This document outlines a federal solicitation for construction services. The General Services Administration is seeking a general contractor for the Clarksburg Courthouse Modernization Project located in Clarksburg, West Virginia. Work includes renovating and modernizing the existing 76,455 square foot facility to construct a new courtroom, judge's elevator, and supporting clerk's office spaces. The estimated price range for the project is between $15-25 million. The solicitation is full and open to all responsible sources without any set-asides. Technical factors will be more important than price in the selection. Interested parties must register at sam.gov and monitor for amendments. The pre-proposal site visit is scheduled for March 8th and requests for information are due by March 13th. Technical proposals without pricing are due by March 27th. Summer Consultants and MTFA Architecture are the architect and project architect respectively.

View the file

Other files

File Type Posted
47PD0323R0003 Clarksburg Courthouse Phase 1 Renovation Clarksburg West Virginia Amendment 0004 Language 4 4 2023.pdf PDF
47PD0323R0003 Clarksburg Courthouse Project SF 30 Amendment 0004 4 4 2023.pdf PDF
47PD0323R0003 Clarksburg Courthouse Project Amendment 0003 SF 30 4 3 2023.pdf PDF
47PD0323R0003 Clarksburg Pre-Proposal Attendance sheet Amendment 0003 4 3 2023.pdf PDF
47PD0323R0003 Clarksburg Courthouse Preliminary Phasing Schedule Amendment 0003 4 3 2023.pdf PDF
47PD0323R0003 Clarksburg Courthouse Phase 1 Renovation Clarksburg West Virginia Amendment 0003 Language 4 3 2023.pdf PDF
47PD0323R0003 Clarksburg Courthouse Phase 1 Renovation Clarksburg West Virginia Amendment 0002 3 30 2023 RJP.pdf PDF
47PD0323R0003 Clarksburg Courthouse Phase 1 Renovation Clarksburg West Virginia Amendment Language 0001 3 22 2023.pdf PDF
47PD0323R0003 Clarksburg Courthouse Phase 1 Renovation Clarksburg West Virginia Amendment 0001 3 22 2023.pdf PDF
47PD0323R0003 Clarksburg Courthouse Pha... Virginia Amendment 0001 3 22 2023.pdf PDF
Clarksburg CH Phase 1 95 Percent Drawings.pdf PDF
Wage Determination 2023 02.txt TXT text file
GC_Agreement_2023 02 22.pdf PDF
Past Performance Questionnaire.docx DOCX document
Individual Model_Subk_Plan - Jan 2023 - Final_508.docx DOCX document
Clarksburg CH Phase 1 95 Percent Calculations Part 1.pdf PDF
Roof Replacement Design.zip ZIP file
GC Reps and Certs 2023 02 22.pdf PDF
ATTACHMENT 1- Offeror Worksheet.docx DOCX document
Site Visit Contractor Form.pdf PDF
Exhibit 1- RFI Submission Form.xlsx XLSX spreadsheet
Clarksburg CH Phase 1 95 Percent Calculations Part 2.pdf PDF
Clarksburg CH Phase 1 Design 95 Percent Specifications.pdf PDF
GC_Solicitation_2023 02 22.pdf PDF
Clarksburg Courthouse Hazardous Materials Report.pdf PDF
Clarksburg CH Phase 1 95 Percent Basis of Design.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question Number Document Name/ Page Offeror's Questions GSA's Answers

1 GC_Solicitation_2023 02 22.pdf / Page 10

Please confirm if non-courtroom renovation projects that included Millwork/Security/Controlled Access will be considered a relevant project.

U.S. District Courtroom projects have a high standard of excellence. For the purpose of Technical Evaluation Factors, work that includes Courtroom/Chambers and similar high profile non-Courtroom projects with an equivalent level of finish and attention to detail would be rated at comparable levels.

Those details that are considered to be of equivalent levels of finish and detail should be highlighted in the proposal to aid the review team.

2 GC_Solicitation_2023 02 22.pdf / Page 8

Please confirm if the Offeror Representations and Certifications count toward the 46 page limitation.

All pages other than past performance as noted on page 8 count toward the 46 page limitation.

3 Pre bid Meeting Please confirm that temporary requirements for security, MEP and other conditions will be included in the bid documents for the phasing of the work and interface with the occupied courts and marshall operations

Temporary requirements for security, MEP, and other conditions for the phasing of the work must be developed and provided by the bidders and coordinated with the courts and the marshals in tandem with GSA.

4 General Please provide any preliminary phasing information developed for the project to date.

See attached preliminary schedule, to be used as a reference only.

Questions for Clarksburg Courthouse Modernization Phase 1 D/B/B