Building Library 6- Time Standard Comparison.pdf

PDF 33 KB Posted

Attached to
Full Maintenance Service for East Texas Federal Buildings
Solicitation number
47PH0218R0001
Issued by

About this file

SECTION J ATTACHMENTS OF EAST TX FULL MAINTENANCE SERVICES

View the file

Other files

File Type Posted
Solicitation_Amendment_47PH0218R0001_0001.pdf PDF
Attachment 3-WD2015-5257_REV 5_DATE 11018- Tyler.pdf PDF
FIGURE L-2 Management Plan Baseline.pdf PDF
Exhibit JM7 - Bldg Op Plan Template 1pg.pdf PDF
Building Library 4 - East Texas Elevator Count FY2018.pdf PDF
Building Library 5-East Texas Roofing Systems FY2018.pdf PDF
Exhibit JM4 - Environmental Sustainable Products 1pg.pdf PDF
Exhibit JC2 - Custodial QASP 29 pg.pdf PDF
47PH0218R0001_Generated_PDF_with_TOC.pdf PDF
FIGURE B-1 Contractor Staffing Declaration for Union and Non Union Contracts.xlsx XLSX spreadsheet
Exhibit JM2 - Green Purchasing Report 2pg.pdf PDF
Exhibit JC4 - Building Exterior and Hardscape Plan 1pg.pdf PDF
Building Library 2 Building Inventory TX0182.pdf PDF
Exhibit JM15 - Misc Best Practices Shave Energy 10 pg.pdf PDF
Building Library 7 - Marshall _ Lufkin W-O list May .pdf PDF
Exhibit JC7 - PBS Waste Audits 1pg.pdf PDF
Exhibit JC6 - Recycle, Solid Wate, Trash Report 2pg.pdf PDF
Exhibit JC5 - Erosion and Sediment Control 1pg.pdf PDF
Building Library 2 Building Inventory TX0130.pdf PDF
Exhibit JM1 - O_M QASP 3pg.pdf PDF
Building Library 2 Building Inventory TX0126.pdf PDF
Exhibit JM8 - Smart Buildings 1pg.pdf PDF
Exhibit JM9 - Water Treatment 19pg.pdf PDF
Figure L-3 Past Performance Questionnaire.pdf PDF
FIGURE L-1 COMBO CBA DOL MGMT PLAN IGE.xlsx XLSX spreadsheet
Building Library 3 - Location General Information.pdf PDF
Building Library 2 Building Inventory TX0262.pdf PDF
Attachment 1 - WW Contractors CBA 10-31-2018.pdf PDF
Exhibit C1 - BUILDING INFORMATION SHEET.pdf PDF
Attachment 3-WD2015-5279_REV 8_DATE 11018 - LUFKIN.pdf PDF
Building Library 1 - Extinguisher Report.pdf PDF
SECTION J APPENDIX.pdf PDF
Exhibit JM14 - Qualificaiton of Electrical Testing Technicians 1pg.pdf PDF
Attachment 2- WD CBA_ 2018-0069_REV 1_DATED 426.18 —
Exhibit JC3 - Surveillance Forms 4pg.pdf PDF
Building Library 7 - Marshall _ Lufkin W-O list May 1 _18.xlsx XLSX spreadsheet
Attachment 3-WD2015-5277_REV 8_DATE 11018- Marshall.pdf PDF
Figure B-3 Pricing of Services.xlsx XLSX spreadsheet
Exhibit JM17 - Preventative Maintenance Guide.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE 1 OF 8 FIELD OFFICE: BUILDING NUMBER: BUILDING ADDRESS:

ANNUAL MAN-HOUR TX0019, TX0182, TX0262

PREVENTIVE MAINTENANCE

REQUIREMENTS REGION: PREPARED BY: SHOP: DATE:

ALL 9/23/2017

SECTION 1 - PM MAN-HOUR REQUIREMENTS

PM MAN-HOURS

GUIDE ITEM QUANTITY FREQUENCY STANDARD TOTAL

NO. ALLOWED

A-1 AIR DRYER, REFRIGERATED OR REFRIGERATIVE DESICCANT TYPE 6 1 0.5 3

A-2 UNITARY, HEATING AND COOLING UNIT 0 1 2 0

A-3 HUMIDIFICATION SYSTEM 0 2 1 0

A-4 AIR COMPRESSOR 9 1 1.5 13.5

A-5 AIR CONDITIONING MACHINE, SPLIT SYSTEM

COMFORT COOLING

10 TONS AND UNDER 0 1 3 0

OVER 10 TONS 0 1 6 0

SPECIAL PURPOSE

10 TONS AND UNDER 6 12 3 216

OVER 10 TONS 0 12 6 0

A-6 AIR CONDITIONING MACHINE PACKAGE UNIT

COMFORT COOLING

10 TONS AND UNDER 0 1 3 0

OVER 10 TONS 1 1 6 6

A-7 AIR CONDITIONING MACHINE, PACKAGE UNIT

SPECIAL PURPOSE

10 TONS AND UNDER 3 12 3 108

OVER 10 TONS 0 12 6 0

A-8 AIR CONDITIONING, WINDOW UNIT 3 0 0 0

A-9 AIR-COOLED CONDENSER

20 TONS AND UNDER 0 1 4 0

OVER 20 TONS 2 1 5 10

A-10 HEAT PUMPS, OVER 10 TONS

5 TONS AND UNDER 1 1 2 2

6 to 10 TONS 0 1 4 0

OVER 10 TONS 0 1 6 0

A-11 AIR HANDLER UNIT

UNDER 5,000 CFM 5 1 2 10

5,001 TO 15,000 CFM 37 1 4 148

15,001 TO 30,000 CFM 2 1 4 8

30,001 TO 50,000 CFM 0 1 12 0

50,001 TO 75,000 CFM 0 1 16 0

OVER 75,000 CFM 0 1 20 0

A-12 GLYCOL DRY COOLER

(COMFORT COOLING)

20 TONS OR LESS 0 1 3.5 0

OVER 20 TONS TO 40 TONS 0 1 4.5 0

OVER 40 TONS 0 1 9 0

(SPECIAL PURPOSE)

20 TONS OR LESS 0 2 7 0

OVER 20 TONS TO 40 TONS 0 2 9 0

OVER 40 TONS 0 2 12 0

A-13 AIR CONDITIONING UNIT, CEILING/WALL MOUNTED

COMFORT COOLING 0 1 3 0

SPECIAL PURPOSE 6 1 3 18

* ADDITIONAL P.M.'S SUBTOTAL 542.5

TOTAL 4225.4

GENERAL SERVICES ADMINISTRATION GSA FORM 2105 (REV 3/10)

PAGE 2 OF 8 FIELD OFFICE: BUILDING NUMBER: BUILDING:

ANNUAL MAN-HOUR

PREVENTIVE MAINTENANCE TX126, TX130

REQUIREMENTS REGION: PREPARED BY: SHOP DATE

ALL 9/23/2017

SECTION 1 - PM MAN-HOUR REQUIREMENTS

TX126, TX130 Tyler, 75702

Tyler, 75702East Texas Contract

211 W. Ferguson East Texas Contract

Sonny Kopech

Sonny Kopech

PM MAN-HOURS

GUIDE ITEM QUANTITY FREQUENCY STANDARD TOTAL

NO. ALLOWED

A-14 AIR WASHER OR WET COIL SYSTEM

(AIR WASHER)

20,000 CFM OR LESS 0 1 4 0

20,001 TO 50,000 CFM 0 1 5 0

50,001 TO 75,000 CFM 0 1 6 0

OVER 75,000 CFM 0 1 8 0

(WET COIL)

20,000 CFM OR LESS 0 1 1.5 0

20,001 TO 40,000 CFM 0 1 2 0

OVER 40,000 CFM 0 1 3 0

A-15 AFTER-COOLER/SEPARATOR 0 2 6 0

A-24 ASH CONVEYOR TUBE (PNEUMATIC AND HYDRAULIC), 0 0.33 4 0

PER TUBE SECTION

B-1 BATTERY CHARGER 0 4 0.25 0

B-2 BOILER, (COAL, OIL, AND GAS)

120 MBTU'S OR LESS 0 1 2.5 0

120 TO 300 MBTU'S 1 1 5 5

300 TO 500 MBTU'S 0 1 8 0

500 TO 700 MBTU'S 0 1 24 0

700 TO 1,000 MBTU'S 2 1 32 64

OVER 1,000 MBTU'S 4 1 40 160

B-3 BURNER, GAS 8 1 2 16

B-4 BURNER, OIL 0 1 3 0

B-5 ELECTRIC BOILERS 0 1 2 0

B-6 BOILER INSTRUMENTS/CONTROLS 0 1 1 0

C-1 CLOCKS, CENTRAL SYSTEM 0 2 4 0

C-2 REMOTE AIR INTAKE DAMPERS 12 2 0.5 12

C-3 COILS, PREHEAT, REHEAT, ETC. (REMOTE LOCATIONS) 12 1 0.75 9

C-4 CENTRAL MINI-COMPUTER - HVAC SYSTEMS 17 2 0 0

C-5 AUTOMATIC MIXING BOX, PNEUMATIC OR ELECTRIC 24 1 1 24

C-6 CONTROLS, CENTRAL SYSTEM, HVAC 55 1 0.5 27.5

C-7 CONDENSATE OR VACUUM PUMP 0 1 3 0

C-8 CENTRAL CONTROL PANEL 0 1 0 0

C-9 COOLING TOWER, MAINTENANCE

50 TONS AND UNDER 0 1 6 0

OVER 50 TO 500 TONS 0 1 15 0

OVER 500 TO 1,000 TONS 6 1 25 150

OVER 1,000 TONS 0 1 35 0

C-10 COOLING TOWER, CLEANING

50 TONS AND UNDER 0 4 15 0

OVER 50 TO 500 TONS 0 4 20 0

OVER 500 TO 1,000 TONS 0 4 30 0

OVER 1,000 TONS 0 4 40 0

C-11 EVAPORATIVE CONDENSER

50 TONS AND UNDER 0 1 7.5 0

OVER 50 TONS 6 1 10 60

C-13 CRANE, ELECTRIC 0 4 8 0

C-14 CHAIN HOIST AND TROLLEY 0 2 5 0

C-16 COOLING POND (SUITLAND, MD, HEATING AND 0 1 320 0

COOLING PLANT ONLY)

C-21 CARTS AND SCOOTERS, ENGINE OR BATTERY POWERED 0 52 0.3 0

ENGINE POWERED 0 1 3 0

BATTERY POWERED 0 1 1 0

C-24 CONDENSING UNIT, REFRIGERATION

COMFORT

20 TONS AND UNDER 1 1 1 1

OVER 20 TONS 0 1 3.5 0

CRITICAL

20 TONS AND UNDER 0 12 1 0

OVER 20 TONS 2 12 2 48

* ADDITIONAL P.M.'S SUBTOTAL 576.5

GENERAL SERVICES ADMINISTRATION GSA FORM 2105 (REV 3/10)

PAGE 3 OF 8 FIELD OFFICE: BUILDING NUMBER: BUILDING:

ANNUAL MAN-HOUR

PREVENTIVE MAINTENANCE

REQUIREMENTS REGION: PREPARED BY: SHOP DATE

ALL 9/23/2017

SECTION 1 - PM MAN-HOUR REQUIREMENTS

PM MAN-HOURS

GUIDE ITEM QUANTITY FREQUENCYSTANDARD TOTAL

NO. ALLOWED

D-1 DOOR, POWER OPERATED 8 2 1.25 20

D-2 DUMBWAITER 0 4 3.75 0

D-3 DRAINS, ROOF, GUTTER (PER 100') 48 1 0.5 24

D-4 DOOR, HYDRAULIC, ELECTRIC OR PNEUMATIC OPERATED 8 4 1.25 40

D-5 DOOR, MAIN ENTRANCE 15 2 1 30

D-6 DRAINS, AREAWAY, DRIVEWAY, STORM 31 1 0.5 15.5

D-7 SEDIMENT BASIN 0 2 0.5 0

D-9 DISTILLER, WATER, (LABORATORY USE ONLY) 0 1 1 0

D-10 DOOR, MANUAL, OVERHEAD 0 1 1 0

E-17 EXPANSION JOINTS IN PIPING 0 1 1.25 0

E-18 EMERGENCY LIGHTS (WET CELL) 0 4 0.4 0

E-19 EMERGENCY LIGHTS (CLOSED SYSTEM) 106 4 0.2 84.8

E-20 INDUCTION DISC OVER CURRENT RELAY 0 1 1.5 0

E-21 OVER AND/OR UNDER VOLTAGE RELAY 9 1 1.6 14.4

E-22 THERMAL OVER CURRENT RELAY 0 1 0.8 0

E-23 INDUCTION DISC-DIRECTIONAL OVER CURRENT RELAY 0 1 0.5 0

E-24 POWER FACTOR REVERSE CURRENT OR WATT TYPE RELAY 1 1 1.2 1.2

E-25 GROUND FAULT TYPE TRANSFORMER OR DIFFERENTIAL RELAY 5 1 1.5 7.5

E-25A BOLTED PRESSURE CONTRACT SWITCH (LOW VOLTAGE) 0 1 1.5 0

E-26 LOW VOLTAGE MOLDED CASE CIRCUIT BREAKER 19 0.33 3.9 24.453

E-27 LOW VOLTAGE POWER CIRCUIT BREAKER (OVER 50 AMPS) 11 0.33 4.2 15.246

E-28 MOTOR STARTERS 100 HP AND UP 0 0.33 6 0

E-29 HIGH VOLTAGE OIL CIRCUIT BREAKER 0 1 6 0

E-30 SWITCHBOARD (PER CUBICLE), MEDIUM VOLTAGE 0 0.33 2 0

E-30A SWITCHBOARDS (PER CUBICLE), LOW VOLTAGE 5 0.33 2 3.3

E-31 NETWORK PROTECTORS 0 1 2.5 0

E-32 HIGH VOLTAGE NETWORK AND POWER

TYPE TRANSFORMER (OIL FILLED)

POWER TYPE 0 1 3 0

NETWORK TYPE 0 1 0.5 0

E-33 HIGH VOLTAGE NETWORK AND POWER DRY TYPE TRANSFORMER

POWER TYPE 1 3.5 0

NETWORK TYPE 0 1 4 0

E-34 DISCONNECTS (ISOLATING SWITCH; PER SWITCH) 0 1 2 0

E-34A DISCONNECT OR ISOLATING SWITCH, LOW VOLTAGE

(FUSED/NON-FUSED, 200 AMPS AND UP)

200 TO 500 AMPS 26 1 1 26

OVER 500 AMPS 0 1 3 0

E-35 MOTOR CONTROL CENTER 12 2 3 72

(INCLUDES MOTOR STARTERS UNDER 100 HP)

E-36 AUTOMATIC TRANSFER SWITCH 1 2 1.5 3

E-37 ALUMINUM BUS DUCT AND CONNECTORS

PER DISCONNECT OR 0 2 1 0

PER 10 FOOT BUST DUCT SECTION 0 2 0.2 0

E-37A ALUMINUM BUS DUCT AND CONNECTORS 0 2 0.08 0

E-38 HIGH VOLTAGE AIR CIRCUIT BREAKER 0 1 6.2 0

E-39 SUPERVISION SET 0 1 0.15 0

E-40 EMERGENCY GENERATOR; ELECTRIC, GASOLINE, OR NATURAL GAS 0 1 4 0

E-41 EMERGENCY GENERATOR, ELECTRIC DIESEL POWER 1 1 4 4

E-42 EMERGENCY GENERATOR ELECTRIC 0 12 1.25 0

E-42A EMERGENCY GENERATOR 0 12 2 0

E-43 LEAD ACID BATTERY (PER CELL) 0 4 0.03 0

E-44 EDISON NICKEL-IRON-ALKALINE BATTERY (PER CELL) 0 4 0.02 0

E-45 EMERGENCY GENERATOR, STEAM TURBINE DRIVER 0 1 6 0

E-49 EMERGENCY PUMP OR VENTILATOR 0 1 3 0

E-50 EMERGENCY PUMP OR VENTILATO 0 4 0.5 0

E-51 MOTOR STARTER, 26 1 1 26

5 HP TO LESS THAN 100 HP

AND LESS THAN 600 VOLTS (FORMERLY E-35A)

E-52 AUXILIARY PROTECTIVE RELAY 0 1 0.25 0

Tyler, 75702TX126, TX130East Texas Contract

7 Sonny Kopech

* ADDITIONAL P.M.'S SUBTOTAL 411.399

GENERAL SERVICES ADMINISTRATION GSA FORM 2105 (REV 3/10)

PAGE 4 OF 8 FIELD OFFICE: BUILDING NUMBER: BUILDING:

ANNUAL MAN-HOUR

PREVENTIVE MAINTENANCE

REQUIREMENTS REGION: PREPARED BY: SHOP DATE

ALL 9/23/2017

SECTION 1 - PM MAN-HOUR REQUIREMENTS

PM MAN-HOURS

GUIDE ITEM QUANTITY FREQUENCYSTANDARD TOTAL

NO. ALLOWED

E-56 DIMMER AND CONTROL, STAGE AND GENERAL LIGHTING 1 4 2 8

E-57 LOW VOLTAGE DRY TYPE TRANSFORMER 2 0.33 3 1.98

(30 KVA AND UP, 600 VOLTS OR LESS)

F-1 ALARM CHECK VALVES & ACCESSORIES 4 2 1.25 10

F-2 DRY PIPE, DELUGE AND PREACTION VALVES 4 12 0.15 7.2

F-2A DRY PIPE, DELUGE AND PREACTION VALVES 0 4 0.4 0

F-2B DRY PIPE, DELUGE AND PREACTION VALVES 0 1 2 0

F-3 FIRE POST INDICATOR VALVE 0 1 0.75 0

F-4 FIRE CONTROL VALVES (4 IN. OR OVER) 17 1 0.2 3.4

FOR INTERIOR WATER DISTRIBUTION SYSTEMS

F-5 FIRE PUMP (MOTOR OR ENGINE DRIVEN 0 52 0.6 0

F-6 FIRE PUMP (MOTOR OR ENGINE DRIVEN 0 12 0.2 0

F-7 FIRE PUMP

MOTOR DRIVEN 2 1 1.6 3.2

ENGINE DRIVEN 0 1 3.4 0

F-8 FIRE HOSE (1 IN. RACKED IN BUILDINGS) 0 1 0.2 0

F-9 FIRE DEPARTMENT HOSE CONNECTIONS (STANDPIPE OUTLETS) 18 1 0.15 2.7

F-10 FIRE DEPARTMENT PUMPER CONNECTIONS 4 1 0.3 1.2

(STANDPIPE OR SPRINKLER)

F-11 FIRE DOORS - STAIRWELLS & EXIT WAYS (SWINGING) 27 4 0.05 5.4

F-12 FIRE DOORS - SLIDING TYPE 0 4 0.2 0

F-13 FIRE SUPERVISORY SIGNAL - TESTING 2 4 0.3 2.4

F-14 AUTOMATIC FIRE DETECTION OR ALARM DEVICES 387 4 0.3 464.4

F-15A FIRE ALARM CONTROL PANEL, SPECIAL SYSTEMS 3 4 0.55 6.6

F-15B CENTRAL STATION, TRANSMITTERS 2 12 0.3 7.2

F-15C CENTRAL STATION, TRANSMITTERS/RETRANSMISSION EQUIPMENT 0 251 1 0

F-16 FIRE ALARM SYSTEM - RECORDER 4 52 0.1 20.8

F-17 FIRE ALARM BOX (MANUAL - CODED AND UNCODED) 26 4 0.3 31.2

F-18 FIRE AND SMOKE DAMPERS 48 0.5 0.2 4.8

F-19 FIRE HYDRANT (DRY BARREL OR WET BARREL) 0 1 0.65 0

F-20 SPRINKLER HEAD - SPRINKLERED AREAS (PER 1,000 SQ. FT.) 1 2 0.1 0.2

F-21 FIRE EXTINGUISHER - SODA ACID OR FOAM 0 1 0.75 0

F-22 FIRE EXTINGUISHER - STORED PRESSURE WITH GAUGE 0 1 0.1 0

F-22A FIRE EXTINGUISHER, STORED PRESSURE WITH GAUGE AND 22 0.17 0.34 1.2716

NON STAINLESS STEEL SHELL

F-23 FIRE EXTINGUISHER - GAS CARTRIDGE OR CYLINDER (NO GAUGE) 1 0.2 0

F-24 FIRE EXTINGUISHER - INSPECTION 108 12 0.02 25.92

F-25 FIRE EXTINGUISHER - HYDROSTATIC TESTING OF CARBON DIOXIDE, 3 0.2 1 0.6

STORED PRESSURE AND CARTRIDGE TYPE

F-26 FIRE EXTINGUISHER SYSTEM - CARBON DIOXIDE (HIGH PRESSURE), 0 2 0.75 0

HALON, DRY CHEMICAL

F-27 FAN, CENTRIFUGAL

UP TO 5,000 CFM 14 1 1 14

OVER 5,000 TO 10,000 CFM 0 1 1.3 0

OVER 10,000 TO 15,000 CFM 9 1 1.6 14.4

OVER 15,000 TO 20,000 CFM 0 1 1.95 0

OVER 20,000 CFM 0 1 2.25 0

F-28 FILTER, MOVEABLE CURTAIN, OIL COATED 0 4 1.75 0

F-29 FILTER, ROLL TYPE, DISPOSABLE MEDIA 0 4 1.75 0

F-30 FILTERS, VISCOUS TYPE 0 4 0.5 0

F-31 FILTER, ROLL TYPE, DISPOSABLE MEDIA, MANUAL OR MOTOR DRIVEN 0 2 1.75 0

F-32 FILTER, THROW AWAY 142 4 0.08 45.44

F-33 FILTER, ELECTROSTATIC 0 4 2.5 0

* ADDITIONAL P.M.'S SUBTOTAL 682.3116

Tyler, 75702TX126, TX130

7 Sonny Kopech

East Texas Contract

F07A and FO7J

PAGE 5 OF 8 FIELD OFFICE: BUILDING NUMBER: BUILDING:

ANNUAL MAN-HOUR

PREVENTIVE MAINTENANCE

REQUIREMENTS REGION: PREPARED BY: SHOP DATE

ALL 9/23/2017

SECTION 1 - PM MAN-HOUR REQUIREMENTS

PM MAN-HOURS

GUIDE ITEM QUANTITY FREQUENCYSTANDARD TOTAL

NO. ALLOWED

F-34 FLUORESCENT LIGHTING FIXTURE, WASHING AND RELAMPING

INDUSTRIAL TYPE:

(1) LAMP/48" 0 0.4 0.07 0

(1) LAMP/96" 0 0.4 0.12 0

(2) LAMPS/48" 24 0.4 0.12 1.152

(2) LAMPS/96" 11 0.4 0.2 0.88

(3) LAMPS/48" 0 0.4 0.17 0

(4) LAMPS/48" 160 0.4 0.25 16

LOUVER TYPE:

(1) LAMP/48" 1520 0.4 0.18 109.44

(2) LAMPS/48" 0 0.4 0.23 0

(3) LAMPS/48" 0 0.4 0.29 0

(4) LAMPS/48" 0 0.4 0.33 0

DIFFUSER TYPE

(1) LAMP/48" 0 0.4 0.13 0

(2) LAMPS/48" 355 0.4 0.17 24.14

(3) LAMPS/48" 0 0.4 0.22 0

(4) LAMPS/48" 0 0.4 0.25 0

F-35 FLUORESCENT LIGHT FIXTURE - RELAMPING ONLY

(1) LAMP 0 0.2 0.05 0

(2) LAMPS 0 0.2 0.07 0

(3) LAMPS 0 0.2 0.11 0

(4) LAMPS 57 0.2 0.13 1.482

F-36 FAN, PROPELLER, 24 IN. DIAMETER OR LARGER 2 1 0.75 1.5

F-37 FLOOR POLISHING MACHINE 0 2 0.35 0

F-38 LIGHTNING PROTECTION (PER DOWN CONDUCTOR) 60 1 0.5 30

F-39 CAFETERIA EXHAUST HOOD 0 2 16 0

(DUCT SYSTEM PER FEET OF DUCT WORK)

F-40 FILTER, THROW AWAY, BAG TYPE (BY DEPTH)

OVER 4" TO 6" 3 2 0.08 0.48

OVER 6" TO 12" 0 2 0.1 0

OVER 12" TO 24" 3 2 0.2 1.2

OVER 24" TO 48" 0 2 0.25 0

F-43 FILTER, CHARCOAL 0 4 0.16 0

F-44 FOUNTAIN, MEMORIAL OR DECORATIVE 0 2 2 0

F-46 FIREPLACE 0 12 0.5 0

F-47 FIREPLACE 0 4 0.5 0

F-49 FILTER, CONTROL AIR 12 4 0.5 24

G-1 FUEL OIL FILTER/STRAINER 1 2 1 2

G-2 GREASE TRAPS 0 12 0.75 0

G-3 GATES AND FENCES, SECURITY AND ACCESS 12 2 2 48

H-1 HOT WATER CONVERTER (STEAM) 0 1 6 0

H-2 HOT WATER HEATER - GAS 5 1 0.6 3

H-3 HOT WATER HEATER - ELECTRIC 1 1 0.6 0.6

H-4 SECONDARY WATER CHILL CONVERTER 0 1 54 0

H-5 HOT WATER HEATER, STEAM COIL 0 1 0.6 0

H-6 HOT AIR FURNACE

120 MBTU'S OR LESS 12 1 2.5 30

120 TO 300 MBTU'S 0 1 5 0

300 TO 500 MBTU'S 0 1 8 0

500 TO 700 MBTU'S 0 1 24 0

700 TO 1,000 MBTU'S 0 1 32 0

OVER 1,000 MBTU'S 0 1 40 0

H-12 HEATER, FUEL OIL, UNIT 0 1 16 0

H-14 HOIST, LIGHTING 0 1 1 0

H-15 HOIST, ELECTRIC 0 1 0.75 0

Tyler, 75702

East Texas Contract TX126, TX130

Sonny Kopech

I-1 INCINERATOR 0 1 15.25 0

I-2 FAN COIL UNIT, UNDER 0 1 0.4 0

I-3 INDUCTION UNIT, UNDER WINDOW TYPE 0 1 0.4 0

I-4 FAN COIL UNIT, CEILING HUNG 39 1 1 39

I-5 FAN COIL UNIT, CEILING HUNG, VAV BOX WITH ELECTRIC REHEAT 0 1 0 0

* ADDITIONAL P.M.'S SUBTOTAL 332.874

GENERAL SERVICES ADMINISTRATION GSA FORM 2105 (REV 3/10)

PAGE 6 OF 8 FIELD OFFICE: BUILDING NUMBER: BUILDING:

ANNUAL MAN-HOUR

PREVENTIVE MAINTENANCE

REQUIREMENTS REGION: PREPARED BY: SHOP DATE

ALL 9/23/2017

SECTION 1 - PM MAN-HOUR REQUIREMENTS

PM MAN-HOURS

GUIDE ITEM QUANTITY FREQUENCYSTANDARD TOTAL

NO. ALLOWED

L-1 LAWN MOWER AND EDGER 0 2 2 0

L-2 LOADING RAMP, ADJUSTABLE 2 4 1.25 10

L-3 LIGHTING, SPECIAL FEATURE 34 1 0.5 17

L-4 LIGHTING, OUTSIDE

INCANDESCENT 1 2 1 2

FLUORESCENT, MERCURY VAPOR

OR HIGH PRESSURE SODIUM 17 2 1.75 59.5

L-5 LAWN SPRINKLERS (PER NOZZLE) 127 1 0.25 31.75

L-6 LOCOMOTIVE, DIESEL (DFC ONLY) 0 2 14 0

L-7 LOCOMOTIVE, DIESEL (ELECTRICAL CONTROLS)(DFC ONLY) 0 2 8 0

L-8 SPOTLIGHTS, FIXED AND 0 12 1.5 0

L-10 LIFT, ELECTRIC, STAGE SCREEN PORTABLE 0 2 3 0

M-1 MANHOLE ELECTRICAL 0 1 2 0

M-2 MANHOLE, SEWER 1 4 2 8

M-3 MOTORS

1 TO 7.5 HP 42 1 0 0

OVER 7.5 TO 50 HP 29 1 0 0

OVER 50 HP 0 1 0 0

M-4 MANHOLE, WATER/STEAM/FUEL OIL (ALSO INCLUDES HOT WATER, 0 2 2 0

CHILLED WATER, AND CONDENSER WATER)

M-6 MATERIAL HANDLING EQUIPMENT, ENGINE DRIVEN 0 2 1 0

M-7 MATERIAL HANDLING EQUIPMENT 0 1 0.5 0

M-8 MAGNETIC DRIVE 0 4 0.5 0

M-9 MOBILE EQUIPMENT 0 4 1 0

M-10 MOTOR CONTROLLER UNIT (600 VOLTS AND ABOVE) 0 1 3.75 0

M-11 MOTORS, 600 VOLT OR 200 HP AND ABOVE 0 1 1 0

P-1 PAPER BALER 0 1 1 0

P-2 PNEUMATIC TUBE SYSTEM 0 1 4 0

P-4 PUMP, CENTRIFUGAL

1 TO 24 HP 12 1 0 0

25 TO 100 HP 0 1 0 0

OVER 100 HP 0 1 0 0

P-6 PUMP, VACUUM 0 2 0 0

P-7 PUMP, GEAR AND RECIPROCATING00 HP 0 1 1.5 0

R-1 RADIATOR, HEATING 0 2 0 0

R-2 ROOF INSPECTION (PER SQUARE, OR 100 SQ. FT.) 14410 2 0.03 864.6

R-3 REFRIGERATION MACHINE (ABSORPTION)

UP TO 500 TONS 0 1 20 0

OVER 500 TO 1,000 TONS 0 1 40 0

OVER 1,000 TONS 0 1 60 0

R-4 CENTRAL CHILLED WATER PACKAGE UNIT

COMFORT COOLING OR CENTRAL DRINKING WATER

25 TONS AND UNDER 0 1 8 0

25 TO 50 TONS 0 1 16 0

50 TO 75 TONS 0 1 22 0

75 TO 100 TONS 0 1 28 0

OVER 100 TONS 0 1 35 0

SPECIAL PURPOSE OR COMPUTER COOLING

25 TONS AND UNDER 0 1 8 0

25 TO 50 TONS 0 1 16 0

East Texas Contract

TX126, TX130 Tyler, 75702

50 TO 75 TONS 0 1 22 0

75 TO 100 TONS 0 1 28 0

OVER 100 TONS 0 1 35 0

R-5 REFRIGERATION MACHINE, CENTRIFUGAL

50 TONS AND UNDER 0 1 8 0

50 TO 25O TONS 0 1 12 0

251 TONS - 500 TONS 0 1 18 0

501 TONS - 750 TONS 0 1 22 0

751 TO 1,000 TONS n 0 1 24 0

ADD 20 MAN-HOURS FOR EACH ADDITIONAL 250 TON 0 1 0 0

INCREMENT OVER 1,000 TONS. 0

* ADDITIONP21=2 SUBTOTAL 992.85

M03- New spec 0 maintenance

GENERAL SERVICES ADMINISTRATION GSA FORM 2105 (REV 3/10)

PAGE 7 OF 8 FIELD OFFICE: BUILDING NUMBER: BUILDING:

ANNUAL MAN-HOUR

PREVENTIVE MAINTENANCE

REQUIREMENTS REGION: PREPARED BY: SHOP DATE

ALL 9/23/2017

SECTION 1 - PM MAN-HOUR REQUIREMENTS

PM MAN-HOURS

GUIDE ITEM QUANTITY FREQUENCYSTANDARD TOTAL

NO. ALLOWED

R-6 REFRIGERATION MACHINE, RECIPROCATING AND SCROLL

50 TONS AND UNDER 0 1 10 0

50 TO 100 TONS 0 1 12 0

100 TO 250 TONS 0 1 14 0

OVER 250 TONS 0 1 20 0

R-7 REFRIGERATION MACHINE, SCREW

50 TONS AND UNDER 2 1 10 20

50 TO 250 TONS 4 1 12 48

250 TO 500 TONS 0 1 16 0

500 TO 750 TONS 0 1 20 0

750 TO 1,000 TONS 0 1 30 0

OVER 1000 TONS 0 1 40 0

R-8 CONTROL PANEL - CENTRAL REFRIGERATION UNIT 3 1 4 12

R-9 RADIATION, BASEBOARD/CONVECTORS 0 0.5 0.5 0

(STEAM, HOT WATER, OR ELECTRIC - PER LINEAR FOOT)

R-10 RAILROAD TRACKAGE (PER 1,000 FT.) 0 1 3.5 0

R-11 REFRIGERATION CONTROLS, CENTRAL SYSTEM 6 1 1 6

R-12 RAILROAD TURNOUT 0 1 0.55 0

R-13 NON-DESTRUCTIVE CHILLER TUBE ANALYSIS 6 0.33 9 17.82

R-14 HIGH EFFICIENCY PURGE UNITS 0 1 2 0

S-2 SEWAGE EJECTOR (PNEUMATIC TANK TYPE EJECTORS) 0 1 4 0

S-5 SWEEPER 0 2 3 0

S-6 SEWAGE EJECTOR, SUMP TYPE 4 1 4 16

S-7 SUMP PUMP 8 1 3.75 30

S-8 STRAINER, Y-TYPE 37 1 0.5 18.5

S-9 STRAINER, BOLTED FLANGE (WATER AND STEAM)

6 TO 14 BOLTS 13 1 2 26

14 TO 34 BOLTS 0 1 6 0

34 TO 58 BOLTS 0 1 10 0

OVER 58 BOLTS 0 1 20 0

S-10 SCRUBBING MACHINE (BATTERY OR PROPANE POWERED) 0 4 1 0

S-11 SNOW BLOWER 0 1 0.9 0

S-14 DUAL STRAINER 0 1 9 0

S-15 BACKWASH STRAINER 0 1 6 0

T-1 TANK, WATER (ALL TYPES) 8 0.33 6.25 16.5

T-2 TANK, AIR/REFRIGERANT/;P GAS 3 1 6.25 18.75

T-3 TANK, FUEL OIL STORAGE 1 0.25 6.25 1.5625

T-5 TRASH COMPACTOR 0 1 4 0

T-6 TANK, CHEMICAL 0 1 8 0

T-8 TRAPS, ALL TYPES

LOW PRESSURE 0 0.2 0.5 0

HIGH PRESSURE 0 1 0.5 0

T-9 TURBINE, STEAM 0 1 11.5 0

T-10 TELECOMMUNICATIONS 0 4 0.75 0

East Texas Contract

T-12 FLUID DRIVE TRANSMISSIONS 0 1 5 0

U-1 UNIT HEATER (STEAM AND HOT WATER) 5 1 1 5

U-2 UNIT HEATER (GAS AND OIL FIRED) 0 1 1 0

V-1 VACUUM CLEANER, HEAVY DUTY, TANK TYPE 0 2 0.5 0

V-2 VALVE, SAFETY RELIEF 27 12 0.5 162

V-3 VALVE REGULATING 15 1 0.6 9

V-5 VALVE, MANUALLY OPERATED

MAIN LINE OR CRITICAL 30 1 0.4 12

OTHER OVER 2 INCHES 0 0.2 0.4 0

V-6 VALVE, MOTOR OPERATED 11 1 0.4 4.4

V-7 VALVE, HYDRAULIC/PNEUMATIC/ELECTRIC 0 1 1.5 0

V-8 VALVE 0 1 1.5 0

* ADDITIONAL P.M.'S SUBTOTAL 423.5325

GENERAL SERVICES ADMINISTRATION GSA FORM 2105 (REV 3/10)

PAGE 8 OF 8 FIELD OFFICE: BUILDING NUMBER: BUILDING:

ANNUAL MAN-HOUR

PREVENTIVE MAINTENANCE

REQUIREMENTS REGION: PREPARED BY: SHOP DATE

ALL 9/23/2017

SECTION 1 - PM MAN-HOUR REQUIREMENTS

PM MAN-HOURS

GUIDE ITEM QUANTITY FREQUENCYSTANDARD TOTAL

NO. ALLOWED

V-9 BACKFLOW PREVENTER

UP TO 1 1/2 INCHES 14 1 0.75 10.5

1 1/2 TO 2 INCHES 2 1 1.5 3

2 TO 3 INCHES 0 1 2 0

3 TO 4 INCHES 0 1 3 0

4 TO 6 INCHES 0 1 4 0

6 TO 8 INCHES 0 1 6 0

OVER 8 INCHES 0 1 8 0

V-10 VACUUM SYSTEM, CENTRALIZED 0 1 2.5 0

W-1 DRINKING WATER FILTER SYSTEMS 0 4 3 0

W-2 WASH, EMERGENCY 11 52 0.05 28.6

W-3 WATER SOFTENER 0 2 4 0

W-4 FILTER, WATER 0 2 0.5 0

W-5 WINDOW WASHING SCAFFOLD, POWER OPERATED 0 1 4 0

W-7 WHEELCHAIR LIFT 1 12 1.75 21

W-8 WATER TREATMENT FOR COOLING TOWERS 4 12 2 96

W-9 WATER TREATMENT FOR HEATING SYSTEMS 4 12 2 96

X-21 KEY CARD SYSTEM 0 4 1 0

X-22 FLAG POLE, ELECTRIC 0 4 0.25 0

X-23 HEATER UNIT, ELECTRIC 0 2 0.75 0

X-26 SOLAR HEATING SYSTEM 0 2 4 0

X-26A SOLAR HEATING SYSTEM (SOLAR COLLECTORS) 0 1 0.03 0

X-29 CHEMICAL FEEDER 2 2 1 4

X-32 PARKING ARM GATES 4 1 1 4

X-37 EMERGENCY SHOWER 3 1 0.1 0.3

X-39 SEPTIC TANK AND DRAIN FIELD 0 1 2 0

X-41 TRACTOR, DIESEL 0 12 0.5 0

0 2 0.25 0 0 1 5 0

X-42 METAL-ENCLOSED BUSS DUCT

(LOW VOLTAGE, 600 VOLTS OR LESS)

OUTDOORS

PER DISCONNECT OR POWER TAKEOFF 0 1 1 0

PER 10 FOOT BUSS DUCT SECTION 0 1 0.2 0

INDOORS

PER DISCONNECT OR POWER TAKEOFF 0 0.33 1 0

PER 10 FOOT BUSS DUCT SECTION 0 0.33 0.2 0

East Texas Contract

ENTER ADDITIONAL PM ITEMS BELOW

* ADDITION P.M.'S R-15 Refrigerant Monitor SUBTOTAL 263.4

X-50 Quantity 4 no maintenance

File details come from the government source that posted it.