This is Amendment 0004 to GSA Solicitation 47PB5126R0003 for Design Build Services for the Bridge of the Americas (BOTA) Land Port of Entry (LPOE) Modernization Project in El Paso, Texas, along with associated pricing templates and specification sections.
Amendment 0004, effective September 15, 2026, introduces three key modifications to the solicitation. First, it establishes that Phase 2 BOTA DB Pricing Sheet Rev 9.16.2026 has been added to the shared drive for offeror use; only the cover page of this pricing sheet requires submission as a PDF to the Contracting Officer (Marsha Howard, marsha.howard@gsa.gov, 817-505-8543). GSA is not responsible for spreadsheet calculations, and offerors must verify accuracy before submission. Second, Spec Section 01 21 00 ALLOWANCES is hereby added to the shared drive and attached to the amendment. Third, the amendment adds artwork protection, storage, and relocation to the base scope requirements, specifically addressing the removal, protection, and storage of the Lion Statue during construction before relocation to its final position, and in-place protection of the Eagle Sculpture at the bridge abutment during nearby work. The Design-Build team must perform comprehensive inspections of both pieces, document existing conditions with photographs and written reports, include both sculptures in the final concept design, and provide all necessary architectural, engineering, structural, sitework, and utility infrastructure integration. The Phase 2 proposal due date of October 15, 2026 remains unchanged. All offerors must acknowledge the amendment in accordance with Standard Form 30 instructions. The contracting office is GSA PBS OAM Capital Construction Projects Division, located at 819 Taylor Street, 11th Floor, Fort Worth, Texas 76102.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2. AMENDMENT/MODIFICATION NUMBER
GSA Solicitation 47PB5126R0003, Design Build Services for the Bridge of the Americas (BOTA) Land Port of Entry (LPOE), El Paso, Texas
See description of changes herein.
All offerors must acknowledge the amendment in accordance with the instructions in Block 11.
GSA PBS OAM Capital Construction Projects Division Div 819 Taylor Street, 11th Floor, Fort Worth, Texas 76102 POC Marsha Howard, Contracting Officer Email: marsha.howard@gsa.gov
PH: 817-505-8543
47PB5126R0003
KAHUA 0347
09/15/2026
01/26/2026
BOTA LPOE Modernization Project, El Paso, TX GSA PBS Capital Delivery Projects Division Solicitation 47PB5126R0003
Solicitation 47PB5126R0003
BOTA LPOE Modernization Project, El Paso, TX
Amendment 0004 amends Solicitation 47PB5126R0003 as follows:
BOTA LPOE Modernization Pricing Form: Phase 2 BOTA DB Pricing Sheet Rev
9.16.2026 has been added to the Shared Drive and can be downloaded to input all pricing. Only the Phase 2 BOTA DB Pricing Sheet Rev 9.16.2026 Cover Page will need to be submitted for Phase 2. Offerors will need to submit a .pdf copy to the Contracting Officer. GSA is not responsible for calculations within the spreadsheet posted on the shared drive. Offerors will need to make sure all calculations are correct prior to submission. The anticipated awardee will be notified to submit the Base Scope, Bid Options, Allowances and Modifications Pricing Sheet Rev 9.16.2026 within 2 weeks of notification. Phase 2 BOTA DB Pricing Sheets Rev 9.16.2026 are attached to this amendment.
The RFP contains references to “Allowances” within the document. Spec Section 01 21 00 ALLOWANCES is hereby added to the Shared Drive and attached.
Add the following to the base scope of requirements: Artwork Protection, Storage and Relocation includes artwork protection, storage, and reinstallation of the Eagle Statue at the Bridge and Lion Statue south of the pedestrian inspection.
Lion Statue: This piece must be removed, protected, and stored during construction before being relocated to its final position. Eagle Sculpture: This statue will remain in its current location at the top of the bridge abutment. It must be protected in place during any nearby work. The Contractor must perform a comprehensive inspection of each piece before handling, to include photographs and a written report detailing existing conditions. The Design-Build (DB) team is required to include both sculptures in the final concept design. Integration responsibilities include all necessary architectural, engineering, structural, sitework, and utility infrastructure to support the relocation.
All offerors must acknowledge the amendment in accordance with the instructions in Block 11 on Standard Form 30.
The Phase 2 proposal due date of October 15, 2026, remains unchanged.
END OF AMENDMENT 0004
Cover Page
Bridge of The Americas (BOTA) LPOE Modernization Project
Pricing Sheet 9.16.2026
GSA RFP Number: 47PB5126R0003
CLIN Description TOTAL
BASE SCOPE
0001 Main Building Base Scope Shell-to include CBP, US Fish & Wild Life, USDA 0002 Main Building Base Scope TI --to include CBP, US Fish & Wild Life, USDA 0003 Noncommercial Insp to include 27 Lanes & Head House Base Scope Shell 0004 Noncommercial Insp to include 27 Lanes & Head House Base Scope TI 0005 Outbound Insp Base Scope Shell 0006 Outbound Insp Base Scope TI 0007 FMCSA Bus Inspection Base Scope Shell 0008 FMCSA Bus Inspection Base Scope TI 0009 TABC Building Base Scope Shell 0010 TABC Building Base Scope TI 0011 Site Utilies Base Scope 0012 Site Work Base Scope 0013 Demolition Base Scope - to Include Abatement and Remediation 0014 CBP Furniture Design & Construction and Move Services
OPTIONS
0015 Option #1A - Kennel Building - Shell
0016 Option #1B - Kennel Building - TI
0017 Option #2A - Noncommercial Insp 8 Additional Lanes -Shell
0018 Option #2B - Noncommercial Insp 8 Additional Lanes -TI
0019 Option #3A - Trusted Traveler Building - Shell
0020 Option #3B - Trusted Traveler Building - TI
0021 Option #4A - Narcotics Vault - Shell
0022 Option #4B - Narcotics Vault - TI
ALLOWANCES
0023 Art in Architecture - support and infrastructure TBD
0024 Unforeseen Utilities Installation TBD
0025 Ceremonies preparations for Groundbreaking and Dedication Ceremonies TBD
UNIT Pricing
1. Imported Structural Fill, per 100 cubic yards
2. Asbestos Abatement, per square foot
3. Porthole Bore, (to maximum depth of vacuum boring equipment), per 10 bores
4. Underground transite pipe that contains 25% Chrysotile asbestos , per linear foot.
TOTAL EVALUATED PRICE
Type or Printed Name:
Title:
Signature:
Firm Name:
Date:
Base Scope 1 of
Project Costs
Bridge of The Americas (BOTA) LPOE Modernization Project
Pricing Sheet 9.16.2026
GSA RFP Number: 47PB5126R0003
CLIN-0001 Main Bldg. Base Scope Costs - Shell
ITEM PRICE
General Conditions $
Foundations $
Basement Construction $
Superstructure $
Exterior Closure $
Roofing $
Interior Construction $
Stairs $
Interior Finishes $
Conveyance System $
Plumbing $
HVAC $
Fire Protection $
Electrical $
Equipment $
Furnishings $
Special Construction $
Environmental - Remediation (soil) $
Environmental- Abatement $
Selective Building Demolition $
Sitework - Building Related $
Sitework - Non-Building Related $
SUBTOTAL - Construction Costs $0.00
Design Fees $0.00
SUBTOTAL - Design & Construction Costs $0.00
Overhead (offeror to enter percentage)* 0% $0.00
Profit (offeror to enter percentage)* 0% $0.00
SUBTOTAL - Design, Construction, Overhead & Profit Costs $0.00
Bond (offeror to enter percentage)* 0% $0.00
Insurance (offeror to enter percentage)* 0% $0.00
Total Main Bldg. Base Scope Costs - Shell $0.00
CLIN-0002 Main Bldg. Base Scope Costs - Tenant Improvement (TI)
ITEM PRICE
General Conditions $
Foundations $
Basement Construction $
Base Scope 2 of
Superstructure $
Exterior Closure $
Roofing $
Interior Construction $
Stairs $
Interior Finishes $
Conveyance System $
Plumbing $
HVAC $
Fire Protection $
Electrical $
Equipment $
Furnishings $
Special Construction $
Environmental - Remediation (soil) $
Environmental- Abatement $
Selective Building Demolition $
Sitework - Building Related $
Sitework - Non-Building Related $
SUBTOTAL - Construction Costs $0.00
Design Fees $0.00
SUBTOTAL - Design & Construction Costs $0.00
Overhead (offeror to enter percentage)* 0% $0.00
Profit (offeror to enter percentage)* 0% $0.00
SUBTOTAL - Design, Construction, Overhead & Profit Costs $0.00
Bond (offeror to enter percentage)* 0% $0.00
Insurance (offeror to enter percentage)* 0% $0.00
Total Main Bldg. Base Scope Costs - Tenant Improvement (TI) $0.00
CLIN-0003
Non-Commercial Inspection Includes 27 Lanes & Head House Base Scope
Costs - Shell
ITEM PRICE
General Conditions $
Foundations $
Basement Construction $
Superstructure $
Exterior Closure $
Roofing $
Interior Construction $
Stairs $
Interior Finishes $
Conveyance System $
Plumbing $
HVAC $
Fire Protection $
Base Scope 3 of
Electrical $
Equipment $
Furnishings $
Special Construction $
Environmental - Remediation (soil) $
Environmental- Abatement $
Selective Building Demolition $
Sitework - Building Related $
Sitework - Non-Building Related $
SUBTOTAL - Construction Costs $0.00
Design Fees $0.00
SUBTOTAL - Design & Construction Costs $0.00
Overhead (offeror to enter percentage)* 0% $0.00
Profit (offeror to enter percentage)* 0% $0.00
SUBTOTAL - Design, Construction, Overhead & Profit Costs $0.00
Bond (offeror to enter percentage)* 0% $0.00
Insurance (offeror to enter percentage)* 0% $0.00
Total Non-Commercial Inspection Includes 27 Lanes & Head House Base Scope Costs - Shell $0.00
CLIN-0004
Non-Commercial Inspection Includes 27 Lanes & Head House Base Scope
Costs - Tenant Improvement (TI)
ITEM PRICE
General Conditions $
Foundations $
Basement Construction $
Superstructure $
Exterior Closure $
Roofing $
Interior Construction $
Stairs $
Interior Finishes $
Conveyance System $
Plumbing $
HVAC $
Fire Protection $
Electrical $
Equipment $
Furnishings $
Special Construction $
Environmental - Remediation (soil) $
Environmental- Abatement $
Selective Building Demolition $
Sitework - Building Related $
Sitework - Non-Building Related $
Base Scope 4 of
SUBTOTAL - Construction Costs $0.00
Design Fees $0.00
SUBTOTAL - Design & Construction Costs $0.00
Overhead (offeror to enter percentage)* 0% $0.00
Profit (offeror to enter percentage)* 0% $0.00
SUBTOTAL - Design, Construction, Overhead & Profit Costs $0.00
Bond (offeror to enter percentage)* 0% $0.00
Insurance (offeror to enter percentage)* 0% $0.00
Total Non-Commercial Inspection Includes 27 Lanes & Head House Base Scope Costs - Tenant Improvement (TI) $0.00
CLIN-0005 Outbound Inspection Base Scope Costs - Shell
ITEM PRICE
General Conditions $
Foundations $
Basement Construction $
Superstructure $
Exterior Closure $
Roofing $
Interior Construction $
Stairs $
Interior Finishes $
Conveyance System $
Plumbing $
HVAC $
Fire Protection $
Electrical $
Equipment $
Furnishings $
Special Construction $
Environmental - Remediation (soil) $
Environmental- Abatement $
Selective Building Demolition $
Sitework - Building Related $
Sitework - Non-Building Related $
SUBTOTAL - Construction Costs $0.00
Design Fees $0.00
SUBTOTAL - Design & Construction Costs $0.00
Overhead (offeror to enter percentage)* 0% $0.00
Profit (offeror to enter percentage)* 0% $0.00
SUBTOTAL - Design, Construction, Overhead & Profit Costs $0.00
Bond (offeror to enter percentage)* 0% $0.00
Insurance (offeror to enter percentage)* 0% $0.00
Base Scope 5 of
Total Outbound Inspection Base Scope Costs - Shell $0.00
CLIN-0006 Outbound Inspection Base Scope Costs - Tenant Improvement (TI)
ITEM PRICE
General Conditions $
Foundations $
Basement Construction $
Superstructure $
Exterior Closure $
Roofing $
Interior Construction $
Stairs $
Interior Finishes $
Conveyance System $
Plumbing $
HVAC $
Fire Protection $
Electrical $
Equipment $
Furnishings $
Special Construction $
Environmental - Remediation (soil) $
Environmental- Abatement $
Selective Building Demolition $
Sitework - Building Related $
Sitework - Non-Building Related $
SUBTOTAL - Construction Costs $0.00
Design Fees $0.00
SUBTOTAL - Design & Construction Costs $0.00
Overhead (offeror to enter percentage)* 0% $0.00
Profit (offeror to enter percentage)* 0% $0.00
SUBTOTAL - Design, Construction, Overhead & Profit Costs $0.00
Bond (offeror to enter percentage)* 0% $0.00
Insurance (offeror to enter percentage)* 0% $0.00
Total Outbound Inspection Base Scope Costs - Tenant Improvement (TI) $0.00
CLIN-0007 FMCSA Bus Inspection Base Scope Costs - Shell
ITEM PRICE
General Conditions $
Foundations $
Base Scope 6 of
Exterior Closure $
Roofing $
Interior Construction $
Stairs $
Interior Finishes $
Conveyance System $
Plumbing $
HVAC $
Fire Protection $
Electrical $
Equipment $
Furnishings $
Special Construction $
Environmental - Remediation (soil) $
Environmental- Abatement $
Selective Building Demolition $
Sitework - Building Related $
Sitework - Non-Building Related $
SUBTOTAL - Construction Costs $0.00
Design Fees $0.00
SUBTOTAL - Design & Construction Costs $0.00
Overhead (offeror to enter percentage)* 0% $0.00
Profit (offeror to enter percentage)* 0% $0.00
SUBTOTAL - Design, Construction, Overhead & Profit Costs $0.00
Bond (offeror to enter percentage)* 0% $0.00
Insurance (offeror to enter percentage)* 0% $0.00
Total FMCSA Bus Inspection Base Scope Costs - Shell $0.00
CLIN-0008 FMCSA Bus Inspection Base Scope Costs - Tenant Improvement (TI)
ITEM PRICE
General Conditions $
Foundations $
Basement Construction $
Superstructure $
Exterior Closure $
Roofing $
Interior Construction $
Stairs $
Interior Finishes $
Conveyance System $
Plumbing $
HVAC $
Base Scope 7 of
Electrical $
Equipment $
Furnishings $
Special Construction $
Environmental - Remediation (soil) $
Environmental- Abatement $
Selective Building Demolition $
Sitework - Building Related $
Sitework - Non-Building Related $
SUBTOTAL - Construction Costs $0.00
Design Fees $0.00
SUBTOTAL - Design & Construction Costs $0.00
Overhead (offeror to enter percentage)* 0% $0.00
Profit (offeror to enter percentage)* 0% $0.00
SUBTOTAL - Design, Construction, Overhead & Profit Costs $0.00
Bond (offeror to enter percentage)* 0% $0.00
Insurance (offeror to enter percentage)* 0% $0.00
Total FMCSA Bus Inspection Base Scope Costs - Tenant Improvement (TI) $0.00
CLIN-009 TABC Building Base Scope Costs - Shell
ITEM PRICE
General Conditions $
Foundations $
Basement Construction $
Superstructure $
Exterior Closure $
Roofing $
Interior Construction $
Stairs $
Interior Finishes $
Conveyance System $
Plumbing $
HVAC $
Fire Protection $
Electrical $
Equipment $
Furnishings $
Special Construction $
Environmental - Remediation (soil) $
Environmental- Abatement $
Selective Building Demolition $
Base Scope 8 of
Sitework - Non-Building Related $
SUBTOTAL - Construction Costs $0.00
Design Fees $0.00
SUBTOTAL - Design & Construction Costs $0.00
Overhead (offeror to enter percentage)* 0% $0.00
Profit (offeror to enter percentage)* 0% $0.00
SUBTOTAL - Design, Construction, Overhead & Profit Costs $0.00
Bond (offeror to enter percentage)* 0% $0.00
Insurance (offeror to enter percentage)* 0% $0.00
TABC Building Base Scope Costs - Shell $0.00
CLIN-0010 TABC Building Base Scope Costs - Tenant Improvement (TI)
ITEM PRICE
General Conditions $
Foundations $
Basement Construction $
Superstructure $
Exterior Closure $
Roofing $
Interior Construction $
Stairs $
Interior Finishes $
Conveyance System $
Plumbing $
HVAC $
Fire Protection $
Electrical $
Equipment $
Furnishings $
Special Construction $
Environmental - Remediation (soil) $
Environmental- Abatement $
Selective Building Demolition $
Sitework - Building Related $
Sitework - Non-Building Related $
SUBTOTAL - Construction Costs $0.00
Design Fees $0.00
SUBTOTAL - Design & Construction Costs $0.00
Overhead (offeror to enter percentage)* 0% $0.00
Profit (offeror to enter percentage)* 0% $0.00
SUBTOTAL - Design, Construction, Overhead & Profit Costs $0.00
Bond (offeror to enter percentage)* 0% $0.00
Base Scope 9 of
Total TABC Building Base Scope Costs - Tenant Improvement (TI) $0.00
CLIN-0011 Site Utilities Base Scope Costs
ITEM PRICE
General Conditions $
Foundations $
Basement Construction $
Superstructure $
Exterior Closure $
Roofing $
Interior Construction $
Stairs $
Interior Finishes $
Conveyance System $
Plumbing $
HVAC $
Fire Protection $
Electrical $
Equipment $
Furnishings $
Special Construction $
Environmental - Remediation (soil) $
Environmental- Abatement $
Selective Building Demolition $
Sitework - Building Related $
Sitework - Non-Building Related $
SUBTOTAL - Construction Costs $0.00
Design Fees $0.00
SUBTOTAL - Design & Construction Costs $0.00
Overhead (offeror to enter percentage)* 0% $0.00
Profit (offeror to enter percentage)* 0% $0.00
SUBTOTAL - Design, Construction, Overhead & Profit Costs $0.00
Bond (offeror to enter percentage)* 0% $0.00
Insurance (offeror to enter percentage)* 0% $0.00
Total Utilities Base Scope Costs $0.00
CLIN-0012 Site Base Scope Costs
ITEM PRICE
General Conditions $
Foundations $
Base Scope 10 of
Exterior Closure $
Roofing $
Interior Construction $
Stairs $
Interior Finishes $
Conveyance System $
Plumbing $
HVAC $
Fire Protection $
Electrical $
Equipment $
Furnishings $
Special Construction $
Environmental - Remediation (soil) $
Environmental- Abatement $
Selective Building Demolition $
Sitework - Building Related $
Sitework - Non-Building Related $
SUBTOTAL - Construction Costs $0.00
Design Fees $0.00
SUBTOTAL - Design & Construction Costs $0.00
Overhead (offeror to enter percentage)* 0% $0.00
Profit (offeror to enter percentage)* 0% $0.00
SUBTOTAL - Design, Construction, Overhead & Profit Costs $0.00
Bond (offeror to enter percentage)* 0% $0.00
Insurance (offeror to enter percentage)* 0% $0.00
Total Site Base Scope Costs $0.00
CLIN-0013 Demolition Base Scope Costs - to Include Abatement and Remediation
ITEM PRICE
General Conditions $
Foundations $
Basement Construction $
Superstructure $
Exterior Closure $
Roofing $
Interior Construction $
Stairs $
Interior Finishes $
Conveyance System $
Plumbing $
HVAC $
Electrical $
Base Scope 11 of
Equipment $
Furnishings $
Special Construction $
Environmental - Remediation (soil) $
Environmental- Abatement $
Selective Building Demolition $
Sitework - Building Related $
Sitework - Non-Building Related $
SUBTOTAL - Construction Costs $0.00
Design Fees $0.00
SUBTOTAL - Design & Construction Costs $0.00
Overhead (offeror to enter percentage)* 0% $0.00
Profit (offeror to enter percentage)* 0% $0.00
SUBTOTAL - Design, Construction, Overhead & Profit Costs $0.00
Bond (offeror to enter percentage)* 0% $0.00
Insurance (offeror to enter percentage)* 0% $0.00
Total Demolition Base Scope Costs $0.00
CLIN-0014 Base Scope CBP Furniture Design & Construction and Move Services Costs
ITEM PRICE
Contractor shall provide furniture and equipment design layouts and all materials and labor for the purchase and installation of furniture and equipment. The awarded contractor shall provide personnel, equipment, supplies, transportation, tools, materials, supervision and any other products and services necessary to provide the following new FF&E requirements: product installation of new furniture and equipment, including but not limited to systems furniture, modular and freestanding case goods: task, side, ganged waiting, conference, and training room seating: all-purpose, training, conference, and detainee interview tables, file , technology and general purpose storage cabinets, weapons storage, heavy open shelving and office accessories. All products are to be entirely new and unused.
$0.00
SUBTOTAL - Construction Costs $0.00
Design Fees $0.00
SUBTOTAL - Design & Construction Costs $0.00
Overhead (offeror to enter percentage)* 0% $0.00
Profit (offeror to enter percentage)* 0% $0.00
SUBTOTAL - Design, Construction, Overhead & Profit Costs $0.00
Bond (offeror to enter percentage)* 0% $0.00
Insurance (offeror to enter percentage)* 0% $0.00
Total Base Scope CBP Furniture Design & Construction and Move Services $0.00
Total Project Cost $0.00
Bid Options 1 of
Bid Options
Bridge of The Americas (BOTA) LPOE Modernization Project
Pricing Sheet 9.16.2026
GSA RFP Number: 47PB5126R0003
CLIN-0015 Option #1A - Kennel Building - Shell
ITEM PRICE
General Conditions $
Foundations $
Basement Construction $
Superstructure $
Exterior Closure $
Roofing $
Interior Construction $
Stairs $
Interior Finishes $
Conveyance System $
Plumbing $
HVAC $
Fire Protection $
Electrical $
Equipment $
Furnishings $
Special Construction $
Environmental - Remediation (soil) $
Environmental- Abatement $
Selective Building Demolition $
Sitework - Building Related $
Sitework - Non-Building Related $
SUBTOTAL - Construction Costs $0.00
Design Fees $0.00
SUBTOTAL - Design & Construction Costs $0.00
Overhead (offeror to enter percentage)* 0% $0.00
Profit (offeror to enter percentage)* 0% $0.00
SUBTOTAL - Design, Construction, Overhead & Profit Costs $0.00
Bond (offeror to enter percentage)* 0% $0.00
Insurance (offeror to enter percentage)* 0% $0.00
Total Option #1A - Kennel Building Costs - Shell $0.00
CLIN-0016 Option #1B - Kennel Building - Tenant Improvement (TI)
ITEM PRICE
General Conditions $
Foundations $
Basement Construction $
Superstructure $
Exterior Closure $
Roofing $
Interior Construction $
Stairs $
Bid Options 2 of
Interior Finishes $
Conveyance System $
Plumbing $
HVAC $
Fire Protection $
Electrical $
Equipment $
Furnishings $
Special Construction $
Environmental - Remediation (soil) $
Environmental- Abatement $
Selective Building Demolition $
Sitework - Building Related $
Sitework - Non-Building Related $
SUBTOTAL - Construction Costs $0.00
Design Fees $0.00
SUBTOTAL - Design & Construction Costs $0.00
Overhead (offeror to enter percentage)* 0% $0.00
Profit (offeror to enter percentage)* 0% $0.00
SUBTOTAL - Design, Construction, Overhead & Profit Costs $0.00
Bond (offeror to enter percentage)* 0% $0.00
Insurance (offeror to enter percentage)* 0% $0.00
Total Option #1B - Kennel Building Costs - Tenant Improvement (TI) $0.00
CLIN-0017 Option #2A - Noncommercial Insp 8 Additional Lanes- Shell
ITEM PRICE
General Conditions $
Foundations $
Basement Construction $
Superstructure $
Exterior Closure $
Roofing $
Interior Construction $
Stairs $
Interior Finishes $
Conveyance System $
Plumbing $
HVAC $
Fire Protection $
Electrical $
Equipment $
Furnishings $
Special Construction $
Environmental - Remediation (soil) $
Environmental- Abatement $
Selective Building Demolition $
Sitework - Building Related $
Sitework - Non-Building Related $
SUBTOTAL - Construction Costs $0.00
Design Fees $0.00
Bid Options 3 of
SUBTOTAL - Design & Construction Costs $0.00
Overhead (offeror to enter percentage)* 0% $0.00
Profit (offeror to enter percentage)* 0% $0.00
SUBTOTAL - Design, Construction, Overhead & Profit Costs $0.00
Bond (offeror to enter percentage)* 0% $0.00
Insurance (offeror to enter percentage)* 0% $0.00
Total Option #2A - Noncommercial Insp 8 Additional Lanes Costs - Shell $0.00
CLIN-0018 Option #2B - Noncommercial Insp 8 Additional Lanes -TI
ITEM PRICE
General Conditions $
Foundations $
Basement Construction $
Superstructure $
Exterior Closure $
Roofing $
Interior Construction $
Stairs $
Interior Finishes $
Conveyance System $
Plumbing $
HVAC $
Fire Protection $
Electrical $
Equipment $
Furnishings $
Special Construction $
Environmental - Remediation (soil) $
Environmental- Abatement $
Selective Building Demolition $
Sitework - Building Related $
Sitework - Non-Building Related $
SUBTOTAL - Construction Costs $0.00
Design Fees $0.00
SUBTOTAL - Design & Construction Costs $0.00
Overhead (offeror to enter percentage)* 0% $0.00
Profit (offeror to enter percentage)* 0% $0.00
SUBTOTAL - Design, Construction, Overhead & Profit Costs $0.00
Bond (offeror to enter percentage)* 0% $0.00
Insurance (offeror to enter percentage)* 0% $0.00
Total Option #2B - Noncommercial Insp 8 Additional Lanes Costs - Tenant Improvement
(TI) $0.00
CLIN-0019 Option #3A - Trusted Traveler Building - Shell
ITEM PRICE
General Conditions $
Foundations $
Basement Construction $
Exterior Closure $
Bid Options 4 of
Roofing $
Interior Construction $
Stairs $
Interior Finishes $
Conveyance System $
Plumbing $
HVAC $
Fire Protection $
Electrical $
Equipment $
Furnishings $
Special Construction $
Environmental - Remediation (soil) $
Environmental- Abatement $
Selective Building Demolition $
Sitework - Building Related $
Sitework - Non-Building Related $
SUBTOTAL - Construction Costs $0.00
Design Fees $0.00
SUBTOTAL - Design & Construction Costs $0.00
Overhead (offeror to enter percentage)* 0% $0.00
Profit (offeror to enter percentage)* 0% $0.00
SUBTOTAL - Design, Construction, Overhead & Profit Costs $0.00
Bond (offeror to enter percentage)* 0% $0.00
Insurance (offeror to enter percentage)* 0% $0.00
Total Option #3A - Trusted Traveler Building Costs - Shell $0.00
CLIN-0020 Option #3B - Trusted Traveler Building - TI
ITEM PRICE
General Conditions $
Foundations $
Basement Construction $
Superstructure $
Exterior Closure $
Roofing $
Interior Construction $
Stairs $
Interior Finishes $
Conveyance System $
Plumbing $
HVAC $
Fire Protection $
Electrical $
Equipment $
Furnishings $
Special Construction $
Environmental - Remediation (soil) $
Environmental- Abatement $
Selective Building Demolition $
Bid Options 5 of
Sitework - Non-Building Related $
SUBTOTAL - Construction Costs $0.00
Design Fees $0.00
SUBTOTAL - Design & Construction Costs $0.00
Overhead (offeror to enter percentage)* 0% $0.00
Profit (offeror to enter percentage)* 0% $0.00
SUBTOTAL - Design, Construction, Overhead & Profit Costs $0.00
Bond (offeror to enter percentage)* 0% $0.00
Insurance (offeror to enter percentage)* 0% $0.00
Total Option #3B - Trusted Traveler Building Costs - Tenant Improvement (TI) $0.00
CLIN-0021 Option #4A - Narcotics Vault - Shell
ITEM PRICE
General Conditions $
Foundations $
Basement Construction $
Superstructure $
Exterior Closure $
Roofing $
Interior Construction $
Stairs $
Interior Finishes $
Conveyance System $
Plumbing $
HVAC $
Fire Protection $
Electrical $
Equipment $
Furnishings $
Special Construction $
Environmental - Remediation (soil) $
Environmental- Abatement $
Selective Building Demolition $
Sitework - Building Related $
Sitework - Non-Building Related $
SUBTOTAL - Construction Costs $0.00
Design Fees $0.00
SUBTOTAL - Design & Construction Costs $0.00
Overhead (offeror to enter percentage)* 0% $0.00
Profit (offeror to enter percentage)* 0% $0.00
SUBTOTAL - Design, Construction, Overhead & Profit Costs $0.00
Bond (offeror to enter percentage)* 0% $0.00
Insurance (offeror to enter percentage)* 0% $0.00
Total Option #4A - Narcotics Vault Costs - Shell $0.00
CLIN-0022 Option #4B - Narcotics Vault - TI
ITEM PRICE
Bid Options 6 of
General Conditions $
Foundations $
Basement Construction $
Superstructure $
Exterior Closure $
Roofing $
Interior Construction $
Stairs $
Interior Finishes $
Conveyance System $
Plumbing $
HVAC $
Fire Protection $
Electrical $
Equipment $
Furnishings $
Special Construction $
Environmental - Remediation (soil) $
Environmental- Abatement $
Selective Building Demolition $
Sitework - Building Related $
Sitework - Non-Building Related $
SUBTOTAL - Construction Costs $0.00
Design Fees $0.00
SUBTOTAL - Design & Construction Costs $0.00
Overhead (offeror to enter percentage)* 0% $0.00
Profit (offeror to enter percentage)* 0% $0.00
SUBTOTAL - Design, Construction, Overhead & Profit Costs $0.00
Bond (offeror to enter percentage)* 0% $0.00
Total Option #4B - Narcotics Vault Costs - Tenant Improvement (TI) $0.00
Allowances 1 of
Allowances
Bridge of The Americas (BOTA) LPOE Modernization Project
Pricing Sheet 9.16.2026
GSA RFP Number: 47PB5126R0003
CLIN ITEM Price
0023 Art in Architecture - Support and Infrastructure To Be Determined
Allowance includes support for Art-in-Architecture infrastructure upon award of the GSA Art in Architecture Program contract(s). The DB Contractor’s Lead Designer must participate in an orientation meeting with the artist(s) and GSA at the project site, as well as subsequent meetings with the artist(s) and GSA as necessary to assure the successful integration of the commissioned artwork in the DB Contractor’s design and construction documents. The DB shall provide to the artist requested drawings, plans, renderings, etc., in order to facilitate collaboration with the artist. Integration items may include but are not limited to architectural and engineering design, structural systems, sitework, utilities, lighting, infrastructure, etc., to support the commissioned art.
0024 Unforeseen Utilities Installation Costs To Be Determined
Allowance includes unforeseen utility installation costs that may arise during construction, including but not limited to permit and fees, unanticipated conflicts with existing utilities, undocumented service lines and unexpected depth or alignment adjustments and any associated labor, equipment, coordination, and field inspection.
Ceremonies preparations for Groundbreaking and Dedication Ceremonies
To Be Determined
Allowance includes DB contractor's coordination for groundbreaking, dedication ceremonies and any other interim dedication ceremonies that may occur due to project phasing. The allowance must include the purchase of light refreshments, groundbreaking shovels, dedication plaques for the GSA and agency stakeholders. Costs for printing banners, renderings for signage, posters and invitations.
Rental of chairs, tables, podiums, tent, AV equipment, etc.
Total Cost, All Allowances To Be Determined
Modifications 1 of
Modifications
Bridge of The Americas (BOTA) LPOE Modernization Project
Pricing Sheet 9.16.2026
GSA RFP Number: 47PB5126R0003
Design Phase: Fees for Contract Modifications
ITEM ITEM PERCENTAGE
1 Contractor's Overhead %
2 Contractor's Profit % 3 Contractor's Subcontractor Mark-ups %
Construction Phase: Fees for Contract Modifications
ITEM ITEM PERCENTAGE
1 Contractor's Overhead %
2 Contractor's Profit Rate %
3 Bonds (must provide documents at award to support this %) %
4 Insurance (must provide documents at award to support this %) % 5 Contractor's Subcontractor Mark-Ups %
Contractor's must adhere to GSAR 552.243-71 Equitable Adjustments (MAR 2019) as it relates to Contractor's Subcontractor Markups
Bridge of the Americas Land Port of Entry Modernization Project
El Paso, Texas
GSA Solicitation No. 47PB5126R0003
APRIL 2026
ALLOWANCES 01 21 00 - page 1 of 4
SECTION 01 21 00 - ALLOWANCES
PART 1 GENERAL
1.1 RELATED DOCUMENTS
A. GSA is providing the references included in this sub-section for information purposes only and is not intended to provide a comprehensive, all-inclusive list of any and all potentially relevant portions of the Contract Documents.
Drawings and general provisions of the Contract, including Federal
Acquisition Regulations (FAR) and General Services Administration
Acquisition Regulations (GSAR) contract clauses, and other Division 01
Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements governing allowances.
1. Certain items are described in the Contract Documents as allowance items. The purpose of allowance items is to defer selection of actual products and systems to a later date when direction will be provided to the Contractor. The Contracting Officer will issue Contract Modifications to incorporate allowance items in the Work after actual products and systems have been determined.
B. Types of allowance items may include the following:
1. Lump-sum allowance items.
2. Unit-price allowance items.
3. Quantity allowance items.
1.3 SELECTION AND PURCHASE
A. At the earliest practical date after award of the Contract, advise the
Contracting Officer of the date when final selection and purchase of each product or system described by an allowance item must be completed to avoid delaying the Work. Allowances must be included in all schedule submissions.
GSA Solicitation No. 47PB5126R0003
ALLOWANCES 01 21 00 - page 2 of 4
1.4 ACTION SUBMITTALS
A. Submit proposals for products or systems described by allowance items in the form specified for Contract Modifications.
1.5 INFORMATIONAL SUBMITTALS
A. Submit copies of invoices or delivery slips to show actual quantities of materials delivered to the site for use in fulfillment of each unit-price and quantity allowance item.
B. Coordinate and process submittals for allowance items in the same manner as for other portions of the Work.
1.6 COORDINATION
A. Coordinate allowance items with other portions of the Work. Furnish templates as required to coordinate installation.
B. Contract Modifications based on an allowance item shall include cost to
Contractor of specific products and systems selected by the Contracting
Officer under allowance and shall include taxes, freight, delivery to Project site, Contractor's costs for receiving and handling at Project site, labor, installation, overhead, and profit.
1. If requested by the Contracting Officer, purchase additional quantities under unit-price or quantity allowances and prepare unused material for storage by the Contracting officer. Deliver unused material to the Contracting Officer's storage space as directed.
1.7 ADJUSTMENT OF ALLOWANCE ITEMS
A. Contract Modifications to an allowance item shall comply with the changes clauses and any other contract modifications procedures found in the Contract Documents.
B. Contracting Officer reserves the right to establish the quantity of work-in-place by independent quantity survey, measure, or count.
C. Allowances shall only be used at the direction of the Contracting Officer and will be applied to actual, documented costs associated with addressing such conditions.
GSA Solicitation No. 47PB5126R0003
ALLOWANCES 01 21 00 - page 3 of 4
PART 2 PRODUCTS - NA
PART 3 EXECUTION
3.1 EXAMINATION
A. Examine products covered by an allowance item promptly on delivery for damage or defects. Return damaged or defective products to the manufacturer for replacement.
3.2 PREPARATION
A. Coordinate materials and their installation for each allowance item with related materials and installations to ensure that each allowance item is completely integrated and interfaced with related work.
3.3 SCHEDULE OF ALLOWANCE ITEMS
A. Allowance Item No. 01 (CLIN 0023): Art-in- Architecture – Support and
Infrastructure: Allowance includes support for art-in-architecture infrastructure upon award of the GSA Art in Architecture Program contract(s). The DB Contractor’s Lead Designer must participate in an orientation meeting with the artist(s) and GSA at the project site, as well as subsequent meetings with the artist(s) and GSA as necessary to ensure the successful integration of the commissioned artwork in the DB
Contractor’s design and construction documents. The DB shall provide to the artist requested drawings, plans, renderings, etc., in order to facilitate collaboration with the artist. Integration items may include but are not limited to architectural and engineering design, structural systems, sitework, utilities, lighting, infrastructure, etc., to support the commissioned art.
B. Allowance Item No. 02 (CLIN 0024): Unforeseen Utility Installation Costs:
Allowance includes unforeseen utility installation costs that may arise during construction, including but not limited to permits and fees, unanticipated conflicts with existing utilities, undocumented service lines and unexpected depth or alignment adjustments and any associated labor, equipment, coordination, and field inspection.
C. Allowance Item No. 03 (CLIN 0025): Ceremonies Preparation for
Groundbreaking and Dedication Ceremonies. Allowance includes DB contractor’s coordination for groundbreaking, dedication ceremonies and
GSA Solicitation No. 47PB5126R0003
ALLOWANCES 01 21 00 - page 4 of 4 any other interim dedication ceremonies that may occur due to project phasing. The allowance must include the purchase of light refreshments, groundbreaking shovels, dedication plaques for the GSA and agency stakeholders. Costs for printing banners, renderings for signage, posters, and invitations. Rental of chairs, tables, podiums, tents, AV equipment, etc. This allowance covers material costs, and any unused portion shall be credited back to the Owner.
END OF SECTION 01 21 00
| SF30 Amendment 0004 |
| BOTA LPOE Amendment 0004 attachment |
| BOTA LPOE Amendment 0004 |
| Phase 2 BOTA DB Pricing Sheet Rev 9.16.2026 - Cover Page |
| Phase 2 BOTA DB Pricing Sheet Rev 9.16.2026 - Base Scope |
| Phase 2 BOTA DB Pricing Sheet Rev 9.16.2026 - Bid Options |
| Phase 2 BOTA DB Pricing Sheet Rev 9.16.2026 - Allowances |
| Phase 2 BOTA DB Pricing Sheet Rev 9.16.2026 - Modifications |
| GSA FY24 01 21 00 ALLOWANCES Final REV |
File details come from the government source that posted it. Updated .