4. FIRST FLOOR POWER.pdf

PDF 345 KB Posted

Attached to
Z2DZ--ATS Replacements for Boiler Plant B3 B25 and T5 | 570-25-501 | Fresno VA
Solicitation number
36C26125R0068
Issued by

About this file

This is a power distribution first floor plan drawing for Building 22 at the VA Central California Health Care System located in Fresno, CA. The detailed electrical schematic includes multiple power system components such as motors (marked with "M"), panel boards, transformers, emergency generators, battery systems, and various electrical routing connections. The drawing uses standard electrical symbols to map out power distribution routes, including connections to multiple motor control centers (MCC-1, MCC-2, MCC-3, MCC-4), chillers, boilers, and other critical infrastructure equipment. The plan is drawn at a scale of 3/16" = 1'-0", was created by V Logic Systems Inc. on 04-05-2010, and is part of the Office of Facilities Management documentation for the Power House and Cooling Tower project.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

97 8654321

Revisions Date

Professional Seal

Approved Project Director:

Drawing Title

Location:

Project Title

Checked:

Building Number:

Drawing Number:

Project Number:

Date:

BUILDING 22 FIRST FLOOR PLAN

POWER

Architects/Engineers/Consultants:

04-05-2010

Office of

Facilities

Management

Dwg. of

Scale :

"=1'-0"

Final Submission

04-05-2010

Drawn:

VL

File Name:

FR-22-01PW

V Logic Systems Inc.

2352 Main Street, Suite 207 Concord, MA 01742 Phone: 978-341-9000 www.vlogicsystems.com

POWER HOUSE AND COOLING TOWER

2615 E. Clinton

Avenue

Fresno, CA 93703

M

COP-1

COP-2

COP-3

SP-1

SP-2

H

2UH1

M

M

AC-2

AC-1

PTRV-1

TO MCC-1

M

OB-1

M

OB-2

M M

CWP-1 CWP-2

BR

EDR

M

BR-22

ER-14,16

CHP-1

CHP-2

M 2-P32-P2

ER-17

MM

2-P1

M M

2-P6

2-P7

2-P4

2-P5

M M

M

M

TO 750 KVA

TRANSFORMER

SWB10

BSB

M 2-P10

ER-20/2

ER-24

BATTERYS

ER-19

EMERGENCY

GENERATOR

130/208V OR

277/480V⌀4W

M

M

ER-21

M M

CH-1

M

TO MCC-1

BR-23

M

OB-3

M

2CF-1

TO PUMP HOUSE

M

SPR-1

TO PUMP HOUSE

PANEL FOR

TRIPLE WIDE

TRAILER

MM

M M M

LVDP

M

PTRV-2

TO MCC-1

M

SPR-2

M

CAB RAN

2-HVU-1

AH

BR-22,24

BR-30/2

M

ER-23

2PTRV-47

EXISTING 300KV

TRANSFORMER

12 KV TO

120/203V, 3⌀

ER-13,15

ER-17

CAB RAN

2-HVU-2

2-PTRV-5

ON ROOF

PULL CONNECTOR

CU

PULL BOX

ER-20

CD

TO LVDP

MCC-3

OPD

MCC-4 BUILDING-31

MCC BUILDING-24

MM

PANEL BR

TO LVPD

S

TO

TRA

BSB

PANEL ER

PANEL PR

M M M

CH-2

BOILER INSTRUMENTATION PANEL

MCC-2

MCC1

MCCB

ER-18

GENERATOR

CONTROL PANEL

2PB-8

J

WATER

SOFTNER

ER-24

CONTINUATION

DUPLEX IN THE CEILING

DISCONNECT SWITCH / FUSED OR UNFUSED SAFETY SWITCH

HOME RUN

CONDUIT DOWN

MOTOR

SYMBOLS

DESCRIPTION

LEGEND

M

120/208V., 3⌀, 4 W PANEL BOARD

HOT WIRE

DUPLEX RECEPTACLE

JUNCTION BOX (CEILING MOUNTED)

J

ELECTRIC THERMOSTAT

SINGLE POLE SWITCH

AUTOMATIC TRANSFER SWITCH

S

TO MCC-1 TO MCC-1

TO MCC-1

TO MCC-1

3" BATTERY

CABLES

CHILLER RM

CONFERENCE

PATIENT

TOILET

PATIENT

TOILET

ENGG

OFFICE

BOILER RM

STAFF

TOILET

EQUIP

STORAGEBOILER

File details come from the government source that posted it. Updated .