This document contains questions from various Department of Veterans Affairs (VA) Consolidated Mail Outpatient Pharmacies (CMOPs) regarding deliveries from a Pharmaceutical Prime Vendor.
The CMOPs inquire about typical delivery details such as the number of pallets received daily, vehicle and driver check-in procedures, product segregation and inspection processes. Questions also address refrigerated products, paperwork handling, and how lot numbers and expiration dates are managed. The CMOPs provide their warehouse management software systems. One attachment outlines material handler responsibilities regarding unloading commercial vehicles.
36W79719R0001 0003 36W79719R0001 0003.docx
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
37W79719R0001 AMENDMENT 3
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 10-08-2019 003A4C Department of Veterans Affairs National Acquisition Center (003A4C4) Building 37 1st Avenue, One Block North of 22nd St.
Hines IL 60141 003A4C Department of Veterans Affairs OA&L National Acquisition Center Building 37 1st Avenue, One Block North of Cermak Hines IL 60141 To all Offerors/Bidders
36W79719R0001 09-10-2019
X X X
X Responses to questions received regarding this RFP are provided on the following pages.
| Section |
| Page |
| Paragraph |
| RFP Excerpt |
| Question |
| Response |
| SOW I-7 |
| 37 |
| J. |
| Ordering: The PPV shall make every effort to ship orders complete with single lot numbers. When quantity equaling a case is ordered, then a full complete case is expected versus a case quantity of loose items |
| If the VA places an order for a quantity equal to a manufacturer full case, expecting to receive an unopened manufacturer full case, but the PPV only has this quantity as eaches, would the VA still want this order to be filled or would it need to be cancelled by the PPV? |
PPV would like to understand if this order should be shipped as individual eaches or should be cancelled.
The consensus from the CMOP sites is to fill the order.
| SOW I-16 |
| 52 |
| p |
| CMOP and National Acquisition Center (NAC) Account(s) Specific Delivery Requirements: Products shall be delivered on non-wooden pallets |
| Can the CMOP locations provide an estimate of the total number of non-wooden pallets they receive on a daily basis? |
PPV would like to understand an estimate of the total number of non-wooden pallets received by the CMOP locations on a daily basis to ensure the response is modeled appropriately Not Applicable, offeror should comply with the solicitation requirement.
The information below does not specify the type of pallet only the number received.
52-78 pallets/day = 2-3 trucks per day at times.
78/day would be the max
| SOW I-1 |
| 20 |
| a. |
| a. The Pharmaceutical Prime Vendor (PPV) shall maintain an adequate |
supply and distribute all drug/pharmaceutical (Federal Supply Class 65) items and other contracted items dispensed under Government supply contracts. These items are sold under various Federal Supply Schedules (FSS), Blanket Purchase Agreements (BPAs), Basic Ordering Agreements (BOA) and VA National Contracts established under the Pharmaceutical Standardization Program (NCS).
Does the VA have products included within their stated formulary that are not actually manufactured by the contracted Vendor?
Many of our generic suppliers are not the manufacturer, for example Golden State, Major, and Avkare are all suppliers to the CMOP and do not manufacture the items supplied.
| NA |
| NA |
| NA |
| NA |
| The proposed contract is a long term, fixed price contract. As the VA is aware, there is a high degree of uncertainty for wholesalers about the effective prices at which they purchase pharmaceuticals. Given these facts, why didn’t the VA include an Economic Price Adjustment clause in the proposed contract? |
| The VA elected not to include the Economic Price Adjustment clause in the proposed contract because the VA does not consider it to be in the government’s best interest at this time. Economic price adjustments must fit into one of four types per the Federal Acquisition Regulation, and this proposed contract does not fit into any of those categories. |
| NA |
| NA |
| NA |
| NA |
| If WAC for contract products declines significantly due to U.S. Government intervention in the commercial market or due to manufacturer driven changes, will the VA commit to renegotiating the PPV’s distribution fees as a change under the Changes clause? |
If WAC for contract products declines significantly, the VA would evaluate this situation when it arose.
| NA |
| NA |
| NA |
| NA |
| Over the last few years the VA has been awarding many more National contracts, especially to pharmaceutical resellers and repackagers. As the VA knows these resellers/repackagers often struggle to supply sufficient product and they are often unwilling to agree to typical supplier-wholesaler terms. Does the VA intend to continue to award more national contracts to these entities rather than awarding contracts to the actual manufacturers? |
The VA intends to continue to award national contracts in accordance with the terms and conditions of the subject solicitation.
| NA |
| NA |
| NA |
| NA |
| Why isn’t the VA using a traditional best value evaluation structure for a contract worth more than $70 billion that is critical to the VA’s mission? |
| The VA has elected to use a lowest-priced, technically-acceptable evaluation because: |
0. the VA is able to comprehensively and clearly describe the minimum requirements expressed in terms of performance objectives, measures, and standards that will be used to determine acceptability of offers;
0. the VA would realize no, or minimal, value from a contract proposal exceeding the minimum technical or performance requirements set forth in the request for proposal;
0. the proposed technical approaches will require no, or minimal, subjective judgment by the source selection authority as to the desirability of one offeror's proposal versus a competing proposal;
0. the executive agency has a high degree of confidence that a review of technical proposals of offerors other than the lowest bidder would not result in the identification of factors that could provide value or benefit to the executive agency; and
0. the executive agency has determined that the lowest price reflects full life-cycle costs, including for operations and support.
It is also noted that multiple current and prior VA and DOD PPV contracts have used the lowest price technically acceptable source selection criteria successfully.
There is an emerging class of pharmaceuticals (CAR-T, cell or gene therapies) entering the market that are ultra-expensive (typically above $100,000 and often $500,000 or more) and have special handling requirements. For example, Kymriah, Yescarta, and Luxturna each have FSS prices in excess of $250,000. In the commercial market these drugs are typically sold with no negative distribution fee. Currently, these few products that are on the VA’s FSS contracts are identified as PPV-False on the VA’s website and the VA’s usage file indicates no purchases through the PPV. If this class of pharmaceuticals is included in the PPV program, even a limited number of sales could adversely impact the PPV contractor’s profits. Can the VA commit to purchase items in this class of pharmaceuticals at WAC (if included in the PPV) or otherwise keep its purchases of these ultra-expensive pharmaceuticals outside of the PPV?
No, VA cannot commit to purchase these drugs at WAC, because they are considered covered drugs as per Public Law 102-585. The statute establishes that these products must not be charged to the government at a price higher than the calculated as the federal ceiling price and that these products must be available on a Federal Supply Schedule contract. The PPV cannot charge more than the contracted price. It is up to the discretion of the manufacturer which drugs are available through the PPV versus other vendors, so that decision is also outside of the control of the VA.
| NA |
| NA |
| NA |
| NA |
| What is the basis for the VA’s projecting a significant decline in WBPG program volume? |
| It was noted that there was an error in the linear regression model used to predict this volume. Line Items 5 and 6 are replaced by the following: |
5. WAC BASED PRICED GENERICS (WBPG)
PHARMACEUTICALS
| ESTIMATED PURCHASES UNDER FASTPAY PROCEDURES |
| FAST PAY |
DISCOUNT OFF PUBLISHED WAC
TOTAL AMOUNT (Total estimated annual purchases *1+proposed distribution fee)
| BASE PERIOD |
| $70,989,282.91 |
| % |
| OPTION PERIOD 1 |
| $70,438,177.81 |
| % |
| OPTION PERIOD 2 |
| $69,891,350.62 |
| % |
| OPTION PERIOD 3 |
| $69,348,768.57 |
| % |
Note: Optional Procurement
Proposed pricing for WBPG may be in the form of
(a) at published WAC, meaning there is no discount and no additional charge, (b) published WAC less a fixed percent, or (c) published WAC plus a fixed percent. The proposed pricing shall be indicated in the appropriate table in each Line Item. For price evaluation purposes, the estimated sales indicated for WBPG are considered WAC cost.
6. WAC BASED PRICED
GENERICS (WBPG) PHARMACEUTICALS
ESTIMATED PURCHASES UNDER NET 30DAYS
NET 30DAYS
DISTRIBUTION FEE DISCOUNT OFF PUBLISHED WAC
TOTAL AMOUNT (Total estimated annual purchases *1+proposed distribution fee)
| BASE PERIOD |
| $7,020,918.09 |
| % |
| OPTION PERIOD 1 |
| $6,966,413.19 |
| % |
| OPTION PERIOD 2 |
| $6,912,331.38 |
| % |
| OPTION PERIOD 3 |
| $6,858,669.43 |
| % |
Note: Optional Procurement
CMOP SITE QUESTIONS
| # |
| CMOP/Question |
| 760- Leavenworth |
| 761 – Chelmsford |
| 762 – Tucson |
| 763 – Dallas |
| 764 – Murfreesboro |
| 765 – Great Lakes |
| 766 – Charleston |
| 1 |
| How many pallets do you receive each morning? |
| 15 to 26 |
| 16 to 40 |
| ON AVERAGE 30 - 40 |
| We usually receive a full truck, 20-26 pallets |
| 10-12 at both facilities daily with some larger shipments surrounding fiscal year closeout |
| NO RESPONSE |
| We average 52 pallets a day |
| 1.a. |
| Understanding that each PO will be separated by pallet, do you allow for POs to be combined on the same pallet if a sleep sheet is utilized? |
| yes |
| No |
| YES |
| We do not have the equipment to utilize a sleep sheet, but no we do not like different accounts |
on the same pallet
| NO RESPONSE |
| No |
| NO RESPONSE |
| 2.b |
| Would it be possible to obtain the manufacturer and model number so we can source the same pallet type? |
| Different CMOPS seem to have different types of pallets, the contract doesn’t require any specific type of pallet, if awarded you could check with the CMOP to see if they have a preference. |
| 2.c |
| Are these returned to the Prime Vendor daily? |
| NO RESPONSE |
| Yes 1-3 per day |
| YES |
| NO RESPONSE |
| Yes |
| NO RESPONSE |
| Yes |
| 3.a |
| Could you provide an overview of the product mix your currently receive, identifying |
Percentage of full cases versus tote shipments
| NO RESPONSE |
| Anywhere from 50-100 totes per day - usually on 1-3 pallets |
| OF THE 30 – 40 PALLETS 6 ARE TOTES QTY VARIES PER PALLET |
| 85% cases versus totes |
| 0.6 |
| Great Lakes would prefer full cases in most situation. There are always outliers like low usage items. |
| 75% Full, 25% Totes |
| 3.b |
| Could you provide an overview of the product mix your currently receive, identifying |
Percentage of refrigerated product vs ambient product:
| NO RESPONSE |
| 3-6 large blue coolers of refrigerated product per day – probably around 20% of truck space is used for refrigerated products |
| DEPENDENT ON DAY 2% - 25% |
| 8%, Varies daily depending on the orders |
| 0.1 |
| 3% refrigerated items |
| 15% refrigerated, 85% Ambient |
| 4 |
| Could you estimate the total number of POs you receive daily? |
| NO RESPONSE |
| 6-9 |
| 18 - 26 |
| 45-50 separate po numbers |
| 12-15 between 2 facilities |
| Between 40 and 60 separate purchase orders. |
| 10 |
| 5 |
| What time does your morning delivery arrive? How long does the offload/delivery take? |
| NO RESPONSE |
| Truck gets unloaded between 5:30a – 6:30a. |
| 5 AM ½ TO 3 HOURS EACH TRUCK TAKES ABOUT A HALF AN HOUR TO 45 MINUTES |
| It arrives between 5:30am and 6:00a.m. |
| NO RESPONSE |
| 5:30am, 20 minutes |
| Arrive @ 6:00AM, Unload time approximately 50 minutes |
| 5.a |
| What type of vehicle makes your morning delivery? |
| NO RESPONSE |
| 53’ tractor trailer |
| SEMI (HOLDS ABOUT 30 PALLETS) PUP TRUCK MAX 12 PALLETS, ADDITIONAL TRUCKS VARY FROM FULL SEMIS TO LTL |
| Regular 18 wheeler |
| 53 foot semi for both locations |
| 53 foot truck. |
| 52ft. Tractor Trailer |
| 6 |
| Do you receive afternoon deliveries? |
| NO RESPONSE |
| No |
| NO |
| yes |
| NO RESPONSE |
| No, but we would like this option. |
| No. |
| 6.a |
| If yes, what time does it arrive? How long does offload/delivery take? |
| NO RESPONSE |
| NA |
| NA |
| Usually by 10:00 in the morning, 10-15 minutes to offload |
| NO RESPONSE |
| 20 minutes |
| NO RESPONSE |
| 6.b |
| If no, do you request afternoon deliveries? |
| NO RESPONSE |
| No |
| YES FOR EMERGENCY ORDERS AS NEEDED |
| no |
| The only afternoon deliveries are for when something is left off the truck and we require it before the next day. |
| Yes |
| No |
| 7 |
| Do you receive Saturday deliveries? |
| NO RESPONSE |
| On occasion when mandatory production work |
| AFTER HOLIDAYS AND EMERGENCIES DEPENDENT ON WORKLOAD TRANSFERS FROM OTHER CMOPS |
| rarely |
| There are occasions that CMOP will be working on Saturday and will request a delivery in advance. It typically arrives at our normal delivery time of 6:00am. Offload takes approximately 45 minutes and a 53 foot semi is used. |
| NO RESPONSE |
| No |
| 7.a |
| If yes, what time does it arrive? How long does offload/delivery take? What type of vehicle is used? |
| NO RESPONSE |
| 5:30am unload time and 53” tractor trailer |
| SAME AS DELIVERIES ABOVE |
| 6:00a.m. arrival, 20-30 minutes depending on the size, regular 18 wheeler truck |
| SEE ABOVE |
| No, NA |
| NO RESPONSE |
| 7.b |
| If no, do you request Saturday deliveries? |
| NO RESPONSE |
| See above |
| NA |
| NO RESPONSE |
| When needed. |
| Yes |
| No. |
| 8 |
| Are drivers required to check-in at a guard shack or other location upon arrival? |
| NO RESPONSE |
| No, check in the receiving area. |
| NO |
| no |
| Drivers will need to check in at the receiving dock door. |
| The driver is required to sign in at the dock. |
| No |
| 8.a |
| Is this process the same for morning, afternoon and Saturday deliveries? |
| NO RESPONSE |
| Yes |
| YES |
| NO RESPONSE |
| Drivers will need to check in at the receiving dock door. |
| This would be the same for all deliveries. |
| NA |
| 9 |
| Is the driver allowed in the facility to unload the truck or will the CMOP associates unload the product and reload any product returns/materials? |
| Yes CMOP associates generally unload the truck and returning products |
| CMOP unloads and reloads |
| IN BACK DOCK AREA TO BRING OUT EMPTY GAYLORDS AND FILL OUT DSCSA RETURN PAPERWORK. We will assist in unloading of truck the driver will reload truck with previous days pallets/products |
| CMOP unload the truck and reload any product for return |
| CMOP associates will unload product and reload any returns. |
| CMOP will load and unload the trucks. |
| Unloading is performed by VA CMOP employees |
*See additional information at the end of this amendment.
| 10 |
| How do you receive and inspect refrigerated product? |
| Cold storage bins Initial inspection done upon delivery, then more thorough upon breaking down the unit. |
| Comes in big blue insulated coolers approx. 40” x 40” |
| Same as we do all products by ndc, lot number , and expiration date |
| yes |
| NO RESPONSE |
| The same way as the other items we receive. |
| NO RESPONSE |
| 10.a |
| Do your refrigerated orders come packaged in a specific manner that we should be aware of? |
| Cold storage bins |
| In blue coolers or blue insulated totes |
| YES NORMALLY IN INSULATED GAYLORDS THAT HAVE FROZED COOLENT PACKS ON THE BOTTOM. THESE ARE UNLOADED AND RETURNED THE SAME DAY |
| Refrigerated orders come in large blue coolers |
| Refrigerated medications come shipped in an insulated container |
| These orders arrive in coolers. |
| Refrigeration is currently identified by specific PO# and is shipped in a blue tote |
| 11 |
| Do you receive physical paperwork with your deliveries to assist with the receiving process? |
| Yes |
| Yes – hard copy invoices and BOL with Seal # and quantity of pallets |
| YES A PAPER COPY OF ALL INVOICES |
| Yes, the daily paper invoices and shipping documents come in an envelope with our delivery |
| Invoices and Copies, Daily Route Manifest, Controlled Substance Receipt, and the Bill of Lading. |
| Yes, we receive packing slips and invoices for all items. The person that delivers the order hands these off. |
| Bill of lading and shipping documents |
| 12 |
| How are the lot and expiration dates for products utilized by your Operation? |
| Line item received by quantity and lot #. Info transmitted to production system through barcode scanners |
| Line item receive by quantity and lot #. Info transmitted to production system through barcode scanners |
| TO RECEIVE IN, TRACK ASSETS, IDENTIFY SPECIFIC RECEIPTS, FIND PRODUCTS FOR RECALLS/TRACK BAD TROUBLESOE PRODUCTS OFTER RECEIPT |
| DSCSA, we cannot stock anything that does not have the correct lot number on the product and the paperwork. Currently, when a lot is incorrect, there is a form we fill out, the invoice is printed and the incorrect lot highlighted and emailed to the prime vendor. It takes 2-4 hours to get a corrected invoice and credit back to us so we can stock the item. |
| Lot and expiration dates are utilized when entering pharmaceuticals into our production operating system. They are validated per DSCSA requirements prior to input for recalls purposes. |
| All item are received by lot and expiration date. The preference is to have as few lots per item as possible. |
| Lot numbers, NDCs, and expiration dates are compared to the product invoice and the warehouse management software |
| 13 |
| Could you provide the operational justification on how you manage the unload of pallets which will be segregated by PO? |
| No sideways pallets. Segregation of PO is essential to the workflow of the receiving process throughout the facility. |
| CMOP staff unloads and stages pallets and insulated coolers. Coolers are unloaded onto carts, and empty coolers are sent back with PPV empty trailer – loaded with empty pallets and returns from prior day. |
| THE DIFFERENT PURCHASE ORDERS IDENTIFY WHAT AREA THE PRODUCT IS DISPENSED FROM |
| We order for five different zones, our receiving employees have their own areas they usually work with to receive and deliver the product. If they have to switch accounts on a pallet they have to go out of that account and download another one, it is very time consuming with lots of chances for errors and things not getting scanned or delivered to the correct zone. |
| Pallets are staged according to purchase order and location of our facilities. Backordered purchase orders are handled first with other areas following. Pallets are staged in different areas due to production system dispensing locations. |
| The different PO’s go by internal locations. This is how we know where to stage the pallets when they arrive. |
| Pallets are unloaded and staged by PO numbers |
| 14 |
| What Warehouse Management software are you currently utilizing? |
| QMSI applications |
| SI Baker/Handling software |
| BAKER – MCKESSON HIGH VOLUME SOLUTIONS |
| McKesson mobile manager 100 |
| QMSI at Sam Jared facility and CASI at Elam Farms location. |
| QMSI system. |
| McKesson Connect and Inventory Maintenance |
ATTACHMENTS:
· TP-90-1 Material Handlers training guide *The attached TP-90-1 Material Handlers training guide. Section 3.02, Page 36 (I-21) speaks to the responsibilities of the truck driver regarding unloading.
3-02. ENTERING COMMERCIAL VEHICLES
1. When drivers do their share and it is in the best interest of the Government, employees are encouraged to assist with unloading trucks, i.e., prearranging the stacking. However, employees should never be in the trailer without the driver. If drivers choose, they may use the services of lumpers (individuals who unload trucks) at their (the driver's) cost, in which case they are responsible for tailgate delivery. The transportation industry standard for truck delivery requires that drivers place freight at the tail of the trailer so the consignee can recover and remove it to a suitable location.
When freight is too large or bulky for a driver to handle, or when the weight of each piece is more than a driver would normally be expected to lift, it is the joint responsibility of the consignee and carrier to arrange sufficient equipment or power to perform unloading functions. One exception to this rule is when a contract is written stating the consignee is responsible for unloading the truck, i.e., Federal Prison Industries.
2. A pallet jack and pallets should be available for drivers to use to complete the tailgate delivery. Drivers can be required to place the loaded pallet on the loading dock but within 1 O feet of the trailer. A dock leveler or dock plate should always be in place for this purpose. For safety reasons, when powered equipment is used in a trailer, it may not be advisable for drivers to do more than assure the unitized load is properly positioned on the lift-truck to prevent damage. If they must first unitize a floor loaded shipment at the delivery dock, the number of packages, their sizes and weights, and the estimated delivery time should be considered before Government manpower is provided.
NOTE: Always chock rear wheels of tractor-trailer before entering vehicle with powered equipment.
3. Drivers who resist unloading for personal reasons, i.e., illness or injury, are still responsible to assist with unloading. They should be given a time limit to begin the unloading after which they may be turned away for interfering with the normal operation or other scheduled use of the dock. A rate of 10,000 pounds per hour as the work standard for unloading a floor loaded shipment should be used. Divide the shipment weight by 10,000 pounds to arrive at the standard unloading time. When evaluating package size and weight for their impact on the unloading time, adjust the standard 10,000 pounds per hour either upward or downward. A load that is at least 1 O percent or more floor loaded qualifies for additional time to unload and is not subject to the standard 2 hours for a palletized load. The point is to agree with the carrier about what is expected using these standardized work rates. If, for the convenience of the Government, employees need to work at a faster rate than drivers can be expected to, then employees may enter the trailer to work along side drivers. It is your responsibility to inform drivers of your expectations based upon standards and to monitor their performance as though they were part of your work force. When a delivery is being made, the carrier is on Government property and must follow Government work rules predicated upon industry standards familiar to the carrier.