Exhibit JC7 - PBS Waste Audits 1pg.pdf

PDF 127 KB Posted

Attached to
Full Maintenance Service for East Texas Federal Buildings
Solicitation number
47PH0218R0001
Issued by

About this file

SECTION J ATTACHMENTS OF EAST TX FULL MAINTENANCE SERVICES

View the file

Other files

File Type Posted
Solicitation_Amendment_47PH0218R0001_0001.pdf PDF
Attachment 3-WD2015-5257_REV 5_DATE 11018- Tyler.pdf PDF
Building Library 6- Time Standard Comparison.pdf PDF
FIGURE L-2 Management Plan Baseline.pdf PDF
Exhibit JM7 - Bldg Op Plan Template 1pg.pdf PDF
Building Library 4 - East Texas Elevator Count FY2018.pdf PDF
Building Library 5-East Texas Roofing Systems FY2018.pdf PDF
Exhibit JM4 - Environmental Sustainable Products 1pg.pdf PDF
Exhibit JC2 - Custodial QASP 29 pg.pdf PDF
47PH0218R0001_Generated_PDF_with_TOC.pdf PDF
FIGURE B-1 Contractor Staffing Declaration for Union and Non Union Contracts.xlsx XLSX spreadsheet
Exhibit JM2 - Green Purchasing Report 2pg.pdf PDF
Exhibit JC4 - Building Exterior and Hardscape Plan 1pg.pdf PDF
Building Library 2 Building Inventory TX0182.pdf PDF
Exhibit JM15 - Misc Best Practices Shave Energy 10 pg.pdf PDF
Building Library 7 - Marshall _ Lufkin W-O list May .pdf PDF
Exhibit JC6 - Recycle, Solid Wate, Trash Report 2pg.pdf PDF
Exhibit JC5 - Erosion and Sediment Control 1pg.pdf PDF
Building Library 2 Building Inventory TX0130.pdf PDF
Exhibit JM1 - O_M QASP 3pg.pdf PDF
Building Library 2 Building Inventory TX0126.pdf PDF
Exhibit JM8 - Smart Buildings 1pg.pdf PDF
Exhibit JM9 - Water Treatment 19pg.pdf PDF
Figure L-3 Past Performance Questionnaire.pdf PDF
FIGURE L-1 COMBO CBA DOL MGMT PLAN IGE.xlsx XLSX spreadsheet
Building Library 3 - Location General Information.pdf PDF
Building Library 2 Building Inventory TX0262.pdf PDF
Attachment 1 - WW Contractors CBA 10-31-2018.pdf PDF
Exhibit C1 - BUILDING INFORMATION SHEET.pdf PDF
Attachment 3-WD2015-5279_REV 8_DATE 11018 - LUFKIN.pdf PDF
Building Library 1 - Extinguisher Report.pdf PDF
SECTION J APPENDIX.pdf PDF
Exhibit JM14 - Qualificaiton of Electrical Testing Technicians 1pg.pdf PDF
Attachment 2- WD CBA_ 2018-0069_REV 1_DATED 426.18 —
Exhibit JC3 - Surveillance Forms 4pg.pdf PDF
Building Library 7 - Marshall _ Lufkin W-O list May 1 _18.xlsx XLSX spreadsheet
Attachment 3-WD2015-5277_REV 8_DATE 11018- Marshall.pdf PDF
Figure B-3 Pricing of Services.xlsx XLSX spreadsheet
Exhibit JM17 - Preventative Maintenance Guide.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT JC7

PBS WASTE AUDITS

This exhibit is provided to the Contractor as a guide for additional considerations for post-audit monitoring, plan implementation, training and other ancillary activities that may assist GSA in meeting the listed objectives.

I. Background GSA’s Public Buildings Service (PBS) provides work environments for over one million Federal employees nationwide. The inventory consists of courthouses, laboratories, offices and border stations.

Tenant activities in these buildings generate tons of solid waste/trash that PBS is obligated to properly dispose of and achieve a minimum waste diversion of 50%. Recycling composting and other alternatives to landfills and incineration are the preferred methods for disposal of solid waste/trash.

II. Objectives Determine the most efficient methods to maximize reduction, recycling, and composting of solid waste/trash and to minimize waste shipments.

Achieve a minimum of 50% waste diversion through waste minimization, recycling, and composting.

Determine the right service level for solid waste/trash collection and removal

III. Extent Of Work The Contractor shall conduct a solid waste/trash audit to include:

100% of the waste and/or recycling collected in a 24 hour period must be audited (excluding durable goods or construction waste).

The audit must represent a 24 hour period on a typical work day.

Use scales to weigh sorted waste, as weight is the preferred metric.

Determine the amount of recyclable materials being thrown away that could have been recycled and composted. At a minimum, the recyclable items within the waste/trash must be identified and separated into the following categories: Paper, Plastic, Cardboard, Glass, Metal/aluminum, and Wet Waste.

The Contractor shall develop a written report and analysis of the conclusions drawn from this audit, including recommendations for improving the economy and efficiency of waste collection, storage, transfer, and disposal (including recycling and composting). This report shall address, at a minimum:

Recommendations to maximize waste minimization, recycling, and composting to achieve at least 50% waste diversion.

Recommendations to right-size service level for solid waste/trash removal services to minimize trash shipments.

The report and analysis is due 60 days after the start date.

File details come from the government source that posted it.