Amendment 02 to RFP NO 374682GMK .pdf

PDF 379 KB Posted

Attached to
Demolition of Sites 50 and 55 - Request for Proposal
Solicitation number
374682GMK
Issued by

About this file

This is Amendment No. 02 to Request for Proposal (RFP) No. 374682GMK for the Demolition of Sites 50 and 55, issued by Fermi Forward Discovery Group, LLC (FFDG) on February 24, 2026. The amendment extends the solicitation closing date to Friday, February 27, 2026 at 3:00 PM CST and includes Questions and Answers received from potential offerors along with photographs of the two sites (Exhibits V and W). All other terms and conditions of the original RFP issued January 22, 2026 remain unchanged. Offerors must acknowledge receipt of this amendment by signing and returning one copy to Gina M. Kern, Procurement Specialist IV, at FFDG's Batavia, Illinois location.

The Questions and Answers section addresses 13 clarification inquiries regarding demolition scope, site logistics, utilities, permits, and project schedule. Key determinations include: Wilson Street entrance is the recommended construction traffic route; on-site spoils are located south on Kautz Road; basement foundation walls and floors must be completely removed to 18 inches below grade per specification 024200; approximately 6 inches of topsoil suitable for grass shall be applied from on-site spoils for fill; the enclosed walkway at Building 55 shall remain intact with weatherproofing; FFDG owns and maintains all gas and power lines on site; no wells are to be filled; asbestos abatement will be completed prior to contract commencement; excavation permits will be requested by the subcontractor and performed by FFDG; and the estimated award timeline is 3–5 weeks following proposal receipt. Vendor access requires a bill of lading or delivery information and valid government identification at the Wilson Street gate entrance.

View the file

Other files

File Type Posted
Amendment 01 to RFP NO 374682GMK .pdf PDF
Exhibit W - Site 55 House.pdf PDF
Exhbit V - Site 50 House.pdf PDF
Exhibit P - FL-42 (Rev 1.25) - Payment Bond.pdf PDF
Exhibit R - WD IL20250008 Mod 13.pdf PDF
Exhibit A - 13-1-69 Demo GPP SOW.pdf PDF
Exhibit C - 010010_General_Requirements.pdf PDF
Exhibit D - 013100_ESH_Requirements_03-2025_FFDG.pdf PDF
Exhibit E - 013300_Submittals.pdf PDF
Exhibit H - FFDG General Terms and Conditions for Construction.pdf PDF
Exhibit L - Fermilab Subcontractor Injury and Illness Data Questionnaire.pdf PDF
Exhibit M - SARC_Subcontractor Annual RepsCerts Rev 7.pdf PDF
Exhibit U - Instructions for Access-Request-form-for-Business-Visitors.pdf PDF
Request for Proposal 374682GMK Demolition of Sites 50 and 55 Rev1.pdf PDF
Exhibit B - 13-1-69_Demo_GPP_Final_Design.pdf PDF
Exhibit I - 2025 Construction Insurance Requirements.pdf PDF
Exhibit J - SF1413-23a.pdf PDF
Exhibit N - PUR-466_Proposal Certifications_r5_10.14.25.pdf PDF
Exhibit Q - FL-40 - Performance Bond.pdf PDF
Exhibit F - 014100_Quality_Requirements_-_March_2025_FermiForward.pdf PDF
Exhibit G - 024200Site_Demolition_Removal_and_Recycling.pdf PDF
Exhibit K -Price Proposal Form 374682GMK.pdf PDF
Exhibit O - Bond Bid FL-41.pdf PDF
Exhibit S - Sample Subcontract.pdf PDF
Exhibit T - 014100 Quality Requirements.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT TO SOLICITATION

AMENDMENT NO.

DATE OF AMENDMENT:

February 24, 2026

SOLICITATION (REQUEST FOR PROPOSAL) NO.

374682GMK

DATE RFP ISSUED:

January 22, 2026

PROJECT NO.

13-1-69

SOLICITATION CLOSE (DUE) DATE:

03:00 PM CT on February 27, 2026

TITLE OF PROJECT:

Demolition of Sites 50 and 55

Offerors must acknowledge this Amendment prior to the hour and date set forth in the solicitation by the following method:

1. Return the Amendment with a signature on the acknowledgment signature line.

If by virtue of this Amendment you desire to change an offer already submitted, such change may be made by email making reference to the Solicitation and this Amendment and it is received prior to the due date and time set for proposals.

The above referenced Solicitation is amended as follows:

1. Extend the closing date for Request for Proposal to Friday, February 27, 2026 at 3:00 pm CST.

2. Provide Questions and Answers received. See below.

3. Provide Photos of Sites 50 and 55. See Exhibit V and Exhibit W.

All other terms and conditions as referenced under the subject RFP remain unchanged.

Kindly acknowledge receipt by signing and returning one (1) copy of this Amendment.

Company Name

Signature & Date

Name & Title of Individual

Fermi Forward Discovery Group, LLC Kirk Road & Wilson St.

P.O. Box 500, MS 312

Batavia, Illinois 60510-0500 USA

Gina M. Kern Procurement Specialist IV 630-840-3955 ginakern@fnal.gov mailto:ginakern@fnal.gov

Demolition GPP questions received 2/18

1. Is there a specific route for trucks that will need to be followed to get to either site? Lowboys, dumpster, dump truck.

Please refer to the cover sheet of the drawing set. Wilson St entrance is the recommended construction traffic entrance.

2. Is there an onsite location for any spoils? If so approximately where?

There’s a large spoils pile south on Kautz Rd.

3. Are basement foundation walls and floors to be left in place and filled or is the intent to completely remove all of this and fill.

Please refer to the specification 024200, 3.05A “The Subcontractor shall demolish and remove completely all buildings, structures, hardstands, paved areas adjacent thereto, vaults, sheds, fences, steps, foundations, and retaining walls to a depth of eighteen (18”) inches below grade.”

1. As far as the fill is concerned what material should we figure on using? Typically material at Fermi is maintained onsite, therefore would have stockpiles available.

For the fill, put ~6” of topsoil suitable for grass on top of the fill from the on-site spoils pile. For the on-site spoils pile, refer to Question 2.

4. At building 55 the door to the garage. Is the intent to completely remove the enclosed walkway from the house or leave some of it intact for weather proofing.

Please see the attached photos for the existing condition from the garage side. Please leave the enclosed walkway and make the demolished end weather tight.

5. As far as gas line cut/caps and reroutes can you please let us know if this is a peoples gas/nicor service or if this is a private service maintained solely by Fermilab?

FFDG owns and maintains the gas lines onsite. Nicor is the lab’s supplier, but their ownership only extends as far as their meter assemblies on the 2 feeds into the site.

6. As far as power source disconnects and reroutes can you please let us know if this is from a public service provider, or if this is a private service maintained solely by Fermilab?

FFDG owns and maintains all of the power lines.

7. Please confirm no wells are to be filled.

No wells are to be filled.

8. Please confirm if permits are required – if so, what permits and who is responsible for obtaining?

Please refer to the specification 013100, Part 8, including excavation permits that the subcontractor will request and FFDG will perform. No other permits are expected for this work.

9. Please confirm that any and all environmental concerns (asbestos, lead, etc.) will be remediated prior to this contract's scope.

Asbestos abatement will be executed prior to the start of the contract scope.

10. Is there an estimated schedule for the when the work is expected to begin? Rough timeline on NTP following the bid?

Please refer to the specification 010010, 3.2 for construction schedule. FFDG expects to make an award as soon as possible once proposals are received. Estimated award timeline would be 3-5 weeks to allow for proposal evaluation, discussion, Procurement reviews, etc.

2/19

11. What is the due date of proposal confirming since the Site meeting date was changed ? February 27, 2026 at 3:00 pm CST.

12. Will there be an asbestos report & all asbestos removed prior to Demolition or is it in our scope or work ?

FFDG will provide the reports upon request. Please also see Question 9. It is not in the contract scope.

13. During the course of the job there will be several different trucking companies removing materials and brining in new materials for backfill. It will be the same company but different drivers how difficult will it be for them to get access through the Security Gates.

Please refer to the following website; Site access – Global Services The subcontractor delivering supplies is granted access at the gate if they have a bill of lading or delivery location information. They are not allowed inside buildings at any time. All vendors must use the Wilson Street entrance and show a valid government ID and bill of lading.

https://get-connected.fnal.gov/site-access/