36E77618R0051-00001002.pdf

PDF 16 MB Posted

Attached to
Iowa City - Replace Steam Traps and Correct Condensate Over Pressurization 636A8-14-006
Solicitation number
36E77618R0051
Issued by

About this file

36E77618R0051 00001 ATTACHMENT 2 - Final Drawings - Fire-Mech 1 - 05-03-2018.pdf

View the file

Other files

File Type Posted
36E77618C0024-000.docx DOCX document
36E77618R0051-0005001.docx DOCX document
36E77618R0051-0005000.docx DOCX document
36E77618R0051-0004001.pdf PDF
36E77618R0051-0004000.docx DOCX document
36E77618R0051-00003002.docx DOCX document
36E77618R0051-00003003.pdf PDF
36E77618R0051-00002000.docx DOCX document
36E77618R0051-00001005.pdf PDF
36E77618R0051-00001007.pdf PDF
36E77618R0051-00001008.pdf PDF
36E77618R0051-00001004.pdf PDF
36E77618R0051-00001003.pdf PDF
36E77618R0051-00001009.docx DOCX document
36E77618R0051-00001000.docx DOCX document
36E77618R0051-00001006.pdf PDF
36E77618R0051-00001001.pdf PDF
36E77618R0051-012.docx DOCX document
36E77618R0051-001.docx DOCX document
36E77618R0051-002.pdf PDF
36E77618R0051-010.pdf PDF
36E77618R0051-005.pdf PDF
36E77618R0051-009.pdf PDF
36E77618R0051-007.pdf PDF
36E77618R0051-004.pdf PDF
36E77618R0051-008.pdf PDF
36E77618R0051-006.pdf PDF
36E77618R0051-003.pdf PDF
36E77618R0051-011.docx DOCX document
36E77618R0051-000.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRE PROTECTION SYMBOLS LIST

SYMBOL: DESCRIPTION:

FIRE SPRINKLER USAGE SCHEDULE

AREA TYPE

(NOTE 1 & 6)

AREA HAZARD

SPRINKLER

MANUFACTURER & MODEL REMARKSSYMBOL

(NOTES 4 & 5)

TYPE RESPONSE FINISH TEMPERATURE

°F

JANITOR CLOSETS,

HOUSE KEEPING

SEE PLANS SPR-1 PENDENT QUICK ROUGH BRASS 155 VIKING VK, RELIABLE F1FR,

TYCO TY-FRB, VICTAULIC V2708

NOTE 3

FINISHED SPACES SEE PLANS SPR-2 CONCEALED QUICK WHITE 155 VIKING VK, RELIABLE G4A, TYCO RFII, VICTAULIC V3802

NOTE 3

NOTES:

1. SEE FLOOR PLANS FOR ZONING REQUIREMENTS.

2. SPRINKLER SHALL HAVE COLOR CODED BULB THERMAL ELEMENT.

3. ALL SPRINKLERS SHALL BE UL LISTED.

4. CONTRACTOR TO VERIFY SPRINKLER REQUIREMENTS BASED ON ACTUAL INSTALLATION, USAGE, ARCHITECTURAL CEILING PLAN AND NFPA 13 REQUIREMENTS.

5. SYMBOL IS PRIMARILY FOR INDENTIFYING SPRINKLERS IN SUBMITTALS. IT MAY OR MAY NOT BE FOUND ELSEWHERE ON THE DRAWINGS. CONTRACTOR TO SUBMIT ALL SPRINKLER TYPES TO BE USED.

6. AREAS ARE GENERAL IN NATURE. CONTRACTOR TO MATCH UNSCHEDULED AREAS TO SIMILAR SPACES.

GENERAL SHEET NOTES

8W FLOOR PLAN - FIRE PROTECTION

R T HN O

The FUTURE.

Built SMARTER.®

GENERAL PHASING NOTES

PHASE 1 CONSISTS OF REPLACING DEFECTIVE

STEAM TRAP ASSEMBLIES, AGED CONDENSATE

PIPING, CONDENSATE PUMPS AND CONSOLIDATION

OF PRESSURE REDUCING VALVES FOR BUILDING 1,

2 AND 7. THE NEW PIPING, CONDENSATE PUMPS

AND PRESSURE REDUCING VALVES SHALL BE

INSTALLED PRIOR TO REMOVAL OF EXISTING.

PHASE 2 CONSISTS OF DECOMMISSIONING THE

EXISTING STEAM AND CONDENSATE ASSOCIATED

WITH THE ORIGINAL BUILDING-1 PERIMETER

CONVECTOR SYSTEM THAT HAS BEEN REMOVED IN

PHASES IN RECENT YEARS. THE FINAL PHASE,

WHICH IS PART OF THIS PROJECT, SHALL BE

REMOVAL OF ALL ASSOCIATED HORIZONTAL PIPING

AND ABANDONING OF THE VERTICAL RISERS. THE

FINAL PHASE OF THIS DECOMMISSIONING MUST

OCCUR AFTER THE VA PROJECT "REPLACE FAN

COILS AND CONVECTORS - PHASE 2" IS COMPLETE.

THIS PROJECT IS CURRENTLY UNDER

CONSTRUCTION. CONTRACTOR SHALL COORDINATE

THE TIMING OF THE FINAL PHASE SUCH THAT THE

EXISTING CONVECTOR SYSTEM REMAINS

OPERATIONAL UNTIL ALL ASSOCIATED EQUIPMENT

IS REMOVED. AS THE "FCU PROJECT" HAS YET TO

BE COMPLETED, THIS DESIGN IS BASED ON THE

ASSUMPTION THAT ALL STEAM EQUIPMENT

ASSOCIATED WITH THIS CONVECTOR SYSTEM WILL

BE REMOVED UPON COMPLETION OF THE "FCU

PROJECT". CONTRACTOR SHALL VERIFY THAT

EVERY PIECE OF EQUIPMENT HAS BEEN REMOVED

FROM THIS SYSTEM AND COORDINATE ANY

ADDITIONAL EQUIPMENT REMOVAL AND

REPLACEMENT WITH THE VA.

PHASING

MECHANICAL SYMBOLS LIST

SYMBOL: DESCRIPTION:

GENERAL DEMOLITION NOTES

SUB-BASEMENT FLOOR PLAN - MECHANICAL DEMOLITION

R T HN O

The FUTURE.

Built SMARTER.®

SUB-BASEMENT FLOOR PLAN - MECHANICAL DEMOLITION

R T HN O

SUB-BASEMENT TUNNEL ENTRY - PIPING DEMOLITION3

TAG AH1-B1

PH Coil 150 LB/HR RH Coil N/A

Humd 45 LB/HR

TAG AH1-B4

PH Coil NONE RH Coil NONE

Humd NONE

TAG AH1-B2

PH Coil 130 LB/HR RH Coil N/A

Humd 50 LB/HR

KEYNOTES

PHASING

BE FLOOR PLAN - MECHANICAL DEMOLITION

R T HN O

TAG AH1-B7

PH Coil 171 RH Coil N/A

Humd N/A

KEYNOTES

PHASING

The FUTURE.

Built SMARTER.®

BS FLOOR PLAN - MECHANICAL DEMOLITION

R T HN O

KEYNOTES

BSW FLOOR PLAN - MECHANICAL DEMOLITION

R T HN O

TAG AH1-B5

PH Coil 550 LB/HR RH Coil N/A

Humd N/A

TAG AH1-B6

PH Coil 719 LB/HR RH Coil 315 LB/HR

Humd 195 LB/HR

KEYNOTES

PHASING

BW FLOOR PLAN - MECHANICAL DEMOLITION

R T HN O

1E FLOOR PLAN - MECHANICAL DEMOLITION

R T HN O

TAG AH1-12

PH Coil 960 lb/h

RH Coil WATER

Humd N/A

KEYNOTES

1S FLOOR PLAN - MECHANICAL DEMOLITION

R T HN O

GENERAL MECHANICAL NOTES

1SW FLOOR PLAN - MECHANICAL DEMOLITION

R T HN O

1W FLOOR PLAN - MECHANICAL DEMOLITION

R T HN O

2E FLOOR PLAN - MECHANICAL DEMOLITION

R T HN O

2S FLOOR PLAN - MECHANICAL DEMOLITION

R T HN O

2SW FLOOR PLAN - MECHANICAL DEMOLITION

R T HN O

2W FLOOR PLAN - MECHANICAL DEMOLITION

R T HN O

3E FLOOR PLAN - MECHANICAL DEMOLITION

R T HN O

TAG AH1-32

PH Coil 393 lb/h

RH Coil 492 lb/h

Humd 281 lb/h

TAG AH1-33

PH Coil 615 lb/h

RH Coil N/A

Humd 81 lb/h

TOTAL

KEYNOTES

3S FLOOR PLAN - MECHANICAL DEMOLITION

R T HN O

The FUTURE.

AH1-32 PIPING DIAGRAM - DEMOLITION2

TAG AH1-39

PH Coil N/A

RH Coil N/A

Humd 85 lb/h

TAG AH1-36

PH Coil 810 lb/h RH Coil N/A (Water)

Humd 245 lb/h

TAG AH1-38

PH Coil 1520 LB/H

RH Coil WATER

Humd 435 LB/H

TAG AH1-37

PH Coil 3800 LB/H

RH Coil WATER

Humd 1150 LB/H

KEYNOTES

3SW FLOOR PLAN - MECHANICAL DEMOLITION

R T HN O

The FUTURE.

Built SMARTER.®

EXISTING 3W103 PRV - DEMOLITION3

EXISTING AH1-37 AND AH1-38 CONTROL VALVE - DEMOLITION2

EXISTING 3W103 PRV - DEMOLITION3

TAG AH1-35

PH Coil 284 lb/h

RH Coil 203 lb/h

Humd 116 lb/h

TAG AH1-34

PH Coil 48 lb/h

RH Coil 24 lb/h

HX 90 lb/h

KEYNOTES

3W FLOOR PLAN - MECHANICAL DEMOLITION

R T HN O

4E FLOOR PLAN - MECHANICAL DEMOLITION

R T HN O

MECH

MECH

CORRIDOR

KEYNOTES

4S FLOOR PLAN - MECHANICAL DEMOLITION

R T HN O

DN

6.6'

TEMP GAS

CLEAN CORE

LAB WORK RM

EQ. ALCOVEEQ. ALCOVEEQ. ALCOVEEQ. ALCOVE

GURNEY

4W

8.2

CORRIDOR

GURNEY

MECH

ELECT

CLEAN CORE

CLEAN CORE

VASC. EQUIP.

SCRUB

ENDOVASCULAR

OR#1

VASCULAR

EQUIP INTEG

VASC.

CONTROL

SUB-STERILE

EQUIPMENT

GURNEY SCRUB

NEURO-SURGERY

OR#2

EQUIPMENTINTEG.

SUB-STERILEOR STORAGE

INTEG.

MECH

STAIR 07

CORRIDOR

GURNEY

SCRUB

GENERAL EYE

OR#3

GENERAL OR#4

SCRUB

EQUIPMENT

SUB-STERILE

OR STOR

INTEGRATION

UROLOGY/

GENERAL OR#5

GURNEY SCRUB SCRUBGURNEY

ORTHOPEDIC

OR#6

EQUIPMENT

SUB-STERILE

ORTHO STOR. STAIR 06

CORRIDOR

CORRIDORELECT

CORRIDOR

COMM ROOM NURSE WORKSIGNAL

C

7'

6'

5'

FEDBA1A

KEYNOTES

4SW FLOOR PLAN - MECHANICAL DEMOLITION

R T HN O

DN

TAG AHU-1-43

PH Coil *** lb/h

RH Coil *** lb/h

Humd *** lb/h

KEYNOTES

4W FLOOR PLAN - MECHANICAL DEMOLITION

R T HN O

The FUTURE.

4W MECHANICAL ROOM PIPING DIAGRAM - DEMOLITION2

636A8.14-006.X-001
636A8.14-006.GI001
03-636A8-14-006 Fire-Mech
1-MD0-00 EXISTING STEAM AND CONDENSATE FLOW DIAGRAM
1-MD1-00 SUB-BASEMENT FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-0E BE FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-0S BS FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-0SW BSW FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-0W BW FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-1E 1E FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-1S 1S FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-1SW 1SW FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-1W 1W FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-2E 2E FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-2S 2S FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-2SW 2SW FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-2W 2W FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-3E 3E FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-3S 3S FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-3SW 3SW FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-3W 3W FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-4E 4E FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-4S 4S FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-4SW 4SW FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-4W 4W FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-5E 5E FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-5S 5S FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-5W 5W FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-6E 6E FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-6S 6S FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-6W 6W FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-7E 7E FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-7W 7W FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-8E 8E FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-8W 8W FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-9E 9E FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-9W 9W FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-10E 10E FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-10W 10W FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-11E 11E FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-11W 11W FLOOR PLAN - MECHANICAL DEMOLITION
1-MD1-12 12-13 FLOOR PLANS - MECHANICAL DEMOLITION
1-MD3-01 ENLARGED SUB-BASEMENT PLAN - MECHANICAL DEMOLITION
1-M0-00 STEAM AND CONDENSATE FLOW DIAGRAM
1-M1-00 SUB-BASEMENT FLOOR PLAN - MECHANICAL
1-M1-0E BE FLOOR PLAN - MECHANICAL
1-M1-0S BS FLOOR PLAN - MECHANICAL
1-M1-0SW BSW FLOOR PLAN - MECHANICAL
1-M1-0W BW FLOOR PLAN - MECHANICAL
1-M1-1E 1E FLOOR PLAN - MECHANICAL
1-M1-1S 1S FLOOR PLAN - MECHANICAL
1-M1-1W 1W FLOOR PLAN - MECHANICAL
1-M1-2S 2S FLOOR PLAN - MECHANICAL
1-M1-2SW 2SW FLOOR PLAN - MECHANICAL
1-M1-3S 3S FLOOR PLAN - MECHANICAL
1-M1-3SW 3SW FLOOR PLAN - MECHANICAL
1-M1-3W 3W FLOOR PLAN - MECHANICAL
1-M1-4S 4S FLOOR PLAN - MECHANICAL
1-M1-4W 4W FLOOR PLAN - MECHANICAL
1-M1-5S 5S FLOOR PLAN - MECHANICAL
1-M1-6S 6S FLOOR PLAN - MECHANICAL
1-M1-8E 8E FLOOR PLAN - MECHANICAL
1-M1-8W 8W FLOOR PLAN - MECHANICAL
1-M1-9E 9E FLOOR PLAN - MECHANICAL
1-M1-9W 9W FLOOR PLAN - MECHANICAL
1-M1-10E 10E FLOOR PLAN - MECHANICAL
1-M1-10W 10W FLOOR PLAN - MECHANICAL
1-M1-11E 11E FLOOR PLAN - MECHANICAL
1-M1-11W 11W FLOOR PLAN - MECHANICAL
1-M1-12 12-13 FLOOR PLANS - MECHANICAL
1-M2-8W 8W FLOOR PLAN - VENTILATION
1-M3-01 ENLARGED SUB-BASEMENT PLAN - MECHANICAL
1-M4-01 MECHANICAL DETAILS
1-M4-02 MECHANICAL DETAILS
1-M5-01 MECHANICAL SCHEDULES
1-M5-02 EAST WEST AND NORTH STEAM TRAP SCHEDULES
1-M5-03 SOUTH AND SOUTHWEST STEAM TRAP SCHEDULES
1-M6-01 MECHANICAL CONTROLS
2-MD1-01 FIRST FLOOR PLAN - MECHANICAL DEMOLITION
2-M1-01 FIRST FLOOR PLAN - MECHANICAL
7-MD1-01 FIRST FLOOR PLAN - MECHANICAL DEMOLITION
7-M1-01 FIRST FLOOR PLAN - MECHANICAL