This document is a First Floor Plan Power drawing for Building 22A at the VC Medical Education and Library facility located in Fresno, CA. The electrical plan details the layout and connection of various mechanical and electrical components, including chillers (CH-1 through CH-4), pumps (CWP-2, CWP-3, CWP-4, CHWP-1 through CHWP-3), and motor control centers (MCC-E1, MCC-6, MCC-7). The drawing includes technical specifications for each component, such as voltage (480V), phase (3Ø), and horsepower ratings, and shows the interconnections between transformers, switchboards, automatic transfer switches, and various electrical panels. The plan uses standard electrical symbols to represent disconnects, motors, variable frequency drives (VFDs), and other electrical equipment, providing a comprehensive overview of the power distribution system for the first floor.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
ELECTRICAL ROOM
1A02
CHILLER ROOM
1A01
P-11
MCC-7-6MCC-7-3MCC-6-3MCC-E1-4
10 11 12
MCC-7-2MCC-6-2MCC-E1-3
P-9
P-21
AUTOMATIC TRANSFER
SWITCH ATS-E
GROUNDING BAR "G2"
SWITCHBOARD E-B22
MOTOR CONTROL CENTER
MCC-E1
MCC-7-7
FC-2
INTEGRATED UNIT SUBSTATION
MEDIUM VOLTAGE SWITCH SN-B22
TRANSFORMER AND
DISTRIBUTION SECTION
HOUSEKEEPING PAD
GROUNDING BAR "G1",TYP.
TRANSFORMERS
EX AND NX
PANEL P
PANEL EP
LIGHTING CONTROL
PANEL LCP
MOTOR CONTROL
CENTER MCC-6
MOTOR CONTROL
CENTER MCC-7
P-12
CH-4CH-3CH-2CH-1
J P-15
MCC-E1-5
MCC-6-4
MCC-7-4
MCC-7-5
CWP-1
CWP-2
CWP-3
CWP-4
MCC-E1-2
MCC-6-1
MCC-7-1
J J J
JJ
P-14
P-13
SHEET NOTES
1 FAN COIL FC-2, 480V, 3Ø, 3 HP.
2 CHILLER CH-1, 480V, 3Ø, 575 MCA.
3 CHILLER CH-2, 480V, 3Ø, 575 MCA.
4 CHILLER CH-3, 480V, 3Ø, 575 MCA.
5 PUMP CWP-2, 480V, 3Ø, 40 HP.
6 PUMP CWP-3, 480V, 3Ø, 40 HP.
7 PUMP CHP-1, 480V, 3Ø, 15 HP.
8 PUMP CHP-2, 480V, 3Ø, 15 HP.
9 PUMP CHP-3, 480V, 3Ø, 15 HP.
10 PUMP CHWP-1, 480V, 3Ø, 100 HP. VIA VFD.
11 PUMP CHWP-2, 480V, 3Ø, 100 HP. VIA VFD.
12 PUMP CHWP-3, 480V, 3Ø, 100 HP. VIA VFD.
13 RELOCATED CHILLER; CH-4, 480V, 3Ø, 460 MCA.
14 RECONNECT TO MCC1-2B.
15 MECHANICAL ALARM PANEL.
16 LOCATE FOR CHILLER CONTROL POWER.
17 PROVIDE POWER FOR MOTORIZED
18 LOCATE FOR MECHANICAL BMS PANEL.
19 MECHANICAL ALARM PANEL.
BACKDRAFT DAMPERS, 120V.
MANUAL MOTOR STARTER
VARIABLE FREQUENCY DRIVE
VFD
WALL MOUNTED JUNCTION BOXJ
HOME RUN
GROUNDING RECEPTACLE
MOTORM
M
M
M
M
M M M
M
M M M
M M M M
M
M
VFD VFD VFD
M
PANEL BOARD
POWER PANEL 277/480V, 3Ø, 4W
M
SYMBOLS DESCRIPTION
NON FUSED DISCONNECT SWITCH / SAFETY SWITCH
FUSED DISCONNECT SWITCH / SAFETY SWITCH
LEGEND:-
COMBINATION TELEPHONE/DATA OUTLET
20 RELOCATED CWP-4, 480V, 3Ø, 40 HP.
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
97 8654321
Revisions Date
Professional Seal
Approved Project Director:
Drawing Title
Location:
Project Title
Checked:
Building Number:
Drawing Number:
Project Number:
Date:
BUILDING 22A FIRST FLOOR PLAN
POWER
Architects/Engineers/Consultants:
02-08-2021
22A
Office of
Facilities
Management
Dwg. of
Final Submission
02-08-2021
Drawn:
VL
File Name:
FR-22A-01PW
V Logic Systems Inc.
2352 Main Street, Suite 207 Concord, MA 01742 Phone: 978-341-9000 www.vlogicsystems.com
VC MEDICAL EDUCATION AND LIBRARY
2615 E. Clinton
Avenue
Fresno, CA 93703