About this file

This document package includes an amendment to construction drawings and a related federal contract opportunity notice. The construction drawings detail access control and CCTV system upgrades at the Martinez VA Outpatient Clinic in California, including card readers, cameras, and integration with existing security systems.

The federal contract opportunity is a solicitation notice for a firm-fixed-price construction project at the same clinic location. The project scope includes a 6,000 square foot building addition, 4,200 square foot renovation, 1,000 square foot addition, and installation of dialysis boxes. Construction must meet infection control standards. The solicitation will be a total SDVOSB set-aside issued by July 24th, with a performance period of approximately 760 days. The estimated value exceeds $10 million. Questions must be submitted in writing by the specified date.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--Construct Dialysis and Sleep Program Construct and Renovate Chronic Dialysis & Sleep Program Project #612 502 Minor Construction - Martinez, CA VISN 21, newest first.
File Type Posted
Amendment 0006 Attachment 2 - Deduct Alternative Update.pdf PDF
Amendment 0006 Attachment 1 - Amendment 0002 SF30.pdf PDF
Amendment 0006 36E77620R0039 - Proposal Extension and Clarifications - 20201008.pdf PDF
Amendment 0005 36E77620R0039 - Proposal Due Date Extension - 20200930.pdf PDF
Amendment 0004 Attachment 1 - Responses to Technical Questions Received.pdf PDF
Amendment 0004 36E77620R0039 - Responses to Technical Questions - 20200928.pdf PDF
Amendment 0003 36E77620R0039 - Proposal Due Date Extension - 20200921.pdf PDF
Amendment 0002 Attachment 1 Martinez Campus Parking 2020.pdf PDF
Amendment 0002 36E77620R0039 - Site Visit - 20200909.docx DOCX document
S06 - Amendment 0001 36E77620R0039 - 20200827.docx DOCX document
Attachment 1 Updated SOW Chronic Dialysis and Sleep Program.docx DOCX document
Attachment 2 Chronic Dialysis Sleep Program Specificiations Book.pdf PDF
Attachment 4 Chronic Dialysis Sleep Program Drawings Part 1.pdf PDF
Attachment 11 - Past Performance Questionnaire 36E77620R0039.docx DOCX document
36E77620R0039_1.docx DOCX document
Attachment 8 Contractor Safety and Environmental Record Evaluation Form.docx DOCX document
Attachment 6 Chronic Dialysis Sleep Program Drawings Part 3.pdf PDF
Attachment 9 Wage Determination DBA - Martinez 20200721.pdf PDF
Attachment 7 Release of Claims.docx DOCX document
Attachment 10 JA Brand Name Items Signed and Redacted.pdf PDF
Attachment 5 Chronic Dialysis Sleep Program Drawings Part 2.pdf PDF
Attachment 3 Chronic Dialysis Sleep Program Cover Page.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

32 33 37.1 38 40 4142 44 48 50 52 53 54 57 60 63 68 7040.8 48.2 74

D1

B27

C11

C9

B25

C8

69'-3 1/2"31'-6" 6" 19'-7"

121'-4 1/2"

12'-1" 6'-0" 12'-0" 47'-4 1/2" 22'-5"

CONSULT

CONFERENCE

VAULT

PREP AND

PACKAGING

BREAKROOM

DINING

FOOD PREP

FRIDGE FREEZER

HOT

COLD

HOT

COLD

RECEIVING STOR

RETAIL SPACE

E L

E C

T R

I C

A L

R O

O M

AC101C

ACCESS CONTROL & CCTV

RENOVATION C

SCALE:

"=1'-0"

AC-101C

ACCESS CONTROL & CCTV PLAN

PROJECT

NORTH

Revisions: Date

Project Number:

Building Number:

Office of

Construction and Facilities

Management

19 & 20

612-502

Location

Drawing Title: Project Title:

Drawing Number:

Date Checked Drawn

Dwg. of

02/25/2020

VA MARTINEZ CAMPUS, CA

D.S.P.W.

ARCHITECT/ENGINEERS:CONSULTANTS:

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9 o n e e i g h t i n c h o n e f o t o n e q u a r t e r i n o t t h r e e e i g h t s i n o t o n e h a l f i n o t t h r e e q u a r t e r s i n o t o n e i n o t o n e a d a l f i n o t o n e i n o t

VA FORM 08-6231

1220 CONCORD AVE., STE 400

CONCORD, CA 94520

925.938.3550

WWW.JENSENHUGHES.COM

ENGINEERING

K F DAVIS

530 LA GONDA WAY, SUITE E,

DANVILE, CA. 94526

WWW.KFDE.COM

(925) 743-8884

K F DAVIS ENGINEERING, INC

CHRONIC DIALYSIS AND

SLEEP PROGRAM

PROJECT

NORTH

KEY PLAN

C

BUILDING 19

BUILDING 20

AutoCAD SHX Text

RX

AutoCAD SHX Text

CR

AutoCAD SHX Text

ES

AutoCAD SHX Text D

AutoCAD SHX Text

RX

AutoCAD SHX Text

ES

AutoCAD SHX Text

CR

AutoCAD SHX Text D

AutoCAD SHX Text

EXISTING ACCESS CONTROL AND CCTV CONTROL LOCATED IN POLICE OFFICE AT LOBBY

AutoCAD SHX Text

PROVIDE CAMERA DOWN EVERY AISLE WITHIN PHARMACY

AutoCAD SHX Text

ES

AutoCAD SHX Text

CR

AutoCAD SHX Text

RX

AutoCAD SHX Text

PROVIDE CARD READERS (2) FOR THE VAULT DOOR AND DAY GATE

AutoCAD SHX Text M

AutoCAD SHX Text

PROVIDE MOTION DETECTOR IN VAULT

AutoCAD SHX Text

RX

AutoCAD SHX Text

CR

AutoCAD SHX Text

ES

AutoCAD SHX Text D

AutoCAD SHX Text

RX

AutoCAD SHX Text

CR

AutoCAD SHX Text

ES

AutoCAD SHX Text D

AutoCAD SHX Text

WP

AutoCAD SHX Text

KP

AutoCAD SHX Text

KP

AutoCAD SHX Text

KP

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text

ACCESS CONTROL LEGEND

AutoCAD SHX Text

CARD READER (PROXIMITY CARD AND PIN REQUIRED)

AutoCAD SHX Text

ELECTRIC DOOR STRIKE

AutoCAD SHX Text

ACCESS CONTROL PANEL

AutoCAD SHX Text

ES

AutoCAD SHX Text

CR

AutoCAD SHX Text

AC

AutoCAD SHX Text

1. WORK INCLUDES THE PROVISION OF A COMPLETE ACCESS WORK INCLUDES THE PROVISION OF A COMPLETE ACCESS CONTROL AND CCTV SYSTEMS FOR THE BUILDING 20 RENOVATION PROJECT. ACCESS CONTROL DRAWINGS REPRESENT DESIGN CRITERIA ONLY. THE CONTRACTOR IS RESPONSIBLE FOR ALL WORK NECESSARY FOR COMPLETE AND OPERATING ACCESS CONTROL AND CCTV SYSTEMS. 2. CONTRACTOR SHALL PROVIDE A CARD READER ON THE ENTRY CONTRACTOR SHALL PROVIDE A CARD READER ON THE ENTRY SIDE OF THE DOOR, DOOR POSITION CONTACT SWITCH AND REQUEST TO EXIT ALLOWING FREE TRAVEL IN THE DIRECTION OF EGRESS FOR THE TWO PHARMACY ROOM DOORS AND FOR THE RETAIL STORE DOOR . CONTRACTOR SHALL INTERFACE WITH ELECTRIC STRIKES ON THESE DOORS. 3. ACCESS CONTROL SYSTEM SHALL BE COMPATIBLE WITH THE ACCESS CONTROL SYSTEM SHALL BE COMPATIBLE WITH THE EXISTING ACCESS CONTROL/SECURITY SYSTEMS ON CAMPUS SO THAT NEW ACCESS CARDS WORK ON THE EXISTING CAMPUS SYSTEMS AND THE EXISTING CAMPUS CARDS WORK ON THIS NEW ACCESS CONTROL SYSTEM. 4. THE ACCESS CONTROL AND CCTV SYSTEM SHALL MEET THE THE ACCESS CONTROL AND CCTV SYSTEM SHALL MEET THE REQUIREMENTS OF THE V.A. CAMERAS SHALL BE ARRANGED SO THEY ARE VIEWED AND CONTROLLED BY SYSTEM CONTROLS IN THE BUILDING 19 POLICE OFFICE AND VIEWED BY SYSTEM MONITORS IN BUILDING 20 POLICE OFFICE. 5. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT THE JOB SITE BEFORE COMMENCING WORK. 6. ALL COSTS FOR INSPECTIONS, TEST SERVICES, BUILDING ALL COSTS FOR INSPECTIONS, TEST SERVICES, BUILDING PERMITS, LICENSES AND CERTIFICATES SHALL BE PAID BY THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL REQUIRED CONTRACTOR STAMPS AND CONTRACTOR LICENSES. 7. SYSTEM SHALL BE CONTROL FROM, AND SYSTEM SHALL REPORT SYSTEM SHALL BE CONTROL FROM, AND SYSTEM SHALL REPORT TO, THE SECURITY OFFICE AT THE LOBBY OF BUILDING 20 AND AT THE POLICE STATION. 8. THE ACCESS CONTROL/SECURITY SYSTEM SHALL BE FIPS 201 THE ACCESS CONTROL/SECURITY SYSTEM SHALL BE FIPS 201 COMPLIANT AND MEET THE REQUIREMENTS OF THE PHYSICAL SECURITY DESIGN MANUAL FOR VA FACILITIES. CONTRACTOR TO COORDINATE WITH ARCHITECTURAL PLANS AND ALL DISCIPLINES FOR PROPER LOCATION AND MOUNTING HEIGHTS OF ACCESS CONTROL DEVICES AND INTERFACES FOR THE REQUIRED SEQUENCES OF OPERATION. 9. THE ACCESS CONTROL SYSTEM AND CCTV SYSTEMS SHALL BE THE ACCESS CONTROL SYSTEM AND CCTV SYSTEMS SHALL BE INTEGRATED INTO THE EXISTING ACCESS CONTROL/SECURITY SYSTEM. NETWORK CONNECTION TO THE CAMPUS ACCESS CONTROL/SECURITY SYSTEM SHALL BE MADE IN THE TELECOM ROOM G105.

AutoCAD SHX Text

DOOR NUMBER

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text

REQUEST TO EXIT PASSIVE INFRARED DEVICE

AutoCAD SHX Text

RX

AutoCAD SHX Text

MOTION DETECTOR

AutoCAD SHX Text M

AutoCAD SHX Text

WEATHERPROOF

AutoCAD SHX Text

WP

AutoCAD SHX Text

PAN/TIP/ZOOM CAMERA IN VANDAL-PROOF HOUSING

AutoCAD SHX Text

KEYED NOTES

AutoCAD SHX Text

DOOR CONTACT SWITCH RECESSED

AutoCAD SHX Text D

AutoCAD SHX Text ENTRY REQUIRES ACCESS CARD USED IN CONJUNCTION WITH A SECONDARY FORM OF AUTHENTICATION. EITHER A PERSONAL IDENTIFICATIN NUMBER (PIN) KNOWN ONLY TO THE CARD HOLDER, OR BIOMETRIC MEASUREMENT SHALL BE USED AS THE SECONDARY AUTHENTICATOR.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

KEYPAD

AutoCAD SHX Text

KP

Sheets and Views
Layout1

File details come from the government source that posted it. Updated .