2_Drawings_1__APB_Dock_PHASE_1_100__Construction.pdf

PDF 3 MB Posted

Attached to
GAOA - Alaska Peninsula NWR Float Plane Dock Repla Federal contract opportunity
Solicitation number
140FGA25R0012
Issued by
Department of the Interior Fish and Wildlife Service

About this file

These are civil engineering drawings for the Alaska Peninsula/Becharof NWR Dock Replacement Project, Phase 1, located in King Salmon, Alaska. The technical documents detail a comprehensive dock replacement project for the Fish and Wildlife Service, involving intricate civil and structural engineering specifications. The drawings include detailed site plans, grading plans, bulkhead and sheet pile details, coordinate layout tables, and typical section diagrams for uplands and bulkhead gravel surfacing. The project involves precise engineering elements such as sheet pile installation, anchor pile sections, pipe bullrail elevation, and careful consideration of existing site conditions, with specific attention to maintaining alignment with existing grades and infrastructure. The drawings are dated March 2023 and prepared by a registered professional engineer, Charles D. Courtright, with the project focusing on replacing the dock in the Naknek River area near Katmai National Park and Preserve.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Kvichak Bay

Naknek

King Salmon Naknek

Lake

Katmai National Park and Preserve

Naknek

River

CIVIL / STRUCTURAL SHEET INDEX

SHEET TITLE SHEET NUMBER

ALASKA PENINSULA / BECHAROF

NWR DOCK REPLACEMENT

MARCH 2023

KING SALMON, AK

VICINITY

Atka Unalaska King Cove

Bethel

Savoonga Nome

Kotzebue

Dillingham

Kodiak

Homer Kenai

Seward

Sitka

Juneau

Ketchikan

Anchorage

Koyukuk Tanana

Wasilla Valdez

Cordova

Fairbanks Eagle

Nuiqsut

Barrow

Kaktovik

SkagwayAttu

STATE OF ALASKA

PROJECT

LOCATION

Salmon

PROJECT

LOCATION

King

PHASE 1

AKAF AL

TS

TA E O

49 TH

S

Charles D. Courtright

CE-12820

REG IST ER ED PR O FE S S IO NA L ENG INEER

ABBREVIATIONSGENERAL NOTES:

A

AKAF AL

TS

TA E O

49 TH

S

Charles D. Courtright

REG IS T ER E D P R O F E S S IO NA L ENGINEER

LEGEND

ESTIMATE OF QUANTITIES

AKAF AL

TS

TA E O

49 TH

S

Charles D. Courtright

REG IS T ER E D P R O F E S S I O NA L ENGINEER

0 40 80 120 FT20

0 20 40 60 FT10

AKAF AL

TS

TA

E O

49 TH

S

Charles D. Courtright

REG IST ER ED PR O FE S S IO NA L ENGINEER

0 20 40 60 FT10

AKAF AL

TS

TA E O

49 TH

S

Charles D. Courtright

REG IST ER ED P R O F E S S IO NA L ENGINEER

A

PLAN

A

SECTION

SHEET PILE SCHEDULE

AKAF AL

TS

TA

E O

49 TH

S

Charles D. Courtright

REG IS T ER ED P R O F E S S IO NA L ENGINEER

A

PIPE BULLRAIL ELEVATION

A

PIPE RAIL SECTION

INCORRECT CORRECT INCORRECT

SHEET PILE INTERLOCK TYPICAL DETAIL

ANCHOR PILE SECTION

PS31

AKAF AL

TS

TA

E O

49 TH

S

Charles D. Courtright

UPLANDS GRAVEL SURFACING TYPICAL SECTION

BULKHEAD GRAVEL SURFACING TYPICAL SECTION

AKAF AL

TS

TA

E O

49 TH

S

Charles D. Courtright

Sheets and Views
01 Phase 1 Cover Sheet-01
02_03 Phase 1 General Notes & Legend-02
02_03 Phase 1 General Notes & Legend-03
04 Phase 1 Existing Conditions & Survey Control-04
05 Phase 1 New Site Plan-05
06 Phase 1 Grading Plan-06
07 Phase 1 Bulkhead Plan & Elevation-07
08 Phase 1 Bulkhead Details-08
09 Phase 1 Civil Details-09

File details come from the government source that posted it. Updated .