9_Price_Schedule.pdf

PDF 169 KB Posted

Attached to
GAOA - Alaska Peninsula NWR Float Plane Dock Repla Federal contract opportunity
Solicitation number
140FGA25R0012
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This is a Price Schedule for the Floatplane Dock Rehabilitation project at the Alaska Peninsula National Wildlife Refuge, solicitation number 140FGA25R0012. The document outlines three primary line items: replacing the bulkhead, replacing the floatplane dock, and an optional boat ramp replacement. The pricing is structured on a Lowest Price Technically Acceptable (LPTA) basis, with each task item requiring comprehensive cost inclusion for materials, labor, expenses, permitting, overhead, and profit.

The price schedule specifies that offerors must provide complete pricing for each item, broken down by divisions and subdivisions. The government will evaluate offers by adding the total price of options to the base requirement price, though the option item evaluation does not obligate the government to award the option. The contract is being solicited by the Department of the Interior's Fish and Wildlife Service, with the estimated quantity for each base and option item set at 1 lump sum (LS). Offerors are required to complete the form with their company details, unique entity ID, preparer information, and submit a comprehensive pricing breakdown.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE

Floatplane Dock Rehabilitation Alaska Peninsula National Wildlife Refuge

140FGA25R0012

Each Task item shall include all cost for materials, labor, expenses, fees, permitting costs, overhead and profit associated with each item in accordance with the solicitation documents. Award will be made based on Lowest Price Technically Acceptable.

Item

Description Estimated Quantity

Unit Unit Price Total Cost

Base Items 1 Base: Replace Bulkhead 1 LS

2 Base: Replace Floatplane Dock 1 LS

Total Proposed Cost of Base

Items

Option Item: Include Overhead, Insurance, Bonds, and Profit

3 Option #1: Replace Boat Ramp 1 LS

Total Proposed Cost of Base Items and Option Item

Evaluation of Option Items:

The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the base requirement. Evaluation of option item will be completed at the time of award. Evaluation of option item will not obligate the Government to award the option. The Government may award the option item at its discretion or may not award the option item at all.

**Incomplete Price Schedules will not be considered: Offerors MUST provide pricing for each item. The offeror MUST also submit their proposal pricing broken down based on divisions and subdivisions.

Company Name Unique Entity ID Quote Prepared By Title Signature Address Date

Phone Number Email

File details come from the government source that posted it. Updated .