This is a scoring sheet attachment for an RFP issued by the State of Utah Division of Purchasing for Disaster Management and Recovery Consultants. The RFP may result in multiple awards and establishes the evaluation criteria for vendor selection. The contract term is five years, with vendors required to guarantee pricing for a minimum of one year. The procurement process includes both technical and cost evaluation stages, with specific scoring methodologies applied to determine contract awards.

The evaluation framework allocates 700 points for technical criteria and 300 points for cost evaluation. Vendors must achieve a minimum of 70% of technical points (490 points) to advance to the cost evaluation stage. Any vendor achieving a combined score of at least 70% of all available points becomes eligible for the statewide cooperative contract. In the cost evaluation phase, the vendor submitting the most competitive average hourly rate receives 100% of the cost points, while all other vendors receive a proportional portion calculated using the formula: Cost Points × (Most Competitive average hourly rate/Proposed average hourly rate). The contract carries an administrative fee of 0%.

View the file

Other files

File Type Posted
3-Attachment A Terms and Conditions.docx DOCX document
2-Vendor Prerequisites - Statewide RFP.pdf PDF
5-Attachment E Technical Criteria.docx DOCX document
6-Attachment B Scope of Work.docx DOCX document
7-Attachment C Cost Sheet.xlsx XLSX spreadsheet
1-Claim of Business Confidentiality Updated.pdf.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Score Sheet

Attachment D
Disaster Management and Recovery Consultants
KK26-12
RFP EVALUATION SCORESHEET
Score will be assigned as follows:
0 = Fail, the proposal fails to address the requirements or criteria described in the RFP or cannot be assessed due to missing information
Firm Name:1 = Poor, the proposal inadequately addresses the requirements or criteria described in the RFP or cannot be assessed due to incomplete information
2 = Unsatisfactory, the proposal addresses the requirements or criteria described in the RFP in an unsatisfactory manner
Evaluator:3 = Satisfactory, the proposal addresses all requirements or criteria described in the RFP in a minimum satisfactory manner
4 = Good, the proposal addresses all requirements or criteria described in the RFP and in some respects exceeds them
Date:5 = Excellent, the proposal addresses and exceeds all of the requirements or criteria described in the RFP
Minimum Mandatory RequirementsRFP SectionEvaluation (Pass/Fail)
1Vendor must upload a proposal in response to the technical criteria listed Attachment E Technical Criteria.
2Vendor must upload a completed Attachment C Cost Sheet.
3
4
5
6
0
Scoreable Technical CriteriaRFP SectionEvaluator Score (0-5)Criteria Weight% of Tech CriteriaPoints PossiblePoints
EarnedMinimum Required
1Vendor Qualifications and ExpertiseAtt. B3021.4%150.000.00
2Technical Approach to FEMA Public Assistance ServicesAtt. B4532.1%225.000.00
3Hazard Mitigation, Alternative Procedures and Special ProgramsAtt. B1510.7%75.000.00
4Financial and Grants Management CapabilityAtt. B2517.9%125.000.00
5Management Plan, Staffing Strategy and ResponsivenessAtt. B2517.9%125.000.00
60.0%0.000.00
70.0%0.000.00
80.0%0.000.00
90.0%0.000.00
100.0%0.000.00
110.0%0.000.00
120.0%0.000.00
130.0%0.000.00
140.0%0.000.00
150.0%0.000.00
160.0%0.000.00
170.0%0.000.00
180.0%0.000.00
190.0%0.000.00
200.0%0.000.00
210.0%0.000.00
220.0%0.000.00
230.0%0.000.00
100.0%700.000.000.00
Required Technical Point ThresholdRFP SectionMin PercentMin Points RequiredPoints EarnedPercent EarnedEvaluation
70%490.00.00.0%0
CostRFP SectionLow Cost OptionOffered CostPercent of TotalPoints PossiblePoints Earned
300.00.0
* Purchasing will use the following cost formula: The points assigned to each offerors cost proposal will be based on the lowest average hourly rate. The offeror with the lowest average hourly rate will receive 100% of the price points. All other offerors will receive a portion of the total cost points based on what percentage higher their Proposed average hourly rate is than the Lowest average hourly rate. The formula to compute the points is: Cost Points x (Lowest average hourly rate/Proposed average hourly rate).
Total Evaluation PointsPercent of TotalPoints PossiblePoints Earned
Total Technical Evaluation Points0%700.00.0
Total Cost Evaluation Points0%300.00.0
Total Evaluation Points0%1,000.00.0

Scoresheet Summary

XX##### Solicitation Name Scoresheet Summary
Instructions:
Enter the solicitation number and name.
Enter each Offeror name.
Enter the Criteria name for each category.
Enter the Weight in column B that corresponds to the Criteria Weight on the Score Sheet tab column J for each criterion.
Enter the Total Possible Points for each Criterion, Cost Points, and Score Summary section.
Mandatory Minimum Requirements: Evaluate each offer and enter pass or fail
Ensure that the number of evaluator lines matches the number of evaluators.
Offers not meeting the Minimum Mandatory Requirements will not be evaluated further.
Ensure that the Total Average Score formula includes all of the evaluator line items.
Technical Scores: Enter each evaluator score for each offer.
Signatures:Date:
Evaluator 1__________________
Evaluator 2__________________
Evaluator 3__________________
Evaluator 4__________________
Evaluator 5__________________
Minimum Mandatory RequirementsOfferor AOfferor BOfferor COfferor DOfferor EOfferor FOfferor GOfferor HOfferor IOfferor JOfferor KOfferor LOfferor MOfferor NOfferor OOfferor POfferor QOfferor ROfferor SOfferor T
1
2
3
WeightTechnical ScoresOfferor AOfferor BOfferor COfferor DOfferor EOfferor FOfferor GOfferor HOfferor IOfferor JOfferor KOfferor LOfferor MOfferor NOfferor OOfferor POfferor QOfferor ROfferor SOfferor T
Criteria #1
Evaluator 1
Evaluator 2
Evaluator 3
Evaluator 4
Evaluator 5
Total Average Score0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #1 - Total Points (Total Possible Points = XX)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #2
Evaluator 1
Evaluator 2
Evaluator 3
Evaluator 4
Evaluator 5
Total Average Score0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #2 - Total Points (Total Possible Points = XX)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #3
Evaluator 1
Evaluator 2
Evaluator 3
Evaluator 4
Evaluator 5
Total Average Score0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #3 - Total Points (Total Possible Points = XX)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #4
Evaluator 1
Evaluator 2
Evaluator 3
Evaluator 4
Evaluator 5
Total Average Score0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #4 - Total Points (Total Possible Points = XX)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #5
Evaluator 1
Evaluator 2
Evaluator 3
Evaluator 4
Evaluator 5
Total Average Score0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #5 - Total Points (Total Possible Points = XX)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #6
Evaluator 1
Evaluator 2
Evaluator 3
Evaluator 4
Evaluator 5
Total Average Score0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #6 - Total Points (Total Possible XX)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #7
Evaluator 1
Evaluator 2
Evaluator 3
Evaluator 4
Evaluator 5
Total Average Score0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Criteria #7 - Total Points (Total Possible Points = XX)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total Technical Points (Total Possible Points = XX) Minimum Threshold = XX0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total Cost PointsCost ScoresOfferor AOfferor BOfferor COfferor DOfferor EOfferor FOfferor GOfferor HOfferor IOfferor JOfferor KOfferor LOfferor MOfferor NOfferor OOfferor POfferor QOfferor ROfferor SOfferor T
Cost
300.0Cost Points0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Score SummaryOfferor AOfferor BOfferor COfferor DOfferor EOfferor FOfferor GOfferor HOfferor IOfferor JOfferor KOfferor LOfferor MOfferor NOfferor OOfferor POfferor QOfferor ROfferor SOfferor T
Total Technical Points (Total Possible = XX)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Total Cost Points (Total Possible = XX)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
Grand Total Points (Total Possible = XX)0.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00