36E77618R0051-005.pdf

PDF 22 MB Posted

Attached to
Iowa City - Replace Steam Traps and Correct Condensate Over Pressurization 636A8-14-006
Solicitation number
36E77618R0051
Issued by

About this file

36E77618R0051 ATTACHMENT 2 - Final Drawings - Pages 61 - 90 - 2.8.18.pdf

View the file

Other files

File Type Posted
36E77618C0024-000.docx DOCX document
36E77618R0051-0005001.docx DOCX document
36E77618R0051-0005000.docx DOCX document
36E77618R0051-0004001.pdf PDF
36E77618R0051-0004000.docx DOCX document
36E77618R0051-00003002.docx DOCX document
36E77618R0051-00003003.pdf PDF
36E77618R0051-00002000.docx DOCX document
36E77618R0051-00001005.pdf PDF
36E77618R0051-00001007.pdf PDF
36E77618R0051-00001008.pdf PDF
36E77618R0051-00001004.pdf PDF
36E77618R0051-00001003.pdf PDF
36E77618R0051-00001009.docx DOCX document
36E77618R0051-00001000.docx DOCX document
36E77618R0051-00001006.pdf PDF
36E77618R0051-00001002.pdf PDF
36E77618R0051-00001001.pdf PDF
36E77618R0051-012.docx DOCX document
36E77618R0051-001.docx DOCX document
36E77618R0051-002.pdf PDF
36E77618R0051-010.pdf PDF
36E77618R0051-009.pdf PDF
36E77618R0051-007.pdf PDF
36E77618R0051-004.pdf PDF
36E77618R0051-008.pdf PDF
36E77618R0051-006.pdf PDF
36E77618R0051-003.pdf PDF
36E77618R0051-011.docx DOCX document
36E77618R0051-000.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

��RE �ROTE�T�ON S�MBOLS L�ST

S�MBOL� �ES�R��T�ON�

��RE S�R�N�LER �SAGE S��E��LE

AREA T��E

�NOTE 1 � ��

AREA �A�AR�

S�R�N�LER

MAN��A�T�RER � MO�EL REMAR�SS�MBOL

�NOTES � � ��

T��E RES�ONSE ��N�S� TEM�ERAT�RE

°F

�AN�TOR �LOSETS�

�O�SE �EE��NG

SEE �LANS S�R�1 �EN�ENT ����� RO�G� BRASS 1�� ����NG ��� REL�ABLE �1�R�

T��O T���RB� ���TA�L�� ���0�

NOTE 3

��N�S�E� S�A�ES SEE �LANS S�R�� �ON�EALE� ����� � ��TE 1�� ����NG ��� REL�ABLE G�A�

T��O R���� ���TA�L�� �3�0�

NOTE 3

NOTES�

1� SEE �LOOR �LANS �OR �ON�NG RE���REMENTS�

�� S�R�N�LER S�ALL �A�E �OLOR �O�E� B�LB T�ERMAL ELEMENT�

3� ALL S�R�N�LERS S�ALL BE �L L�STE��

�� �ONTRA�TOR TO �ER��� S�R�N�LER RE���REMENTS BASE� ON A�T�AL �NSTALLAT�ON� �SAGE� AR���TE�T�RAL �E�L�NG �LAN AN� N��A 13 RE���REMENTS� �� S�MBOL �S �R�MAR�L� �OR �N�ENT����NG S�R�N�LERS �N S�BM�TTALS� �T MA� OR MA� NOT BE �O�N� ELSE� �ERE ON T�E �RA� �NGS� �ONTRA�TOR TO S�BM�T ALL S�R�N�LER T��ES TO BE �SE�� �� AREAS ARE GENERAL �N NAT�RE� �ONTRA�TOR TO MAT�� �NS��E��LE� AREAS TO S�M�LAR S�A�ES�

GENERAL S�EET NOTES

�� �LOOR �LAN � ��RE �ROTE�T�ON

R T HN O

The ��T�RE.

Built SMARTER.®

GENERAL ��AS�NG NOTES

PHASE 1 CONSISTS OF REPLACING DEFECTIVE

STEAM TRAP ASSEMBLIES, AGED CONDENSATE

PIPING, CONDENSATE PUMPS AND CONSOLIDATION

OF PRESSURE REDUCING VALVES FOR BUILDING 1,

2 AND 7. THE NEW PIPING, CONDENSATE PUMPS

AND PRESSURE REDUCING VALVES SHALL BE

INSTALLED PRIOR TO REMOVAL OF EXISTING.

PHASE 2 CONSISTS OF DECOMMISSIONING THE

EXISTING STEAM AND CONDENSATE ASSOCIATED

WITH THE ORIGINAL BUILDING-1 PERIMETER

CONVECTOR SYSTEM THAT HAS BEEN REMOVED IN

PHASES IN RECENT YEARS. THE FINAL PHASE,

WHICH IS PART OF THIS PROJECT, SHALL BE

REMOVAL OF ALL ASSOCIATED HORIZONTAL PIPING

AND ABANDONING OF THE VERTICAL RISERS. THE

FINAL PHASE OF THIS DECOMMISSIONING MUST

OCCUR AFTER THE VA PROJECT "REPLACE FAN

COILS AND CONVECTORS - PHASE 2" IS COMPLETE.

THIS PROJECT IS CURRENTLY UNDER

CONSTRUCTION. CONTRACTOR SHALL COORDINATE

THE TIMING OF THE FINAL PHASE SUCH THAT THE

EXISTING CONVECTOR SYSTEM REMAINS

OPERATIONAL UNTIL ALL ASSOCIATED EQUIPMENT

IS REMOVED. AS THE "FCU PROJECT" HAS YET TO

BE COMPLETED, THIS DESIGN IS BASED ON THE

ASSUMPTION THAT ALL STEAM EQUIPMENT

ASSOCIATED WITH THIS CONVECTOR SYSTEM WILL

BE REMOVED UPON COMPLETION OF THE "FCU

PROJECT". CONTRACTOR SHALL VERIFY THAT

EVERY PIECE OF EQUIPMENT HAS BEEN REMOVED

FROM THIS SYSTEM AND COORDINATE ANY

ADDITIONAL EQUIPMENT REMOVAL AND

REPLACEMENT WITH THE VA.

��AS�NG

ME��AN��AL S�MBOLS L�ST

S�MBOL� �ES�R��T�ON�

GENERAL �EMOL�T�ON NOTES

S�B�BASEMENT �LOOR �LAN � ME��AN��AL �EMOL�T�ON

R T HN O

The ��T�RE.

Built SMARTER.®

S�B�BASEMENT �LOOR �LAN � ME��AN��AL �EMOL�T�ON

R T HN O

S�B�BASEMENT T�NNEL ENTR� � ����NG �EMOL�T�ON3

TAG AH1-B1

PH Coil 150 LB/HR RH Coil N/A

Humd 45 LB/HR

TAG AH1-B4

PH Coil NONE RH Coil NONE

Humd NONE

TAG AH1-B2

PH Coil 130 LB/HR RH Coil N/A

Humd 50 LB/HR

�E�NOTES

��AS�NG

BE �LOOR �LAN � ME��AN��AL �EMOL�T�ON

R T HN O

TAG AH1-B�

PH Coil 1�1 RH Coil N/A

Humd N/A

�E�NOTES

��AS�NG

The ��T�RE.

Built SMARTER.®

BS �LOOR �LAN � ME��AN��AL �EMOL�T�ON

R T HN O

�E�NOTES

BS� �LOOR �LAN � ME��AN��AL �EMOL�T�ON

R T HN O

TAG AH1-B5

PH Coil 550 LB/HR RH Coil N/A

Humd N/A

TAG AH1-B�

PH Coil �1� LB/HR RH Coil 315 LB/HR

Humd 1�5 LB/HR

�E�NOTES

��AS�NG

B� �LOOR �LAN � ME��AN��AL �EMOL�T�ON

R T HN O