These are design and construction drawings for the Alaska Peninsula/Becharof National Wildlife Refuge (NWR) Dock Replacement Project, Phase 2, located in King Salmon, Alaska. The comprehensive set of 20 technical drawings details a complex dock replacement project including a new gangway, float system, boat ramp, dock shed, fuel tank, and associated infrastructure. Key technical elements include a 46'-8" aluminum gangway with a truss design, a modular float system with multiple components, a gravel surfaced boat ramp with specific elevation and construction specifications, and a metal-sided dock shed. The project involves precise engineering considerations for marine environments, including anchoring systems, chain configurations, pile and frame connections, and accommodations for varying water levels. The drawings are dated March 2023 and prepared by a registered professional engineer, indicating a detailed, professionally engineered approach to replacing the existing dock infrastructure at the NWR site.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_Amendment_4_0004.pdf | ||
| Sol_140FGA25R0012_Amd_0004.pdf | ||
| Sol_140FGA25R0012_Amd_0003.pdf | ||
| Sol_140FGA25R0012_Amd_0002.pdf | ||
| Questions_and_Answers_Amendment_2_0002.pdf | ||
| Updated_Provisions__Clauses__and_Evaluation_Method_in_Section_M_0002.pdf | ||
| Sol_140FGA25R0012_Amd_0001.pdf | ||
| Pre-Bid_Site_Visit_Sign_In_0001.pdf | ||
| Notice_to_Offerors.pdf | ||
| 9_Price_Schedule.pdf | ||
| Sol_140FGA25R0012.pdf | ||
| 2_Drawings_1__APB_Dock_PHASE_1_100__Construction.pdf | ||
| 5_Drawings_1_3_APB_Dock_100__Final_Construction_Electrical.pdf | ||
| 8_DOL_Wage_Determination.pdf | ||
| 1_SOW_King_Salmon.pdf | ||
| 6_Specifications_2_1_APB_Dock_Replacement_PHASE_1_Conformed_Project_Specifications.pdf | ||
| SF_1442_140FGA25R0012.pdf | ||
| 4_Drawings_1_2_APB_Dock_100__Final_Construction_Mechanical.pdf | ||
| 7_Specifications_2_1_APB_Dock_Replacement_PHASE_2_Conformed_Project_Specifications.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Kvichak Bay
Naknek
King Salmon Naknek
Lake
Katmai National Park and Preserve
Naknek
River
CIVIL / STRUCTURAL SHEET INDEX
SHEET TITLE SHEET NUMBER
VICINITY
Atka Unalaska King Cove
Bethel
Savoonga Nome
Kotzebue
Dillingham
Kodiak
Homer Kenai
Seward
Sitka
Juneau
Ketchikan
Anchorage
Koyukuk Tanana
Wasilla Valdez
Cordova
Fairbanks Eagle
Nuiqsut
Barrow
Kaktovik
SkagwayAttu
STATE OF ALASKA
Salmon
PROJECT
LOCATION
King
MECHANICAL SHEET INDEX
SHEET TITLE SHEET NUMBER
ELECTRICAL SHEET INDEX
SHEET TITLE SHEET NUMBER
ALASKA PENINSULA / BECHAROF
NWR DOCK REPLACEMENT
MARCH 2023
KING SALMON, AK
PROJECT
LOCATION
PHASE 2
AKAF AL
TS
TA
E O
49 TH
S
Charles D. Courtright
CE-12820REGIS T ER E D P R O F E S S IO NA L ENGINEER
ABBREVIATIONSGENERAL NOTES:
A
AKAF AL
TS
TA
E O
49 TH
S
Charles D. Courtright
CE-12820
REG IS T ER E D P R O F E S S IO NA L ENGINEER
LEGEND
ESTIMATE OF QUANTITIES
AKAF AL
TS
TA E O
49 TH
S
Charles D. Courtright
REG IS T ER ED P R O F E S S I O NA L ENGINEER
0 40 80 120 FT20
A
2A
1A
2B 1B
0 20 40 60 FT10
AKAF AL
TS
TA
E O
49 TH
S
Charles D. Courtright
REG IS T ER ED P R O F E S S IO NA L ENGINEER
0 20 40 60 FT10
AKAF AL
TS
TA
E O
49 TH
S
Charles D. Courtright
TS
TA
E O
49 TH
S
Charles D. Courtright
A
PLAN
A
SECTION AKAF AL
TS
TA E O
49 TH
S
Charles D. Courtright
SHORE MOUNT - ELEVATION
SHORE MOUNT - PLAN
SHORE MOUNT - SECTION
ROLLER GUIDE
AKAF AL
TS
TA E O
49 TH
S
Charles D. Courtright
C
SPIN FIN PILES
A
TOP BEAM / PILE CONNECTION
ELEVATION TYPICAL SECTION
B
TYPICAL SPLICE WELD
FIN PLATE
SECTION
A
PILE FRAME ELEVATION
PIPE PILE SCHEDULE
AKAF AL
TS
TA E O
49 TH
S
Charles D. Courtright
TOP BEAM & GANGWAY RIGGING
BATTER PILE CONNECTION
GUSSET PLATE
SECTION @ TOP FLANGE
PADEYE PLATES
TOP BEAM PIPE PILES GANGWAY*
AKAF AL
TS
TA E O
49 TH
S
Charles D. Courtright
REGIST ER ED P R O F E S S IO NA L ENGINEER
GANGWAY ELEVATION & PLAN
TYPICAL SECTION
TRANSITION PLATES
HINGE ASSEMBLY
AKAF AL
TS
TA
E O
49 TH
S
Charles D. Courtright
FLOAT TRANSITION PLATE - SECTION
ASSEMBLED GANGWAY FLOAT - PLAN
A
A
PILE HOOP SECTION
AKAF AL
TS
TA
E O
49 TH
S
Charles D. Courtright
REG IST ER ED P R O F E S S IO NA L ENGINEER
2B
2A
1B
1A
NEW FLOAT LAYOUT
FINGER FLOAT
AKAF AL
TS
TA
E O
49 TH
S
Charles D. Courtright
CE-12820REG IS T ER E D P R O F E S S IO NA L ENGINEER
SIDE
END
PLAN
FACEPLAN
PILE BRACKET & HOOP (EZ FLOAT MODEL 100800)
80x120 MOLDED POLY FLOAT UNIT (EZ FLOAT MODEL 208010)
PLAN FACE
PLAN FACE
PLAN
FACE
ANCHOR BRACKET (EZ FLOAT MODEL 100700
MODIFIED w/ KEYHOLE ANCHOR CONNECTOR)
ALUMINUM 10" CLEAT (EZ FLOAT MODEL 300110)
UNIFIED COUPLER (EZ FLOAT MODEL 301100)
OWNER SUPPLIED MATERAILS
AKAF AL
TS
TA E O
49 TH
S
Charles D. Courtright
ANCHOR CHAIN PAIRS 1 & 2 - SECTION
ANCHOR CHAIN CONFIGURATION (ALL LOCATIONS)
AKAF AL
TS
TA
E O
49 TH
S
Charles D. Courtright
REG IST ER ED P R O F E S S IO NA L ENGINEER
B
C
D
A
SECTION A: BOAT RAMP PROFILE
B
SECTION B: BOAT RAMP TOE (ADD ALT #1) 17
D
SECTION D: BOAT RAMP - ABOVE +14.7' (ADD ALT #1)
C
SECTION C: BOAT RAMP - BELOW +14.7' (ADD ALT #1)
DETAIL: SECTION TRANSITION AT +14.7' (ADD ALT #1)
AKAF AL
TS
TA
E O
49 TH
S
Charles D. Courtright
REG IST ER ED PR O FE S S IO NA L ENGINEER
BOLLARD DETAIL
GRAVEL SURFACING TYPICAL SECTION
FLAMMABLE NO SMOKING1
FUEL TANK HOLD DOWN LOCATIONS
END SIDE
HOLD DOWN DETAIL
SECTION
Z CLIP - PLAN
CONCRETE PAD TYPICAL JOINT DETAIL
HOSE GUIDE STAND
AKAF AL
TS
TA E O
49 TH
S
Charles D. Courtright
REG IST ER E D P R O F E S S IO NA L ENGINEER
DOCK SHED - PLAN
A
DOCK SHED - SIDE ELEVATION
B
DOCK SHED - END ELEVATION
B
A
DOCK LAYOUT - PLANCONCRETE PAD DETAIL
AKAF AL
TS
TA E O
49 TH
S
Charles D. Courtright
TS
TA
E O
49 TH
S
Charles D. Courtright
8/29/22
ABBREVIATIONS
LEGEND
FUEL PUMP SCHEDULE
HOSE REEL SCHEDULE
2 2
8/29/22
FUEL TANK AND HOSE REEL PLAN
1/4" = 1'-0"
2 2
MECHANICAL SITE PLAN
1/32" = 1'-0"
KEEP FIRE AND FLAME AWAY
COMBUSTIBLE LIQUID
DANGER
TANK ELEVATION TANK SIDE VIEW
O
PW
NOTES:
8/29/22
FUEL TANK DETAIL
NOT TO SCALE
2 3
EXISTING FUEL TANK AND HOSE REEL (FOR REFERENCE)
NOT TO SCALE
2 3
OFCI FUEL TANK
NOT TO SCALE
2 3
2 2
7/1/2022
LEGEND SHEET NOTES
SHEET NOTES
1 ELECTRICAL SITE PLAN
1" = 20' 2 ENLARGED FUEL TANK PLAN
1/4" = 1'-0"
7/1/2022
ELECTRICAL SPECIFICATIONS
7/1/2022
1 HAZARDOUS BOUNDARY PLAN
1/4" = 1'-0"
SHEET NOTES
HAZARDOUS LOCATION LEGEND
HAZARDOUS LOCATIONS
2 TYPICAL FUEL STORAGE TANK HAZARDOUS AREA
NO SCALE
3 TYPICAL FUEL DISPENSER HAZARDOUS AREA
NO SCALE
| APB Dock_PHASE 2_100% Design Construction Drawings_S&S 3-24-2023 |
| Sheets and Views |
| 01 Phase 2 Cover Sheet-01 |
| 02_03 Phase 2 General Notes & Legend-02 |
| 02_03 Phase 2 General Notes & Legend-03 |
| 04 Phase 2 Existing Conditions & Survey Control-04 |
| 05 Phase 2 New Site Plan-05 |
| 06 Grading Plan (Base Bid)-06 |
| 07 Grading Plan (Add Alt #1)-06 |
| 08 Gangway Plan & Elevation-08 |
| 09 Phase 2 Shore Mount Details-09 |
| 10_11 Phase 2 Lifting Frame Details-10 |
| 10_11 Phase 2 Lifting Frame Details-11 |
| 12 Phase 2 Gangway Details (1 of 2)-12 |
| 13 Phase 2 Gangway Details (2 of 2)-13 |
| 14_16 Phase 2 Float Layout & Details-14 |
| 14_16 Phase 2 Float Layout & Details-15 |
| 14_16 Phase 2 Float Layout & Details-16 |
| 17 Phase 2 Ramp Profile and Section (Add Alt #1)-17 |
| 18 Phase 2 Civil Details-18 |
| 19 Phase 2 Dock Plan and Shed-19 |
| 20 Phase 2 Old Ramp Fill Grading Plan (Add Alt #1)-20 |
| APB Dock 100% Final Construction Documents_Mechanical Drawings - Signed |
| Sheets and Views |
| M0193 Mseries-M1 |
| M0193 Mseries-M2 |
| M0193 Mseries-M3 |
| APB Dock 100% Final Construction Documents_Electrical Drawings - Signed |
| Sheets and Views |
| M0193 Eseries-E1 |
| M0193 Eseries-E2 |
| M0193 Eseries-E3 |