This solicitation amendment provides additional details for a federal contract opportunity to replace the fire alarm system in the Bricker Federal Building and garage in Columbus, Ohio. The General Services Administration seeks to award a contract by September 2022 to a small business contractor to replace tampers, flows, and monitoring devices; test new sprinkler devices; and refurbish the existing fire alarm and notification system over 357 and 140 calendar day periods. The estimated cost range is $1,000,000 to $5,000,000. Evaluation criteria include past experience, key personnel, project management plan, and past performance. The technical factors are more important than price. The bid due date of August 17, 2022 at 4pm EST remains unchanged.
View the file
Other files for this federal contract opportunity
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
INSTRUCTIONS (Back Page):
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g)
(h)
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(1)
(2)
(3)
(4)
(5)
(6)
STANDARD FORM 30 (REV. 11/2016) BACK
(1) Accounting classification Net increase $
Amendment 1 to RFP 47PF0022R0063 Bricker Fire Alarm
1. Specifications include Section 013510 Historic Building Treatment Procedures; however, drawings indicate that the building is not historic. Please confirm intent. The building is not an historic building. Disregard Section 013510 Historic Building Treatment Procedures.
2. Fire stopping specification section 078413 1.5 A indicates that all penetration firestopping must be performed by "A firm that has been approved by FMG". Confirm that all Fire-stopping work is to be completed by a specific fire-stop vendor rather than by trade. Fire Stopping seals must only be constructed by individuals that have been certified by the manufacture of the fire stopping material and have been approved by the GSA. All fire stopping seal designs must be submitted and approved prior to construction. The materials used for the construction of fire stopping seals must meet the requirements of the “BUY AMERICAN ACT” for this project and be provided by a single manufacturer (such as STI, etc.).
3. Confirm that the application of new fire-stopping only applies to new work; existing conduit penetrations for the fire alarm system to remain in place is not in the scope of work. Firestopping seals must be constructed for all new holes created for piping, or other penetrations which pass through floor slabs, fire-rated walls, partitions with fire-rated doors, vertical service shafts, or any fire-rated assemblies in accordance with Section 07 84 00. Existing holes through which new piping for this project passes through an existing hole shall be totally firestopped in a manner that restores the fire protection rating of the penetrated wall, floor, ceiling, or other structure. Fire Stopping seals are not required to be constructed for any existing holes or penetrations in the building where there is no new work or new piping is being installed.
4. As part of the site visit conducted during the pre-bid walk-through, it was noted that the Fire Alarm Conduit is only "banded red" and utilizes set screw fittings. The conduit runs are to be re-utilized per the drawings. Please confirm replacement of conduit that does not meet GSA standards is not to be included in the scope of work. Existing fire alarm conduits that are currently installed and that have existing “banded red” identification and utilize set screw fittings are not required to be replaced to meet the current GSA project standards if they remain in place and are unaltered. Any existing conduit that must be removed cannot be repurposed or reused in its existing condition. Conduit that is removed and relocated or repurposed must be either painted red per the project requirements prior to being reinstalled or new approved red conduit must be provided. The existing set screw fittings can remain provided they are unaltered. Any set screw fitting is altered or disconnected from a conduit, conduit body, or workbox it must be removed in its entirety and discarded. Only new compression type fittings and couplings may be used.
5. Specification Section 21 13 15 Sprinkler System Modifications indicate that the scope of work for project "includes designing and providing a modified, complete, automatic sprinkler system as described herein and on the contract drawings" The contract drawings do not indicate sprinkler system design modifications, and the work is limited to replacement of tampers, flows, and monitoring devices. Confirm the scope of services being requested in regards to system design and hydraulic calculations. Fire protection hydraulic calculations are not required to be provided for the replacement of tamper switches or waterflow monitoring devices or the piping alterations utilizing the same size piping to replace or relocate these types of devices. Hydraulic calculations are required when there are additional sprinklers being provided and the new piping configurations do not conform to piping schedules listed in NFPA 13.
6. Referencing Specification Section 21 13 15 Sprinkler System Modifications, please confirm system testing is limited to testing of new sprinkler devices as applicable to the fire alarm system, and the system will be tested at standing pressure in regards to device replacement. All new sprinkler system devices and sprinkler piping alterations will be required to be tested as required by NFPA 13, NFPA 25, NFPA 72 specification Section
211315, Section 283105, and the contract documents. Fire protection system alterations involving reconfiguration of piping or the installation of less than 20 sprinklers in one sprinkler zone will only require testing at the system working pressure. Any leaks or drips within the two-hour test period is considered a failed test and the leak must be repaired. Any leaks discovered during the warranty period must be repaired.
7. Referencing Specification Section 28 31 05 1.4A "The contractor shall completely repair, refurbish, and provide additional equipment to the existing completely supervised, multiplex intelligent, analog, addressable fire detection and alarm system as shown on the design drawings and described within this specification." Confirm all design has been completed, the contractor is not to include design in the scope of services. The design documents and design drawings dated 7/19/2019 in the solicitation no. 47PF0022R0063 dated July 8,2022 do not require the contractor to include design in the scope of services outside of what is specified in the solicitation.
8. Specification Section 28 31 05 3.7 indicates the project testing requirements. A number of devices and circuits are scheduled to remain in place impeding tests such as loop resistance, loop capacitance, continuity. Confirm the applicability of the testing requirements on existing circuits. Fire alarm circuits will be tested in accordance with the contract documents and NFPA 72 Current Edition Chapter 14 requirements. Notification appliance circuits will be required to be free of grounds and be tested for continuity, current draw, voltage drop, and circuit supervision. Existing notification appliance circuits will not be required to be tested directly for loop resistance (Loop resistance will be calculated based on the circuits current draw and end of line voltage drop to confirm compliance with the project documents), or loop capacitance.
9. Please confirm existing wiring diagrams indicating circuit layout will be provided for development of the project submittals to the installing contractor after award. Fire alarm existing wiring can be provided in AutoCAD format upon request in writing to the GSA.
The AutoCAD files being provided will need to be completed by the contractor to provide a complete submittal in conformance with the contract documents including devices, addresses, conduits, conduit sizes, conduit fills, elevations, riser diagrams, terminal cabinet layouts, point-to-point wiring details, calculation, etc. as specified in the contract documents to provide a complete submittal package.
10. Referencing Specification Section 28 31 05 2.3.C.8, please clarify if this shall be provided in addition to 28 31.05 3.9 – Spare parts and tools. Fire alarm parts, materials, labor, programming, and testing for Section 28 31 05 2.3.C.8 is in addition to the spare parts and tool required by Section 283105-3.9.
11. Referencing Question 10 above, if the material is to be provided in addition to, please provide square footage to be used to calculate additional spares. The first through seventh floors used to calculate to raw square footage is approximately 198,757 square feet.
12. Referencing Specification Section 28.31.05.3.5, please identify any Acoustically Distinguishable spaces per this specification section that would require mockup and/or intelligibility testing. All spaces within the facility are required to have intelligible voice messages that are capable of being understood and are clear and comprehensible with the voice fire alarm system. All spaces within the facility are required to meet the audibility levels specified in Section 283105. This project will not have any spaces that will be requiring mockup intelligibility testing as part of any designs.
13. Referencing Sheet FA-111, Note #4, the garage portion of the project calls to replace all PAD- 3’s with PAD-5’s. Please confirm if intent is to replace all the existing PAD-3 with new devices in the main building as well. Yes.
14. Referencing Sheet FA-109, Notes #4 calls for supervisory monitoring of shunt trip power. Key note 4 does not appear to be evidenced on Sheet FA-109; please confirm if there are there any shut trips involved on this floor. There are currently four shunt trip circuit breakers located in the elevator penthouse that do not have supervisory monitoring of shunt trip power and will require shunt trip power monitoring.
15. Sheet FA-11B indicates AHU-3 in elevator lobby. Please confirm is this AHU will require a duct detector. Fire alarm drawing FA-11B refers to the parking garage lower level. There are no duct smoke detectors required to be installed in the parking garage.
| Solicitation Amendment 47PF0022R0063_0001 (1) |
| Amendment 1 |
| topmostSubform[0]: |
| Page2[0]: |
| TextField1[5]: |
| TextField1[2]: |
| TextField1[1]: |
| TextField1[4]: |
| TextField1[3]: |
| TextField1[0]: |
| Page1[0]: |
| Code[0]: 5P2QCBAK |
| Copies[0]: 1 |
| CheckBox9[0]: 1 |
| Code[2]: 5P1QCCA |
| NameandTitleOfficer[0]: Martin Harris, Contracting Officer |
| Is[0]: 1 |
| CheckBox10[0]: Off |
| NameandAddress[0]: |
| DateSigned[1]: |
| Pages[0]: 2 |
| AmendmentNo[0]: 0002 |
| Dated10B[0]: |
| ModificationNo[0]: |
| AdministeredBy[0]: R5 AMD Southern Construction Contracting Team |
2 S Main St Akron, OH 44308-1818 USA
| FacilityCode[0]: |
| CheckBox13B[0]: Off |
| CheckBox13D[0]: Off |
| ReqNumber[0]: EQ5P2SS2P1-22-0025 |
| Dated9B[0]: 7/6/2022 |
| C13[0]: |
| Description[0]: Amendment 2 to 47PF0022R0063 Bricker Fire Alarm and Notification System Replacement Project, 200 North High Street Columbus, Ohio 43215. Please find enclosed twelve (12) documents associated with this amendment. Bid due date remains unchanged at 8/17/2022 at 4pm EST. |
| NotExtended[0]: Off |
| Code[1]: |
| AmendmentNo[1]: 47PF0022R0063 |
| ContractIDCode[0]: |
| DateSigned[0]: |
| CheckBox11[0]: 1 |
| Page[0]: 1 |
| AccountingData[0]: |
| CopiesReturned[0]: 1 |
| CheckBox13A[0]: Off |
| IsNot[0]: Off |
| EffectiveDate[0]: 8/11/2022 |
| A13[0]: |
| ProjectNo[0]: ROH11067 |
| CheckBox13C[0]: Off |
| Extended[0]: 1 |
| D13[0]: |
| IssuedBy[0]: R5 AMD Repair & Alterations Contracting Branch Southern Team |
2 S Main St Akron, OH 44308 USA NameandTitleSigner[0]:
File details come from the government source that posted it. Updated .