16. Price Breakdown Worksheet.docx

DOCX document 23 KB Posted

Attached to
Z2DZ--ATS Replacements for Boiler Plant B3 B25 and T5 | 570-25-501 | Fresno VA
Solicitation number
36C26125R0068
Issued by

About this file

The document is a Price Breakdown Worksheet for Solicitation No. 36C26125R0068, detailing cost allocation across multiple construction divisions. The worksheet provides a structured template for contractors to break down their pricing into categories including Material, Labor, Equipment, and Other costs for Divisions 01 (General Requirements), 02 (Existing Conditions), 07 (Thermal and Moisture Protection), and 26 (Electrical). The template allows for calculating subtotals, adding overhead, profit, and bonds/insurance to arrive at a total proposal price.

This pricing document corresponds to a Department of Veterans Affairs project for Automated Transfer Switches (ATS) replacements at the Fresno VA Medical Center, specifically in Boiler Plants B3, B25, and T5. The project is a firm-fixed price construction requirement set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) within VISN 21, MACC GROUP 2 Contract Holders. The project has a 366-calendar day performance period from the Notice to Proceed, with award basis focused on price and price-related factors, and the government intends to award without conducting discussions.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. 36C26125R0068 Attachment - Price Breakdown Worksheet

DESCRIPTION
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL

Division 01 -General Requirements

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 02 – Existing Conditions
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 07 – Thermal and Moisture Protection
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 26 – Electrical
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
SUB TOTAL
$
$
$
$
$
Overhead
$
$
$
$
$
Profit
$
$
$
$
$
Bonds and Insurance
$
$
$
$
$
TOTAL PROPOSAL
$
$
$
$
$

NOTE: All other costs may be included as a separate item and must be specified in this breakdown.

File details come from the government source that posted it. Updated .