36E77618R0051-0005001.docx

DOCX document 23 KB Posted

Attached to
Iowa City - Replace Steam Traps and Correct Condensate Over Pressurization 636A8-14-006
Solicitation number
36E77618R0051
Issued by

About this file

36E77618R0051 0005 Iowa City Technical Questions Document.docx

View the file

Other files

File Type Posted
36E77618C0024-000.docx DOCX document
36E77618R0051-0005000.docx DOCX document
36E77618R0051-0004001.pdf PDF
36E77618R0051-0004000.docx DOCX document
36E77618R0051-00003002.docx DOCX document
36E77618R0051-00003003.pdf PDF
36E77618R0051-00002000.docx DOCX document
36E77618R0051-00001005.pdf PDF
36E77618R0051-00001007.pdf PDF
36E77618R0051-00001008.pdf PDF
36E77618R0051-00001004.pdf PDF
36E77618R0051-00001003.pdf PDF
36E77618R0051-00001009.docx DOCX document
36E77618R0051-00001000.docx DOCX document
36E77618R0051-00001006.pdf PDF
36E77618R0051-00001002.pdf PDF
36E77618R0051-00001001.pdf PDF
36E77618R0051-012.docx DOCX document
36E77618R0051-001.docx DOCX document
36E77618R0051-002.pdf PDF
36E77618R0051-010.pdf PDF
36E77618R0051-005.pdf PDF
36E77618R0051-009.pdf PDF
36E77618R0051-007.pdf PDF
36E77618R0051-004.pdf PDF
36E77618R0051-008.pdf PDF
36E77618R0051-006.pdf PDF
36E77618R0051-003.pdf PDF
36E77618R0051-011.docx DOCX document
36E77618R0051-000.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36E77618R0051 Iowa City Replace Steam Traps & Correct Condensate Over Pressurization TECHNICAL QUESTIONS AND VA RESPONSE TRACKING SHEET

ITEM

NO.

DATE QUESTION RECEIVED
DATE QUESTION ANSWERED
QUESTION
GOVERNMENT RESPONSE
1.
4.26.18
5.7.18
We are having trouble getting a clear view of many of the drawings posted in the solicitation. Has anyone else raised this concern? Would there be a way to get updated files that are easier to view?
Attachment 2 documents have been replaced reformatted drawings issued in Amendment 0001.
1.
4.24.18
5.7.18
The plans listed on the VA site are not full-sized drawings, they are set up as 8 x 11 so if I were to enlarge them to actually view them on paper, it will not be to scale.
Attachment 2 documents have been replaced reformatted drawings issued in Amendment 0001.
1.
5.2.18
5.7.18
Is there an ETA on the posting of the correct sized documents. At this time if we do not receive them today are subs will not have enough time to bid the project. They need the correct sized drawings in order to perform their takeoff and provide accurate pricing for the project.
Attachment 2 documents have been replaced reformatted drawings issued in Amendment 0001.
1.
5.2.18
5.7.18
We were reviewing the Mechanical Schedule for the Iowa City VA – Steam Trap project and discovered that the font for all the equipment to be installed has been corrupted.
Attachment 2 documents have been replaced and reformatted drawings were issued in Amendment 0001.
1.
6.8.18
6.18.18
Drawing 1-M1-00 detail 2 (upper left corner) shows a 3” PC line going up and references drawing 1-M1-1S for continuation. The line is between column rows 9/10 & D/E. This 3” PC line does not show up on 1-M1-1S (or any floors above). Where does this 3” PC line go
The detail should reference drawing 1-M1-0S page 128 for the basement instead of 1-M1-1S for the 1st floor. You can see the 3” PC line continues in the ash silo on the basement floor.
1.
6.8.18
6.18.18
Drawing 1-M1-1S shows a 4” LPC line between column rows 9/10 & D/E. As you go through the floor above there are several other LPC lines that connect to it. However, there is no continuation in the basement (drawing 1-M1-00) for this 4” LPC line. Where does it go?
Drawing 1-M1-00 is for the sub-basement. The 4” LPC line in question continues in the basement level on drawing 1-M1-0S page 128