMPER CONNECTIONS 4 1 0.3 1.2
(STANDPIPE OR SPRINKLER)
F-11 FIRE DOORS - STAIRWELLS & EXIT WAYS (SWINGING) 27 4 0.05 5.4
F-12 FIRE DOORS - SLIDING TYPE 0 4 0.2 0
F-13 FIRE SUPERVISORY SIGNAL - TESTING 2 4 0.3 2.4
F-14 AUTOMATIC FIRE DETECTION OR ALARM DEVICES 387 4 0.3 464.4
F-15A FIRE ALARM CONTROL PANEL, SPECIAL SYSTEMS 3 4 0.55 6.6
F-15B CENTRAL STATION, TRANSMITTERS 2 12 0.3 7.2
F-15C CENTRAL STATION, TRANSMITTERS/RETRANSMISSION EQUIPMENT 0 251 1 0
F-16 FIRE ALARM SYSTEM - RECORDER 4 52 0.1 20.8
F-17 FIRE ALARM BOX (MANUAL - CODED AND UNCODED) 26 4 0.3 31.2
F-18 FIRE AND SMOKE DAMPERS 48 0.5 0.2 4.8
F-19 FIRE HYDRANT (DRY BARREL OR WET BARREL) 0 1 0.65 0
F-20 SPRINKLER HEAD - SPRINKLERED AREAS (PER 1,000 SQ. FT.) 1 2 0.1 0.2
F-21 FIRE EXTINGUISHER - SODA ACID OR FOAM 0 1 0.75 0
F-22 FIRE EXTINGUISHER - STORED PRESSURE WITH GAUGE 0 1 0.1 0
F-22A FIRE EXTINGUISHER, STORED PRESSURE WITH GAUGE AND 22 0.17 0.34 1.2716
NON STAINLESS STEEL SHELL
F-23 FIRE EXTINGUISHER - GAS CARTRIDGE OR CYLINDER (NO GAUGE) 1 0.2 0
F-24 FIRE EXTINGUISHER - INSPECTION 108 12 0.02 25.92
F-25 FIRE EXTINGUISHER - HYDROSTATIC TESTING OF CARBON DIOXIDE, 3 0.2 1 0.6
STORED PRESSURE AND CARTRIDGE TYPE
F-26 FIRE EXTINGUISHER SYSTEM - CARBON DIOXIDE (HIGH PRESSURE), 0 2 0.75 0
HALON, DRY CHEMICAL
F-27 FAN, CENTRIFUGAL
UP TO 5,000 CFM 14 1 1 14
OVER 5,000 TO 10,000 CFM 0 1 1.3 0
OVER 10,000 TO 15,000 CFM 9 1 1.6 14.4
OVER 15,000 TO 20,000 CFM 0 1 1.95 0
OVER 20,000 CFM 0 1 2.25 0
F-28 FILTER, MOVEABLE CURTAIN, OIL COATED 0 4 1.75 0
F-29 FILTER, ROLL TYPE, DISPOSABLE MEDIA 0 4 1.75 0
F-30 FILTERS, VISCOUS TYPE 0 4 0.5 0
F-31 FILTER, ROLL TYPE, DISPOSABLE MEDIA, MANUAL OR MOTOR DRIVEN 0 2 1.75 0
F-32 FILTER, THROW AWAY 142 4 0.08 45.44
F-33 FILTER, ELECTROSTATIC 0 4 2.5 0
* ADDITIONAL P.M.'S SUBTOTAL 682.3116
Tyler, 75702TX126, TX130
7 Sonny Kopech
East Texas Contract
F07A and FO7J
PAGE 5 OF 8 FIELD OFFICE: BUILDING NUMBER: BUILDING:
ANNUAL MAN-HOUR
PREVENTIVE MAINTENANCE
REQUIREMENTS REGION: PREPARED BY: SHOP DATE
ALL 9/23/2017
SECTION 1 - PM MAN-HOUR REQUIREMENTS
PM MAN-HOURS
GUIDE ITEM QUANTITY FREQUENCYSTANDARD TOTAL
NO. ALLOWED
F-34 FLUORESCENT LIGHTING FIXTURE, WASHING AND RELAMPING
INDUSTRIAL TYPE:
(1) LAMP/48" 0 0.4 0.07 0
(1) LAMP/96" 0 0.4 0.12 0
(2) LAMPS/48" 24 0.4 0.12 1.152
(2) LAMPS/96" 11 0.4 0.2 0.88
(3) LAMPS/48" 0 0.4 0.17 0
(4) LAMPS/48" 160 0.4 0.25 16
LOUVER TYPE:
(1) LAMP/48" 1520 0.4 0.18 109.44
(2) LAMPS/48" 0 0.4 0.23 0
(3) LAMPS/48" 0 0.4 0.29 0
(4) LAMPS/48" 0 0.4 0.33 0
DIFFUSER TYPE
(1) LAMP/48" 0 0.4 0.13 0
(2) LAMPS/48" 355 0.4 0.17 24.14
(3) LAMPS/48" 0 0.4 0.22 0
(4) LAMPS/48" 0 0.4 0.25 0
F-35 FLUORESCENT LIGHT FIXTURE - RELAMPING ONLY
(1) LAMP 0 0.2 0.05 0
(2) LAMPS 0 0.2 0.07 0
(3) LAMPS 0 0.2 0.11 0
(4) LAMPS 57 0.2 0.13 1.482
F-36 FAN, PROPELLER, 24 IN. DIAMETER OR LARGER 2 1 0.75 1.5
F-37 FLOOR POLISHING MACHINE 0 2 0.35 0
F-38 LIGHTNING PROTECTION (PER DOWN CONDUCTOR) 60 1 0.5 30
F-39 CAFETERIA EXHAUST HOOD 0 2 16 0
(DUCT SYSTEM PER FEET OF DUCT WORK)
F-40 FILTER, THROW AWAY, BAG TYPE (BY DEPTH)
OVER 4" TO 6" 3 2 0.08 0.48
OVER 6" TO 12" 0 2 0.1 0
OVER 12" TO 24" 3 2 0.2 1.2
OVER 24" TO 48" 0 2 0.25 0
F-43 FILTER, CHARCOAL 0 4 0.16 0
F-44 FOUNTAIN, MEMORIAL OR DECORATIVE 0 2 2 0
F-46 FIREPLACE 0 12 0.5 0
F-47 FIREPLACE 0 4 0.5 0
F-49 FILTER, CONTROL AIR 12 4 0.5 24
G-1 FUEL OIL FILTER/STRAINER 1 2 1 2
G-2 GREASE TRAPS 0 12 0.75 0
G-3 GATES AND FENCES, SECURITY AND ACCESS 12 2 2 48
H-1 HOT WATER CONVERTER (STEAM) 0 1 6 0
H-2 HOT WATER HEATER - GAS 5 1 0.6 3
H-3 HOT WATER HEATER - ELECTRIC 1 1 0.6 0.6
H-4 SECONDARY WATER CHILL CONVERTER 0 1 54 0
H-5 HOT WATER HEATER, STEAM COIL 0 1 0.6 0
H-6 HOT AIR FURNACE
120 MBTU'S OR LESS 12 1 2.5 30
120 TO 300 MBTU'S 0 1 5 0
300 TO 500 MBTU'S 0 1 8 0
500 TO 700 MBTU'S 0 1 24 0
700 TO 1,000 MBTU'S 0 1 32 0
OVER 1,000 MBTU'S 0 1 40 0
H-12 HEATER, FUEL OIL, UNIT 0 1 16 0
H-14 HOIST, LIGHTING 0 1 1 0
H-15 HOIST, ELECTRIC 0 1 0.75 0
Tyler, 75702
East Texas Contract TX126, TX130
Sonny Kopech
I-1 INCINERATOR 0 1 15.25 0
I-2 FAN COIL UNIT, UNDER 0 1 0.4 0
I-3 INDUCTION UNIT, UNDER WINDOW TYPE 0 1 0.4 0
I-4 FAN COIL UNIT, CEILING HUNG 39 1 1 39
I-5 FAN COIL UNIT, CEILING HUNG, VAV BOX WITH ELECTRIC REHEAT 0 1 0 0
* ADDITIONAL P.M.'S SUBTOTAL 332.874
GENERAL SERVICES ADMINISTRATION GSA FORM 2105 (REV 3/10)
PAGE 6 OF 8 FIELD OFFICE: BUILDING NUMBER: BUILDING:
ANNUAL MAN-HOUR
PREVENTIVE MAINTENANCE
REQUIREMENTS REGION: PREPARED BY: SHOP DATE
ALL 9/23/2017
SECTION 1 - PM MAN-HOUR REQUIREMENTS
PM MAN-HOURS
GUIDE ITEM QUANTITY FREQUENCYSTANDARD TOTAL
NO. ALLOWED
L-1 LAWN MOWER AND EDGER 0 2 2 0
L-2 LOADING RAMP, ADJUSTABLE 2 4 1.25 10
L-3 LIGHTING, SPECIAL FEATURE 34 1 0.5 17
L-4 LIGHTING, OUTSIDE
INCANDESCENT 1 2 1 2
FLUORESCENT, MERCURY VAPOR
OR HIGH PRESSURE SODIUM 17 2 1.75 59.5
L-5 LAWN SPRINKLERS (PER NOZZLE) 127 1 0.25 31.75
L-6 LOCOMOTIVE, DIESEL (DFC ONLY) 0 2 14 0
L-7 LOCOMOTIVE, DIESEL (ELECTRICAL CONTROLS)(DFC ONLY) 0 2 8 0
L-8 SPOTLIGHTS, FIXED AND 0 12 1.5 0
L-10 LIFT, ELECTRIC, STAGE SCREEN PORTABLE 0 2 3 0
M-1 MANHOLE ELECTRICAL 0 1 2 0
M-2 MANHOLE, SEWER 1 4 2 8
M-3 MOTORS
1 TO 7.5 HP 42 1 0 0
OVER 7.5 TO 50 HP 29 1 0 0
OVER 50 HP 0 1 0 0
M-4 MANHOLE, WATER/STEAM/FUEL OIL (ALSO INCLUDES HOT WATER, 0 2 2 0
CHILLED WATER, AND CONDENSER WATER)
M-6 MATERIAL HANDLING EQUIPMENT, ENGINE DRIVEN 0 2 1 0
M-7 MATERIAL HANDLING EQUIPMENT 0 1 0.5 0
M-8 MAGNETIC DRIVE 0 4 0.5 0
M-9 MOBILE EQUIPMENT 0 4 1 0
M-10 MOTOR CONTROLLER UNIT (600 VOLTS AND ABOVE) 0 1 3.75 0
M-11 MOTORS, 600 VOLT OR 200 HP AND ABOVE 0 1 1 0
P-1 PAPER BALER 0 1 1 0
P-2 PNEUMATIC TUBE SYSTEM 0 1 4 0
P-4 PUMP, CENTRIFUGAL
1 TO 24 HP 12 1 0 0
25 TO 100 HP 0 1 0 0
OVER 100 HP 0 1 0 0
P-6 PUMP, VACUUM 0 2 0 0
P-7 PUMP, GEAR AND RECIPROCATING00 HP 0 1 1.5 0
R-1 RADIATOR, HEATING 0 2 0 0
R-2 ROOF INSPECTION (PER SQUARE, OR 100 SQ. FT.) 14410 2 0.03 864.6
R-3 REFRIGERATION MACHINE (ABSORPTION)
UP TO 500 TONS 0 1 20 0
OVER 500 TO 1,000 TONS 0 1 40 0
OVER 1,000 TONS 0 1 60 0
R-4 CENTRAL CHILLED WATER PACKAGE UNIT
COMFORT COOLING OR CENTRAL DRINKING WATER
25 TONS AND UNDER 0 1 8 0
25 TO 50 TONS 0 1 16 0
50 TO 75 TONS 0 1 22 0
75 TO 100 TONS 0 1 28 0
OVER 100 TONS 0 1 35 0
SPECIAL PURPOSE OR COMPUTER COOLING
25 TONS AND UNDER 0 1 8 0
25 TO 50 TONS 0 1 16 0
East Texas Contract
TX126, TX130 Tyler, 75702
50 TO 75 TONS 0 1 22 0
75 TO 100 TONS 0 1 28 0
OVER 100 TONS 0 1 35 0
R-5 REFRIGERATION MACHINE, CENTRIFUGAL
50 TONS AND UNDER 0 1 8 0
50 TO 25O TONS 0 1 12 0
251 TONS - 500 TONS 0 1 18 0
501 TONS - 750 TONS 0 1 22 0
751 TO 1,000 TONS n 0 1 24 0
ADD 20 MAN-HOURS FOR EACH ADDITIONAL 250 TON 0 1 0 0
INCREMENT OVER 1,000 TONS. 0
* ADDITIONP21=2 SUBTOTAL 992.85
M03- New spec 0 maintenance
GENERAL SERVICES ADMINISTRATION GSA FORM 2105 (REV 3/10)
PAGE 7 OF 8 FIELD OFFICE: BUILDING NUMBER: BUILDING:
ANNUAL MAN-HOUR
PREVENTIVE MAINTENANCE
REQUIREMENTS REGION: PREPARED BY: SHOP DATE
ALL 9/23/2017
SECTION 1 - PM MAN-HOUR REQUIREMENTS
PM MAN-HOURS
GUIDE ITEM QUANTITY FREQUENCYSTANDARD TOTAL
NO. ALLOWED
R-6 REFRIGERATION MACHINE, RECIPROCATING AND SCROLL
50 TONS AND UNDER 0 1 10 0
50 TO 100 TONS 0 1 12 0
100 TO 250 TONS 0 1 14 0
OVER 250 TONS 0 1 20 0
R-7 REFRIGERATION MACHINE, SCREW
50 TONS AND UNDER 2 1 10 20
50 TO 250 TONS 4 1 12 48
250 TO 500 TONS 0 1 16 0
500 TO 750 TONS 0 1 20 0
750 TO 1,000 TONS 0 1 30 0
OVER 1000 TONS 0 1 40 0
R-8 CONTROL PANEL - CENTRAL REFRIGERATION UNIT 3 1 4 12
R-9 RADIATION, BASEBOARD/CONVECTORS 0 0.5 0.5 0
(STEAM, HOT WATER, OR ELECTRIC - PER LINEAR FOOT)
R-10 RAILROAD TRACKAGE (PER 1,000 FT.) 0 1 3.5 0
R-11 REFRIGERATION CONTROLS, CENTRAL SYSTEM 6 1 1 6
R-12 RAILROAD TURNOUT 0 1 0.55 0
R-13 NON-DESTRUCTIVE CHILLER TUBE ANALYSIS 6 0.33 9 17.82
R-14 HIGH EFFICIENCY PURGE UNITS 0 1 2 0
S-2 SEWAGE EJECTOR (PNEUMATIC TANK TYPE EJECTORS) 0 1 4 0
S-5 SWEEPER 0 2 3 0
S-6 SEWAGE EJECTOR, SUMP TYPE 4 1 4 16
S-7 SUMP PUMP 8 1 3.75 30
S-8 STRAINER, Y-TYPE 37 1 0.5 18.5
S-9 STRAINER, BOLTED FLANGE (WATER AND STEAM)
6 TO 14 BOLTS 13 1 2 26
14 TO 34 BOLTS 0 1 6 0
34 TO 58 BOLTS 0 1 10 0
OVER 58 BOLTS 0 1 20 0
S-10 SCRUBBING MACHINE (BATTERY OR PROPANE POWERED) 0 4 1 0
S-11 SNOW BLOWER 0 1 0.9 0
S-14 DUAL STRAINER 0 1 9 0
S-15 BACKWASH STRAINER 0 1 6 0
T-1 TANK, WATER (ALL TYPES) 8 0.33 6.25 16.5
T-2 TANK, AIR/REFRIGERANT/;P GAS 3 1 6.25 18.75
T-3 TANK, FUEL OIL STORAGE 1 0.25 6.25 1.5625
T-5 TRASH COMPACTOR 0 1 4 0
T-6 TANK, CHEMICAL 0 1 8 0
T-8 TRAPS, ALL TYPES
LOW PRESSURE 0 0.2 0.5 0
HIGH PRESSURE 0 1 0.5 0
T-9 TURBINE, STEAM 0 1 11.5 0
T-10 TELECOMMUNICATIONS 0 4 0.75 0
East Texas Contract
T-12 FLUID DRIVE TRANSMISSIONS 0 1 5 0
U-1 UNIT HEATER (STEAM AND HOT WATER) 5 1 1 5
U-2 UNIT HEATER (GAS AND OIL FIRED) 0 1 1 0
V-1 VACUUM CLEANER, HEAVY DUTY, TANK TYPE 0 2 0.5 0
V-2 VALVE, SAFETY RELIEF 27 12 0.5 162
V-3 VALVE REGULATING 15 1 0.6 9
V-5 VALVE, MANUALLY OPERATED
MAIN LINE OR CRITICAL 30 1 0.4 12
OTHER OVER 2 INCHES 0 0.2 0.4 0
V-6 VALVE, MOTOR OPERATED 11 1 0.4 4.4
V-7 VALVE, HYDRAULIC/PNEUMATIC/ELECTRIC 0 1 1.5 0
V-8 VALVE 0 1 1.5 0
* ADDITIONAL P.M.'S SUBTOTAL 423.5325
GENERAL SERVICES ADMINISTRATION GSA FORM 2105 (REV 3/10)
PAGE 8 OF 8 FIELD OFFICE: BUILDING NUMBER: BUILDING:
ANNUAL MAN-HOUR
PREVENTIVE MAINTENANCE
REQUIREMENTS REGION: PREPARED BY: SHOP DATE
ALL 9/23/2017
SECTION 1 - PM MAN-HOUR REQUIREMENTS
PM MAN-HOURS
GUIDE ITEM QUANTITY FREQUENCYSTANDARD TOTAL
NO. ALLOWED
V-9 BACKFLOW PREVENTER
UP TO 1 1/2 INCHES 14 1 0.75 10.5
1 1/2 TO 2 INCHES 2 1 1.5 3
2 TO 3 INCHES 0 1 2 0
3 TO 4 INCHES 0 1 3 0
4 TO 6 INCHES 0 1 4 0
6 TO 8 INCHES 0 1 6 0
OVER 8 INCHES 0 1 8 0
V-10 VACUUM SYSTEM, CENTRALIZED 0 1 2.5 0
W-1 DRINKING WATER FILTER SYSTEMS 0 4 3 0
W-2 WASH, EMERGENCY 11 52 0.05 28.6
W-3 WATER SOFTENER 0 2 4 0
W-4 FILTER, WATER 0 2 0.5 0
W-5 WINDOW WASHING SCAFFOLD, POWER OPERATED 0 1 4 0
W-7 WHEELCHAIR LIFT 1 12 1.75 21
W-8 WATER TREATMENT FOR COOLING TOWERS 4 12 2 96
W-9 WATER TREATMENT FOR HEATING SYSTEMS 4 12 2 96
X-21 KEY CARD SYSTEM 0 4 1 0
X-22 FLAG POLE, ELECTRIC 0 4 0.25 0
X-23 HEATER UNIT, ELECTRIC 0 2 0.75 0
X-26 SOLAR HEATING SYSTEM 0 2 4 0
X-26A SOLAR HEATING SYSTEM (SOLAR COLLECTORS) 0 1 0.03 0
X-29 CHEMICAL FEEDER 2 2 1 4
X-32 PARKING ARM GATES 4 1 1 4
X-37 EMERGENCY SHOWER 3 1 0.1 0.3
X-39 SEPTIC TANK AND DRAIN FIELD 0 1 2 0
X-41 TRACTOR, DIESEL 0 12 0.5 0
0 2 0.25 0 0 1 5 0
X-42 METAL-ENCLOSED BUSS DUCT
(LOW VOLTAGE, 600 VOLTS OR LESS)
OUTDOORS
PER DISCONNECT OR POWER TAKEOFF 0 1 1 0
PER 10 FOOT BUSS DUCT SECTION 0 1 0.2 0
INDOORS
PER DISCONNECT OR POWER TAKEOFF 0 0.33 1 0
PER 10 FOOT BUSS DUCT SECTION 0 0.33 0.2 0
East Texas Contract
ENTER ADDITIONAL PM ITEMS BELOW
* ADDITION P.M.'S R-15 Refrigerant Monitor SUBTOTAL 263.4
X-50 Quantity 4 no maintenance