Copy of Copy of 36C78622B0022 _BEU Questions (002).pdf

PDF 158 KB Posted

Attached to
Z1PZ--NCA Multi-Award Shrine Projects Multiple Cemeteries
Solicitation number
36C78622B0022
Issued by

About this file

This document contains details for an invitation for bid for National Multi-Award Shrine Projects at multiple national cemeteries. The contractor will be required to provide all labor, materials, equipment and supervision to perform construction and service work described in the statement of work and specifications at 11 national cemeteries located across the United States. The work will include both construction and service contracts assessed at Davis-Bacon wages. Bids are to be submitted through both the vendor portal and via email by the date specified. The contractor must provide a bid bond with their submission and will be required to provide a performance and payment bond if awarded a project. Pricing is to be submitted according to the instructions provided in the solicitation documentation.

View the file

Other files

File Type Posted
36C78622B0022 A0004.docx DOCX document
36C78622B0022 A0003.docx DOCX document
SOW -CORRECTED - Fort Douglas Post Cem - Shrine 09-29-2022.pdf PDF
SOW - CORRECTED - Dallas Fort Worth Natl Cem - 08-29-2022.pdf PDF
SOW - CORRECTED - Fort Sam Houston Natl Cem - Shrine - 08-29-2022.pdf PDF
36C78622B0022 A0002.docx DOCX document
36C78622B0022 A0001.docx DOCX document
SOW - Corrected Fort Douglas Post - Shrine FY22.pdf PDF
SOW - Corrected - Fort Bliss Natl Cem Shrine - FY-22.pdf PDF
Davis Bacon WD for Nashville Nalt Cem-Davidson County TN.pdf PDF
F365700-22-2000006-SOW- FSNC Shrine FY22.pdf PDF
F364724-22-2000000-SOW-Nashville Shrine FY22.pdf PDF
Davis Bacon WD for Ft. Snelling Nalt Cem-Hennepin County MN.pdf PDF
Davis Bacon WD for Ft. Sam Houston Nalt Cem-Bexar County TX.pdf PDF
Davis Bacon WD for Ft. Bliss Nalt Cem-El Paso County TX.pdf PDF
Davis Bacon WD for Camp Butler Nalt Cem-Sangamon County IL.pdf PDF
F368483-22-2000000-SOW-Ft Douglas Post Shrine FY22.pdf PDF
P07 SCA WD 2015-4853_Rev19_06272022_Kalamazoo_Fort Custer NC.pdf PDF
P07 SCA WD 2015-5253_Rev19_07132022_Bexar_Fort Sam Houston NC.pdf PDF
P07 SCA WD 2015-5229_Rev19_07132022_El Paso_Fort Bliss NC.pdf PDF
F367518-22-2000000-SOW-Dallas Fort Worth Shrine FY22.pdf PDF
Davis Bacon WD for Fort Custer Nalt Cem -Kalamazoo County MI.pdf PDF
Davis Bacon WD for Ft. Douglas Post Nalt Cem-Johnson County AR.pdf PDF
F365143-22-2000001-SOW-Camp Butler Shrine FY22.pdf PDF
F3661X2-22-0000006-SOW-Keokuk Shrine-FY22.pdf PDF
F367465-22-2000000-SOW-Ft Bliss Shrine FY22.pdf PDF
P07 SCA WD 2015-5233_Rev23_07132022_Harris_Houston NC.pdf PDF
F367471-22-2000000-SOW-Fort Sam Shrine FY22.pdf PDF
P07 SCA WD 2015-4647_Rev20_06272022_Davidson_Nashville NC.pdf PDF
F367463-22-2000004-SOW-Houston Shrine FY22.pdf PDF
Davis Bacon WD for Dallas Fort Worth Nalt Cem -Dallas County TX.pdf PDF
P07 SCA WD 2015-5031_Rev18_07112022_Sangamon_Camp Butler NC.pdf PDF
F365144-22-0000016-SOW-Rock Island Shrine FY22.pdf PDF
Davis Bacon WD for Corinth Nalt Cem-Alcorn County MS.pdf PDF
Davis Bacon WD for Houston Nalt Cem-Harris County TX.pdf PDF
36C78622B0022_1.docx DOCX document
P07 SCA WD 2015-5227_Rev18_07142022_Dallas_Dallas Fort Worth NC.pdf PDF
F364412-22-2000001-SOW-Corinth Shrine FY22.pdf PDF
F365425-22-2000001-SOW-Fort Custer Shrine FY22.pdf PDF
P07 SCA WD 2015-4945_Rev20_07012022_Hennepin_Fort Snelling NC.pdf PDF
P07 SCA WD 2015-5489_Rev19_06272022_Salt Lake_Fort Douglas Post NC.pdf PDF
P07 SCA WD 2015-5157_Rev19_07132022_Alcorn_Corinth NC.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dallas Ft Worth National Cemetery Is the 193,760 SF on the pricing sheet correct to establish Turf in sections 21 and 77 ? CLIN 0001A Correct

Dallas Ft Worth National Cemetery DFWNC CLIN 0001A includes "Clean Upright Marble Headstones" with Turf as a SF Unit, followed by 0001B "Clean Upright Granite Headstones, also marked as SF (Typo). Please clarify all CLIN quanitity/unit/descriptions Should Be Each (ea)

Fort Snelling National Cemetery Confirming Contractor will have a lay-down area, as well as power/electric and water access for all requirement fulfillment? Yes Fort Snelling National Cemetery Can Customer confirm how awarding/notice to proceed of additional 9 options would be initiated? Does NCA have an expectation of how many of the 10 total line items in this SOW will be managed/phased? No Options. All work must be completed within POP Camp Butler National Cemetery Confirming Contractor will have a lay-down area, as well as power/electric and water access for all requirement fulfillment? Yes to laydown area, no to power and water.

Camp Butler National Cemetery Are any of the listed sections in need of complete re-grading/ water runoff support? Yes Sect. “S” and in-between Section S and CremG and a few columns in CremG need re-grading.

N/A- Solicitation Please clarify CLIN accuracy- Some quantity to unit misalignment, but also in CLIN's and/or doubling up without separate Units Verified N/A- Solicitation Confirming- "Estimated magnitude of construction" only for the DBA CLINs, not for the entire per-cemetery Project? Correct

N/A- Solicitation It is stated all Cemeteries' PoPs will be started within 10 days. Based off differing seasonal changes per cemetery location and optimal sod/turf scheduling, what is technically considered "Starting?" ie Is the winning Contractor expected to be onsite 10 days after award starting work, or is that just official PoP and all scheduling to be done directly with Cemetery Personnel, as long as completion is during the stated PoP?

It is based off award. If a later date is needed due to season, it will be discussed after award.

N/A- Solicitation It states individual PoP's for each site, however confirming that the ones more than 365 days won't be an issue/in violation of crossing the FY funding (FAR 32.703-3(b))? There's none that will be over 365 days

N/A- Solicitation Submission is mentioned as Email only but also then contradicts with instructions re: Vendor Portal Issues directly below, and mentions subnimssion of RFI to 5 separate POC's-- Confirming bids should be sent only via email to all 5 POC's listed or just listed CO (M Benson?)

Submit bids to Vendor Portal AND Email. Send bids to the following email: NCAConstructionBidOpenings@va.gov

N/A- Solicitation States a required "Completed S02_Attachment-_IFB Contractor Cost Estimate Worksheet. Confirming this is not a separate attachment, and that pricing is to be submitted in B.2 PRICE/COST SCHEDULE, starting on page 23 of solicitation, as mentioned on Page 42, #4.

See attachment. One must be submitted with every project bidder is bidding on

N/A- Solicitation States to include a copy of the Bond in submission instructions and multiple pricing boxes says "Include Bond." Elsewhere states to provide bond post-award W/I 10 days. Normally bonds aren't required prior to award, please confirm what is required when it comes to bonds.

You are required to have a Bid Bond prior to award. If you are awarded the project, you are required to have a performance and payment bond.

Answers

Questions- Solicitation 36C78622B0022 Multi-Award Shrine Project

QuestionCemetery Reference

36C78622B0022 Question Matrix

File details come from the government source that posted it. Updated .