LEAD AND COPPER IN WATER TESTING
ASSESSMENT LOCATION:
GOLDEN COLLUM FB-CT
207 NW 2ND STREET
OCALA, FL 34475
GSA BUILDING NUMBER: FL0057ZZ
REFERENCE NUMBER: 450175/485587/485705
SURVEY DATE: OCTOBER 10, 2019
REPORT DATE: NOVEMBER 1, 2019
PREPARED BY:
UNITED STATES PUBLIC HEALTH SERVICE
FEDERAL OCCUPATIONAL HEALTH
PROGRAM SUPPORT CENTER
ANNUAL ASBESTOS SURVEILLANCE REPORT
COMPLETED FOR THE
GENERAL SERVICES ADMINISTRATION – SAFETY/FIRE
PROTECTION/ENVIRONMENTAL BRANCH
A Federal Occupational Health (FOH) Contractor Representative Lisa Swain, MPH, CSP, performed a limited walk-through Annual Asbestos Visual Surveillance Check as required by the General Services Administration (GSA) for their owned facilities. Bulk or air samples were not collected. Compliance with GSA contract safety and health requirements, listed on the attached checklist, was determined for Operations and Maintenance (O&M) and Custodial contractors. As indicated by GSA instructions, only spaces listed on Table A were visually checked. During the surveillance check, observations of any potential damage to the asbestos-containing materials (ACM) was noted and recorded. If any imminently dangerous conditions had been observed they would have been immediately reported to the FOH Representative, GSA Customer Service Center Manager, and GSA Safety and Environmental Management Branch Representative in accordance with GSA established procedure.
The GSA Form 3614, GSA Notice of Unsafe/Unhealthful Workplace Conditions, was completed for any potential deficiencies and provided to the GSA Building Manager.
One GSA Form 3614 may list multiple violations. An opportunity to correct violations, if any, would be given to the GSA employee or representative during the inspection.
Those violations corrected are noted in the text of the report.
The FOH Contractor Representative used the GSA ACM Checklist for fiscal year 2019, which was approved by GSA for consistency purposes and to ensure the required information was obtained at this facility. The checklist and 3614 forms, if any, are attached to this report as supporting documentation.
This report is based on personal observations during the surveillance check and from conversations with on-site personnel. Not all possible hazards and conditions may have been identified during this brief inspection, because not all spaces were inspected (per GSA), conditions may be hidden or inaccessible and changes in equipment, regulations, operations and personnel may not be known at the time of the inspection.
The report contains the following GSA required sections: Building Descriptions, General Findings, Comments and Concerns, Action Items, 3614s, Form 3559, Corrected Items and Other.
Note: The FOH Contractor Representative designated in this project is an employee of H,S&E Resources, Inc. which has performed the services indicated in this report.
Nothing in this report is intended nor should be interpreted as establishing any form of employment or contractor relationship between the FOH Contractor Representative and General Services Administration, Federal Occupational Health, U. S. Public Health Service, or any division, agency, or contractor thereof.
Reports and other publications issued by the Environmental Health Services program of the Federal Occupational Health (FOH) were prepared under procedures established by FOH, which were designed to assure the technical competency of the persons or organizations under contract to FOH. In addition, reports and other publications were reviewed internally by one or more FOH technical staff, and all comments were addressed to the satisfaction of the issuing office, prior to dissemination.
I. BUILDING DESCRIPTION
The Golden Collum FB-CT (FL0057ZZ) is a four-story facility constructed in 1961. It has a gross area of 68,822 square feet. Three floors are above ground and one below. There is a mezzanine between the first and second floors.
The exterior surface of the building is composed of form stone. The floors are constructed with concrete beams and solid slabs. The general construction type of the building is a skeleton steel frame with reinforced concrete. The interior of the building is predominately plaster, wallboard, cement block and slab. The roof is composition built up.
The prominent features of this building are an automatic elevator that services all floors, an outdoor parking area located on the north side of the facility and offices throughout the building. There are two stairways located in the central East Side of the building, adjacent to the elevator and in the northwest portion of the building.
Mechanical systems of this facility include a boiler room and air conditioning equipment room in the basement, two mechanical equipment rooms on the mezzanine level, a mechanical equipment room, cooling tower and elevator machine room on the roof of the structure. The facility has 7 AHU’s. Four new AHU’s and an outside air unit were located in the mezzanine. These units handle the 1st and 2nd floors.
The facility has been renovated and ACM has been removed. The full scope of renovations and abatement is unknown. Construction/renovation occurred during the FY2011 survey on the 2nd floor of the US Marshals space.
New AHU’s were installed in FY2016-2017 in the Penthouse (2 units) and one unit each on the 3rd floor and basement. This installation reportedly abated all ACM in the Penthouse. Further, ACM black mastic had been removed from Rooms 235-239, and small sections of white duct mastic was removed in the basement hall near the maintenance office and basement restroom.
Sections of various ACM had been abated on the 3rd floor in 2017. Reportedly, VAT will remain under carpeting. Construction was ongoing during the survey, however this “abate only where necessary” locations on the 3rd floor will make it difficult to determine abatement locations as well as where ACM remains in future surveys.
Abatement of window glazing was conducted in the chiller room when a window was removed.
A new roof was installed in 2019.
Due to the extensive renovations and abatement projects the FOH Representative recommends a new ACM survey.
II. GENERAL FINDINGS
An Annual Visual ACM Surveillance Check of the Golden Collum Federal Building/Courthouse was conducted by a Contractor Representative of the Federal Occupational Health (FOH), Lisa Swain, MPH, CSP. The Annual Visual Surveillance check was conducted on October 10, 2019. Mr. Richard Hearne, the GSA Building Manager and the O&M representative accompanied the inspector during this surveillance check.
The overall building Risk Assessment Code (RAC) is 3. Significant deficient findings (RAC 1 or 2) were not identified during this surveillance. Seventeen (17) citations were issued during this visual surveillance of which all seventeen (17) are repeat deficiencies. Corrective measures were not taken during this surveillance.
Damaged ACM was observed in the following locations:
Minor cracks observed on ACM TSI in Rooms B-01, B-04, B-14, B-01, B- 11, B-06, basement men's restroom, and B-15. Suspect mold on TSI in Rooms B-14 & B-15. Piping associated with tank in B-06 has minor damage.
Most ACM floor tile throughout the building is dull and scuffed. Floor tile in the 3rd floor custodial closet is in poor condition.
Otherwise, the remaining ACM observed during this building re-surveillance survey was in good condition.
This is a contractor-operated facility. Katmai is the O&M and custodial contractor.
Inaccessible spaces – The following spaces were not accessible during the visual surveillance: 3rd Floor USMS space and 3rd floor communication closet and chase closet 321. As previously noted, tenant spaces were not intentionally inspected.
New suspect ACM was not identified during this inspection. Suspect materials must be treated as asbestos until sampled and analyzed. Suspect materials are noted in in blue font in the attached table.
The Annual Visual ACM Surveillance Spreadsheet, Table A, was taken from the previous annual visual surveillance report and used to prepare for this surveillance check.
Any additional information obtained by the FOH Contractor Representative during this surveillance check was added to the table. The FOH Contractor Representative did not conduct any asbestos sampling or measure ACM quantities other than noting if ACM was removed since the last surveillance. The FOH Contractor Representative may note suspect materials that were not previously identified or tested and listed them in the spreadsheet (Table A) as suspect with recommendations for testing. Findings are located in the attached table.
Three attachments are associated with this report: 1) An annual surveillance table, 2) Checklist and Form 3614 and 3) Form 3559.
III. COMMENTS AND CONCERNS
Following is a list of comments and concerns in conducting the annual visual surveillance inspections:
Due to various construction projects from 2011 to present, the exact locations of ACM is unknown. As a result, Table A may not fully represent the locations and condition of remaining ACM. Further, most room numbers have changed and abatement documents are not on site for review. As noted above, the FOH Representative recommends a new asbestos survey for the building.
Minor/Moderate cracks observed on ACM TSI in Rooms B-01, B-04, B-14, B- 01, B-11, B-06, basement men's restroom, and B-15. Suspect mold on TSI in Rooms B-14 & B-15. Piping associated with tank in B-06 has minor damage.
Most ACM floor tile throughout the building is dull and scuffed. Floor tile in the 3rd floor custodial closet is in poor condition.
Labels missing on ACM pipe elbows, white duct mastic and black duct mastic above ceiling tiles. The ACM could potentially be disturbed during work operations above the suspended ceiling.
The O&M contract has the following nine asbestos O&M contract requirements:
1) at least one O&M asbestos trained worker/supervisory person onsite; 2) annual fit tests; 3) annual medical exams; 4) the EPA asbestos O&M document;
5) The NIBS O&M book (either available onsite or access to); 6) Asbestos repair equipment onsite; 7) written respirator program; 8) written medical surveillance plan; 9) written protective equipment plan. The O&M contractor had not met these requirements, with the exception of providing the 16-hour training.
However, the refresher training has not been provided in the past two years. As a result, the 16-hour training may no longer be valid.
The annual notification letter regarding current location, status and condition of asbestos within the building had not been provided by GSA to the tenants and contractors.
The Custodial contractor had not provided the required annual asbestos refresher training.
A contractor notification and sign-in sheet regarding the presence of ACM within the building was not present and implemented by the O&M contractor.
The GSA building manager had participated in the GSA online asbestos awareness training.
ACM records onsite were incomplete.
Not all the TSI could be inspected because it was in pipe chases, under carpeting or above ceilings.
IV. ACTION ITEMS
Due to the various construction projects, the FOH Representative strongly recommends an AHERA survey to identify the remaining types and locations of the ACM in the building.
Abate/repair damaged ACM insulation noted above in accordance with State and Federal guidelines.
Maintain wax coating on all ACM floor tile. Low speed buffers/scrubbers and non-abrasive pads must be utilized on ACM floor tile.
Label ACM to alert contractors working in this space of the presence and location. Maintain labels and signs on all accessible TSI.
Ensure sampling, abatement and disposal documents for renovation projects are on site and available for review.
Maintain asbestos containing building materials in good condition.
Ensure only trained and properly equipped personnel perform maintenance on ACM.
Ensure GSA Building Managers participate in the GSA online asbestos awareness training.
Require O&M and Custodial contractors to meet all requirements of the asbestos O&M portion of contract and annually document all training.
Distribute the annual notification letter concerning location and condition of ACM to building occupants and contractors.
GSA should ensure that the custodial staff possesses the requisite training and that they are aware of the following: 1) ACM is present in the building, 2) Annual asbestos refresher awareness training is required and must be documented each year, 3) Cleanup of any suspect ACM material is prohibited and 4) The use of HEPA vacuums for routine cleaning is contract-required.
Ensure contractors sign and date a form regarding notification of the presence of ACM before allowing any contractor to commence work within the building. This document demonstrates communication between the contractor and GSA regarding ACM and procedures for working around ACM.
GSA should ensure that agencies hiring contractors also provide notification.
Any changes to the quantity and condition (including repairs and removal) of ACM in the facility should be incorporated into GSA’s Operations and Maintenance (O&M) plan. Abatement documents must be maintained on-site. Maintain a copy of all inspection reports to clearly show the current status of ACM at this facility.
The facility should review the attached updated spreadsheet (Table A) ACM Surveillance Table for accuracy and use it to record all changes in ACM amount, location, condition, etc. This summary table will be requested during all future inspections and be audited.
Sample and analyze suspect ACM and new floor tiles and mastic before performing any renovation or demolition or obtain documentation from the manufacturer stating that their product contained no asbestos. Maintain records in the asbestos file to be used for future inspections and surveillances. GSA should request that all records regarding renovations be forwarded on a timely basis.
Test all previously identified suspect mastic-containing materials by TEM prior renovating any areas.
Any new or future renovation or remodeling must have a letter from the architect and/or contractor stating no ACM building products were reinstalled.
Otherwise all building materials must be considered Suspect ACM and be tested for asbestos before being disturbed. GSA must perform a pre-renovation check as per the GSA asbestos policy.
Suspect ACM must be treated as ACM until sampling and analysis is completed.
Asbestos Free stickers should be placed on all reinsulated items that once housed asbestos to visually show that ACM is no longer present.
Carpet may have been installed over VAT in several spaces. If carpet is adhering (glued) to floor tiles, carpet removal must be considered an abatement project.
Sample and analyze suspect ACM PRIOR performing any renovation or demolition. Maintain records in the asbestos file to be used for future inspection and surveillances.
IV. 3614’s
1. Repeat - Minor cracks observed on ACM TSI in Rooms B-01, B-04, B-14, B- 01, B-11, B-06, basement men's restroom, and B-15. Suspect mold on TSI in Rooms B-14 & B-15. Piping associated with tank in B-06 has minor damage.
Abate damaged TSI or repair immediately. Maintain in good condition. The O&M contract limits repairs to 3 linear/square feet. Cumulatively, the FOH Representative estimates that the damage exceeds 3 SQ/LF and abatement/repairs should be contracted to asbestos abatement contractor.
2. The O&M contractor did not have all necessary asbestos equipment and supplies on site to conduct an O&M repair/removal action. Require contractor to maintain the necessary equipment and supplies to conduct asbestos repair/removal projects less than 3 square or linear feet.
3. Most ACM floor tile throughout the building is dull and scuffed. Floor tile in the
3rd floor custodial closet is in poor condition. Abate floor tile in custodial closet. Maintain wax seal on ACM floor tile.
4. The O&M contractor did not have documentation of refresher Asbestos
Awareness maintenance training. Provide annual Asbestos Awareness Training to O&M employees annually. Submit a copy of the training records to GSA annually.
5. The O&M contractor did not have evidence that employees have been enrolled in a medical evaluation program to determine their ability to wear a respirator. Enroll employees in a medical evaluation program and document ability to wear a respirator. Maintain a copy on site. Provide a medical clearance letter annually to GSA.
6. The O&M contractor did not have a record of Respiratory Protection training.
Train employees on respiratory protection as required by OSHA and submit a copy of the training records to GSA. Maintain a copy on site.
7. Repeat - Labels missing on ACM pipe elbows, white duct mastic and black duct mastic above ceiling tiles. The ACM could potentially be disturbed during work operations above the suspended ceiling. Label all ACM where work may be performed.
8. The O&M contractor did not have an annual respirator fit-test. Provide annual respirator fit-test. Maintain document on site.
9. Custodial contractor did not have documentation of annual refresher Asbestos
Awareness Training. Provide custodial contractor with Annual Asbestos Awareness Refresher Training.
10. Tenants, O&M and custodial contractors were not notified annually of presence, location and condition of asbestos within their building. Notify tenants, O&M and custodial contractors, other contractors in writing annually of presence, location and condition of ACM.
11. Documentation was not available notifying contractors of presence of ACM within this facility. Notify contractors of presence of ACM within their work area as per facilities Asbestos O&M program. Have contractors sign and date the document. Maintain records.
12. The O&M contractor did not have the NIBS O&M asbestos manual on site to follow in event of an asbestos incident. Require contractor to maintain a copy of this reference manual or have access to it via their company.
13. The O&M contractor did not have evidence of a written Respiratory Protection
Program. Develop, implement and update annually a written Respiratory Protection Program and submit a copy to GSA.
14. The O&M contractor did not have evidence of a written medical surveillance program. Develop, implement an annually review the written medical surveillance program. Maintain a copy on site.
15. Repeat - ACM records were not maintained in the building as required by law. Update and maintain a copy of all ACM records. This enables the building mechanic to make other contractors aware of ACM locations before they commence work. Maintain all asbestos repairs, abatement, sampling and inspection documents on site for review.
16. Abatement documents were not available for review including air monitoring and disposal records. Include all abatement/repair documents and job notes in ACM master file.
17. The O&M contractor did not have the EPA O&M asbestos guide, “Green
Book” onsite as a guide to follow in event of an asbestos incident. Require contractor to maintain a copy of this reference manual.
V. OTHER
Each facility upon receiving this updated ACM Surveillance Table A should review it for accuracy and use it to record all changes in ACM amount, location, condition, etc. This table will be requested during all future inspections and audited.
When conducting the next annual visual surveillance, please provide the GSA inspector a copy of this report so that they may verify location and condition.
Request the GSA inspector to note any additional suspect ACM. When using the previous Contract Inspector, request them to use this report and to verify discrepancies between the reports. Require all contractors to modify their surveillance report to include the attached table. All changes to condition, location, etc., should be made on this standardized spreadsheet.
The Surveillance Table is to be updated continuously. The table contains three color-highlighted areas that indicate changes in the amount, location or condition of ACM. Red indicates changes in the amount or condition of ACM. Blue denotes “suspect asbestos,” as noted by the inspector, that should be sampled and analyzed before any renovation or demolition occurs. Green indicates that suspect asbestos was determined not to be ACM or that ACM was removed.
Column 3 indicates the remaining ACM as of the last annual visual ACM surveillance inspection. In the “Condition” column, good implies no or very minor damage (i.e., less than 1 percent), fair implies between 1 and 10 percent overall damage and poor means damage greater than 10 percent overall or 25 percent localized.
SUMMARY LISTING OF ALL ACM REINSPECTED
DURINGTHE ANNUAL VISUAL ACM SURVEILLANCE INSPECTION
Golden - Collum Federal Building and Courthouse Conducted by: Lisa Swain, MPH, CSP
GSA Building Number - FL0057ZZ
Ocala, FL 34475
LOCATION
MATERIAL
DESCRIPTION FRIABLE PHOTO CONDITION ACTION COMMENTS
THROUGHOUT
THROUGHOUT AND ALL MECHANICAL
ROOMS
PACM - ALL PIPE RUN
INSULATION Unknown VARIES
ADDITIONAL SAMPLING
REQUIRED TO CONFIRM
TSI ON PIPES MARKED ACM,
HOWEVER, DATA IS AVAILABLE ONLY
FOR ELBOWS
THROUGHOUT AND ALL MECHANICAL
ROOMS; B-11, SHELTER AREA (B-4 & B13) PIPE ELBOWS Unknown GOOD NONE Total removal on Mezzanine in 2009
THROUGHOUT WINDOW CAULKING Unknown UNKNOWN
PROPERLY REPLACE
DAMAGED CAULKING,
SAMPLE AND/OR CHECK
NEGATIVE DATA PRIOR
TO DISTURBING
3 SAMPLES NEG IN NEW MARSHALS
OFFICE AND 248, SEE WC2 IS
NEGATIVE. POSITIVE IN 312, 314
THROUGHOUT
WHITE AND BLACK
ELECTRICAL WIRING Unknown UNKNOWN
ADDITIONAL SAMPLING
REQUIRED TO CONFIRM
NOT OBSERVED DURING 2010 OR 2011
SURVEY - BELEIVED TO HAVE BE
REMOVED.
THROUGHOUT PACM - FIRE DOOR Yes UNKNOWN O&M
Additional items have been moved into the storage space. Could not locate during this survey.
THROUGHOUT
BLACK DUCT MASTIC ON
HVAC No
GOOD - where visible
O&M, INSPECT SEVERAL
LOCATIONS EACH FLOOR Total removal on Mezzanine in 2009
BASEMENT
B-09, B-10, BASEMENT FLOOR TILE 9X9 GRAY No UNKNOWN O&M, Maintain wax coating
No floor tile in B-9. Abated?? ACM IN
TILE ONLY, NOT IN MASTIC, TILE
UNDER CARPET
Date: October 10, 2019
TABLE A: ANNUAL ACM VISUAL SURVEILLANCE RESULTS AND COMMENTS
Ocala, FL 34475
LOCATION
MATERIAL
DESCRIPTION FRIABLE PHOTO CONDITION ACTION COMMENTS
Date: October 10, 2019
TABLE A: ANNUAL ACM VISUAL SURVEILLANCE RESULTS AND COMMENTS
THROUGHOUT WINDOW GLAZING Unknown UNKNOWN
PROPERLY REPLACE
DAMAGED CAULKING,
SAMPLE AND/OR CHECK
NEGATIVE DATA PRIOR
TO DISTURBING
Glazing for window in chiller room abated in FY2016 for chiller replacement. Sampled as positive by construction company.
GYM (B-15) (UNDER CARPET)
FLOOR TILE 9X9 TAN
STREAKED No Unknown O&M
BOILER ROOM (B-04), SHOP (B-11),
CUSTODIAL CLOSET (B-01), O&M'S OFFICE
(B-03 RESTROOM), WOMEN'S RESTROOM (B-
02), HALLWAYS, STORAGE (B-14), WORKOUT
AREA (B-15)
GREY FIBROUS OR WHITE
SOLID DOMESTIC WATER
LINE ELBOWS Yes
Minor cracks in B-
14, B-01, B-11, B-
01 B-06 and Men's
Restroom. Repair/Abate, Label, O&M
BOTH HOT AND COLD WATER
ELBOWS/FITTINGS WERE POSITIVE
AS TESTED IN 1992
B-4 SUPPLY STORAGE ROOM
CHILLED WATER ELBOW-
WHITE FRIABLE POWDER Yes GOOD O&M, Label
LOCKER ROOM B9, STORAGE (B-14), B-15
BEIGE FIBROUS LOW
PRESSURE STEAM ELBOWS Yes
Minor cracks B-15
- suspect mold on pipes in B-14 & B-
15 Repair, O&M
Eliminate conditions that support mold growth and replace/seal/repair areas where suspect mold is present
Ocala, FL 34475
LOCATION
MATERIAL
DESCRIPTION FRIABLE PHOTO CONDITION ACTION COMMENTS
Date: October 10, 2019
TABLE A: ANNUAL ACM VISUAL SURVEILLANCE RESULTS AND COMMENTS
MECHANICAL ROOMS, BASEMENT HALLWAY
AND ANY WHITE INSULATION COVERED AIR
CONDITIONING DUCTS
WHITE CHALKY DUCT
INSULATION Yes GOOD O&M
Small section in front of restroom and maintenance office removed FY2016
MECHANICAL ROOMS, WHITE INSULATION
COVERED AIR HANDLER COMPONENTS
WHITE CHALKY INSULATION
ON AIR HANDLER
COMPONENTS Unknown GOOD
SAMPLE AT TIME OF
ABATEMENT
Appears to be fiberglass, ACM may have been removed.
AHU-1 A/C DUCT INSULATION Unknown GOOD
O&M Determine ACM content.
Partial abatement in 2016-2017.
Sampling data not available. A/C DUCT
NOT LABELED
AHU-1
PACM - WHITE WRAP ON
FIBERGLASS Unknown GOOD
O&M - SAMPLE AT TIME
OF ABATEMENT
ALL MECHANICAL ROOMS PACM - VIBRATION DAMPER Unknown UNKNOWN
O&M - SAMPLE AT TIME
OF ABATEMENT
SOME UNDER COVER, NEWER
VIBRATION DAMPERS LIKELY
NEGATIVE
B-06, NEW BOILER PIPE 2006
PACM - NEW PIPES
STRAIGHT RUN AND
ELBOWS Unknown GOOD
O&M - CONFIRM
NEGATIVE WITH
SAMPLING
NOT SUSPECT, BOILER REPLACED
B-06, ABANDONED H20 TANK T-11 TANK INSULATION Unknown
Pipe associated with tank, labeled
ACM, Minor
Damage. Good
Repair and SAMPLE TO
CONFIRM, O&M
MARKED ACM, POSITIVE IN 1986 GSA
REPORT FROM 1 SAMPLE
Ocala, FL 34475
LOCATION
MATERIAL
DESCRIPTION FRIABLE PHOTO CONDITION ACTION COMMENTS
Date: October 10, 2019
TABLE A: ANNUAL ACM VISUAL SURVEILLANCE RESULTS AND COMMENTS
B-06, CONDENSATION RETURN TANK T-12
PACM - WRAP ON
FIBERGLASS Unknown GOOD O&M - SAMPLE WRAP
CHILLER ROOM, CHILLED WATER PIPE
VALVE
PACM - WRAP ON FOAM
GLASS INSULATION Unknown GOOD O&M - SAMPLE WRAP
CHILLER ROOM, CONDENSATE PUMP PACM - INSULATION Unknown GOOD O&M - SAMPLE WRAP
CONDENSATE RETURN B-6,
PACM - PIPE RUN
INSULATION WRAP Unknown
MINOR CRACKS,
GOOD
SEAL/REPAIR, TREAT AS
ACM UNITL ADDITIONAL
SAMPLING REQUIRED TO
CONFIRMS RESULTS, O&M
TSI ON PIPES MARKED ACM,
HOWEVER DATA IS AVAILABLE ONLY
FOR ELBOWS
FALLOUT SHELTER b-13 Fire Door Insulation Unknown
Unknown, Previously noted as damaged
Seal, Treat as ACM until sampled and analyzed
Additional items have been moved into the storage space. Could not locate during this survey.
FALLOUT SHELTER
PACM - DOMESTIC COLD
WATER PIPE RUN
INSULATION Unknown GOOD
O&M - CONFIRM
NEGATIVE WITH
ADDITIONAL SAMPLES,
LABEL PIPE NAD
ONE SAMPLE COLLECTED AND
TESTED NEGATIVE IN 1992 REPORT
MEZZANINE
ALL MECHANICAL ROOMS PACM - VIBRATION DAMPER Unknown GOOD
O&M - SAMPLE AT TIME
OF ABATEMENT
SOME UNDER COVER, NEWER
VIBRATION DAMPERS LIKELY
NEGATIVE
Ocala, FL 34475
LOCATION
MATERIAL
DESCRIPTION FRIABLE PHOTO CONDITION ACTION COMMENTS
Date: October 10, 2019
TABLE A: ANNUAL ACM VISUAL SURVEILLANCE RESULTS AND COMMENTS
CONDENSATE RETURN B-6,
PACM - PIPE RUN
INSULATION WRAP Unknown GOOD
O&M - ADDITIONAL
SAMPLING REQUIRED TO
CONFIRM
TSI ON PIPES MARKED ACM,
HOWEVER DATA IS AVAILABLE ONLY
FOR ELBOWS
1ST FLOOR
ROOM 149 (entryway into mezzanine), Previously Room 105 and Room 147
(Electrical Closet) FLOOR TILE 12"X12" BEIGE No Good, Dull O&M, Seal with wax
Removed in multi-purpose room/cafeteria. Determine if FT remains in hallway.
POST OFFICE AND OLD SSA ROOMS PIPE ELBOWS Unknown GOOD
Determine if all ACM removed.
REMOVAL SEPT. 2009 - DETERMINE IF
ANY ACM REMAINS AFTER
CONSTRUCTION
POST OFFICE AND OLD SSA ROOMS AND
THROUGHOUT
BLACK DUCT MASTIC ON
HVAC Unknown Unknown
O&M, Determine locations where mastic remains.
Reportedly removed in some areas in
Sept. 2009 - Present above drop ceiling in areas. Photo taken above CT in CSO hallway during previous survey.
Unable to locate in FY2019
Ocala, FL 34475
LOCATION
MATERIAL
DESCRIPTION FRIABLE PHOTO CONDITION ACTION COMMENTS
Date: October 10, 2019
TABLE A: ANNUAL ACM VISUAL SURVEILLANCE RESULTS AND COMMENTS
Roo 148 and Custodial Closet Floor Tile 12"x12" Green No Good
O&M - SAMPLE AT TIME
OF ABATEMENT
STAIRWELLS EACH FLOOR
FLOOR TILE 9X9 PEACH
COLOR No GOOD, Dull O&M, Maintain wax coating
OLD SSA FLOOR 1'X2' BLACK ASPHALTIC TILE No Unknown
Determine if all FT and mastic removed. Removed 2010
2ND FLOOR
ROOM 207 - Previously 205 (ELECTRICAL
CLOSET HAS SMALL DOOR ACCESS TO PIPE
CHASE) PIPE ELBOWS Unknown GOOD Label, O&M
Observed in hall near Room 236. Most likely in other locations.
Ocala, FL 34475
LOCATION
MATERIAL
DESCRIPTION FRIABLE PHOTO CONDITION ACTION COMMENTS
Date: October 10, 2019
TABLE A: ANNUAL ACM VISUAL SURVEILLANCE RESULTS AND COMMENTS
HVAC - PROBATION SUITE, ABOVE
CT9,WEST OF 248 HVAC, SW OF 248 HVAC,
PROBATION OFFICE,
BLACK DUCT MASTIC ON
HVAC No Unknown
Could not locate, determine if abated during renovation.
Removed from Marshal's space in 2010.
Could not locate 248. Removed from
235-239 (Probation) in FY2016.
NEW MARSHALS OFFICE, ALSO PREVIOUS 6-
MO REPORTS ITS IN NORTH SIDE OF BLDG TRANSITE PIPE Unknown UNKNOWN NONE
REMOVAL SEPT. 2009 - DETERMINE IF
ANY ACM REMAINS AFTER
CONSTRUCTION
EAST STAIRWELL, Room 207 (Electrical
Closet)
FLOOR TILE 9X9 PEACH
COLOR No Dull O&M, Maintain wax coating Previously reported in Closet 205.
Hallway (under carpet), custodial, phone and electrical closet 207
FLOOR TILE 9X9 GREEN
COLOR Dull, Scuffed
Seal with wax and maintain, O&M
Carpet in custodial space. Dull in phone closet and electrical closet
THROUGHOUT ABOVE PLASTER CEILING PIPE ELBOWS Unknown UNKNOWN O&M
Ocala, FL 34475
LOCATION
MATERIAL
DESCRIPTION FRIABLE PHOTO CONDITION ACTION COMMENTS
Date: October 10, 2019
TABLE A: ANNUAL ACM VISUAL SURVEILLANCE RESULTS AND COMMENTS
ROOM 248, STORED IN 248, COMPUTER
ROOM, ALL OFFICES IN US MARSHALS 216
CEILING TILE 2X4 Red back
(above non-ACM 2'x4' tiles) Yes Unknown
Obtain abatement documentation
Reportedly removed in US Marshal space in 2009 - However may still be present. Determine if ACM remains in
US Marshal space.
3RD FLOOR
MECHANICAL ROOMS, AHU-5 AND ANY
WHITE INSULATION COVERED AIR
HANDLING COMPONENTS
WHITE CHALKY HVAC
COMPONENTS INSULATION Yes NA NA
Abated FY2018. Abatement documentation not available.
MECHANICAL ROOMS, WHITE INSULATION
COVERED AIR CONDITIONING DUCTS
WHITE CHALKY DUCT
INSULATION Yes NA NA
Abated FY2018. Abatement documentation not available.
312,314 WINDOW CAULK No UNKNOWN
O&M, Inspect Windows for damage
GLAZING, NON-FRIABLE, SOME
NEGATIVE RESULTS AS WELL AS
POSITIVE, SEE WC2
AHU 5 (ROOM 320) CHILLED WATER PIPE
ELBOW
WHITE, BEIGE OR GREY
FIBROUS ELBOW Yes GOOD O&M Abated in 2017
Courtroom Wall Tiles, 1'x1' Unknown GOOD O&M no access in session
Ocala, FL 34475
LOCATION
MATERIAL
DESCRIPTION FRIABLE PHOTO CONDITION ACTION COMMENTS
Date: October 10, 2019
TABLE A: ANNUAL ACM VISUAL SURVEILLANCE RESULTS AND COMMENTS
ALL MECHANICAL ROOMS PACM - VIBRATION DAMPER No UNKNOWN
O&M - SAMPLE AT TIME
OF ABATEMENT All AHU's replaced in 2017
MECHANICAL ROOM -CHILLED WATER PIPE
RUNS
HVAC FG INSULATION WITH
WHITE WRAP Unknown NA NA
Abated FY2018. Abatement documentation not available.
CLERKS WAITING ROOM
BLACK DUCT MASTIC ON
HVAC No NA NA
Abated FY2018. Abatement documentation not available.
DUCT CHASE INSIDE ELECTRICAL CLOSET
307 BY EAST STAIRWELL AND POSSIBLY
ABOVE PLASTER CEILINGS AND CHASE
CLOSET 321
HEATING WATER ELBOWS
AND FITTINGS AND OTHER
PIPING Yes GOOD O&M, Label No access - prisoners on site
STAIRWELL EAST
FLOOR TILE 9X9 PEACH
COLOR No Dull, Scuffed
Seal with wax and maintain, O&M
Ocala, FL 34475
LOCATION
MATERIAL
DESCRIPTION FRIABLE PHOTO CONDITION ACTION COMMENTS
Date: October 10, 2019
TABLE A: ANNUAL ACM VISUAL SURVEILLANCE RESULTS AND COMMENTS
CORRIDOR, ROOM 314, 307 ENTRY,
RECEPTION CLOSET, 321, 313, Phone and
Electrical Closets, CSO Closet
FLOOR TILE 9X9 TAN
STREAKED No
Dull, Scuffed throughout 3rd floor. Poor in
Janitor's Closet
Abate, Seal with wax and maintain, O&M
ACM IN TILE ONLY NAD IN BLACK
MASTIC. (Under carpet in hallway, exposed in 314 and 321)
MECHANICAL ROOM BLACK ROPE INSULATION No Unknown O&M
Could not locate FY2018, FIBROUS, NON-FRIABLE
PENTHOUSE
MECHANICAL ROOM- AHU-6 AHU-7 WHITE
INSULATION COVERED AIR HANDLER
COMPONENTS
WHITE CHALKY HVAC
INSULATION Yes NA NA
Abated in 2016-2017, Need abatement documentation
MECHANICAL ROOM- WHITE INSULATION
COVERED AIR CONDITIONING DUCTS
WHITE AND GREY CHALKY
DUCT INSULATION Yes NA NA
Abated in 2016-2017, Need abatement documentation
MECHANICAL ROOM
BLACK DUCT MASTIC ON
HVAC No NA NA
Abated in 2016-2017, Need abatement documentation
MECHANICAL ROOM- CHILLED WATER PIPE
ELBOW and VALVES
WHITE, BEIGE FIBROUS
ELBOW INSULATION Yes NA NA
Abated in 2016-2017, Need abatement documentation
Ocala, FL 34475
LOCATION
MATERIAL
DESCRIPTION FRIABLE PHOTO CONDITION ACTION COMMENTS
Date: October 10, 2019
TABLE A: ANNUAL ACM VISUAL SURVEILLANCE RESULTS AND COMMENTS
MECHANICAL ROOM
GREY FIBROUS OR WHITE
SOLID DOMESTIC WATER
LINE ELBOWS Yes NA NA
Abated in 2016-2017, Need abatement documentation
ALL MECHANICAL ROOMS PACM - VIBRATION DAMPER VD NA NA
Abated in 2016-2017, Need abatement documentation
CONDENSATE RETURN B-6,
PACM - PIPE RUN
INSULATION WRAP PRI NA NA
Abated in 2016-2017, Need abatement documentation
ROOF
MAIN ROOF PACM - ROOF UNKNOWN
O&M - TEST PRIOR TO
WORKING ON ROOF
NOT SAMPLED TO DATE, ACCORDING
TO O&M NEW ROOF INSTALLED OVER
OLD ROOF.
ROOF AIR SUPPLY DUCT MASTIC A2 GOOD O&M
2 CANOPY ROOFS PACM - ROOF UNKNOWN
O&M - TEST PRIOR TO
WORKING ON ROOF
RED- Indicates removal or repair work required ACM - Asbestos Containing Material FD - Fire Door PA - Plaster
GREEN - Indicates ACM has been removed or is not asbestos
BLUE - Indicates presumed asbestos containing material (PACM) , additional sampling required
BLACK - Indicates ACM
Most Recent 3 Year Survey - FOH - 2007
CHECKLIST/FORM 3614
Total Citations_____
Repeat Citations _____
Corrected Citations _____
Building No: FL0057
Building Manager: Rich Hearn Facility Phone No:
Date of Inspection: 10/10/19 Other Contact No:
GSA Personnel Accompanying Inspector: Richard Hearn
Name of GSA PMC Asbestos Program Manager
O&M Contractor: Katmai O&M Contact Adam Muniz
Company Phone Number:
Custodial Contractor: Katmai Custodial Contact Adam Muniz
Company Phone Number:
x Yes No N/A ACM present? ___TSI ___VAT ___SURFACING ___MISC
Yes x No N/A
Were documented annual notifications present for the following?
GSA policy and 1910.1001(j)(2)(ii)
___ Tenants ___ O&M Contractor ___ Custodial
Yes No x N/A
Annual visual surveillance inspections conducted since previous year? Date of last inspection? List date x Yes No N/A
Has the GSA BM completed the 2 hour GSA University class for asbestos?
Yes No x N/A
Does the GSA BMS/FOS person have current asbestos awareness or higher level training?
List Current Level of Training
Yes x No N/A
Is there documented evidence of outside contractors being notified of the presence of ACM before they were allowed to work in the building? (e.g., telephone) 1910.1001(j)(2)(iii) x Yes No N/A
Is new sampling data available since last inspection? If yes, obtain a copy, check against Inspection records and add copy to GSA SEMB binder.
Yes x No N/A Were ACM records available for review in this building?
Check all dates that apply: 1910.1001(j)(2)(ii)
___ 1986 survey ___1990 - 1992 Survey ___1995 Survey
___2007 - 2009 3-yr Re-inspection ___ Annual Visual
___Other Surveys? List Dates and Authors
ANNUAL VISUAL ACM INSPECTION CHECKLIST 2019
I. FACILITY QUESTIONS (Based on GSA Asbestos portion of the Contract with both O&M and
Custodial contractors)
Facility Name: Ocala
Yes x No N/A Were the ACM records up to date?
Yes x No N/A
Did the O&M Contractor repair/remove any ACM <3 SF/LF since the last inspection?
Yes x No N/A
Did the O&M Contractor have their Asbestos removal contractor remove any ACM <3 SF/LF?
Yes No x N/A
If yes to any of the two above questions is there paperwork available for review as per NIBS and GSA asbestos O&M plan documents?
Yes No x N/A If yes, is there disposal paperwork?
Yes x No N/A Did a minor or major fiber release episode(s) occur this year?
Yes No x N/A If yes, was documentation present?
Yes No x N/A If yes, who handled release(s)? List name:
Yes No x N/A
If yes, was air monitoring conducted? GSA asbestos contract requirements.
Yes No x N/A If yes, was air monitoring data available for review?
Yes No x N/A
Was any work done above drop ceilings that contain ACM fireproofing material? This includes stringing cable, telephone wiring, ductwork or new piping.
x Yes No N/A
Were there any new AHUs, chillers, boilers, hot water heaters, cooling towers, new roof, etc. added since the last inspection? If yes, then what type of equipment and was any asbestos removed?
New roof
Yes x No N/A
Were there any new renovation or remodeling since the last inspection? If yes, then was any asbestos removed? Note: List areas where new renovation occurred for future AHERA sampling.
construction not complete, letter pending
Yes No N/A
If yes, was there documentation from the re-modeler, renovator, roofer, architect, engineer, etc., stating no asbestos was used in any of the building materials? If yes, obtain a copy for the file. If no, recommend that they need to obtain an “Asbestos not used in building materials to the best of their knowledge” document for each renovation. Note: remind BM that asbestos still found in current building products.
Pending
Yes x No N/A Is there sprayed-on material at this facility?
Yes No x N/A
If yes, was annual air monitoring performed as per GSA PBS
Asbestos Policy Final Issuance dated September 17, 2007?
Yes No x N/A Did GSA RED remove any ACM since the last inspection?
If yes, how much, where and did they leave the BM this paperwork?
Quantity
Location
II. CONTRACTOR’S PROGRAMS
Custodial
Yes x No N/A
Does Custodial Contractor have documentation of annual refresher asbestos awareness training records? GSA contract requirements &
OSHA 1910.1001 (j)(7)(iv) x Yes No N/A
Does Custodial Contractor have documentation of 2-hr initial asbestos awareness training records for new employees since last year’s inspection? GSA contract requirements & OSHA 1910.1001
(j)(7)(iv)
Yes x No N/A Does the Custodial Contractor strip VAT flooring?
Yes No x N/A
If yes, does the Custodial Contractor use a stripper operating at less than 300 rpm, use wet methods and non-abrasive pads? OSHA
1910.1001 (k)(7)(ii) x Yes No N/A
Does the Custodial Contractor use HEPA vacuum cleaners on a periodic basis or wet wipe surfaces (In those areas with asbestos sprayed-on ceiling and wall material or Asbestos ceiling tiles are present)? OSHA 1910.1001 (k)(4)
O&M x Yes No N/A
Does O&M contractor have one 16-hour asbestos trained O&M maintenance mechanic onsite? GSA asbestos contract requirements and OSHA 1926.1101 (k)(9)(i) & (v) Note: O&M must have one 16-hour O&M asbestos trained person at a minimum.
Yes x No N/A
Does the O&M contractor have the EPA Green book onsite or readily available entitled “Managing Asbestos in Place”? Note: GSA asbestos contract requirements. Note: Readily available means the
O&M contractor supervisor had a copy either onsite or at another facility that you observed or has a copy at their home office.
Yes x No N/A
Does the O&M contractor have the NIBS manual either onsite or readily available entitled “Asbestos Operations and Work Practices”.
Note: GSA asbestos contract requirements.
x Yes No N/A
Does O&M contractor have initial asbestos awareness training records for current employees if they do not work on asbestos?
OSHA 1926.1101 (k)(9)(i) & (vi)
Yes x No N/A
Does O&M Contractor have asbestos awareness refresher training records? OSHA 1926.1101 (k)(9)(ii)
Yes x No N/A
Does the O&M Contractor have an Asbestos Abatement (removal)
Subcontractor under contract?
Yes No x N/A If yes, does contract state that they will be there within 1 hour?
Yes x No N/A
Does the O&M contractor have equipment available on site for handling minor releases (e.g., HEPA vacuum, respirator, disposable clothing, glove bags, patching supplies, etc)? Note: Depends on GSA
Contract.
Yes No N/A
Does the O&M contractor performing asbestos O&M maintenance have the following records current? GSA asbestos contract requirements
Yes x No N/A Written Respirator Program
Yes x No N/A Annual Fit Test
Yes x No N/A Medical Exam or Clearance Letter
Yes x No N/A Written Medical Surveillance Program x Yes No N/A Written PPE Program
Yes x No N/A Respirator Training
III. LABELING
Yes x No N/A Was ACM properly labeled? 1910.1001(j)(4) If no, list locations:
Yes x No N/A Were labels painted over?
x Yes No N/A
Was ACM properly marked at the entrance?(i.e., visible label or sign)
1910.1001(j)(3)
IV. DAMAGED ACM
Yes No N/A Damaged ACM present? If yes, take pictures and include in report.
If O&M mechanics do not perform Asbestos O&M, then answer these questions as N/A and move on to next section (cite O&M Contractor only for lack of 16-hr training). Exception - If no, contract in place with asbestos company or if abatement contractor cannot get there within one hour, then cite all items missing below.
V. GENERAL COMMENTS OR CONCERNS REGARDING THIS SURVEY
tenants not notifying contractors core samples on roof, removed roof and installed new, non ACM
Floor tile under carpet on 3rd floor sampled - pos for Chrysotile
DATE OBSERVED DATE POSTED
GSA Bldg No. FL0057ZZ 10/10/2019
29CFR1910.1001(J) (2), GSA
Region IV Asbestos Management
Plan & AHERA
RISK ASSESSMENT
CODE (RAC)
C II 3
2 29CFR1910.1001(J) (2), AHERA &
GSA Region IV Asbestos program
C III 4
29CFR1910.1001(2)(ii)
C III 4
29CFR1910.1001(2)(ii)
C III 4
5 29CFR1910.1001(J)(7)(iv) & GSA
Custodial Contract
C III 4
(F) Repeat - The O&M contractor did not have all necessary asbestos equipment and supplies on site to conduct an O&M repair/removal action.
(F) Repeat - The O&M contractor did not have evidence of a written Respiratory Protection Program.
(F) Repeat - Custodial contractor did not have documentation of annual refresher Asbestos Awareness
Training.
(F) Repeat - Labels missing on ACM pipe elbows, white duct mastic and black duct mastic above ceiling tiles.
The ACM could potentially be disturbed during work operations above the suspended ceiling.
GSA NOTICE OF UNSAFE/UNHEALTHFUL WORKPLACE CONDITIONS
LOCATION
Golden - Collum Federal Building and Courthouse
207 NW 2nd Street
Ocala, FL 34475
HAZARDOUS CONDITIONS
OBSERVED
(F) Repeat - Most ACM floor tile throughout the building is dull and scuffed. Floor tile in the 3rd floor custodial closet is in poor condition.
(F) Repeat - Tenants, O&M and custodial contractors were not notified annually of presence, location and condition of asbestos within their building.
(F) Repeat -Documentation was not available notifying contractors of presence of ACM within this facility.
(F) Repeat - ACM records were not maintained in the building as required by law.
(F) Repeat - The O&M contractor did not have an annual respirator fit-test.
(F) Repeat - The O&M contractor did not have evidence that employees have been enrolled in a medical evaluation program to determine their ability to wear a respirator.
(F) Repeat - The O&M contractor did not have evidence of a written medical surveillance program.
(F) Repeat - The O&M contractor did not have a record of Respiratory Protection training.
(F) Repeat - Abatement documents were not available for review including air monitoring and disposal records.
(F) Repeat - The O&M contractor did not have the EPA O&M asbestos guide, “Green Book” onsite as a guide to follow in event of an asbestos incident.
(F) Repeat - The O&M contractor did not have the NIBS O&M asbestos manual on site to follow in event of an asbestos incident.
NUMBER OF GSA EMPLOYEES
EXPOSED
STANDARD(S) VIOLATED
(F) Repeat - Minor/moderate cracks observed on ACM TSI in Rooms B-01, B-04, B-14, B-01, B-11, B-06 basement men's restroom, and B-15. Suspect mold on TSI in Rooms B-14 & B-15. Piping associated with tank in B-06 has minor damage.
11/1/2019
(F) Repeat - The O&M contractor did not have documentation of refresher Asbestos Awareness maintenance training.
GSA Asbestos O&M contract specifications
C III 4
GSA Asbestos O&M contract specifications
C III 4
29CFR1926.1101(K)(9) & GSA O&M
Contract
C III 4
GSA Asbestos O&M contract specifications
C III 4
10 29CFR1910.134(b)(1) C III 4
11 29CFR1910.134(f)(2) C III 4
12 29CFR1910.134(e)(1) C III 4
GSA Asbestos O&M contract specifications
C III 4
14 29CFR1910.134 (k) C III 4
15 29CFR1910.1001 (J)(4)(I) C III 4
16 29CFR1926.1101, AHERA & GSA
Region IV Asbestos program
C II 3
29CFR1926.1101, AHERA & GSA
Region IV Asbestos program
C II 3
NUMBER OF GSA EMPLOYEES
EXPOSED
STANDARD(S) VIOLATED
INTERIM CONTROL
MEASURES IMPLEMENTED
(R) Notify tenants, O&M and custodial contractors, other contractors in writing annually of presence, location and condition of ACM.
(R) Notify contractors of presence of ACM within their work area as per facilities Asbestos O&M program.
Have contractors sign and date the document. Maintain records.
(R) Update and maintain a copy of all ACM records. This enables the building mechanic to make other contractors aware of ACM locations before they commence work.
RECOMMENDATION FOR
ABATEMENT
(R) Custodial contractor had no documentation of Asbestos Awareness Refresher Training.
(R) Provide annual Asbestos Awareness Training to O&M employees annually. Submit a copy of the training records to GSA annually.
(R) Require contractor to maintain a copy of this reference manual.
(R) Require contractor to maintain a copy of this reference manual or have access to it via their company.
(R) Maintain all asbestos repairs, abatement, sampling and inspection documents on site for review.
11/1/2019
GSA FORM 3614 (4-90)
(R) Label all ACM in mechanical rooms.
GENERAL SERVICES ADMINISTRATION 1. POST AT OBSERVATION SITE
GSA REPRESENTATIVE/ FOH
CONTRACT REPRESENTATIVE
Lisa Swain, MPH, CSP 850-624-4726
EXPECTED COMPLETION
DATE
RECOMMENDATION FOR
ABATEMENT
SIGNATURE OF GSA
REPRESENTATIVE
DATE
(R) Provide annual respirator fit-test. Maintain document on site
12/1/2019
(R) Enroll employees in a medical evaluation program and document ability to wear a respirator. Maintain a copy on site. Provide a medical clearance letter annually to GSA.
(R) Develop, implement an annually review the written program. Maintain a copy on site.
(R) Train employees on respiratory protection as required by OSHA and submit a copy of the training records to GSA. Maintain a copy on site.
(R) Abate floor tile in custodial closet. Maintain wax seal on ACM floor tile.
(R) Abate damaged TSI or repair immediately. Maintain in good condition. The O&M contract limits repairs to
3 linear/square feet. Cumulatively, the FOH Representative estimates that the damage exceeds 3 SQ/LF and abatement/repairs should be contracted to asbestos abatement contractor.
(R) Require contractor to maintain the necessary equipment and supplies to conduct asbestos repair/removal projects less than 3 square or linear feet
(R) Develop, implement and update annually a written Respiratory Protection Program and submit a copy to
GSA.
FORM 3559
Other corrective measures are possible and it is the responsibility of GSA and/or its O&M/Custodial contractors to determine the best way to correct.
GSA Form 3559
REPORT FOR FACILITY SAFETY, HEALTH, OR FIRE PROTECTION SURVEY (PART I) PAGES (3)
1. REPORT CONTROL
NO.
G-4-101019-FL0057ZZ
2. DATE OF REPORT
November 1, 2019
3. BUILDING NAME AND ADDRESS
U.S. Federal Building/Courthouse 207 NW 2ND Street Ocala, FL 34475 GSA Building Number: FL0057ZZ
4. PBS FIELD
OFFICE
5. BRC B=BLDG LOCAL
0 RAC 1,2=P1,P2 9 RAC 1,2,3=R2
2 RAC 3=R1 6 RAC 4,5=A1
0 RAC 4,5=A1
6. DATE OF SURVEY __X__ SCHEDULED
_____ FOLLOW-UP
October 10, 2019 _____ UNSCHEDULED
7. SURVEY CONDUCTED BY
Lisa Swain, MPH, CSP
8. TRAVEL COST INCURRED
9. TOTAL MANHOURS
EXPENDED
10. DIRECTIVE LEGEND (Referenced in Item 14)
A - OSHA STANDARD D - GSA DIRECTIVE
B - NFPA CODE E - OTHER
C - ANSI STANDARD
11. TYPE OF REPORT (Check appropriate box(es)) ____ (F) Fire Safety/Protection ____ (L) Pre-Lease ____ (S) Facility Safety & Health ____ (P) Pre-Occupancy _X__ (O) OSH/Asbestos ____ (M) Misc/Other
12. Travel Code ___ Govt. = T X Com. = C
13.
Condition Number
14.
Responsible Office (BM, RED, AGY, R&A, AM)
15. Mishap Probability
16.
Hazard Severity
17.
RAC
18.
Square
Feet Affected
19.
Estimated
Cost
20.
Design Reference
21. Condition Finding (F) Recommendation (R)
1-2019- Asbes
BM C II 3 >3’ $2000
29CFR1926.1101,
AHERA & GSA
Region IV Asbestos program
(F) Repeat - Minor cracks observed on ACM TSI in Rooms B-01, B- 04, B-14, B-01, B-11, B-06 basement men's restroom, and B-15.
Suspect mold on TSI in Rooms B-14 & B-15. Piping associated with tank in B-06 has minor damage.
(R) Abate damaged TSI or repair immediately. Maintain in good condition. The O&M contract limits repairs to 3 linear/square feet.
Cumulatively, the FOH Representative estimates that the damage exceeds 3 SQ/LF and abatement/repairs should be contracted to asbestos abatement contractor.
2-2019- Asbes
BM C II 3 NA $1000
GSA Asbestos O&M contract specifications
(F) The O&M contractor did not have all necessary asbestos equipment and supplies on site to conduct an O&M repair/removal action.
(R) Require contractor to maintain the necessary equipment and supplies to conduct asbestos repair/removal projects less than 3 square or linear feet
3-2019- Asbes
BM C II 3 ~350’ $1000
29CFR1926.1101,
AHERA & GSA
Region IV Asbestos program
(F) Most ACM floor tile throughout the building is dull and scuffed.
Floor tile in the 3rd floor custodial closet is in poor condition.
(R) Abate floor tile in custodial closet. Maintain wax seal on ACM floor tile.
GAINESVILLE U.S. FEDERAL BUILDING
GSA BUILDING NUMBER FL0065ZZ
401 SOUTHEAST FIRST AVENUE
GAINESVILLE, FL
REPORT FOR FACILITY SAFETY, HEALTH, OR FIRE PROTECTION SURVEY (PART I) PAGES (3)
4-2019- Asbes
BM C II 3 NA $250
29CFR1926.1101(K)
(9) & GSA O&M
Contract
(F) The O&M contractor did not have documentation of refresher Asbestos Awareness maintenance training.
(R) Provide annual Asbestos Awareness Training to O&M employees annually. Submit a copy of the training records to GSA annually.
5-2019- Asbes
BM C II 3 NA $200
29CFR1910.134
(e)(1)
(F) The O&M contractor did not have evidence that employees have been enrolled in a medical evaluation program to determine their ability to wear a respirator.
(R) Enroll employees in a medical evaluation program and document ability to wear a respirator. Maintain a copy on site.
Provide a medical clearance letter annually to GSA.
6-2019- Asbes
BM C II 3 NA $200 29CFR1910.134 (k)
(F) The O&M contractor did not have a record of Respiratory Protection training.
(R) Train employees on respiratory protection as required by OSHA and submit a copy of the training records to GSA. Maintain a copy on site.
7-2019- Asbes
BM C II 3 >3’ $200
29CFR1910.1001
(J)(4)(I)
(F) Repeat - Labels missing on ACM pipe elbows, white duct mastic and black duct mastic above ceiling tiles. The ACM could potentially be disturbed during work operations above the suspended ceiling.
(R) Label all ACM where work may be performed.
8-2019- Asbes
BM C II 3 NA $150
29CFR1910.134
(f)(2)
(F) The O&M contractor did not have an annual respirator fit-test.
(R) Provide annual respirator fit-test. Maintain document on site.
9-2019- Asbes
BM C II 3 NA $100
29CFR1910.1001(J)
(7)(iv) & GSA Custodial Contract
(F) Custodial contractor did not have documentation of annual refresher Asbestos Awareness Training.
(R) Provide custodial contractor with Annual Asbestos Awareness Refresher Training.