This document contains an Energized Electrical Work Permit for the VA Long Beach Healthcare System. The permit details work to be performed on energized electrical equipment located at Building 164, including preparation of the site and installation of required utilities for a pharmacy sterile compounding trailer. Personal protective equipment requirements and hazard analyses results are specified based on the level of electrical exposure. The permit outlines qualifications for workers, supervision by a competent person, barricading and signage requirements. Signatures are required from qualified personnel to acknowledge the safety plan, as well as approvals from supervisors, managers and the facility director.

View the file

Other files

File Type Posted
11. DBA Wage Determination CA20200022 - 08-07-2020 .pdf PDF
15. 600-19-117 (Pharmacy Trailer)_Specs_Addendum 1.pdf PDF
17. Cable Instal Label Test SOP 07-013 Ver. 2.pdf PDF
13. 000110 - Specs TOC_Addendum 1 .pdf PDF
19. 600-19-117 (Trailer Site Prep) RFI Log Trailer_2020818.docx DOCX document
14. 600-19-117 (Pharmacy Trailer)_Plans_Addendum 1.pdf PDF
16. Hirsch_TS_ScramblePad_Reader_Family_DS.pdf PDF
36C25820B0014 0002.docx DOCX document
18. Site Visit Sign-In Sheet - 600-19-117 - 36C25820B0014 - Trailer Prep Site.pdf PDF
36C25820B0014 0001.docx DOCX document
IFB - 36C25820B0014 - Trailer Prep Site .docx DOCX document
10 - Meeting Minutes Fillable.pdf PDF
36C25820B0014_1.docx DOCX document
12 - VHA STANDARDIZED VENDOR FILE PROCEDURE.docx DOCX document
7. IMS SOP 07-013 Cable Installation Labeling and Testing Ver. 2.pdf PDF
5. VALBMC - Above The Ceiling Permit.pdf PDF
8. Excavation Permit.pdf PDF
2. 600-19-117 Plans & Designs.pdf PDF
1. 600-19-117 Specs.pdf PDF
9. Utility and Service Impact Permit Form (USIP 600-148-R2)-07.10.2020.pdf PDF
11 - DBA Wage Determination CA20200022 - 07-10-2020 .pdf PDF
6. VALBMC Hot Work Permit.pdf PDF
3. Mobile Crane Permit 08-2017.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA LONG BEACH ENERGIZED ELECTRICAL WORK PERMIT

Supervisor, Competent Person, or VA Project Engineer (if no contractor):

Printed Name: Sign:

Work start/stop dates: From: To: Time:

EQUIPMENT NAME, LOCATION AND DESCRIPTION: Work order number:

DESCRIPTION OF WORK TO BE PERFORMED:

JUSTIFICATION FOR ENERGIZED WORK:

ELECTRICAL ENERGY SOURCESPRESENT: Check all that apply:

Maximum Exposure

Minimum PPE level:

RESULTS OF SHOCK AND FLASH ANALYSES: Flash Protection Boundary (2nd degree burn potential):

Approach Boundary (shock protection boundary):

(Note: Employee work on Levels 3 and above is PROHIBITED (work must be contracted) REQUIRED

PERSONAL PROTECTIVE EQUIPMENT:

Non-melting, untreated natural fiber clothing, all layers Shirt (long-sleeve) 8 cal/cm2 Pants (long) 8 cal/cm2 Polycarbonate safety glasses Ear protection EH-rated footwear Insulated tools

Leather gloves Flame-retardant coveralls (Level 1+) 8 cal/cm2

Type 1, Class E hard hat (Levels 1&2) Arc-rated face shield (Levels 1&2) FR flash suit and hood (Level 3+) 40 cal/cm2 Switchboard matting/insulated blankets Other items (specify)

Voltage-rated rubber gloves (Minimum 600V) (Inspect all gloves before each use) BARRIERS (to prevent access to flash protection and limited approach boundaries)

Locked access Electrical hazard signs Barrier tapes, stanchions Other (describe):

SUPERVISOR’S PRE-JOB BRIEFING BY: Printed Name: Sign:

[ ] Workers are “qualified” (see 29 CFR 1910.399) with a journeyman electrical rating.

[ ] Safety watch is required. This person must be “qualified,” able to disconnect all power sources with proper

PPE and have immediate access to a telephone or radio to summon help in the event of an emergency.

[ ] All jewelry and metal apparel have been removed.

[ ] Confirmed that insulated tools, EH-rated footwear, switchboard matting, FR-clothing and other equipment is available, in good condition, and appropriate for the hazard level to be encountered.

[ ] Verified that barricades and warning signs are installed.

[ ] Outlined safe work practices to be followed (document under Special Instructions, below).

[ ] STOP WORK POINTS: Permit is void if any unexpected energy is found, or equipment has been modified since the permit was issued.

120 Volt 208 Volt

277 Volt 480 Volt

12KV

Generator

[ ] Special instructions and specific job-related hazards:

QUALIFIED PERSONS that understand and agree to the above plan:

Printed name(s): Signature(s) & Date: Printed name(s): Signature(s) & Date:

SAFETY WATCH:

Printed name: Signature & Date: Printed name: Signature & Date:

APPROVALS Print Sign Date Electric Shop Supervisor Mike Mommerency

Project Engineer

Maintenance Supervisor

John Gorman

Safety Officer

Facility Manager Anthony Streletz

Medical Center Associate Director

Jean Gurga

Work completed date/time: List any unexpected hazards or “STOP WORK” issues encountered:

Supervisor Competent Person or VA Project Engineer if no contractor Printed Name Sign:
EQUIPMENT NAME LOCATION AND DESCRIPTION Work order number:
DESCRIPTION OF WORK TO BE PERFORMED:
JUSTIFICATION FOR ENERGIZED WORK:
Other items specify:
Printed namesRow1_2:
Printed namesRow2:
Printed namesRow2_2:
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box17: Off
Text1:
Text2:
Text3:
Text5:
Text7:
Text8:
Text9:
Text10:
Printed names:
Printed Name:
Check Box15: Off
Check Box16: Off
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box24: Off
Check Box25: Off
Text6:
Text11:
Text12:
Text25:
Dropdown2: [NONE]
Text4:

File details come from the government source that posted it. Updated .