Cost Estimate Worksheet.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- 36C78623B50188
About this file
This document contains a cost estimate worksheet template for contractors to submit pricing for various construction divisions under a federal solicitation for grounds maintenance services. The solicitation number is 36C78623B50188 from the Department of Veterans Affairs National Cemetery Administration Midwest Districts and is for services including upright headstone raising and realignment, headstone cleaning, and topsoil/turf renovation. Contractors should complete the worksheet with lump sum pricing for each construction division to be utilized on the project, unit costs, extended costs, and notes. General requirements, mobilization, site investigation, and other standard divisions are included. The worksheet also includes lines for subtotals, overhead, profit, and a grand total price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78623B50188 0002.docx | DOCX document | |
| Past Performance.pdf | ||
| 36C78623B50188 0001.docx | DOCX document | |
| 36C78623B50188 Amendment 0001.pdf | ||
| 36C78623B50188 _ 06232023.pdf | ||
| 36C78623B50188.docx | DOCX document | |
| DOL Davis Bacon Wage Determination _ Hennepin County MN.pdf | ||
| DOL Davis Bacon Wage Determination _ Montgomery County OH.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| IFB Contractor Cost Estimate Worksheet |
| Lump Sums are required for each Division that will be utilized in this project to total the Final Lump Sum number. |
If a Division is not being used put N/A in that field.
Additional lines/items can be added if needed or appropriate.
| Offeror shall use and edit to fit Task Order Project |
| Project Number: |
| Solicitation Number: |
| Project Title: |
| Division | Unit of Measure | # of Units | Unit Cost $ | Extended/Total Cost $ | Comments / Remarks |
| Division 0 - Special Sections | |||||
| General Conditions and Administration | JB | 1 | |||
| Division 01 - General Requirements | |||||
| Mobilization | JB | 1 | |||
| Division 02 - Existing Conditions | |||||
| Site Investigation | JB | 1 | |||
| Division 03 - Concrete |
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastic, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings (Doors, Windows, etc...)
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12- Furnishings
Division 13 - Special Construction
Division 14 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heat, Ventilating, and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
| Mechanical, Electrical, Plumbing Subtotal | ||
| General Construction Subtotal | ||
| Total Base Construction Cost | ||
| Insurance (if applicable) | ||
| Bonding (if applicable) | ||
| Overhead | ________ % | $0.00 |
| Profit | ________ % | $0.00 |
| GRAND TOTALS | $ |