FIRE PROTECTION SYMBOLS LIST
SYMBOL: DESCRIPTION:
FIRE SPRINKLER USAGE SCHEDULE
AREA TYPE
(NOTE 1 & 6)
AREA HAZARD
SPRINKLER
MANUFACTURER & MODEL REMARKSSYMBOL
(NOTES 4 & 5)
TYPE RESPONSE FINISH TEMPERATURE
°F
JANITOR CLOSETS,
HOUSE KEEPING
SEE PLANS SPR-1 PENDENT QUICK ROUGH BRASS 155 VIKING VK, RELIABLE F1FR,
TYCO TY-FRB, VICTAULIC V2708
NOTE 3
FINISHED SPACES SEE PLANS SPR-2 CONCEALED QUICK WHITE 155 VIKING VK, RELIABLE G4A, TYCO RFII, VICTAULIC V3802
NOTE 3
NOTES:
1. SEE FLOOR PLANS FOR ZONING REQUIREMENTS.
2. SPRINKLER SHALL HAVE COLOR CODED BULB THERMAL ELEMENT.
3. ALL SPRINKLERS SHALL BE UL LISTED.
4. CONTRACTOR TO VERIFY SPRINKLER REQUIREMENTS BASED ON ACTUAL INSTALLATION, USAGE, ARCHITECTURAL CEILING PLAN AND NFPA 13 REQUIREMENTS.
5. SYMBOL IS PRIMARILY FOR INDENTIFYING SPRINKLERS IN SUBMITTALS. IT MAY OR MAY NOT BE FOUND ELSEWHERE ON THE DRAWINGS. CONTRACTOR TO SUBMIT ALL SPRINKLER TYPES TO BE USED.
6. AREAS ARE GENERAL IN NATURE. CONTRACTOR TO MATCH UNSCHEDULED AREAS TO SIMILAR SPACES.
GENERAL SHEET NOTES
8W FLOOR PLAN - FIRE PROTECTION
R T HN O
The FUTURE.
Built SMARTER.®
GENERAL PHASING NOTES
PHASE 1 CONSISTS OF REPLACING DEFECTIVE
STEAM TRAP ASSEMBLIES, AGED CONDENSATE
PIPING, CONDENSATE PUMPS AND CONSOLIDATION
OF PRESSURE REDUCING VALVES FOR BUILDING 1,
2 AND 7. THE NEW PIPING, CONDENSATE PUMPS
AND PRESSURE REDUCING VALVES SHALL BE
INSTALLED PRIOR TO REMOVAL OF EXISTING.
PHASE 2 CONSISTS OF DECOMMISSIONING THE
EXISTING STEAM AND CONDENSATE ASSOCIATED
WITH THE ORIGINAL BUILDING-1 PERIMETER
CONVECTOR SYSTEM THAT HAS BEEN REMOVED IN
PHASES IN RECENT YEARS. THE FINAL PHASE,
WHICH IS PART OF THIS PROJECT, SHALL BE
REMOVAL OF ALL ASSOCIATED HORIZONTAL PIPING
AND ABANDONING OF THE VERTICAL RISERS. THE
FINAL PHASE OF THIS DECOMMISSIONING MUST
OCCUR AFTER THE VA PROJECT "REPLACE FAN
COILS AND CONVECTORS - PHASE 2" IS COMPLETE.
THIS PROJECT IS CURRENTLY UNDER
CONSTRUCTION. CONTRACTOR SHALL COORDINATE
THE TIMING OF THE FINAL PHASE SUCH THAT THE
EXISTING CONVECTOR SYSTEM REMAINS
OPERATIONAL UNTIL ALL ASSOCIATED EQUIPMENT
IS REMOVED. AS THE "FCU PROJECT" HAS YET TO
BE COMPLETED, THIS DESIGN IS BASED ON THE
ASSUMPTION THAT ALL STEAM EQUIPMENT
ASSOCIATED WITH THIS CONVECTOR SYSTEM WILL
BE REMOVED UPON COMPLETION OF THE "FCU
PROJECT". CONTRACTOR SHALL VERIFY THAT
EVERY PIECE OF EQUIPMENT HAS BEEN REMOVED
FROM THIS SYSTEM AND COORDINATE ANY
ADDITIONAL EQUIPMENT REMOVAL AND
REPLACEMENT WITH THE VA.
PHASING
MECHANICAL SYMBOLS LIST
SYMBOL: DESCRIPTION:
GENERAL DEMOLITION NOTES
SUB-BASEMENT FLOOR PLAN - MECHANICAL DEMOLITION
R T HN O
The FUTURE.
Built SMARTER.®
SUB-BASEMENT FLOOR PLAN - MECHANICAL DEMOLITION
R T HN O
SUB-BASEMENT TUNNEL ENTRY - PIPING DEMOLITION3
TAG AH1-B1
PH Coil 150 LB/HR RH Coil N/A
Humd 45 LB/HR
TAG AH1-B4
PH Coil NONE RH Coil NONE
Humd NONE
TAG AH1-B2
PH Coil 130 LB/HR RH Coil N/A
Humd 50 LB/HR
KEYNOTES
PHASING
BE FLOOR PLAN - MECHANICAL DEMOLITION
R T HN O
TAG AH1-B7
PH Coil 171 RH Coil N/A
Humd N/A
KEYNOTES
PHASING
The FUTURE.
Built SMARTER.®
BS FLOOR PLAN - MECHANICAL DEMOLITION
R T HN O
KEYNOTES
BSW FLOOR PLAN - MECHANICAL DEMOLITION
R T HN O
TAG AH1-B5
PH Coil 550 LB/HR RH Coil N/A
Humd N/A
TAG AH1-B6
PH Coil 719 LB/HR RH Coil 315 LB/HR
Humd 195 LB/HR
KEYNOTES
PHASING
BW FLOOR PLAN - MECHANICAL DEMOLITION
R T HN O
1E FLOOR PLAN - MECHANICAL DEMOLITION
R T HN O
TAG AH1-12
PH Coil 960 lb/h
RH Coil WATER
Humd N/A
KEYNOTES
1S FLOOR PLAN - MECHANICAL DEMOLITION
R T HN O
GENERAL MECHANICAL NOTES
1SW FLOOR PLAN - MECHANICAL DEMOLITION
R T HN O
1W FLOOR PLAN - MECHANICAL DEMOLITION
R T HN O
2E FLOOR PLAN - MECHANICAL DEMOLITION
R T HN O
2S FLOOR PLAN - MECHANICAL DEMOLITION
R T HN O
2SW FLOOR PLAN - MECHANICAL DEMOLITION
R T HN O
2W FLOOR PLAN - MECHANICAL DEMOLITION
R T HN O
3E FLOOR PLAN - MECHANICAL DEMOLITION
R T HN O
TAG AH1-32
PH Coil 393 lb/h
RH Coil 492 lb/h
Humd 281 lb/h
TAG AH1-33
PH Coil 615 lb/h
RH Coil N/A
Humd 81 lb/h
TOTAL
KEYNOTES
3S FLOOR PLAN - MECHANICAL DEMOLITION
R T HN O
The FUTURE.
AH1-32 PIPING DIAGRAM - DEMOLITION2
TAG AH1-39
PH Coil N/A
RH Coil N/A
Humd 85 lb/h
TAG AH1-36
PH Coil 810 lb/h RH Coil N/A (Water)
Humd 245 lb/h
TAG AH1-38
PH Coil 1520 LB/H
RH Coil WATER
Humd 435 LB/H
TAG AH1-37
PH Coil 3800 LB/H
RH Coil WATER
Humd 1150 LB/H
KEYNOTES
3SW FLOOR PLAN - MECHANICAL DEMOLITION
R T HN O
The FUTURE.
Built SMARTER.®
EXISTING 3W103 PRV - DEMOLITION3
EXISTING AH1-37 AND AH1-38 CONTROL VALVE - DEMOLITION2
EXISTING 3W103 PRV - DEMOLITION3
TAG AH1-35
PH Coil 284 lb/h
RH Coil 203 lb/h
Humd 116 lb/h
TAG AH1-34
PH Coil 48 lb/h
RH Coil 24 lb/h
HX 90 lb/h
KEYNOTES
3W FLOOR PLAN - MECHANICAL DEMOLITION
R T HN O
4E FLOOR PLAN - MECHANICAL DEMOLITION
R T HN O
MECH
MECH
CORRIDOR
KEYNOTES
4S FLOOR PLAN - MECHANICAL DEMOLITION
R T HN O
DN
6.6'
TEMP GAS
CLEAN CORE
LAB WORK RM
EQ. ALCOVEEQ. ALCOVEEQ. ALCOVEEQ. ALCOVE
GURNEY
4W
8.2
CORRIDOR
GURNEY
MECH
ELECT
CLEAN CORE
CLEAN CORE
VASC. EQUIP.
SCRUB
ENDOVASCULAR
OR#1
VASCULAR
EQUIP INTEG
VASC.
CONTROL
SUB-STERILE
EQUIPMENT
GURNEY SCRUB
NEURO-SURGERY
OR#2
EQUIPMENTINTEG.
SUB-STERILEOR STORAGE
INTEG.
MECH
STAIR 07
CORRIDOR
GURNEY
SCRUB
GENERAL EYE
OR#3
GENERAL OR#4
SCRUB
EQUIPMENT
SUB-STERILE
OR STOR
INTEGRATION
UROLOGY/
GENERAL OR#5
GURNEY SCRUB SCRUBGURNEY
ORTHOPEDIC
OR#6
EQUIPMENT
SUB-STERILE
ORTHO STOR. STAIR 06
CORRIDOR
CORRIDORELECT
CORRIDOR
COMM ROOM NURSE WORKSIGNAL
C
7'
6'
5'
FEDBA1A
KEYNOTES
4SW FLOOR PLAN - MECHANICAL DEMOLITION
R T HN O
DN
TAG AHU-1-43
PH Coil *** lb/h
RH Coil *** lb/h
Humd *** lb/h
KEYNOTES
4W FLOOR PLAN - MECHANICAL DEMOLITION
R T HN O
The FUTURE.
4W MECHANICAL ROOM PIPING DIAGRAM - DEMOLITION2
| 636A8.14-006.X-001 |
| 636A8.14-006.GI001 |
| 03-636A8-14-006 Fire-Mech |
| 1-MD0-00 EXISTING STEAM AND CONDENSATE FLOW DIAGRAM |
| 1-MD1-00 SUB-BASEMENT FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-0E BE FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-0S BS FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-0SW BSW FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-0W BW FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-1E 1E FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-1S 1S FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-1SW 1SW FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-1W 1W FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-2E 2E FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-2S 2S FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-2SW 2SW FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-2W 2W FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-3E 3E FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-3S 3S FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-3SW 3SW FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-3W 3W FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-4E 4E FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-4S 4S FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-4SW 4SW FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-4W 4W FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-5E 5E FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-5S 5S FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-5W 5W FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-6E 6E FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-6S 6S FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-6W 6W FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-7E 7E FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-7W 7W FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-8E 8E FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-8W 8W FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-9E 9E FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-9W 9W FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-10E 10E FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-10W 10W FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-11E 11E FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-11W 11W FLOOR PLAN - MECHANICAL DEMOLITION |
| 1-MD1-12 12-13 FLOOR PLANS - MECHANICAL DEMOLITION |
| 1-MD3-01 ENLARGED SUB-BASEMENT PLAN - MECHANICAL DEMOLITION |
| 1-M0-00 STEAM AND CONDENSATE FLOW DIAGRAM |
| 1-M1-00 SUB-BASEMENT FLOOR PLAN - MECHANICAL |
| 1-M1-0E BE FLOOR PLAN - MECHANICAL |
| 1-M1-0S BS FLOOR PLAN - MECHANICAL |
| 1-M1-0SW BSW FLOOR PLAN - MECHANICAL |
| 1-M1-0W BW FLOOR PLAN - MECHANICAL |
| 1-M1-1E 1E FLOOR PLAN - MECHANICAL |
| 1-M1-1S 1S FLOOR PLAN - MECHANICAL |
| 1-M1-1W 1W FLOOR PLAN - MECHANICAL |
| 1-M1-2S 2S FLOOR PLAN - MECHANICAL |
| 1-M1-2SW 2SW FLOOR PLAN - MECHANICAL |
| 1-M1-3S 3S FLOOR PLAN - MECHANICAL |
| 1-M1-3SW 3SW FLOOR PLAN - MECHANICAL |
| 1-M1-3W 3W FLOOR PLAN - MECHANICAL |
| 1-M1-4S 4S FLOOR PLAN - MECHANICAL |
| 1-M1-4W 4W FLOOR PLAN - MECHANICAL |
| 1-M1-5S 5S FLOOR PLAN - MECHANICAL |
| 1-M1-6S 6S FLOOR PLAN - MECHANICAL |
| 1-M1-8E 8E FLOOR PLAN - MECHANICAL |
| 1-M1-8W 8W FLOOR PLAN - MECHANICAL |
| 1-M1-9E 9E FLOOR PLAN - MECHANICAL |
| 1-M1-9W 9W FLOOR PLAN - MECHANICAL |
| 1-M1-10E 10E FLOOR PLAN - MECHANICAL |
| 1-M1-10W 10W FLOOR PLAN - MECHANICAL |
| 1-M1-11E 11E FLOOR PLAN - MECHANICAL |
| 1-M1-11W 11W FLOOR PLAN - MECHANICAL |
| 1-M1-12 12-13 FLOOR PLANS - MECHANICAL |
| 1-M2-8W 8W FLOOR PLAN - VENTILATION |
| 1-M3-01 ENLARGED SUB-BASEMENT PLAN - MECHANICAL |
| 1-M4-01 MECHANICAL DETAILS |
| 1-M4-02 MECHANICAL DETAILS |
| 1-M5-01 MECHANICAL SCHEDULES |
| 1-M5-02 EAST WEST AND NORTH STEAM TRAP SCHEDULES |
| 1-M5-03 SOUTH AND SOUTHWEST STEAM TRAP SCHEDULES |
| 1-M6-01 MECHANICAL CONTROLS |
| 2-MD1-01 FIRST FLOOR PLAN - MECHANICAL DEMOLITION |
| 2-M1-01 FIRST FLOOR PLAN - MECHANICAL |
| 7-MD1-01 FIRST FLOOR PLAN - MECHANICAL DEMOLITION |
| 7-M1-01 FIRST FLOOR PLAN - MECHANICAL |