This document provides details for a federal solicitation seeking construction services. The General Services Administration is soliciting proposals for the Clarksburg Courthouse Modernization Phase 1 Construction Project located in Clarksburg, West Virginia. The project involves renovations to construct a new courtroom, judge's elevator, and supporting clerk's office spaces. The renovations shall include space modifications within the existing USMS area to relocate the prisoner processing area and add a new isolation cell. The work includes demolition, hazardous material abatement, fire protection, and modifications to the existing structure to relocate columns, strengthen for seismic and blast requirements, and support renovations. A new mechanical penthouse will also be provided. The project will be phased to allow occupancy during construction. The estimated price range for the project is between $15-25 million. Proposals are due by March 27, 2023 for the technical proposal only, with price proposals to follow. The award will be made using a tradeoff process considering technical factors and price.

View the file

Other files

File Type Posted
47PD0323R0003 Clarksburg Courthouse Phase 1 Renovation Clarksburg West Virginia Amendment 0004 Language 4 4 2023.pdf PDF
47PD0323R0003 Clarksburg Courthouse Project SF 30 Amendment 0004 4 4 2023.pdf PDF
47PD0323R0003 Clarksburg Courthouse Project Amendment 0003 SF 30 4 3 2023.pdf PDF
47PD0323R0003 Clarksburg Pre-Proposal Attendance sheet Amendment 0003 4 3 2023.pdf PDF
47PD0323R0003 Clarksburg CH Phase 1 Construction PreProposal RFI responses Amendment 0003 4 3 2023.pdf PDF
47PD0323R0003 Clarksburg Courthouse Preliminary Phasing Schedule Amendment 0003 4 3 2023.pdf PDF
47PD0323R0003 Clarksburg Courthouse Phase 1 Renovation Clarksburg West Virginia Amendment 0003 Language 4 3 2023.pdf PDF
47PD0323R0003 Clarksburg Courthouse Phase 1 Renovation Clarksburg West Virginia Amendment 0002 3 30 2023 RJP.pdf PDF
47PD0323R0003 Clarksburg Courthouse Phase 1 Renovation Clarksburg West Virginia Amendment 0001 3 22 2023.pdf PDF
47PD0323R0003 Clarksburg Courthouse Pha... Virginia Amendment 0001 3 22 2023.pdf PDF
Clarksburg CH Phase 1 95 Percent Drawings.pdf PDF
Wage Determination 2023 02.txt TXT text file
GC_Agreement_2023 02 22.pdf PDF
Past Performance Questionnaire.docx DOCX document
Individual Model_Subk_Plan - Jan 2023 - Final_508.docx DOCX document
Clarksburg CH Phase 1 95 Percent Calculations Part 1.pdf PDF
Roof Replacement Design.zip ZIP file
GC Reps and Certs 2023 02 22.pdf PDF
ATTACHMENT 1- Offeror Worksheet.docx DOCX document
Site Visit Contractor Form.pdf PDF
Exhibit 1- RFI Submission Form.xlsx XLSX spreadsheet
Clarksburg CH Phase 1 95 Percent Calculations Part 2.pdf PDF
Clarksburg CH Phase 1 Design 95 Percent Specifications.pdf PDF
GC_Solicitation_2023 02 22.pdf PDF
Clarksburg Courthouse Hazardous Materials Report.pdf PDF
Clarksburg CH Phase 1 95 Percent Basis of Design.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number: 47PD0323R0003

Amendment Number: 0001

Please be advised that solicitation number 47PD0323R0003 for the Clarksburg Courthouse Modernization Phase 1 Construction Project is hereby amended effective 22 March 2023 to incorporate the following:

1. Standard Form 30 – Amendment 0001.

2. The Clarksburg Courthouse Modernization Phase 1 Construction Project proposal due date is hereby extended to 11 April 2023 by 2 PM EST. Technical Proposal Only. Do Not Submit a Price Proposal until Requested as Part of Phase 2. Please provide to the attention of the GSA Contracting Officer Raymond J Porter via email at raymondj.porter@gsa.gov.

3. All other terms and conditions remain unchanged.

File details come from the government source that posted it. Updated .