3_Drawings_1_1_APB_Dock_PHASE_2_100__Design_Construction.pdf

PDF 7 MB Posted

Attached to
GAOA - Alaska Peninsula NWR Float Plane Dock Repla Federal contract opportunity
Solicitation number
140FGA25R0012
Issued by
Department of the Interior Fish and Wildlife Service

About this file

These are design and construction drawings for the Alaska Peninsula/Becharof National Wildlife Refuge (NWR) Dock Replacement Project, Phase 2, located in King Salmon, Alaska. The comprehensive set of 20 technical drawings details a complex dock replacement project including a new gangway, float system, boat ramp, dock shed, fuel tank, and associated infrastructure. Key technical elements include a 46'-8" aluminum gangway with a truss design, a modular float system with multiple components, a gravel surfaced boat ramp with specific elevation and construction specifications, and a metal-sided dock shed. The project involves precise engineering considerations for marine environments, including anchoring systems, chain configurations, pile and frame connections, and accommodations for varying water levels. The drawings are dated March 2023 and prepared by a registered professional engineer, indicating a detailed, professionally engineered approach to replacing the existing dock infrastructure at the NWR site.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Kvichak Bay

Naknek

King Salmon Naknek

Lake

Katmai National Park and Preserve

Naknek

River

CIVIL / STRUCTURAL SHEET INDEX

SHEET TITLE SHEET NUMBER

VICINITY

Atka Unalaska King Cove

Bethel

Savoonga Nome

Kotzebue

Dillingham

Kodiak

Homer Kenai

Seward

Sitka

Juneau

Ketchikan

Anchorage

Koyukuk Tanana

Wasilla Valdez

Cordova

Fairbanks Eagle

Nuiqsut

Barrow

Kaktovik

SkagwayAttu

STATE OF ALASKA

Salmon

PROJECT

LOCATION

King

MECHANICAL SHEET INDEX

SHEET TITLE SHEET NUMBER

ELECTRICAL SHEET INDEX

SHEET TITLE SHEET NUMBER

ALASKA PENINSULA / BECHAROF

NWR DOCK REPLACEMENT

MARCH 2023

KING SALMON, AK

PROJECT

LOCATION

PHASE 2

AKAF AL

TS

TA

E O

49 TH

S

Charles D. Courtright

CE-12820REGIS T ER E D P R O F E S S IO NA L ENGINEER

ABBREVIATIONSGENERAL NOTES:

A

AKAF AL

TS

TA

E O

49 TH

S

Charles D. Courtright

CE-12820

REG IS T ER E D P R O F E S S IO NA L ENGINEER

LEGEND

ESTIMATE OF QUANTITIES

AKAF AL

TS

TA E O

49 TH

S

Charles D. Courtright

REG IS T ER ED P R O F E S S I O NA L ENGINEER

0 40 80 120 FT20

A

2A

1A

2B 1B

0 20 40 60 FT10

AKAF AL

TS

TA

E O

49 TH

S

Charles D. Courtright

REG IS T ER ED P R O F E S S IO NA L ENGINEER

0 20 40 60 FT10

AKAF AL

TS

TA

E O

49 TH

S

Charles D. Courtright

TS

TA

E O

49 TH

S

Charles D. Courtright

A

PLAN

A

SECTION AKAF AL

TS

TA E O

49 TH

S

Charles D. Courtright

SHORE MOUNT - ELEVATION

SHORE MOUNT - PLAN

SHORE MOUNT - SECTION

ROLLER GUIDE

AKAF AL

TS

TA E O

49 TH

S

Charles D. Courtright

C

SPIN FIN PILES

A

TOP BEAM / PILE CONNECTION

ELEVATION TYPICAL SECTION

B

TYPICAL SPLICE WELD

FIN PLATE

SECTION

A

PILE FRAME ELEVATION

PIPE PILE SCHEDULE

AKAF AL

TS

TA E O

49 TH

S

Charles D. Courtright

TOP BEAM & GANGWAY RIGGING

BATTER PILE CONNECTION

GUSSET PLATE

SECTION @ TOP FLANGE

PADEYE PLATES

TOP BEAM PIPE PILES GANGWAY*

AKAF AL

TS

TA E O

49 TH

S

Charles D. Courtright

REGIST ER ED P R O F E S S IO NA L ENGINEER

GANGWAY ELEVATION & PLAN

TYPICAL SECTION

TRANSITION PLATES

HINGE ASSEMBLY

AKAF AL

TS

TA

E O

49 TH

S

Charles D. Courtright

FLOAT TRANSITION PLATE - SECTION

ASSEMBLED GANGWAY FLOAT - PLAN

A

A

PILE HOOP SECTION

AKAF AL

TS

TA

E O

49 TH

S

Charles D. Courtright

REG IST ER ED P R O F E S S IO NA L ENGINEER

2B

2A

1B

1A

NEW FLOAT LAYOUT

FINGER FLOAT

AKAF AL

TS

TA

E O

49 TH

S

Charles D. Courtright

CE-12820REG IS T ER E D P R O F E S S IO NA L ENGINEER

SIDE

END

PLAN

FACEPLAN

PILE BRACKET & HOOP (EZ FLOAT MODEL 100800)

80x120 MOLDED POLY FLOAT UNIT (EZ FLOAT MODEL 208010)

PLAN FACE

PLAN FACE

PLAN

FACE

ANCHOR BRACKET (EZ FLOAT MODEL 100700

MODIFIED w/ KEYHOLE ANCHOR CONNECTOR)

ALUMINUM 10" CLEAT (EZ FLOAT MODEL 300110)

UNIFIED COUPLER (EZ FLOAT MODEL 301100)

OWNER SUPPLIED MATERAILS

AKAF AL

TS

TA E O

49 TH

S

Charles D. Courtright

ANCHOR CHAIN PAIRS 1 & 2 - SECTION

ANCHOR CHAIN CONFIGURATION (ALL LOCATIONS)

AKAF AL

TS

TA

E O

49 TH

S

Charles D. Courtright

REG IST ER ED P R O F E S S IO NA L ENGINEER

B

C

D

A

SECTION A: BOAT RAMP PROFILE

B

SECTION B: BOAT RAMP TOE (ADD ALT #1) 17

D

SECTION D: BOAT RAMP - ABOVE +14.7' (ADD ALT #1)

C

SECTION C: BOAT RAMP - BELOW +14.7' (ADD ALT #1)

DETAIL: SECTION TRANSITION AT +14.7' (ADD ALT #1)

AKAF AL

TS

TA

E O

49 TH

S

Charles D. Courtright

REG IST ER ED PR O FE S S IO NA L ENGINEER

BOLLARD DETAIL

GRAVEL SURFACING TYPICAL SECTION

FLAMMABLE NO SMOKING1

FUEL TANK HOLD DOWN LOCATIONS

END SIDE

HOLD DOWN DETAIL

SECTION

Z CLIP - PLAN

CONCRETE PAD TYPICAL JOINT DETAIL

HOSE GUIDE STAND

AKAF AL

TS

TA E O

49 TH

S

Charles D. Courtright

REG IST ER E D P R O F E S S IO NA L ENGINEER

DOCK SHED - PLAN

A

DOCK SHED - SIDE ELEVATION

B

DOCK SHED - END ELEVATION

B

A

DOCK LAYOUT - PLANCONCRETE PAD DETAIL

AKAF AL

TS

TA E O

49 TH

S

Charles D. Courtright

TS

TA

E O

49 TH

S

Charles D. Courtright

8/29/22

ABBREVIATIONS

LEGEND

FUEL PUMP SCHEDULE

HOSE REEL SCHEDULE

2 2

8/29/22

FUEL TANK AND HOSE REEL PLAN

1/4" = 1'-0"

2 2

MECHANICAL SITE PLAN

1/32" = 1'-0"

KEEP FIRE AND FLAME AWAY

COMBUSTIBLE LIQUID

DANGER

TANK ELEVATION TANK SIDE VIEW

O

PW

NOTES:

8/29/22

FUEL TANK DETAIL

NOT TO SCALE

2 3

EXISTING FUEL TANK AND HOSE REEL (FOR REFERENCE)

NOT TO SCALE

2 3

OFCI FUEL TANK

NOT TO SCALE

2 3

2 2

7/1/2022

LEGEND SHEET NOTES

SHEET NOTES

1 ELECTRICAL SITE PLAN

1" = 20' 2 ENLARGED FUEL TANK PLAN

1/4" = 1'-0"

7/1/2022

ELECTRICAL SPECIFICATIONS

7/1/2022

1 HAZARDOUS BOUNDARY PLAN

1/4" = 1'-0"

SHEET NOTES

HAZARDOUS LOCATION LEGEND

HAZARDOUS LOCATIONS

2 TYPICAL FUEL STORAGE TANK HAZARDOUS AREA

NO SCALE

3 TYPICAL FUEL DISPENSER HAZARDOUS AREA

NO SCALE

APB Dock_PHASE 2_100% Design Construction Drawings_S&S 3-24-2023
Sheets and Views
01 Phase 2 Cover Sheet-01
02_03 Phase 2 General Notes & Legend-02
02_03 Phase 2 General Notes & Legend-03
04 Phase 2 Existing Conditions & Survey Control-04
05 Phase 2 New Site Plan-05
06 Grading Plan (Base Bid)-06
07 Grading Plan (Add Alt #1)-06
08 Gangway Plan & Elevation-08
09 Phase 2 Shore Mount Details-09
10_11 Phase 2 Lifting Frame Details-10
10_11 Phase 2 Lifting Frame Details-11
12 Phase 2 Gangway Details (1 of 2)-12
13 Phase 2 Gangway Details (2 of 2)-13
14_16 Phase 2 Float Layout & Details-14
14_16 Phase 2 Float Layout & Details-15
14_16 Phase 2 Float Layout & Details-16
17 Phase 2 Ramp Profile and Section (Add Alt #1)-17
18 Phase 2 Civil Details-18
19 Phase 2 Dock Plan and Shed-19
20 Phase 2 Old Ramp Fill Grading Plan (Add Alt #1)-20
APB Dock 100% Final Construction Documents_Mechanical Drawings - Signed
Sheets and Views
M0193 Mseries-M1
M0193 Mseries-M2
M0193 Mseries-M3
APB Dock 100% Final Construction Documents_Electrical Drawings - Signed
Sheets and Views
M0193 Eseries-E1
M0193 Eseries-E2
M0193 Eseries-E3

File details come from the government source that posted it. Updated .