The FUTURE.
Built SMARTER.®
GENERAL MECHANICAL NOTES
KEYNOTES
SUB-BASEMENT FLOOR PLAN - MECHANICAL
R T HN O
The FUTURE.
Built SMARTER.®
SUB-BASEMENT FLOOR PLAN - MECHANICAL
R T HN O
SUB-BASEMENT TUNNEL ENTRY - PIPING DIAGRAM3
TAG AH1-B1
PH Coil 150 LB/HR RH Coil N/A
Humd 45 LB/HR
TAG AH1-B4
PH Coil NONE RH Coil NONE
Humd NONE
TAG AH1-B2
PH Coil 130 LB/HR RH Coil N/A
Humd 50 LB/HR
KEYNOTES
BE FLOOR PLAN - MECHANICAL
R T HN O
The FUTURE.
Built SMARTER.®
BOTTOM OF RISER DETAIL2
PRV (1-PRV-B-15, 1-PRV-B-60) DETAIL3
TAG AH1-B7
PH Coil 171 RH Coil N/A
Humd N/A
KEYNOTES
The FUTURE.
Built SMARTER.®
BS FLOOR PLAN - MECHANICAL
R T HN O
BSW FLOOR PLAN - MECHANICAL
R T HN O
TAG AH1-B5
PH Coil 550 LB/HR RH Coil N/A
Humd N/A
TAG AH1-B6
PH Coil 719 LB/HR RH Coil 315 LB/HR
Humd 195 LB/HR
PIPE TRENCH DETAIL2
KEYNOTES
BW FLOOR PLAN - MECHANICAL
R T HN O
1E FLOOR PLAN - MECHANICAL
R T HN O
TAG AH1-12
PH Coil 960 lb/h
RH Coil WATER
Humd N/A
KEYNOTES
1S FLOOR PLAN - MECHANICAL
R T HN O
1W FLOOR PLAN - MECHANICAL
R T HN O
2S FLOOR PLAN - MECHANICAL
2SW FLOOR PLAN - MECHANICAL
TAG AH1-32
PH Coil 393 lb/h
RH Coil 492 lb/h
Humd 281 lb/h
TAG AH1-33
PH Coil 615 lb/h
RH Coil N/A
Humd 81 lb/h
TOTAL
KEYNOTES
3S FLOOR PLAN - MECHANICAL
R T HN O
The FUTURE.
AH1-32 PIPING DIAGRAM - NEW2
TAG AH1-39
PH Coil N/A
RH Coil N/A
Humd 85 lb/h
TAG AH1-36
PH Coil 810 lb/h RH Coil N/A (Water)
Humd 245 lb/h
TAG AH1-38
PH Coil 1520 LB/H
RH Coil WATER
Humd 435 LB/H
TAG AH1-37
PH Coil 3800 LB/H
RH Coil WATER
Humd 1150 LB/H
KEYNOTES
3SW FLOOR PLAN - MECHANICAL
R T HN O
The FUTURE.
Built SMARTER.®
EXISTING AH1-37 AND AH1-38 CONTROL VALVE - MECHANICAL2
EXISTING 3W103 PRV - MECHANICAL3
TAG AH1-35
PH Coil 284 lb/h
RH Coil 203 lb/h
Humd 116 lb/h
TAG AH1-34
PH Coil 48 lb/h
RH Coil 24 lb/h
HX 90 lb/h
KEYNOTES
3W FLOOR PLAN - MECHANICAL
R T HN O
CO
4S FLOOR PLAN - MECHANICAL
R T HN O
DN
4W FLOOR PLAN - MECHANICAL
R T HN O
TAG AH1-51
PH Coil 515 LB/HR
RH Coil N/A
Humd 200 LB/HR
TAG AH1-310
PH Coil 2025 LB/HR
RH Coil N/A
Humd 693 LB/HR
KEYNOTES
5S FLOOR PLAN - MECHANICAL
R T HN O
TAG AHU-1-62
PH Coil 545 lb/h
Humd 210 lb/h
GENERAL MECHANICAL NOTES
6S FLOOR PLAN - MECHANICAL
R T HN O
TAG AH1-81
PH Coil NONE RH Coil NONE
Humd 44
8E FLOOR PLAN - MECHANICAL
R T HN O
GENERAL SHEET NOTES
8W FLOOR PLAN - MECHANICAL
R T HN O
9E FLOOR PLAN - MECHANICAL
9W FLOOR PLAN - MECHANICAL
R T HN O
10E FLOOR PLAN - MECHANICAL
R T HN O
TAG AH1-101
PH Coil 505 lb/h
Humd 68 lb/h
KEYNOTES
10W FLOOR PLAN - MECHANICAL
R T HN O
The FUTURE.
10W PENTHOUSE PIPING DIAGRAM - MECHANICAL2
11E FLOOR PLAN - MECHANICAL
R T HN O
The FUTURE.
11E PENTHOUSE PIPING DIAGRAM - MECHANICAL2 11TH FLOOR PRV PIPING DIAGRAM - MECHANICAL3
TAG AH1-114
PH Coil 188 lb/h
RH Coil 129 lb/h
Humd 88 lb/h
TAG AHU-1-113
PH Coil 420 lb/h
Humd 172 lb/h
TAG AH1-112
PH Coil 2535 LB/HR
RH Coil 575 LB/HR
Humd 805 LB/HR
KEYNOTES
11W FLOOR PLAN - MECHANICAL
R T HN O
The FUTURE.
11W PENTHOUSE PIPING DIAGRAM - MECHANICAL2
12th FLOOR PLAN - MECHANICAL
R T HN O
The FUTURE.
Built SMARTER.®
13th FLOOR PLAN - MECHANICAL
VENTILATION SYMBOLS LIST
SYMBOL: DESCRIPTION:
GENERAL SHEET NOTES
FILTERED RETURN GRILLE DETAIL2
KEYNOTES
8W FLOOR PLAN - VENTILATION
R T HN O
GENERAL NOTESKEYNOTES
ENLARGED SUB-BASEMENT PLAN - MECHANICAL
R T HN O
TYPICAL AHU STEAM COIL OR WATER HEATER PIPING CONNECTION4 FAN COIL UNIT PIPE COMPONENTS - FOUR PIPE6
DUPLEX STEAM POWERED CONDENSATE PUMP DETAIL7
STEAM UNIT HEATER DETAIL2
TYPICAL STEAM TRAP ASSEMBLY1
STEAM HUMIDIFIER PIPING5
STEAM DRIP POCKET DETAIL3
STEAM RELIEF VENT DETAIL3
SMALL PIPE ANCHOR 1 1/2" - 4"1 SUPPORT / ANCHOR FOR PIPE RISERS2
PIPE HANGER DETAIL4
PRESSURE REDUCING VALVE SERVICE
SYMBOL SERVICE LB/HR
INLET
PRESSURE
PSI
OUTLET
PRESSURE
PSI
REMARKS
1-PRV-B-60 27,425 100.0 60.0
1-PRV-11-15 12,529 60 15
1-PRV-B-15 14,896 60 15
1-PRV-B-15 14,896 60 15
ENTRY VESTIBULE 0 15 0 Air Curtain
AH1-B1 195 15 0 Peheat Coil and Humidifier
AH1-B2 180 15 0 Peheat Coil and Humidifier
AH1-B5 550 15 0 Peheat Coil, Reheat Coil and Humidifier
AH1-B6 1,229 15 0 Preheat Coil
AH1-B7 171 15 0 Preheat Coil
AH1-12 960 15 0 Preheat Coil
AH1-32 1,166 15 0 Peheat Coil, Reheat Coil and Humidifier
AH1-33 655 15 0 Peheat Coil and Humidifier
AH1-34 162 15 0 Peheat Coil, Reheat Coil and HX
AH1-35 603 15 0 Peheat Coil, Reheat Coil and Humidifier
AH1-43 190 15 0 Stm to Stm Humidifer only
AH1-51 1,387 15 0 Current AHU has a capacity of 713 lb/h. Capacity shown is for future AHU.
AH1-62 733 15 0 Peheat Coil and Humidifier
5S -WH'S 4,000 15 0 1-WH-B-1S, 1-WH-2-3S, 1-WH-4-5S
AH2-12 480 15 0 Peheat Coil and Humidifier
AH2-11 555 15 0 Peheat Coil and Humidifier
AH2-21 212 15 0 Peheat Coil and Humidifier
H2-1, H2-2 193 15 0 Steam to Steam Humidifier
HX2-1, HX2-2 610 15 0 Building 2 heat exchangers
BLDG 7 665 15 0 AH7-2, AH7-1, (9) UH'S
1-PRV-11-15 12,529 60 15
AH1-81 40 15 0 Humidifier only
AH1-101 615 15 0 Preheat Coil, Stm to Stm Humidifier and Unit Heater
AH1-111 740 15 0 Preheat Coil, Humidifier and Unit Heater
AH1-112 3,915 15 0 Peheat Coil, Reheat Coil and Humidifier
AH1-113 632 15 0 Preheat Coil, Humidifier and Unit Heater
AH1-114 405 15 0
11th Floor WH's 6,000 15 0 1-WH-4-5E, 1-WH-6-7E, 1-WH-8-10E, 1-WH-4-5W, 1-WH-6-7W, 1-WH-8-10W, 12/13th FLR UH'S 182 15 0 Unit Heaters
NOTES:
1.
PRESSURE REDUCING VALVE SCHEDULE
SYMBOL SERVICE LB/HR
INLET
PRESSURE
PSI
OUTLET
PRESSURE
PSI
VALVE
SIZE
MANUFACTURER
(BASIS OF DESIGN)
MODEL REMARKS
1-PRV-B-15A NOTE 1 5,000 60.0 15.0 2.5" WATSON MCDANIEL HD-18-F150 1/3 TOTAL CAPACITY
1-PRV-B-15B NOTE 1 10,000 60.0 15.0 4" WATSON MCDANIEL HD-20-F150 2/3 TOTAL CAPACITY
1-PRV-B-60A NOTE 1 9,250 100.0 60.0 2.5" WATSON MCDANIEL HD-18-F150 1/3 TOTAL CAPACITY
1-PRV-B-60B NOTE 1 18,500 100.0 60.0 4" WATSON MCDANIEL HD-20-F150 2/3 TOTAL CAPACITY
1-PRV-11-15A NOTE 1 4,250 60.0 15.0 2" WATSON MCDANIEL HD-17-F150 1/3 TOTAL CAPACITY
1-PRV-11-15B NOTE 1 8,500 60.0 15.0 3" WATSON MCDANIEL HD-19-F150 2/3 TOTAL CAPACITY
1-PRV-SB-HX HEATING WATER HX 45,400 100.0 15.0 N/A N/A N/A EXISTING
1-PRV-SB-WH WATER HEATERS 4,000 100.0 15.0 N/A N/A N/A EXISTING
1-PRV-3SW-60 CLINCAL ADDITION 14,825 100.0 60.0 N/A N/A N/A EXISTING
1-PRV-3SW-15 CLINICAL ADDITION 12,095 60.0 15.0 N/A N/A N/A EXISTING
1-PRV-3SW-OR OPERATING ROOM
ADDITION 3,350 100.0 60.0 N/A N/A N/A EXISTING
NOTES:
1. REFER TO PRV SERVICE SCHEDULE FOR EQUIPMENT SERVED BY PRV
2. PROVIDE EACH PRV WITH AN ACCOUSTICAL ORIFICE PLATE RATED FOR 5-10 dba ATTENUATION
CONDENSATE RETURN STATION SCHEDULE (STEAM PUMP)
SYMBOL SERVICE TYPE
DESIGN LOAD
COND
(LB/HR)
COND
PRESSURE
(PSI)
RECEIVER
CAPACITY
(GALLONS)
FILLING HEAD
(IN.)
MOTIVE
PRESSURE
(PSI)
TOTAL BACK
PRESSURE
(PSI)
# OF PUMPS PUMP
(GPM)
MANUFACTURER
(BASIS OF DESIGN)
MODEL REMARKS
1-CRS-BE15 AH1-B2 AND AH1-B1 DUPLEX 500 15 2 12 15 5 2 1.0 WATSON MCDANIEL NOTE 1
1-CRS-BS05 SOUTH, SOUTHWEST, BLD
2 AND BLD 7
TRIPLEX 37,500 15 125 - 30 - 3 75.0 WATSON MCDANIEL EXISTING
1-CRS-SB04 EAST WEST AND NORTH
WINGS DUPLEX 20,500 15 75 12 45 40 2 40.0 WATSON MCDANIEL NOTE 1
1-CRS-SB04-WH1 WATER HEATERS DUPLEX
(ELECTRIC)
2500 15 30 - 40 N/A 2 10.0 ROTH 212F EXISTING, NOTE 4
1-CRS-SB04-WH2 WATER HEATERS DUPLEX
(ELECTRIC)
2500 15 30 - 40 N/A 2 10.0 ROTH 212F EXISTING
1-CRS-SB05-HX FCU HEAT EXCHANGERS DUPLEX 45,400 15 UNKNOWN - NOTE 2 40 2 - EXISTING
2-CRS-103E BLD 2 WAREHOUSE SIMPLEX 1287 15 4 6 15 5 2 2.5 WATSON MCDANIEL NOTE 3
2-CRS-130 BUILDING 2 DUPLEX 1470 15 NOT
SPECIFIED - 15 5 2 N/A EXISTING
7-CRS-1 BLD 7 DUPLEX 1670 15 - - 15 5 2 - WATSON MCDANIEL EXISTING, NOTE 5
NOTES:
1. PREPIPED SKID MOUNTED UNIT. REFER TO SPECIFICATION 23 22 23 FOR DETAILS.
2. PROVIDE NEW PRESSURE REDUCING VALVE FOR EXISTING PUMP TO REDUCE MOTIVE PRESSURE FROM 100 PSI TO 45 PSI
3. UNIT SHALL BE FIELD ASSEMBLED WITHIN EXISTING TUNNEL WHICH HAS TIGHT SPACE REQUIREMENTS. REFER TO SPECIFICATION 23 22 23 FOR DETAILS.
4. EXISTING CONDENSATE PUMP TO BE RELOCATED FROM THE 3S MECHANICAL ROOM TO THE SUB-BASEMENT.
5. EXISTING CONDENSATE PUMP TO BE RELOCATED FROM 4W MECHANICAL ROOM TO BUILDING 7
UNIT HEATER SCHEDULE - STEAM
SYMBOL SERVICE TYPE CFM MBH STEAM
PRESSURE
ELECTRICAL
CONTROL MANUFACTURER
(BASIS OF DESIGN)
MODEL REMARKS
WATTS RPM VOLT-
PHASE
DISCONNECT CONTROLLER/
STARTERBY
(NOTE A)
TYPE
(NOTE B) BY (NOTE A)
UH1-BS BS10A HORIZONTAL 395 18 15.0 16W 1,550 115-1 EC NF MFR NOTE 1 TRANE S
UH1-5S 5S16 MECH ROOM HORIZONTAL 550 36 15.0 25W 1,550 115-1 EC NF MFR NOTE 1 TRANE S
UH1-11W 11W PENTHOUSE HORIZONTAL 550 36 15.0 25W 1,550 115-1 EC NF MFR NOTE 1 TRANE S
UH2-1 BLD 2 WAREHOUSE HORIZONTAL 550 36 15.0 25W 1,550 115-1 EC NF MFR NOTE 1 TRANE S
UH2-2 BLD 2 WAREHOUSE HORIZONTAL 550 36 15.0 25W 1,550 115-1 EC NF MFR NOTE 1 TRANE S
NOTES:
1. PROVIDE WITH ROOM THERMOSTAT CONTROLS
GRILLES REGISTERS & DIFFUSERS SCHEDULE
SYMBOL MAT'L TYPE MARGIN
(NOTE 1)
INLET
SIZE
(INCH)
FACE
SIZE
(INCH)
VOLUME
DAMPER
REQ'D
FINISH REMARKS
CD-1 STEEL PANEL FACE LAY-IN SEE DWG. 24x24 NO WHITE FLUSH FACE PANEL
RG-1 STEEL EGGCRATE
FACE LAY-IN 20x20 24x24 NO WHITE FILTERED RETURN
EG-1 ALUMINUM EGGCRATE
FACE LAY-IN SEE DWG. 24x24 NO WHITE
NOTES:
1. CONTRACTOR SHALL DETERMINE PROPER MARGIN STYLE TO MATCH CEILING CONSTRUCTION.
2. ALL RUN OUT DUCTWORK TO DIFFUSERS SHALL BE NECK SIZE UNLESS OTHERWISE NOTED.
FAN COIL UNIT SCHEDULE - 4 PIPE HYDRONIC
SYMBOL SERVICE TYPE NOMINAL
CFM
EXT.
S.P.
IN W.C.
EAT COOLING COIL HEATING COIL ELECTRICAL
REMARKS
DB °F WB °F TOTAL
MBH
SENSIBLE
MBH GPM EWT
°F W.P.D.
FT. HD
TOTAL
MBH GPM EWT
°F W.P.D.
FT. HD HP VOLT-
PHASE
DISCONNECT CONTROLLER/STARTER
BY (NOTE A) TYPE (NOTE A)
FCU-8C01 Elevator Lobby HORIZONTAL CONCEALED 900 0.20 75 62 17.8 16.5 4.0 45 6.9 28.5 1.3 180 8.5 1/4 120-1 EC MFR NOTE 1
FCU-8CW01A Corridor HORIZONTAL CONCEALED 150 0.20 75 62 3.6 3.1 1.0 45 1.6 6.6 0.5 180 1.0 1/8 120-1 EC MFR NOTE 1
FCU-8W05 WAITING RM HORIZONTAL
CONCEALED 400 0.20 75 62 8.9 7.9 2.0 45 6.4 14.7 1.0 180 3.7 1/8 120-1 EC MFR NOTE 1
FCU-8W06 OFFICE HORIZONTAL
CONCEALED 150 0.20 75 62 3.6 3.1 1.0 45 1.6 6.6 0.5 180 1.0 1/8 120-1 EC MFR NOTE 1
FCU-8W07 OFFICE HORIZONTAL
CONCEALED 300 0.20 75 62 7.3 6.6 1.5 45 3.4 11.2 0.5 180 1.1 1/8 120-1 EC MFR NOTE 1
FCU-8W08 CONFERENCE HORIZONTAL
CONCEALED 300 0.20 75 62 7.3 6.6 1.5 45 3.4 11.2 0.5 180 1.1 1/8 120-1 EC MFR NOTE 1
FCU-8W09 OFFICE HORIZONTAL
CONCEALED 150 0.20 75 62 3.6 3.1 1.0 45 1.6 6.6 0.5 180 1.0 1/8 120-1 EC MFR NOTE 1
FCU-8W10 OFFICE HORIZONTAL
CONCEALED 250 0.20 75 62 5.3 4.9 1.3 45 2.4 8.9 0.5 N/A 1.0 1/8 120-1 EC MFR NOTE 1
FCU-8W11 OFFICE HORIZONTAL
CONCEALED 200 0.20 75 62 5.3 4.9 1.3 45 2.4 8.9 0.5 N/A 1.0 1/8 120-1 EC MFR NOTE 1
FCU-8W12 OFFICE HORIZONTAL
CONCEALED 250 0.20 75 62 5.3 4.9 1.3 45 2.4 8.9 0.5 N/A 1.0 1/8 120-1 EC MFR NOTE 1
FCU-8W13 NURSE STATION HORIZONTAL
CONCEALED 300 0.20 75 62 7.3 6.6 1.5 45 3.4 11.2 0.5 180 1.1 1/8 120-1 EC MFR NOTE 1
FCU-8W16 EXAM RM HORIZONTAL
CONCEALED 250 0.20 75 62 5.3 4.9 1.3 45 2.4 8.9 0.5 N/A 1.0 1/8 120-1 EC MFR NOTE 1
FCU-8W18A PATIENT RM HORIZONTAL
CONCEALED 500 0.20 75 62 9.2 8.1 2.3 45 7.9 14.8 1.0 180 3.7 1/8 120-1 EC MFR NOTE 1
FCU-8W18B PATIENT RM HORIZONTAL
CONCEALED 500 0.20 75 62 9.2 8.1 2.3 45 7.9 14.8 1.0 180 3.7 1/8 120-1 EC MFR NOTE 1
FCU-8W18C PATIENT RM HORIZONTAL
CONCEALED 500 0.20 75 62 9.2 8.1 2.3 45 7.9 14.8 1.0 180 3.7 1/8 120-1 EC MFR NOTE 1
FCU-8W18D PATIENT RM HORIZONTAL
CONCEALED 500 0.20 75 62 9.2 8.1 2.3 45 7.9 14.8 1.0 180 3.7 1/8 120-1 EC MFR NOTE 1
NOTES:
1. PROVIDE WITH LITTLE GIANT CONDENSATE PUMP, MODEL VCMX. INCLUDE SAFETY OVERFLOW SWITCH WIRED BY CONTROLS CONTRACTOR, CHECK VALVE, ANTI-SWEAT SLEEVE AND MOUNTING BRACKET.
COIL SCHEDULE - WATER
SYMBOL SERVICE
SIZE
L x H
(IN.)
CFM EAT LAT TOTAL
MBH
A.P.D.
IN.
W.C.
EWT
°F GPM
W.P.D.
FT.
HEAD
MANUFACTURER
(BASIS OF DESIGN)
MODEL REMARKS
HC-8W14 RESTROOM 8W14 8x6 150 55 90 5.7 0.1 180 0.5 0.05 TRANE ST
HC-8W15 SOILED 8W15 6x6 75 55 90 2.9 0.1 180 0.5 0.05 TRANE ST
UNIT HEATER SCHEDULE - HOT WATER
SYMBOL SERVICE TYPE CFM MBH GPM EWT
°F
LWT
°F
W.P.D.
FT.
HEAD
ELECTRICAL
CONTROL MANUFACTURER
(BASIS OF DESIGN)
MODEL REMARKS
HP RPM VOLT-
PHASE
DISCONNECT
BY
(NOTE A)
TYPE
(NOTE B)
UH1-1E AMBULANCE
GARAGE HORIZONTAL 900 31 1.6 180 140 0.9 1/20 1,000 115-1 EC NF NOTE 1 TRANE S
NOTES:
1. PROVIDE WITH ROOM THERMOSTAT CONTROLS
SAFETY RELIEF VALVE SCHEDULE
SYMBOL SERVICE CAPACITY
LB/HR
SET
POINT
PSIG
INLET
SIZE
(IN.)
OUTLET
SIZE
(IN.)
ORIFICE
(SQ IN.)
MANUFACTURER
(BASIS OF DESIGN) MODEL REMARKS
1-SRV-B-15 1-PRV-B-15 28,615 20 6 8 16.798 WATSON MCDANIEL SV1-22F-23F-R
1-SRV-B-60 1-PRV-B-60 45,186 65 6 8 11.593 WATSON MCDANIEL SV1-22F-23F-Q
1-SRV-11-15 1-PRV-11-15 11,408 20 4 6 6.692 WATSON MCDANIEL SV1-20F-22F-P
NOTES:
1. PROVIDE WITH DRIP PAN ELBOW.
FAN SCHEDULE
SYMBOL SERVICE CFM
S.P.
IN.
W.C.
WHEEL
DIA.
INCHES
FAN
RPM
(NOTE F)
DRIVE
MAX.
AMCA
SONES
BACKDRAFT
DAMPER
ELECTRICAL
MANUFACTURER MODEL REMARKSBHP
(NOTE E)
MHP
(NOTE E)
VOLT-
PHASE
DISCONNECT CONTROLLER/STARTER
BY (NOTE A) BY (NOTE A) TYPE (NOTE C)
1-EF-BE01 MECH RM BE01 1,000 0.25 16.0 954 DIRECT 11.2 ELECTRIC 0.150 0.250 120-1 EC MFR SS GREENHECK SE1-16 SEE NOTES
NOTES:
1. PROVIDE WITH BACKDRAFT DAMPER, DISCONNECT SWITCH, SPEED CONTROLLER AND OSHA APPROVED WALL HOUSING.
TRAP SCHEDULE
SYMBOL SERVICE LOCATION TRAP
TYPE
STEAM
PRESSURE
(PSI)
EQUIPMENT
LB/HR.
SAFETY
FACTOR
TRAP
LB/HR.
(NOTE 1)
NOMINAL
TRAP
SIZE (IN.)
ORIFICE
SIZE
(IN.)
PRESSURE
DIFFERENTIAL
MANUFACTURER
(BASIS OF DESIGN)
MODEL REMARKS
TRAP SCHEDULE
SYMBOL SERVICE LOCATION TRAP
TYPE
STEAM
PRESSURE
(PSI)
EQUIPMENT
LB/HR.
SAFETY
FACTOR
TRAP
LB/HR.
(NOTE 1)
NOMINAL
TRAP
SIZE (IN.)
ORIFICE
SIZE
(IN.)
PRESSURE
DIFFERENTIAL
MANUFACTURER
(BASIS OF DESIGN)
MODEL REMARKS
T1-SB-ASB1 AH1-SB1 SB11 F&T 15 200 2.5 500 1 1/2 0.39 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-SB-WB1Ea WH-B-1WE SB04 F&T 15 2900 2 5800.0 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-SB-WB1Eb WH-B-1E SB04 THERM 15 10 3 30.0 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-SB-WB1Wa WH-B-1W SB04 F&T 15 2900 2 5800.0 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-SB-WB1Wb WH-B-1W SB04 THERM 15 10 3 30.0 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-SB-W23Ea WH-2-3E SB04 F&T 15 2900 2 5800.0 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-SB-W23Eb WH-2-3E SB04 THERM 15 10 3 30.0 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-SB-W23Wa WH-2-3W SB04 F&T 15 2900 2 5800.0 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-SB-W23Wb WH-2-3W SB04 THERM 15 10 3 30.0 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-SB-D1 DRIP (WH) SB04 I.B. 15 10 3 30.0 EXISTING EXISTING 12 EXISTING EXISTING TO REMAIN
T1-SB-D2 DRIP (WH) SB04 I.B. 15 10 3 30.0 EXISTING EXISTING 12 EXISTING EXISTING TO REMAIN
T1-SB-D3 DRIP (WH) SB04 I.B. 60 10 3 30.0 EXISTING EXISTING 48 EXISTING EXISTING TO REMAIN
T1-SB-D4 DRIP (WH) SB04 I.B. 15 10 3 30.0 EXISTING EXISTING 12 EXISTING EXISTING TO REMAIN
T1-SB-D5 DRIP (PRV) SB04 I.B. 15 10 3 30.0 EXISTING EXISTING 12 EXISTING EXISTING TO REMAIN
T1-SB-D6 DRIP (PRV) SB04 I.B. 100 10 3 30.0 1/2 7/64 80 WATSON MCDANIEL 1031 NOTE 2, 3
T1-SB-D7 DRIP (COND PUMP) SB04 I.B. 100 10 3 30.0 1/2 7/64 80 WATSON MCDANIEL 1031 NOTE 2, 3
T1-SB-D8 DRIP (PRV) SB05 I.B. 100 10 3 30.0 1/2 7/64 80 WATSON MCDANIEL 1031 NOTE 2, 3
T1-SB-D9 DRIP SB07 I.B. 15 10 3 30.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-SB-D10 DRIP SB07 I.B. 100 10 3 30.0 1/2 7/64 80 WATSON MCDANIEL 1031 NOTE 2, 3
T1-SB-D11 DRIP SB11 I.B. 15 20 3 60.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-SB-D12 DRIP SB12A I.B. 100 10 3 30.0 1/2 7/64 80 WATSON MCDANIEL 1031 NOTE 2, 3
T1-SB-D13 DRIP SB07 I.B. 100 10 3 30.0 1/2 7/64 80 WATSON MCDANIEL 1031 NOTE 2, 3
T1-BE-AB1b AH1-B1 PREHEAT BE24 F&T 15 75 1.25 93.8 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-BE-AB1a AH1-B1 PREHEAT BE24 F&T 15 75 1.25 93.8 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-BE-AB2a AH1-B2 PREHEAT BE24 F&T 15 65 1.25 81.3 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-BE-AB2b AH1-B2 PREHEAT BE24 F&T 15 65 1.25 81.3 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-BE-D1 DRIP BE24 I.B. 15 10 3 30.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-BE-D2 DRIP BE15 I.B. 15 10 3 30.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-BE-D3 PRV DRIP BE01 I.B. 60 10 3 30.0 0.50 1/8 48 WATSON MCDANIEL 1031 NOTE 2, 3
T1-BE-D4 PRV DRIP BE01 I.B. 15 10 3 30.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-BE-D5 MAIN RISER DRIP BE01 I.B. 60 10 3 30.0 0.50 1/8 48 WATSON MCDANIEL 1031 NOTE 2, 3
T1-BE-HB1 AH1-B1 HUMDIFIER BE24 F&T 15 50 1.25 62.5 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-BE-HB2 AH1-B2 HUMDIFIER BE15 F&T 15 50 1.25 62.5 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-BW-AB5a AH1-B5 PREHEAT BW02 F&T 15 550 1.25 687.5 1 1/2 0.39 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-BW-AB5b AH1-B5 PREHEAT BW02 F&T 15 550 1.25 687.5 1 1/2 0.39 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-BW-AB6a AH1-B6 PREHEAT BW02 F&T 15 360 1.25 450.0 1 1/2 0.39 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-BW-AB6b AH1-B6 PREHEAT BW02 F&T 15 360 1.25 450.0 1 1/2 0.39 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-BW-AB6c AH1-B6 REHEAT BW02 F&T 15 160 1.25 200.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-BW-AB6d AH1-B6 REHEAT BW02 F&T 15 160 1.25 200.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-BW-HB6 AH1-B6 HUMDIFIER BW02 F&T 15 50 1.25 62.5 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-BW-D1 DRIP BCW01 I.B. 15 10 3 30.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-BW-D2 DRIP BW09 I.B. 15 10 3 30.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-BW-D3 DRIP (AH1-B6) BW02 I.B. 15 10 3 30.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-BW-D4 DRIP BW05A I.B. 15 10 3 30.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-BW-D5 DRIP BW02 I.B. 15 10 3 30.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-BW-U1 UNIT HEATER BW02B F&T 15 40 2 80.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-BW-U2 UNIT HEATER BW02A F&T 15 40 2 80.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-3W-A34a AH1-34 PREHEAT 3W09 F&T 15 24 1.25 30.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-3W-A34b AH1-34 REHEAT 3W09 F&T 15 24 1.25 30.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-3W-A35a AH1-35 PREHEAT 3W09 F&T 15 142 1.25 177.5 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-3W-A35b AH1-35 PREHEAT 3W09 F&T 15 142 1.25 177.5 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-3W-A35c AH1-35 REHEAT 3W09 F&T 15 100 1.25 125.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-3W-A35d AH1-35 REHEAT 3W09 F&T 15 100 1.25 125.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-3W-H35 AH1-35 HUMIDIFER 3W09 F&T 15 10 1.25 12.5 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-3W-HX HEAT EXCHANGER 3W09 F&T 15 90 2 180.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-3W-D1 DRIP 3W09 I.B. 15 10 3 30.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-3W-D2 DRIP 3W09 I.B. 15 10 3 30.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-4W-D1 DRIP 4W61 I.B. 15 10 3 30.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-4W-H43a AH1-43 HUMIDIFER 4W61 F&T 15 95 1.25 118.8 3/4 0.228 0.25 WATSON MCDANIEL WFT STEAM TO STEAM HUMIDIFIER
T1-4W-H43b AH1-43 HUMIDIFER 4W61 F&T 15 95 1.25 118.8 3/4 0.228 0.25 WATSON MCDANIEL WFT STEAM TO STEAM HUMIDIFIER
T1-9W-D1 DRIP 9W SHAFT I.B. 15 10 3 30.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-9W-D2 DRIP 9CW05 I.B. 15 5 3 15.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-10E-D1 DRIP 10E13 I.B. 15 10 3 30.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-10E-D2 DRIP 10E03B I.B. 15 10 3 30.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-10W-A101a AH1-101 PREHEAT 10W PENTHOUSE F&T 15 255 1.25 318.8 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-10W-A101b AH1-101 PREHEAT 10W PENTHOUSE F&T 15 255 1.25 318.8 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-10W-H101 AH1-101 HUMIDIFER 10W PENTHOUSE F&T 15 50 2 100.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-10W-D1 DRIP 10W20 I.B. 15 10 3 30.0 1/2 3/16 0.25 WATSON MCDANIEL 1031 NOTE 1, 3
T1-10W-D2 DRIP 10W PENTHOUSE I.B. 15 5 3 15.0 1/2 3/16 0.25 WATSON MCDANIEL 1031 NOTE 1, 3
T1-10W-U1 UNIT HEATER 10W PENTHOUSE F&T 15 40 2 80.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-11E-A111a AH1-111 PREHEAT 11E PENTHOUSE F&T 15 275 1.25 343.8 1 1/2 0.39 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-11E-A111b AH1-111 PREHEAT 11E PENTHOUSE F&T 15 275 1.25 343.8 1 1/2 0.39 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-11E-A111c AH1-111 REHEAT 11E PENTHOUSE F&T 15 60 2 120.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-11E-A111d AH1-111 REHEAT 11E PENTHOUSE F&T 15 45 2 90.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-11E-A111e AH1-111 REHEAT 11E PENTHOUSE F&T 15 55 2 110.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-11E-H111 AH1-111 HUMIDIFIER 11E PENTHOUSE F&T 15 50 2 100.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-11E-D1 AH1-111 DRIP 11E PENTHOUSE I.B. 15 10 3 30.0 1/2 3/16 12.00 WATSON MCDANIEL 1031 NOTE 2, 3
T1-11E-D2 DRIP (WH) 1100 I.B. 15 10 3 30.0 EXISTING EXISTING 12.00 EXISTING EXISTING EXISTING TO REMAIN
T1-11E-D3 DRIP (WH) 1100 I.B. 15 10 3 30.0 EXISTING EXISTING 12.00 EXISTING EXISTING EXISTING TO REMAIN
T1-11E-D4 DRIP (WH) 1100 I.B. 15 10 3 30.0 EXISTING EXISTING 12.00 EXISTING EXISTING EXISTING TO REMAIN
T1-11E-D5 DRIP (WH) 1100 I.B. 15 10 3 30.0 EXISTING EXISTING 12.00 EXISTING EXISTING EXISTING TO REMAIN
T1-11E-U1 UH1-11E 11E PENTHOUSE F&T 15 40 2 80.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-11E-W45Ea WH-4-5E 1100 F&T 15 2900 2 5800.0 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-11E-W45Eb WH-4-5E 1100 THERM 15 10 3 30.0 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-11E-W45Wa WH-4-5W 1100 F&T 15 2900 2 5800.0 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-11E-W45Wb WH-4-5W 1100 THERM 15 10 3 30.0 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-11E-W67Ea WH-6-7E 1100 F&T 15 2900 2 5800.0 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-11E-W67Eb WH-6-7E 1100 THERM 15 10 3 30.0 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-11E-W67Wa WH-6-7W 1100 F&T 15 2900 2 5800.0 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-11E-W67Wb WH-6-7W 1100 THERM 15 10 3 30.0 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-11E-W810Ea WH-8-10E 1100 F&T 15 2900 2 5800.0 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-11E-W810Eb WH-8-10E 1100 THERM 15 10 3 30.0 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-11E-W810Wa WH-8-10W 1100 F&T 15 2900 2 5800.0 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-11E-W810Wb WH-8-10W 1100 THERM 15 10 3 30.0 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-11W-A112a AH1-112 PREHEAT 1100 F&T 15 CO 1.25 #VALUE! 2 0.50 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-11W-A112b AH1-112 PREHEAT 1100 F&T 15 795 1.25 993.8 2 0.50 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-11W-A112c AH1-112 PREHEAT 1100 F&T 15 795 1.25 993.8 2 0.50 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-11W-A112d AH1-112 PREHEAT 1100 F&T 15 795 1.25 993.8 2 0.50 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-11W-A112e AH1-112 REHEAT 1100 F&T 15 290 1.25 362.5 1 1/2 0.39 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-11W-A112f AH1-112 REHEAT 1100 F&T 15 290 1.25 362.5 1 1/2 0.39 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-11W-H112a AH1-112 HUMIDIFIER 1100 F&T 15 50 2 100.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-11W-H112b AH1-112 HUMIDIFIER 1100 F&T 15 50 2 100.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-11W-A113a AH1-113 PREHEAT 11W PENTHOUSE F&T 15 210 1.25 262.5 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-11W-A113b AH1-113 PREHEAT 11W PENTHOUSE F&T 15 210 1.25 262.5 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-11W-H113a AH1-113 HUMIDIFIER 11W PENTHOUSE F&T 15 50 2 100.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-11W-H113b AH1-113 HUMIDIFIER 11W PENTHOUSE F&T 15 50 2 100.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-11W-A114a AH1-114 PREHEAT 11W ROOF F&T 15 95 1.25 118.8 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-11W-A114b AH1-114 PREHEAT 11W ROOF F&T 15 95 1.25 118.8 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-11W-H114 AH1-114 HUMIDIFIER 11W ROOF F&T 15 50 2 100.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-11W-D1 DRIP (A1-112) 1100 I.B. 15 10 3 30.0 1/2 3/16 12.00 WATSON MCDANIEL 1031 NOTE 2, 3
T1-11W-D2 DRIP (A1-112) 1100 I.B. 15 10 3 30.0 1/2 3/16 12.00 WATSON MCDANIEL 1031 NOTE 2, 3
T1-11W-D3 DRIP (A1-112) 1100 I.B. 15 10 3 30.0 1/2 3/16 12.00 WATSON MCDANIEL 1031 NOTE 2, 3
T1-11W-D4 DRIP (A1-113) 11W PENTHOUSE I.B. 15 10 3 30.0 1/2 3/16 12.00 WATSON MCDANIEL 1031 NOTE 2, 3
T1-11W-U1 UH1-11W 11W PENTHOUSE F&T 15 37 2 74.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-12-U1 UNIT HEATER 1200 F&T 15 40 2 80.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-12-U2 UNIT HEATER 1200 F&T 15 40 2 80.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-13-R1 RADIATOR 1300 F&T 15 27 2 54.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-13-R2 RADIATOR 1300 F&T 15 27 2 54.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
NOTES:
1. SUITABLE TO 125 PSIG, SIDE INLET & OUTLET, SS FLOAT MECHANISM AND VALVE, CAST IRON BODY, BALANCED PRESSURE
THERMOSTATIC AIR VENT, ALL INTERNALS REPLACEABLE IN-LINE.
2. SIDE INLET AND OUTLET INVERTED BUCKET TRAP. 250 PSIG RATED. CAST IRON BODY, ALL INTERNAL COMPONENTS OF
STAINLESS STEEL AND REPLACEABLE IN-LINE. ALL INVERTED BUCKET TRAPS SHALL BE PROVIDED WITH BIMETALLIC THERMOSTATIC ELEMENT FOR RELEASE OF NON-CONDENSABLES THAT CLOSES UPON REACHING STEAM TEMPERATURE.
3. FOR ALTERNATE MANUFACTURERS, RATED TRAP MAXIMUM OPERATING PRESSURE SHALL BE A MINIMUM OF 5PSIG GREATER THAN STEAM PRESSURE.
4. EACH TRAP, EXISTING OR NEW SHALL BE PROVIDED WITH BRASS VALVE TAG WITH ENGRAVED BLACK LETTERS WITH THE NAMES LISTED ABOVE.
5. CONTRACTOR IS RESPONSIBLE FOR UPDATING THESE SCHEDULES IN THE RECORD DRAWINGS FOR ALL TRAPS TO REMAIN WITHIN BUILDING, INCLUDING THOSE NOT CURRENTLY LISTED
TRAP SCHEDULE
SYMBOL SERVICE LOCATION TRAP
TYPE
STEAM
PRESSURE
(PSI)
EQUIPMENT
LB/HR.
SAFETY
FACTOR
TRAP
LB/HR.
(NOTE 1)
NOMINAL
TRAP
SIZE (IN.)
ORIFICE SIZE
(IN.)
PRESSURE
DIFFERENTIAL
MANUFACTURER
(BASIS OF DESIGN) MODEL REMARKS
T1-BS-A7a AH1-B7 PREHEAT BS05B AHU F&T 15 171 1.25 214 0.75 0.23 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-BS-A7b AH1-B7 PREHEAT BS05B AHU F&T 15 171 1.25 214 0.75 0.23 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-BS-D1 1ST FLOOR MECH DRIP BS06 SOUTH I.B. 15 10 3.00 30 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-BS-D2 MAIN LOW PRESS DRIP BS06 I.B. 15 20 3.00 60 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-BS-D3 AH1-B7 BRANCH DRIP BS05B I.B. 15 5 3.00 15 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-BS-D4 STEAM PUMP MOTIVE
DRIP BS05A - 100 15 3.00 45 EXISTING EXISTING 80 EXISTING EXISTING TO REMAIN
T1-BS-D5 SOUTH AHU RISER DRIP BS05A I.B. 15 25 3.00 75 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-BS-D6 DISHWASHER DRIP BS04D I.B. 15 5 3.00 15 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-BS-D7 8" LOW PRESS DRIP BS04 I.B. 15 20 3.00 60 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-BS-U1 UNIT HEATER BS10A F&T 15 20 2.5 50 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-BSW-CW CART WASH BW102A F&T 60 15 3.00 45 1/2 1/8 48 EXISTING EXISTING TO REMAIN
T1-BSW-D1 MED PRESS DRIP TO
STERILIZERS BW102 I.B. 60 30 3.00 90.0 EXISTING EXISTING 48 EXISTING EXISTING TO REMAIN
T1-BSW-D2 MED PRESS DRIP TO
STERILIZERS BW102 I.B. 60 10 3.00 30.0 EXISTING EXISTING 48 EXISTING EXISTING TO REMAIN
T1-BSW-D3 CLINICAL HIGH
PRESSURE RISER DRIP BC07 I.B. 100 30 3.00 90.0 1/2 7/64 80 WATSON MCDANIEL 1031 NOTE 2, 3
T1-BSW-D4 CLINICAL MED
PRESSURE RISER DRIP BW108B I.B. 60 30 3.00 90.0 1/2 1/8 48 WATSON MCDANIEL 1031 NOTE 2, 3
T1-BSW-S2a STERILIZER 2 BW102 DISK 60 10 3.00 30.00 EXISTING EXISTING 48 EXISTING EXISTING TO REMAIN
T1-BSW-S2b STERILIZER 2 BW102 F&T 60 5 3.00 15.0 EXISTING EXISTING 48 EXISTING EXISTING TO REMAIN
T1-BSW-S2c STERILIZER 2 BW102 ORIFICE 60 10 3.00 30.0 EXISTING EXISTING 48 EXISTING EXISTING TO REMAIN
T1-BSW-S3a STERILIZER 3 BW102 F&T 60 5 3.00 15.0 EXISTING EXISTING 48 EXISTING EXISTING TO REMAIN
T1-BSW-S3b STERILIZER 3 BW102 ORIFICE 60 10 3.00 30.0 EXISTING EXISTING 48 EXISTING EXISTING TO REMAIN
T1-BSW-S5 STERILIZER 5 BW119B I.B. 60 10 3.00 30 1/2 1/8 48 WATSON MCDANIEL 1031 NOTE 2, 3
T1-BSW-S6 STERILIZER 6 BW115 I.B. 60 10 3.00 30 1/2 1/8 48 WATSON MCDANIEL 1031 NOTE 2, 3
T1-1S-A12a AH1-12 PREHEAT 1S41 F&T 15 960.00 1.25 1200.0 2.00 0.50 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-1S-A12b AH1-12 PREHEAT 1S41 F&T 15 960.00 1.25 1200.0 2.00 0.50 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-1S-BH KITCHEN BOOSTER
HEATER 1S04 F&T 15 130.00 2.50 325.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-1S-D1 KITCHEN DRIP 1S04 I.B. 15 5.00 3.00 15.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-1S-D2 KITCHEN DRIP 1S04 I.B. 15 5.00 3.00 15.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-1S-D3 KITCHEN DRIP 1S04 I.B. 15 5.00 3.00 15.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-3S-A32a AH1-32 PREHEAT 3S08A F&T 15 393 1.25 491.3 1 1/2 0.39 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-3S-A32b AH1-32 PREHEAT 3S08A F&T 15 393 1.25 491.3 1 1/2 0.39 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-3S-A32c AH1-32 REHEAT 3S08A F&T 15 492 1.25 615.0 1 1/2 0.39 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-3S-A32d AH1-32 REHEAT 3S08A F&T 15 492 1.25 615.0 1 1/2 0.39 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-3S-A33a AH1-33 PREHEAT 3S08A F&T 15 615 1.25 768.8 1 1/2 0.39 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-3S-A33b AH1-33 PREHEAT 3S08A F&T 15 615 1.25 768.8 1 1/2 0.39 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-3S-D1 DRIP FOR 6" RISER UP 3S08A I.B. 15 5 3.00 15.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-3S-D2 AH1-32 DRIP 3S08A I.B. 15 5 3.00 15.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-3S-H32a AH1-32 HUMID SEPARATOR 3S08A F&T 15 10.00 3.00 30.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-3S-H32b AH1-32 HUMID HEADER 3S08A F&T 15 5.00 3.00 15.0 3/4 0.228 WATSON MCDANIEL WFT NOTE 1, 3
T1-3S-H33a AH1-33 HUMID A 3S08A DUCT F&T 15 10.00 3.00 30.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-3S-H33b AH1-33 HUMID B 3S08A DUCT F&T 15 10.00 3.00 30.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-3SW-A36a AH1-36 PREHEAT 3W103 F&T 15 810 1.25 1012.5 2 0.50 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-3SW-A36b AH1-36 PREHEAT 3W103 F&T 15 810 1.25 1012.5 2 0.50 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-3SW-A37a AH1-37 PREHEAT 3W103 F&T 15 3800 1.25 4750.0 2 0.94 0.25 WATSON MCDANIEL FTE NOTE 1, 3
T1-3SW-A37b AH1-37 PREHEAT 3W103 F&T 15 3800 1.25 4750.0 2 0.94 0.25 WATSON MCDANIEL FTE NOTE 1, 3
T1-3SW-A38a AH1-39 PREHEAT 3W103 F&T 15 1520 1.25 1900.0 2 0.94 0.25 WATSON MCDANIEL FTE NOTE 1, 3
T1-3SW-A38b AH1-39 PREHEAT 3W103 F&T 15 1520 1.25 1900.0 2 0.94 0.25 WATSON MCDANIEL FTE NOTE 1, 3
T1-3SW-D1 HIGH PRESSURE PRV
DRIP 3W103 I.B. 100 10 3.00 30.0 1/2 7/64 80 WATSON MCDANIEL 1031 NOTE 2, 3
T1-3SW-D2 MEDIUM PRESSURE PRV
DRIP 3W103 I.B. 60 10 3.00 30.0 1/2 1/8 48 WATSON MCDANIEL 1031 NOTE 2, 3
T1-3SW-D3 LOW PRESSURE PRV
DRIP 3W103 I.B. 15 5 3.00 15.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-3SW-D4 3W103 WH DRIP 3W103 I.B. 15 10 3.00 30.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-3SW-D5 O.R. LOW PRESS MAIN
DRIP 3W103 I.B. 15 10 3.00 30.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-3SW-D6 O.R. MED PRESS MAIN
DRIP 3W103 I.B. 60 10 3.00 30.0 1/2 1/8 48 WATSON MCDANIEL 1031 NOTE 2, 3
T1-3SW-D7 AH1-37 HUMID DRIP 3W103 I.B. 15 5 3.00 15.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-3SW-D8 AH1-37 AND 38 CONTROL
VALVE DRIP 3W103 I.B. 15 5 3.00 15.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-3SW-D9 AH1-37 CV DRIP 3W103 I.B. 15 5 3.00 15.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-3SW-D10 AH1-38 CV DRIP 3W103 I.B. 15 5 3.00 15.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-3SW-D11 AH1-38 HUMID DRIP 3W103 I.B. 15 5 3.00 15.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-3SW-D12 LOW PRESSURE DRIP
NEAR AH1-36 3W103 I.B. 15 5 3.00 15.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-3SW-D13 AH1-36 HUMID DRIP 3W103 I.B. 15 5 3.00 15.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-3SW-D14 AH1-36 PREHEAT DRIP 3W103 I.B. 15 5 3.00 15.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-3SW-D15 O.R. PRV HIGH
PRESSURE DRIP 3W103 I.B. 100 10 3.00 30.0 1/2 7/64 80 WATSON MCDANIEL 1031 NOTE 2, 3
T1-3SW-D16 O.R. PRV HIGH
PRESSURE DRIP 3W103 I.B. 100 10 3.00 30.0 1/2 7/64 80 WATSON MCDANIEL 1031 NOTE 2, 3
T1-3SW-D17 O.R. PRV MED PRESSURE
DRIP 3W103 I.B. 60 10 3.00 30.0 1/2 1/8 48 WATSON MCDANIEL 1031 NOTE 2, 3
T1-3SW-D18 O.R. PRV LOW PRESSURE
DRIP 3W103 I.B. 15 5 3.00 15.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-3SW-FT O.R. PRV FLASH TANK 3W103 I.B. 10 90 3 270.0 1/2 3/16 8 WATSON MCDANIEL 1031 NOTE 2, 3
T1-3SW-H36 AH1-36 HUMIDIFIER 3W103 F&T 15 5 3 15.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-3SW-H37 AH1-37 HUMIDIFIER 3W103 F&T 15 10 3 30.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-3SW-H38 AH1-38 HUMIDIFIER 3W103 F&T 15 10 3 30.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-3SW-H39 AH1-39 HUMIDIFIER 3W103 F&T 15 5 3 15.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-3SW-WH1a WATER HEATER 1 3W103 F&T 15 1995 2.5 4987.5 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-3SW-WH1b WATER HEATER 1 3W103 THERM 15 5 3 15.0 EXISTING EXISTING 12 EXISTING EXISTING TO REMAIN
T1-3SW-WH2a WATER HEATER 2 3W103 F&T 15 1995 2.5 4987.5 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-3SW-WH2b WATER HEATER 2 3W103 THERM 15 5 3 15.0 EXISTING EXISTING 12 EXISTING EXISTING TO REMAIN
TRAP SCHEDULE
SYMBOL SERVICE LOCATION TRAP
TYPE
STEAM
PRESSURE
(PSI)
EQUIPMENT
LB/HR.
SAFETY
FACTOR
TRAP
LB/HR.
(NOTE 1)
NOMINAL
TRAP
SIZE (IN.)
ORIFICE SIZE
(IN.)
PRESSURE
DIFFERENTIAL
MANUFACTURER
(BASIS OF DESIGN)
MODEL REMARKS
T1-4SW-D1 MEDIUM PRESS DRIP 4W123 I.B. 60 7 3 20.0 EXISTING EXISTING 48 EXISTING EXISTING TO REMAIN
T1-4SW-H1 ZONE HUMID SH-1 4W106 I.B. 10 2 3 6.0 EXISTING EXISTING 8 EXISTING EXISTING TO REMAIN
T1-4SW-H2 ZONE HUMID SH-2 4W106 I.B. 10 2 3 6.0 EXISTING EXISTING 8 EXISTING EXISTING TO REMAIN
T1-4SW-H3 ZONE HUMID SH-3 4W106 I.B. 10 2 3 6.0 EXISTING EXISTING 8 EXISTING EXISTING TO REMAIN
T1-4SW-H4 ZONE HUMID SH-4 4C09 I.B. 10 2 3 6.0 EXISTING EXISTING 8 EXISTING EXISTING TO REMAIN
T1-4SW-H5 ZONE HUMID SH-5 4C09 I.B. 10 2 3 6.0 EXISTING EXISTING 8 EXISTING EXISTING TO REMAIN
T1-4SW-H6 ZONE HUMID SH-6 4C09 I.B. 10 2 3 6.0 EXISTING EXISTING 8 EXISTING EXISTING TO REMAIN
T1-4SW-S1 STERILIZER 1 4W102C I.B. 60 5 3 15.0 EXISTING EXISTING 48 EXISTING EXISTING TO REMAIN
T1-4SW-S2 STERILIZER 2 4W108D I.B. 60 5 3 15.0 EXISTING EXISTING 48 EXISTING EXISTING TO REMAIN
T1-4SW-S3 STERILIZER 3 4W116C I.B. 60 5 3 15.0 EXISTING EXISTING 48 EXISTING EXISTING TO REMAIN
T1-4SW-S4 STERILIZER 4 4W121A I.B. 60 5 3 15.0 EXISTING EXISTING 48 EXISTING EXISTING TO REMAIN
T1-5S-A51a AH1-51 PREHEAT 5S16 F&T 15 515 1.25 643.8 1 1/2 0.39 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-5S-A51b AH1-51 PREHEAT 5S16 F&T 15 515 1.25 643.8 1 1/2 0.39 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-5S-D1 WH-B-1S DRIP 5S16 I.B. 15 2 3 6.0 EXISTING EXISTING 12 EXISTING EXISTING TO REMAIN
T1-5S-D2 WH-2-3S DRIP 5S16 I.B. 15 2 3 6.0 EXISTING EXISTING 12 EXISTING EXISTING TO REMAIN
T1-5S-D3 WH-4-5S DRIP 5S16 I.B. 15 2 3 6.0 EXISTING EXISTING 12 EXISTING EXISTING TO REMAIN
T1-5S-D4 ALL WH DRIP 5S16 I.B. 15 5 3 15.0 EXISTING EXISTING 12 EXISTING EXISTING TO REMAIN
T1-5S-D5 AH1-51 HUMIDIFIER DRIP 5S16 F&T 15 2 3 6.0 3/4 0.228 12 WATSON MCDANIEL WFT NOTE 1, 3
T1-5S-D6 AH1-51 COIL DRIP 5S16 I.B. 15 5 3 15.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-5S-D7 6TH PENTHOUSE DRIP 5CS02 I.B. 15 10 3 30.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T1-5S-H51 AH1-51 HUMIDIFIER 5S16 F&T 15 12 1.25 15.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-5S-U1 UNIT HEATER 5S16 F&T 15 40 2.5 100.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-5SW-A310 O.R. AHU PREHEAT 5SW RTU F&T 10 2025 2.5 5062.5 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-5S-WH23a 1-WH-2-3S MAIN 5S16 F&T 15 1995 2.5 4987.5 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-5S-WH23b 1-WH-2-3S LEG 5S16 THERM 15 5 3 15.0 EXISTING EXISTING 12 EXISTING EXISTING TO REMAIN
T1-5SW-H310 O.R. AHU HUMIDIFIER 5SW RTU I.B. 10 693 1.25 866.3 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-5S-WH45a 1-WH-4-5S MAIN 5S16 F&T 15 1995 2.5 4987.5 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-5S-WH45b 1-WH-4-5S LEG 5S16 THERM 15 5 3 15.0 EXISTING EXISTING 12 EXISTING EXISTING TO REMAIN
T1-5S-WHB1a 1-WH-B-1S MAIN 5S16 F&T 15 1995 2.5 4987.5 EXISTING EXISTING 0.25 EXISTING EXISTING TO REMAIN
T1-5S-WHB1b 1-WH-B-1S LEG 5S16 THERM 15 5 3 15.0 EXISTING EXISTING 12 EXISTING EXISTING TO REMAIN
T1-6S-A62a AH1-62 PREHEAT 6S PENTHOUSE F&T 15 545 1.25 681.3 1 1/2 0.39 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-6S-A62b AH1-62 PREHEAT 6S PENTHOUSE F&T 15 545 1.25 681.3 1 1/2 0.39 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-6S-D2 DRIP 6S PENTHOUSE I.B. 15 10 3 30.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 1, 3
T1-6S-H62 AH1-62 HUMIDIFER 6S PENTHOUSE F&T 15 12 1.25 15.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-6S-U1 PENTHOUSE UNIT
HEATER 6S PENTHOUSE F&T 15 150 2 300.0 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T1-6S-D1 DRIP 6S PENTHOUSE I.B. 15 5 3 15.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T2-A211 AH2-11 PREHEAT BLD 2 RM 130 F&T 15 671 EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING TO REMAIN
T2-A212a AH2-12 PREHEAT BLD 2 RM 103E F&T 15 385 1.25 481.3 1 1/2 0.39 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T2-A212b AH2-12 PREHEAT BLD 2 RM 103E F&T 15 385 1.25 481.3 1 1/2 0.39 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T2-A221 AH2-21 PREHEAT BLD 2 RM 130 F&T 15 212 EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING TO REMAIN
T2-C1 CONVERTER 1 BLD 2 RM 130 F&T 15 610 EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING TO REMAIN
T2-C2 CONVERTER 2 BLD 2 RM 130 F&T 15 610 EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING TO REMAIN
T2-D1 WAREHOUSE DRIP BLD 2 RM 103E I.B. 15 30 3.00 90.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T2-D2 STEAM PUMP MOTIVE
DRIP 103E TUNNEL I.B. 15 5 3.00 15.0 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T2-D3 STEAM TO STEAM
HUMIDIFIER BLD 2 RM 130 I.B. 15 5 EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING TO REMAIN
T2-D4 AH2-11 DRIP BLD 2 RM 130 I.B. 15 5 EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING TO REMAIN
T2-D5 AH2-21 DRIP BLD 2 RM 130 I.B. 15 5 EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING TO REMAIN
T2-D6 CONVERTER C1 DRIP BLD 2 RM 130 I.B. 15 5 EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING TO REMAIN
T2-D7 CONVERTER C2 DRIP BLD 2 RM 130 I.B. 15 5 EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING TO REMAIN
T2-D8 LOW PRESS DRIP BLD 2 RM 130 I.B. 15 20 EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING TO REMAIN
T2-H211 STEAM TO STEAM
HUMIDIFIER BLD 2 RM 130 DISK 15 193 EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING TO REMAIN
T2-H212 AH2-12 HUMIDIFIER BLD 2 RM 103E F&T 15 10 3.00 30.0 3/4 0.228 12 WATSON MCDANIEL WFT NOTE 1, 3
T2-U1 UH2-1 BLD 2 RM 103 F&T 15 40 2.5 100 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T2-U2 UH2-2 BLD 2 RM 103 F&T 15 40 2.5 100 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T7-A1 7-AHU-1 BLD 7 OFFICE F&T 15 14 2.5 35 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T7-A2a 7-AHU-2 DRIP BLD 7 AHU-2 IB 15 3 3 10 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T7-A2b 7-AHU-2 COIL BLD 7 AHU-2 F&T 15 310 2.5 775 1 1/2 0.39 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T7-D1 BLD 7 DRIP 1 NEAR ELEC RM IB 15 3 3 10 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T7-D2 BLD 7 DRIP 2 STEAM MAIN IB 15 3 3 10 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T7-D3 BLD 7 DRIP 3 TUNNEL FROM BLD 7 TO
BLD 2 IB 15 5 3 15 1/2 3/16 12 WATSON MCDANIEL 1031 NOTE 2, 3
T7-U1 BLD 7 UH 1 BY AHU-2 F&T 15 46 2.5 115 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T7-U2 BLD 7 UH 2 MIDDLE OF BLD F&T 15 60 2.5 150 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T7-U3 BLD 7 UH 3 ELEC RM F&T 15 22 2.5 55 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T7-U4 BLD 7 UH 4 ROOM NEAR ELEC RM F&T 15 10 2.5 25 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T7-U5 BLD 7 UH 5 WEST F&T 15 60 2.5 150 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T7-U6 BLD 7 UH 6 NORTHWEST F&T 15 60 2.5 150 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T7-U7 BLD 7 UH 7 NORTH F&T 15 60 2.5 150 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
T7-U8 BLD 7 UH 8 NORTHEAST F&T 15 22 2.5 55 3/4 0.228 0.25 WATSON MCDANIEL WFT NOTE 1, 3
NOTES:
1. SUITABLE TO 125 PSIG, SIDE INLET & OUTLET, SS FLOAT MECHANISM AND VALVE, CAST IRON BODY, BALANCED PRESSURE
THERMOSTATIC AIR VENT, ALL INTERNALS REPLACEABLE IN-LINE.
2. SIDE INLET AND OUTLET INVERTED BUCKET TRAP. 250 PSIG RATED. CAST IRON BODY, ALL INTERNAL COMPONENTS OF STAINLESS STEEL AND REPLACEABLE IN-LINE. ALL INVERTED BUCKET TRAPS SHALL BE PROVIDED WITH BIMETALLIC THERMOSTATIC ELEMENT FOR RELEASE OF NON-CONDENSABLES THAT CLOSES UPON REACHING STEAM TEMPERATURE.
3. FOR ALTERNATE MANUFACTURERS, RATED TRAP MAXIMUM OPERATING PRESSURE SHALL BE A MINIMUM OF 5PSIG GREATER THAN STEAM PRESSURE.
4. EACH TRAP, EXISTING OR NEW SHALL BE PROVIDED WITH BRASS VALVE TAG WITH ENGRAVED BLACK LETTERS WITH THE NAMES LISTED ABOVE.
5. CONTRACTOR IS RESPONSIBLE FOR UPDATING THESE SCHEDULES IN THE RECORD DRAWINGS FOR ALL TRAPS TO REMAIN WITHIN BUILDING, INCLUDING THOSE NOT CURRENTLY LISTED
UNIT HEATER HOT WATER CONTROL5 NO SCALE
UNIT HEATER CONTROL - STEAM4 NO SCALE
4 PIPE FAN COIL UNIT CONTROL1 NO SCALE
REHEAT COIL CONTROL DIAGRAM2 NO SCALE
STEAM CONDENSATE PUMP CONTROLS3 NO SCALE
CONDENSATE PRESSURE AND TEMPERATURE MONITORING6 NO SCALE
CONTROL SYMBOLS LIST
SYMBOL: DESCRIPTION:
GENERAL CONTROL NOTES
C.7C.7
EXISTING
WAREHOUSE
1C04B
LIQUID
NITROGEN
STORAGE
114H
MEETING
ROOM
RECEPTION/
WAITING/
FINGER
114G
TRAINING
ROOM 1C04A
ELECTRICAL
114E
OFFICE,
LEAD
SUPER
114D
OFFICE,
CHIEF
114C
OFFICE,
ASST.
CHIEF
114B
OFFICE,
LEAD
SPECIALIST
114A
OFFICE,
LEAD
SPECIALIST
HUMAN
RESOURCES
113A
OFFICE,
PIV
COORD
1C03
CORRIDOR
BCS04
CORRIDOR
1C02
LOBBY
Q
9A
9A
G.1
3.1 5.84.64.2 5.4
J
B
1C01
VESTIBULE
MECHANICAL
EQUIPMENT
ROOM
130A
ELECTRICAL
EQUIPMENT
ROOM
BS11
IV
STORAGE
BS12
WOMEN'S
TOILET
BS14
MEN'S
TOILET
BS13
UNIV
WASTE
HOLDING
BCS05
CORRIDOR
SAFETY
EQUIPMENT
STORAGE
IT
CLOSET
ELEV.
EQUIP.
ROOM109
ELEC
CLST
P-1
ELEVATOR
BREAKROOM
HSKPG
1ST02
EGRESS
STAIR
114F
OFFICE,
LEAD
SUPER
1C04
RECEIVING
A
A2
A4
A6
C
DD
EE
FF
GG
HH
UP
UP
DN
DN
DN
TAG AH2-12
PH Coil 385
Humd 96
KEYNOTES
TAG AH2-21
PH Coil 212
Humd N/A
TAG AH2-11
PH Coil 671
Humd N/A
FIRST FLOOR PLAN - MECHANICAL DEMOLITION
R T HN O
C.7C.7
EXISTING
WAREHOUSE
1C04B
LIQUID
NITROGEN
STORAGE
114H
MEETING
ROOM
RECEPTION/
WAITING/
FINGER
114G
TRAINING
ROOM 1C04A
ELECTRICAL
114E
OFFICE,
LEAD
SUPER
114D
OFFICE,
CHIEF
114C
OFFICE,
ASST.
CHIEF
114B
OFFICE,
LEAD
SPECIALIST
114A
OFFICE,
LEAD
SPECIALIST
HUMAN
RESOURCES
113A
OFFICE,
PIV
COORD
1C03
CORRIDOR
BCS04
CORRIDOR
1C02
LOBBY
Q
9A
9A
G.1
3.1 5.84.64.2 5.4
J
B
1C01
VESTIBULE
MECHANICAL
EQUIPMENT
ROOM
130A
ELECTRICAL
EQUIPMENT
ROOM
BS11
IV
STORAGE
BS12
WOMEN'S
TOILET
BS14
MEN'S
TOILET
BS13
UNIV
WASTE
HOLDING
BCS05
CORRIDOR
SAFETY
EQUIPMENT
STORAGE
IT
CLOSET
ELEV.
EQUIP.
ROOM109
ELEC
CLST
P-1
ELEVATOR
BREAKROOM
HSKPG
1ST02
EGRESS
STAIR
114F
OFFICE,
LEAD
SUPER
1C04
RECEIVING
A
A2
A4
A6
C
DD
EE
FF
GG
HH
UP
UP
DN
DN
DN
TAG AH2-12
PH Coil 385
Humd 96
TAG AH2-21
PH Coil 212
Humd N/A
TAG AH2-11
PH Coil 671
Humd N/A
SIMPLEX STEAM POWERED CONDENSATE PUMP DETAIL2
KEYNOTES
FIRST FLOOR PLAN - MECHANICAL
R T HN O
FIRST FLOOR PLAN - MECHANICAL DEMOLITION
R T HN O
FIRST FLOOR PLAN - MECHANICAL
R T HN O
| 636A8.14-006.X-001 |
| 636A8.14-006.GI001 |
| 03-636A8-14-006 Fire-Mech |
| 1-MD0-00 EXISTING STEAM AND CONDENSATE FLOW DIAGRAM |
| 1-MD1-00 SUB-BASEMENT FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-0E BE FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-0S BS FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-0SW BSW FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-0W BW FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-1E 1E FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-1S 1S FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-1SW 1SW FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-1W 1W FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-2E 2E FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-2S 2S FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-2SW 2SW FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-2W 2W FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-3E 3E FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-3S 3S FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-3SW 3SW FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-3W 3W FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-4E 4E FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-4S 4S FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-4SW 4SW FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-4W 4W FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-5E 5E FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-5S 5S FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-5W 5W FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-6E 6E FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-6S 6S FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-6W 6W FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-7E 7E FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-7W 7W FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-8E 8E FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-8W 8W FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-9E 9E FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-9W 9W FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-10E 10E FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-10W 10W FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-11E 11E FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-11W 11W FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-12 12-13 FLOOR PLANS - MECHANICAL DEMOLITION |
| 1-MD3-01 ENLARGED SUB-BASEMENT PLAN - MECHANICAL DEMOLITION |
| 1-M0-00 STEAM AND CONDENSATE FLOW DIAGRAM |
| 1-M1-00 SUB-BASEMENT FLOOR PLAN - MECHANICAL |
| 1-M1-0E BE FLOOR PLAN - MECHANICAL |
| 1-M1-0S BS FLOOR PLAN - MECHANICAL |
| 1-M1-0SW BSW FLOOR PLAN - MECHANICAL |
| 1-M1-0W BW FLOOR PLAN - MECHANICAL |
| 1-M1-1E 1E FLOOR PLAN - MECHANICAL |
| 1-M1-1S 1S FLOOR PLAN - MECHANICAL |
| 1-M1-1W 1W FLOOR PLAN - MECHANICAL |
| 1-M1-2S 2S FLOOR PLAN - MECHANICAL |
| 1-M1-2SW 2SW FLOOR PLAN - MECHANICAL |
| 1-M1-3S 3S FLOOR PLAN - MECHANICAL |
| 1-M1-3SW 3SW FLOOR PLAN - MECHANICAL |
| 1-M1-3W 3W FLOOR PLAN - MECHANICAL |
| 1-M1-4S 4S FLOOR PLAN - MECHANICAL |
| 1-M1-4W 4W FLOOR PLAN - MECHANICAL |
| 1-M1-5S 5S FLOOR PLAN - MECHANICAL |
| 1-M1-6S 6S FLOOR PLAN - MECHANICAL |
| 1-M1-8E 8E FLOOR PLAN - MECHANICAL |
| 1-M1-8W 8W FLOOR PLAN - MECHANICAL |
| 1-M1-9E 9E FLOOR PLAN - MECHANICAL |
| 1-M1-9W 9W FLOOR PLAN - MECHANICAL |
| 1-M1-10E 10E FLOOR PLAN - MECHANICAL |
| 1-M1-10W 10W FLOOR PLAN - MECHANICAL |
| 1-M1-11E 11E FLOOR PLAN - MECHANICAL |
| 1-M1-11W 11W FLOOR PLAN - MECHANICAL |
| 1-M1-12 12-13 FLOOR PLANS - MECHANICAL |
| 1-M2-8W 8W FLOOR PLAN - VENTILATION |
| 1-M3-01 ENLARGED SUB-BASEMENT PLAN - MECHANICAL |
| 1-M4-01 MECHANICAL DETAILS |
| 1-M4-02 MECHANICAL DETAILS |
| 1-M5-01 MECHANICAL SCHEDULES |
| 1-M5-02 EAST WEST AND NORTH STEAM TRAP SCHEDULES |
| 1-M5-03 SOUTH AND SOUTHWEST STEAM TRAP SCHEDULES |
| 1-M6-01 MECHANICAL CONTROLS |
| 2-MD1-01 FIRST FLOOR PLAN - MECHANICAL DEMOLITION |
| 2-M1-01 FIRST FLOOR PLAN - MECHANICAL |
| 7-MD1-01 FIRST FLOOR PLAN - MECHANICAL DEMOLITION |
| 7-M1-01 FIRST FLOOR PLAN - MECHANICAL |