These documents are detailed mechanical drawings for the Alaska Peninsula/Bechara NWR Dock Replacement project, specifically focusing on the fuel system infrastructure. The drawings include a legend, fuel pump and hose reel schedules, site plans, and detailed tank elevation and side view diagrams for a 1,000-gallon double-wall fuel tank. Key components include an emergency fuel shut-off, fuel filter, dispensers, and a fire extinguisher, with specific technical specifications for each element. The drawings provide comprehensive layout and installation details for the fuel tank system, including mounting, support structures, and safety features like spill prevention and containment measures. The documents are dated 8/29/22 and are part of the mechanical design documentation for the float plane dock replacement project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_Amendment_4_0004.pdf | ||
| Sol_140FGA25R0012_Amd_0004.pdf | ||
| Sol_140FGA25R0012_Amd_0003.pdf | ||
| Sol_140FGA25R0012_Amd_0002.pdf | ||
| Questions_and_Answers_Amendment_2_0002.pdf | ||
| Updated_Provisions__Clauses__and_Evaluation_Method_in_Section_M_0002.pdf | ||
| Sol_140FGA25R0012_Amd_0001.pdf | ||
| Pre-Bid_Site_Visit_Sign_In_0001.pdf | ||
| Notice_to_Offerors.pdf | ||
| 9_Price_Schedule.pdf | ||
| Sol_140FGA25R0012.pdf | ||
| 2_Drawings_1__APB_Dock_PHASE_1_100__Construction.pdf | ||
| 3_Drawings_1_1_APB_Dock_PHASE_2_100__Design_Construction.pdf | ||
| 5_Drawings_1_3_APB_Dock_100__Final_Construction_Electrical.pdf | ||
| 8_DOL_Wage_Determination.pdf | ||
| SF_1442_140FGA25R0012.pdf | ||
| 7_Specifications_2_1_APB_Dock_Replacement_PHASE_2_Conformed_Project_Specifications.pdf | ||
| 1_SOW_King_Salmon.pdf | ||
| 6_Specifications_2_1_APB_Dock_Replacement_PHASE_1_Conformed_Project_Specifications.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8/29/22
ABBREVIATIONS
LEGEND
FUEL PUMP SCHEDULE
HOSE REEL SCHEDULE
2 2
8/29/22
FUEL TANK AND HOSE REEL PLAN
1/4" = 1'-0"
2 2
MECHANICAL SITE PLAN
1/32" = 1'-0"
KEEP FIRE AND FLAME AWAY
COMBUSTIBLE LIQUID
DANGER
TANK ELEVATION TANK SIDE VIEW
O
PW
NOTES:
8/29/22
FUEL TANK DETAIL
NOT TO SCALE
2 3
EXISTING FUEL TANK AND HOSE REEL (FOR REFERENCE)
NOT TO SCALE
2 3
OFCI FUEL TANK
NOT TO SCALE
2 3
| Sheets and Views |
| M0193 Mseries-M1 |
| M0193 Mseries-M2 |
| M0193 Mseries-M3 |