10-Appendix VIII - Depot District Charger As-Builts.pdf
PDF 48 MB Posted
- Solicitation number
- 26-04030VW
- Issued by
- Salt Lake County, Salt Lake City, Utah
About this file
This is an as-built documentation file for the Depot District Charger component of the Davis-SLC Community Connector project in Utah. The document contains technical drawings and specifications for the charging infrastructure installation at the Depot District facility, which serves as an end-of-line terminal for the bus rapid transit service connecting Davis and Salt Lake City. The as-built plans detail the final constructed configuration of the electric vehicle charging station, including equipment placement, electrical connections, site layout modifications, and integration with the existing depot facilities. These documents represent the completed design specifications after construction and are intended to provide an accurate record of the installed charging infrastructure for operational and maintenance purposes.
The as-built documentation serves as the official record for the constructed charging facilities and supports project closeout and asset management for the Davis-SLC Community Connector initiative. This file type is typically generated during the final phases of design and construction services to document deviations from original plans, verify compliance with specifications, and establish baseline information for ongoing operations and future maintenance. The documentation would be essential for facility operators, maintenance personnel, and project stakeholders to understand the actual configuration of the installed systems and ensure proper functionality of the electric charging infrastructure that supports the community connector bus service.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .