2_Drawings_1__APB_Dock_PHASE_1_100__Construction.pdf
PDF 3 MB Posted
- Attached to
- GAOA - Alaska Peninsula NWR Float Plane Dock Repla Federal contract opportunity
- Solicitation number
- 140FGA25R0012
About this file
These are civil engineering drawings for the Alaska Peninsula/Becharof NWR Dock Replacement Project, Phase 1, located in King Salmon, Alaska. The technical documents detail a comprehensive dock replacement project for the Fish and Wildlife Service, involving intricate civil and structural engineering specifications. The drawings include detailed site plans, grading plans, bulkhead and sheet pile details, coordinate layout tables, and typical section diagrams for uplands and bulkhead gravel surfacing. The project involves precise engineering elements such as sheet pile installation, anchor pile sections, pipe bullrail elevation, and careful consideration of existing site conditions, with specific attention to maintaining alignment with existing grades and infrastructure. The drawings are dated March 2023 and prepared by a registered professional engineer, Charles D. Courtright, with the project focusing on replacing the dock in the Naknek River area near Katmai National Park and Preserve.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Kvichak Bay
Naknek
King Salmon Naknek
Lake
Katmai National Park and Preserve
Naknek
River
CIVIL / STRUCTURAL SHEET INDEX
SHEET TITLE SHEET NUMBER
ALASKA PENINSULA / BECHAROF
NWR DOCK REPLACEMENT
MARCH 2023
KING SALMON, AK
VICINITY
Atka Unalaska King Cove
Bethel
Savoonga Nome
Kotzebue
Dillingham
Kodiak
Homer Kenai
Seward
Sitka
Juneau
Ketchikan
Anchorage
Koyukuk Tanana
Wasilla Valdez
Cordova
Fairbanks Eagle
Nuiqsut
Barrow
Kaktovik
SkagwayAttu
STATE OF ALASKA
PROJECT
LOCATION
Salmon
PROJECT
LOCATION
King
PHASE 1
AKAF AL
TS
TA E O
49 TH
S
Charles D. Courtright
CE-12820
REG IST ER ED PR O FE S S IO NA L ENG INEER
ABBREVIATIONSGENERAL NOTES:
A
AKAF AL
TS
TA E O
49 TH
S
Charles D. Courtright
REG IS T ER E D P R O F E S S IO NA L ENGINEER
LEGEND
ESTIMATE OF QUANTITIES
AKAF AL
TS
TA E O
49 TH
S
Charles D. Courtright
REG IS T ER E D P R O F E S S I O NA L ENGINEER
0 40 80 120 FT20
0 20 40 60 FT10
AKAF AL
TS
TA
E O
49 TH
S
Charles D. Courtright
REG IST ER ED PR O FE S S IO NA L ENGINEER
0 20 40 60 FT10
AKAF AL
TS
TA E O
49 TH
S
Charles D. Courtright
REG IST ER ED P R O F E S S IO NA L ENGINEER
A
PLAN
A
SECTION
SHEET PILE SCHEDULE
AKAF AL
TS
TA
E O
49 TH
S
Charles D. Courtright
REG IS T ER ED P R O F E S S IO NA L ENGINEER
A
PIPE BULLRAIL ELEVATION
A
PIPE RAIL SECTION
INCORRECT CORRECT INCORRECT
SHEET PILE INTERLOCK TYPICAL DETAIL
ANCHOR PILE SECTION
PS31
AKAF AL
TS
TA
E O
49 TH
S
Charles D. Courtright
UPLANDS GRAVEL SURFACING TYPICAL SECTION
BULKHEAD GRAVEL SURFACING TYPICAL SECTION
AKAF AL
TS
TA
E O
49 TH
S
Charles D. Courtright
| Sheets and Views |
| 01 Phase 1 Cover Sheet-01 |
| 02_03 Phase 1 General Notes & Legend-02 |
| 02_03 Phase 1 General Notes & Legend-03 |
| 04 Phase 1 Existing Conditions & Survey Control-04 |
| 05 Phase 1 New Site Plan-05 |
| 06 Phase 1 Grading Plan-06 |
| 07 Phase 1 Bulkhead Plan & Elevation-07 |
| 08 Phase 1 Bulkhead Details-08 |
| 09 Phase 1 Civil Details-09 |
File details come from the government source that posted it. Updated .