3. FIRST FLOOR PLAN A POWER.pdf

PDF 430 KB Posted

Attached to
Z2DZ--ATS Replacements for Boiler Plant B3 B25 and T5 | 570-25-501 | Fresno VA
Solicitation number
36C26125R0068
Issued by

About this file

This document is a First Floor Plan Power drawing for Building 22A at the VC Medical Education and Library facility located in Fresno, CA. The electrical plan details the layout and connection of various mechanical and electrical components, including chillers (CH-1 through CH-4), pumps (CWP-2, CWP-3, CWP-4, CHWP-1 through CHWP-3), and motor control centers (MCC-E1, MCC-6, MCC-7). The drawing includes technical specifications for each component, such as voltage (480V), phase (3Ø), and horsepower ratings, and shows the interconnections between transformers, switchboards, automatic transfer switches, and various electrical panels. The plan uses standard electrical symbols to represent disconnects, motors, variable frequency drives (VFDs), and other electrical equipment, providing a comprehensive overview of the power distribution system for the first floor.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

ELECTRICAL ROOM

1A02

CHILLER ROOM

1A01

P-11

MCC-7-6MCC-7-3MCC-6-3MCC-E1-4

10 11 12

MCC-7-2MCC-6-2MCC-E1-3

P-9

P-21

AUTOMATIC TRANSFER

SWITCH ATS-E

GROUNDING BAR "G2"

SWITCHBOARD E-B22

MOTOR CONTROL CENTER

MCC-E1

MCC-7-7

FC-2

INTEGRATED UNIT SUBSTATION

MEDIUM VOLTAGE SWITCH SN-B22

TRANSFORMER AND

DISTRIBUTION SECTION

HOUSEKEEPING PAD

GROUNDING BAR "G1",TYP.

TRANSFORMERS

EX AND NX

PANEL P

PANEL EP

LIGHTING CONTROL

PANEL LCP

MOTOR CONTROL

CENTER MCC-6

MOTOR CONTROL

CENTER MCC-7

P-12

CH-4CH-3CH-2CH-1

J P-15

MCC-E1-5

MCC-6-4

MCC-7-4

MCC-7-5

CWP-1

CWP-2

CWP-3

CWP-4

MCC-E1-2

MCC-6-1

MCC-7-1

J J J

JJ

P-14

P-13

SHEET NOTES

1 FAN COIL FC-2, 480V, 3Ø, 3 HP.

2 CHILLER CH-1, 480V, 3Ø, 575 MCA.

3 CHILLER CH-2, 480V, 3Ø, 575 MCA.

4 CHILLER CH-3, 480V, 3Ø, 575 MCA.

5 PUMP CWP-2, 480V, 3Ø, 40 HP.

6 PUMP CWP-3, 480V, 3Ø, 40 HP.

7 PUMP CHP-1, 480V, 3Ø, 15 HP.

8 PUMP CHP-2, 480V, 3Ø, 15 HP.

9 PUMP CHP-3, 480V, 3Ø, 15 HP.

10 PUMP CHWP-1, 480V, 3Ø, 100 HP. VIA VFD.

11 PUMP CHWP-2, 480V, 3Ø, 100 HP. VIA VFD.

12 PUMP CHWP-3, 480V, 3Ø, 100 HP. VIA VFD.

13 RELOCATED CHILLER; CH-4, 480V, 3Ø, 460 MCA.

14 RECONNECT TO MCC1-2B.

15 MECHANICAL ALARM PANEL.

16 LOCATE FOR CHILLER CONTROL POWER.

17 PROVIDE POWER FOR MOTORIZED

18 LOCATE FOR MECHANICAL BMS PANEL.

19 MECHANICAL ALARM PANEL.

BACKDRAFT DAMPERS, 120V.

MANUAL MOTOR STARTER

VARIABLE FREQUENCY DRIVE

VFD

WALL MOUNTED JUNCTION BOXJ

HOME RUN

GROUNDING RECEPTACLE

MOTORM

M

M

M

M

M M M

M

M M M

M M M M

M

M

VFD VFD VFD

M

PANEL BOARD

POWER PANEL 277/480V, 3Ø, 4W

M

SYMBOLS DESCRIPTION

NON FUSED DISCONNECT SWITCH / SAFETY SWITCH

FUSED DISCONNECT SWITCH / SAFETY SWITCH

LEGEND:-

COMBINATION TELEPHONE/DATA OUTLET

20 RELOCATED CWP-4, 480V, 3Ø, 40 HP.

on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

97 8654321

Revisions Date

Professional Seal

Approved Project Director:

Drawing Title

Location:

Project Title

Checked:

Building Number:

Drawing Number:

Project Number:

Date:

BUILDING 22A FIRST FLOOR PLAN

POWER

Architects/Engineers/Consultants:

02-08-2021

22A

Office of

Facilities

Management

Dwg. of

Final Submission

02-08-2021

Drawn:

VL

File Name:

FR-22A-01PW

V Logic Systems Inc.

2352 Main Street, Suite 207 Concord, MA 01742 Phone: 978-341-9000 www.vlogicsystems.com

VC MEDICAL EDUCATION AND LIBRARY

2615 E. Clinton

Avenue

Fresno, CA 93703

File details come from the government source that posted it. Updated .