40_-_2023_Std_Plans_9-3_to_9-5.pdf
PDF 738 KB Posted
- Solicitation number
- IFB No. PW-0149
- Issued by
- Santa Cruz County, San Francisco City, California
About this file
The provided document is a set of California Department of Transportation (Caltrans) Standard Plan sheets (B9-3, B9-4, and B9-5) detailing structural approach slab design standards for bridge construction and retrofit projects. These technical drawings provide comprehensive engineering specifications for two approach slab types: Type R (10) and Type EQ (10), which are designed for different bridge abutment configurations (seat type and diaphragm type).
The standard plan sheets specify detailed reinforcement requirements, including rebar placement, spacing, and orientation, with specific provisions for freeze-thaw areas. The documents include design notes referencing the 2012 AASHTO LRFD Bridge Design Specifications with Caltrans Amendments, and provide technical details for elements such as joint seals, expansion joints, geocomposite drainage, barriers, and connection methods. The design accounts for various load conditions including live load (HL93 and permit design load), dead load, and different limit states, with specific concrete material specifications (f'c = 3.6 ksi, fy = 60 ksi).
View the file
Other files
Show 40 more
Latest 50 of 114 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLAN
Typ
LINE,
LANE
SKEW < 20^
SKEW > 20^
10'-0"
BB OR EB
Exist
DECK
BRIDGE
Exist
PAVEMENT
ROADWAY
Exist HMA
WINGWALL
END OF Exist
BARRIER
OF Exist
FRONT FACE
TRANSVERSE JOINT
WALL
RETAINING
Exist
SKEW^
SEE
Const JOINT, LONGITUDINAL
OPTIONAL
SEE
APPROACH SLAB,
EDGE OF TYPE E-2
JOINT
TRANSVERSE
10'-0"
JOINT FILLER
¼" EXPANSION
DECK GRADE
MATCH Exist BRIDGE
C l r
10'-0"
Exist Abut BACKWALL
TO LANE LINES
PARALLEL
#7 @ 6
Exist BB OR EB
ABUTMENT BACKWALL
1'-0" INTO Exist
#5 x 2'-0" @ 12, DRILL & BOND
APPROACH SLAB (TYPE R)
PAY LIMITS FOR STRUCTURAL CONCRETE,
#5 @ 18 BOTH WAYS
LANE LINES
#6 @ 12 NORMAL TO
JOINT SEAL
#5 @ 6
SEE NOTE 1
TO LANE LINES,
PARALLEL
È
1'-0"
3"
6"
PARALLEL TO BB OR EB
#5 Cont Tot 3
SEALED JOINT JOINT SEAL ASSEMBLY
Min
M i n
TO BB OR EB
PARALLEL
#5 Cont Tot 4
1'-0" 1'-0"
6"
3"
JOINT FILLER
¼" EXPANSION
Abut BACKWALL
1'-0" INTO Exist
#5 x 2'-8" @ 12, DRILL & BOND
ASSEMBLY
JOINT SEAL
BLOCKOUT FOR
SEE NOTE 1
#5 @ 9
SEE NOTE 1
#5 @ 9
#5 BOTH WAYS
LANE LINES
#6 NORMAL TO
BACKWALL
Exist Abut
EXISTING BB OR EB
#5 Tot 2
DECK GRADE
MATCH Exist BRIDGE
Exist BB OR EB
SEE NOTE 2
1'-0" INTO Exist, #5 @ 18
DRILL & BOND
#5 BOTH WAYS
#6 NORMAL TO LANE LINES
ABUTMENT TIE DETAILS"
SEE "DIAPHRAGM
PARALLEL TO BB OR EB
#5 Cont, Tot 2
6"
EXISTING DIAPHRAGM ABUTMENT
MR < ½"
JOINT SEAL
1'-6"
SEE NOTE 1
TO LANE LINES,
#5 @ 6 PARALLEL
LANE LINES
#7 PARALLEL TO
SECTION A-A
EXISTING SEAT ABUTMENT
C l r
Max
PAVING NOTCH EXTENSION
FOR CONSTRUCTING
LIMIT OF EXCAVATION
SEE NOTE 2
1'-0" INTO Exist, DRILL & BOND
1'-6"
POLYSTYRENE
2" X 6" EXPANDED
PAPER
BUILDING
PAPER
BUILDING
Typ
JOINT FILLER
¼" EXPANSION
3'-0"
3"
TO BB OR EB
#5 Cont Tot 3 PARALLEL
JOINT FILLER
¼" EXPANSION
2"
Clr
Clr
2"
ASSEMBLY, Typ
AROUND ANCHOR
EXPANDED POLYSTYRENE
WITH 1"Ø HOLE
 ¼ x 2¼ x 2¼
SEAL BOTH ENDS OF PVC CONDUIT
M i n
DIAPHRAGM ABUTMENT TIE DETAILS
12" PAVING NOTCH 9" PAVING NOTCH
Exist BB OR EB
Exist BB OR EB
1'-6"
SEE NOTE 1
TO LANE LINES,
#5 @ 6 PARALLEL
È
#5 @ 6, SEE NOTE 1
BLOCKOUT IF NECESSARY
LINES, BEND TO AVOID
#7 PARALLEL TO LANE
see "SEALED JOINT"
For additional details not shown, NOTE:
see "EXISTING SEAT ABUTMENT"
For additional details not shown, NOTE:
see "12" PAVING NOTCH"
For details not shown, NOTE:
NOTES:
LEGEND:
Indicates Existing Structure
A
X-2
X-4
REMOVAL
LIMITS OF
IN 1" Ø x 2'-4" PVC CONDUIT
AND THREADED END. ROD ENCASED
¾" Ø Galv ROD @ 24 WITH NUT
ENGINEER
MUST BE AUTHORIZED BY
8" CLEAR, OTHER DEPTHS
#6 PARALLEL TO BB OR EB
and top mat cover 2½" clear in Freeze-Thaw Area.
* - All approach slab reinforcement shall be epoxy coated
6.
5.
4.
3.
2.
1.
SEE NOTE 5
PAVING NOTCH EXTENSION,
For details not shown, refer to Standard Plan B9-5.
Paving notch extension is required if existing diaphragm paving notch is < 6".
be placed parallel to BB or EB. Spacing of transverse reinforcement is
At the Contractor's option, approach slab transverse reinforcement may refer to Standard Plans P10 and P30.
Place dowels into the adjacent PCC pavement along the Transverse Joint, anchorages and other reinforcement in abutment, as needed.
Space reinforcement and abutment ties to avoid existing prestressing to avoid joint seal assembly anchorage.
For MR > 2", reinforcement must be normal to BB or EB and spaced
For MR < 2", adjust reinforcement to clear sawcut for sealed joint.
X-3
TYPE R (10)
STRUCTURE APPROACH
NO SCALE
DEPARTMENT OF TRANSPORTATION
STATE OF CALIFORNIA
T
O
A A
A A
B9-5
B9-5
B9-5
B6-21
Daniel Sessions
77723
6-30-23
COUNTY ROUTE
POST MILES
TOTAL PROJECT
SHEET TOTAL
SHEETS
PLANS APPROVAL DATE
No.
Exp.
R E
G I
S T
E R
E
D P
ROFESSIONA
L
E
N G I
N E
E R
S
TATE OF CALIFORNI
A
REGISTERED CIVIL ENGINEER
CIVIL
Dist No.
THE STATE OF CALIFORNIA OR ITS OFFICERS
OR AGENTS SHALL NOT BE RESPONSIBLE FOR
COPIES OF THIS PLAN SHEET.
THE ACCURACY OR COMPLETENESS OF SCANNED
May 1, 2023
B9-3
S T
A N
D A
R D
P
A
B
1-31-23
Return to Table of Contents
1'-6"
ABUTMENT TIE DETAILS
JOINT FILLER
¼" EXPANSION
Abut BACKWALL
¾"Ø x 8" BOLT
PARALLEL TO BB OR EB
#5 Cont Tot 2
WITH 1"Ø HOLE
 ¼ x 2¼ x 2¼
FILLER
¼" Exp Jt
PVC CONDUIT
ROD ENCASED IN 1"Ø x 2'-4"
NUT AND THREADED ENDS.
¾"Ø Galv ROD @ 24 WITH
TO BB OR EB
PARALLEL
#5 Cont Tot 2
Typ
C l r
COUPLING NUT
¾" Galv
SEAL BOTH ENDS OF PVC CONDUIT
6"
3" 3" 2"
½
2"
SEAT TYPE ABUTMENT DIAPHRAGM TYPE ABUTMENT
MR < 2" MR > 2"
BB OR EB
ASSEMBLY
AROUND ANCHOR
POLYSTYRENE
EXPANDED
JOINT SEAL
BACKWALL
INTO Abut
@ 12, 1'-3"
#5 x 2'-0"
2'-6"
SEE NOTE 1
LANE LINES,
PARALLEL TO
#5 @ 6
Min
BB OR EB
#5 @ 9
M i n
JOINT FILLER
¼" EXPANSION
Abut BACKWALL
TO BB OR EB
PARALLEL
#5 Cont Tot 4
6"
3"
1'-0" 1'-0"
BACKWALL
INTO Abut
@ 9, 1'-0"
#5 x 2'-8"
SEE NOTE 1
#5 @ 9
SEE NOTE 1
ASSEMBLY
JOINT SEAL
BLOCKOUT FOR
MR < ½"
JOINT SEAL,
SEE NOTE 1
PARALLEL TO LANE LINES,
#5 @ 6, 4.
3.
2.
1.
TYPE EQ (10)
STRUCTURE APPROACH
NO SCALE
DEPARTMENT OF TRANSPORTATION
STATE OF CALIFORNIA
NOTES:
BB OR EB
SKEW < 20^ SKEW > 20^PLAN
Typ
LINE,
LANE
OF BARRIER
FRONT FACE
DECK
BRIDGE
BB OR EB
10'-0"
PAVEMENT
HMA ROADWAY
SKEW^
JOINT
TRANSVERSE
10'-0"
RETAINING WALL
SEE
APPROACH SLAB,
EDGE OF TYPE E-2
SEE
Const JOINT, LONGITUDINAL
OPTIONAL
JOINT
TRANSVERSE
WINGWALL
END OF
SECTION A-A
C l r
TIE DETAILS"
SEE "ABUTMENT
BACKWALL
Abut
IF NECESSARY
BEND TO AVOID BLOCKOUT
PARALLEL TO LANE LINES,
#7 @ 6
BB OR EB
10'-0"
APPROACH SLAB (TYPE EQ)
PAY LIMITS FOR STRUCTURAL CONCRETE,
#5 @ 18 BOTH WAYS
LANE LINES
NORMAL TO
#6 @ 12
X-2
X-4 diaphragm type abutment similar.
NOTE: Seat type abutment shown, C
BY ENGINEER
MUST BE AUTHORIZED
8" Clr, OTHER DEPTHS
LEGEND:
minimum top mat cover 2½" in Freeze-Thaw Area.
* - All approach slab reinforcement shall be epoxy coated and
For details not shown, refer to Standard Plan B9-5.
reinforcement may be placed parallel to BB or EB. Spacing
At the Contractor's option, approach slab transverse
Transverse Joint, refer to Standard Plans P10 and P30.
Place dowels into the adjacent PCC pavement along the
BB or EB and spaced to avoid joint seal assembly anchorage.
sealed joint. For MR > 2", reinforcement must be normal to
For MR < 2", adjust reinforcement to clear sawcut for
X-3 A A
AA
B9-5
Daniel Sessions
77723
6-30-23
COUNTY ROUTE
POST MILES
TOTAL PROJECT
SHEET TOTAL
SHEETS
PLANS APPROVAL DATE
No.
Exp.
R E
G I
S T
E R
E
D P
G I
N E
E R
S
TATE OF CALIFORNI
A
REGISTERED CIVIL ENGINEER
CIVIL
Dist No.
THE STATE OF CALIFORNIA OR ITS OFFICERS
OR AGENTS SHALL NOT BE RESPONSIBLE FOR
COPIES OF THIS PLAN SHEET.
THE ACCURACY OR COMPLETENESS OF SCANNED
May 1, 2023
B9-4
A N
D A
JOINT ALTERNATIVES
LONGITUDINAL CONSTRUCTION
RECESSED KEY
CONTINUOUS
1½" x 3½"
2'-0"
STAGE 2STAGE 1
STAGE 1 STAGE 2
STAGE 1 STAGE 2
3" Typ
3" Typ
3" Typ
1'-3"6"
Min LAP
Min LAP
¾" Ø x 8" BOLT
STRUCTURE APPROACH
CONNECTING TO EXISTING
RECESSED KEY, OMIT IF
1½" x 3½" CONTINUOUS
OR Exist
THREADED ROD, Galv
¾" Ø x 1'-0" @ 12
Galv
COUPLING NUT,
¾" Ø x 3"
DETAIL X-3
RETAINING WALL
WINGWALL OR
APPROACH
STRUCTURE
#8 x 8'-0" @ 9
TPB
RETAINING WALL
WINGWALL OR
TPB
RETAINING WALL
WINGWALL OR
DRAIN
GEOCOMPOSITE DRAIN
GEOCOMPOSITE
Tot 5
#5 Cont, #5 x 4'-0" @ 18
9"
13-1
B0-13
Max
SHOWN
Reinf
BARRIER
NOT ALL
#5 @ 18
#10 @ 6 remove after concrete is placed.
Indicates Expanded Polystyrene, APPROACH
STRUCTURE
OVERHANG
MATCH DECK
OPTIONAL EDGE OF SLAB
TYPE E-1 TYPE E-2
APPROACH
STRUCTURE
2"
#10 @ 6 Tot 5
Tot 10 BARS
#10 BUNDLES @ 6
2'-0"
SEE NOTE 2
BARRIER,
SEE NOTE 2
BARRIER,
SEE NOTE 2
BARRIER,
DETAIL X-1 DETAIL X-2 TYPE R (10) AND EQ
DETAIL X-2
NO SCALE
SLAB DETAILS
STRUCTURE APPROACH
DEPARTMENT OF TRANSPORTATION
STATE OF CALIFORNIA
LOW SIDE ONLY
SEE "DETAIL B"
LOW SIDE ONLY
SEE "DETAIL B"
INTO 6" DEEP HOLE
DRILL AND BOND
#5 @ 12
BB OR EB
DECK
BRIDGE
6"
OR L3 x 3 x ¼
EDGE ANGLE PLAN
SEE NOTE 2
BARRIER,
NOTE 1
SEE
BACKWALL
ABUTMENT
1" CHAMFER
3" BONDING
3"
SMOOTH FINISH
3" BONDING ON
STRUCTURE APPROACH
WITH INSERTS
TEMPORARY BUMPER
ALTERNATIVE 1
Jt FILLER
¼" EXPANSION
DRAIN
GEOCOMPOSITEINTO CHAMFER)
(FOLD NEOPRENE
TEMPORARY BUMPER.
AND INSTALLING THE
ABUTMENT BACKWALL
BACKFILLING THE
PLACE PRIOR TO
?" x 1' NEOPRENE STRIP.
SMOOTH FINISH
3" BONDING ON
DETAIL C
SEE NOTE 3
JOINT SEAL (MR 2")
#5
SEE NOTE 4
4.
3.
2.
1.
NOTES:
match bridge deck protection in Freeze-Thaw Area.
Polyester concrete shall be placed across approach slab to when joint seal assembly is required.
Joint protection details shown for MR < 2". Details similar all concrete and standard post-beam barriers.
Solid concrete barrier shown, details similar for end of wingwall or end of structure approach as applicable.
End the plate or edge angle at beginning of barrier transition, Max
½"
2"
60^
AND NOTE A
SEE "EDGE ANGLE PLAN"
BENT Â ¼ x 6 (Galv), DETAIL B
NOTE A:
TOWARD WALL
SMOOTH SIDE
AND WALL WITH
BETWEEN SLAB
HARDBOARD
PLACE ¼"
curb with vertical face.
for concrete barrier or
Use L3 x 3 x ¼ (Galv)
BAR ¾ x ¼ x 8" @ 12
SEAL
POURABLE
2½"
BAR CHAIR DETAIL
AND 4'-0"± LONGITUDINALLY
#5 @ 3'-0"± TRANSVERSELY
DETAIL X-4
M i n
DETAIL A
PAVEMENT
HMA ROADWAY
JOINT FOR
TRANSVERSE
SLAB
APPROACH
EDGE OF
DESIGN NOTES
LIVE LOAD:
Slab span: L = 7.83 ft (10 ft Approach Slab)
Slab span: L = 24.5 ft (30 ft Approach Slab)
Equivalent strip width method: W = 12 ft
HL93 and permit design load
DEAD LOAD: Includes 35 psf for future wearing surface
LIMIT STATES:
FATand Fatigue I ( = 1.0)
Service I, Strength I & , Extreme
DESIGN:
preface dated January 2014
2012 Edition with Caltrans Amendments, AASHTO LRFD Bridge Design Specifications, REINFORCED CONCRETE:
n = 8 f' = 3.6 ksi f = 60 ksi c y
BENT Â ¼ x 6
B0-1
1-2
LEGEND:
Min lap splice for bottom Reinf in Freeze-Thaw Area shall be 3'-6".
and Bond dowels into a 9" deep hole.
stainless steel or epoxy-coated prefabricated 9" Drill
Threaded Rods and Dowels in Freeze-Thaw Area shall be
Daniel Sessions
77723
6-30-23
COUNTY ROUTE
POST MILES
TOTAL PROJECT
SHEET TOTAL
SHEETS
PLANS APPROVAL DATE
No.
Exp.
R E
G I
S T
E R
E
D P
G I
N E
E R
S
TATE OF CALIFORNI
A
REGISTERED CIVIL ENGINEER
CIVIL
Dist No.
THE STATE OF CALIFORNIA OR ITS OFFICERS
OR AGENTS SHALL NOT BE RESPONSIBLE FOR
COPIES OF THIS PLAN SHEET.
THE ACCURACY OR COMPLETENESS OF SCANNED
May 1, 2023
B9-5
A N
D A
File details come from the government source that posted it. Updated .