4-Appendix IX DSL Cost Pricing Form.xlsx
XLSX spreadsheet 17 KB Posted
- Solicitation number
- 26-04030VW
- Issued by
- Salt Lake County, Salt Lake City, Utah
About this file
This is a cost pricing form for the Davis-SLC Community Connector Final Design and Construction Services project in Utah, specifically prepared as Appendix IX of the solicitation documents. The form is designed for A/E (Architecture/Engineering) consultant services to support the final design and construction documents for bus stop and end-of-line facilities with associated improvements. The pricing form requires proposers to provide detailed labor hour estimates and cost breakdowns across multiple task categories, including project management, design, right-of-way, drainage, traffic signal priorities, utilities, design services during construction, grant submittal assistance, and quality control. Proposers are required to complete this form concurrently with their technical response to the solicitation.
The pricing form requires proposers to submit their basic hourly rates, audited overhead rates as a percentage, and fee percentages, which are then used to calculate fully burdened rates and total labor costs. Proposers must provide a copy of their FAR Office Overhead Audited Rates (referenced as 25-03991 for Davis Salt Lake) with their submission. The form structure allows for itemized hours and costs by task and employee role, with a signature line and date field required from the proposer. The total project budget is to be calculated based on the sum of all task budgets, providing a comprehensive cost proposal for the consulting services required throughout the design and construction phases of the project.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Simple Budget
| 23-XXXXVW Utah County Park & Ride Facilities A/E Consultant Services Pricing Form | |||
| Name of Proposer | |||
| Task # | Task Title | Hours | Task Budget |
| 1 | Project Management | 0 | $ - 0 |
| 2 | Design | 0 | $ - 0 |
| 3 | Right-of-Way | 0 | $ - 0 |
| 4 | Drainage | 0 | $ - 0 |
| 5 | ERROR:#REF! | 0 | $ - 0 |
| Total Project Budget | $ - 0 |
Budget w Fees Appendix VIII Pricing Form Pricing form must be prepared at the same time as the consultant prepares a response to this solicitation.
**Please supply a copy of the FAR Office Overhead Audited Rates
| 25-03991 Davis Salt Lake Final Design | |||||||||||||||
| [insert Company Name] | |||||||||||||||
| Employee Name | - | - | - | - | - | - | - | - | - | - | - | - | Hours by Task | Cost by Task | |
| Title/Role | - | - | - | - | - | - | - | - | - | - | - | - | |||
| 1 | Project Management | - 0 | $ - 0 | ||||||||||||
| 2 | Design | - 0 | $ - 0 | ||||||||||||
| 3 | Charging Design | - 0 | $ - 0 | ||||||||||||
| 4 | Branding | - 0 | $ - 0 | ||||||||||||
| 5 | Right-of-Way | - 0 | $ - 0 | ||||||||||||
| 6 | Drainage | - 0 | $ - 0 | ||||||||||||
| 7 | Traffic Signal Priorities | - 0 | $ - 0 | ||||||||||||
| 8 | Utilities | - 0 | $ - 0 | ||||||||||||
| 9 | Design Services During Construction | - 0 | $ - 0 | ||||||||||||
| 10 | Grant Submittal Assistance | ||||||||||||||
| 11 | Quality Control | ||||||||||||||
| 11 | add additional items as required | - 0 | $ - 0 | ||||||||||||
| Total Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - 0 | ||
| Basic Hourly Rate ($) | |||||||||||||||
| Audited Overhead Rate % | |||||||||||||||
| Fee % | |||||||||||||||
| Fully Burdened Rate | |||||||||||||||
| Labor Costs (Total Hours times Fully Burdened Rate) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||
| Total Cost | $0 |
| Proposers Signature ____________________________ |
| Date: _____________________ |
File details come from the government source that posted it. Updated .