Asbestos Notification Letter - Bricker FB and Garage.pdf
PDF 43 KB Posted
- Solicitation number
- 47PF0021R0116
About this file
This notification provides information on asbestos containing materials present in the Bricker Federal Building and Parking Facility located in Columbus, Ohio. Asbestos is present in mastic, duct sealant, drywall systems, insulating cement, chilled water tank insulation, roofing materials, mirror mastics, fire doors, and other locations. The notice requires prospective contractors to be aware of the asbestos locations and quantities prior to bidding on contracts involving work in the building.
The federal contract opportunity is for elevator maintenance services at four locations in Columbus and Dayton, Ohio. Services are required from July 2022 through June 2027 under an initial one-year contract with four one-year options. The contractor will maintain safety and condition of the elevators according to codes and industry standards. Requirements include management, labor, materials, and repair to operate elevators efficiently. The solicitation will be available on December 28, 2021 with proposals due January 27, 2022. The General Services Administration is the contracting agency.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: 3/8/2021
Prospective Contractors (bidders), Pursuant to the Code of Federal Regulations all building owners are required to provide notification of the presence, location, and quantity of asbestos containing materials (ACM) and presumed asbestos containing materials (PACM) in their facilities. This notification is provided as a safeguard, to ensure prospective contractors (bidders) are aware of this information.
Asbestos containing material is present in the Bricker Federal Building and Parking Facility (OH0208CL and OH0209CL) in the following forms, locations, and quantities:
Type Location Quantity
Mastic Throughout Building 8850 sf
Duct Sealant All Ducts and AHUs Throughout Building and Penthouse 14000 sf
Sink Undercoating All Sinks Throughout Building Undefined 1
Drywall Systems Elevator Lobby (2nd Floor) 1000 sf
Insulating Cement at Ends of Pipes Parking Garage 1000 sf
Chilled Water Tank Insulation2 Air Handling Room 250 cf
Roofing Materials2 Roof 30000 sf
Mirror Mastics2 Restroom Mirrors Undefined1
Fire Doors2 Throughout Building Undefined1
If you have any questions, please contact Arthur McCleese (Arthur.mccleese@gsa.gov, 614-620-9179)
GSA point of contact for the procurement.
1 Quantity was not defined at the time of the most recent survey.
2 Denotes material was not tested at the time of the most recent survey. Testing is not feasible in some cases as it would result in damage to the material or its structural components. In other cases, the material or area may not have been accessible. As such, the material must be presumed to be ACM based on its characteristics, age or other technical factors. Material is presumed to be ACM to ensure appropriate precautions and methods are employed when contemplating or executing activity that may disturb the material.
mailto:Arthur.mccleese@gsa.gov
| 2021-03-08T13:16:17-0500 | |
| ARTHUR MCCLEESE | |
| I am the author of this document |
File details come from the government source that posted it. Updated .