This document is Addendum No. 2 to the bid documents for the Expand Pharmacy and Radiology project at Oscar G. Johnson VA Medical Center in Iron Mountain, Michigan (Commission No. 6163.03). The addendum modifies the original drawings and specifications and must be acknowledged on the Bid Form.
The specification modifications add a new Section 2.2 for Gypsum Sheathing Board, requiring ASTM C1396 Type X water-resistant core boards at 16 mm (5/8 inch) thick, and ASTM C1177 Type X boards. A corresponding new Section 3.3 details installation requirements per ASTM C840, including screw spacing at 9 mm (3/8 inch) from edges and 200 mm (8 inches) on center, with maximum spacing of 200 mm on intermediate framing members. Horizontal sheathing boards measure 600 mm by 2400 mm (2 foot by 8 foot) with tongue edge up, while vertical boards are 1200 mm by 2400 mm or 2700 mm (4 ft. by 8 ft. or 9 foot) with edges over framing. The drawing modifications span 16 sheets, including demolition plans, new work plans, wall sections, exterior details, door and partition schedules, and mechanical/piping plans. Changes encompass window removals and infilling, penthouse modifications, HSS jamb removals, column relocations, roof deck notes, wall reinforcement revisions, fireproofing details, and HWS/R piping size adjustments. The addendum was issued February 6, 2025, by Berners-Schober Associates, Inc. in Green Bay, Wisconsin, with re-issued specification sections and sheets provided as attachments.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 2, Page 1 of 4 Comm. No. 6163.03
ADDENDUM NO. 2
EXPAND PHARMACY AND RADIOLOGY
OSCAR G. JOHNSON VA MEDICAL CENTER
IRON MOUNTAIN, MICHIGAN
COMMISSION NO. 6163.03
This Addendum is issued to modify, explain or correct the original drawings and specifications and is hereby made part of the Contract Documents.
Receipt of the Addendum shall be acknowledged in the appropriate place on the Bid Form.
SPECIFICATIONS:
1. Section 09 29 00 GYPSUM BOARD
A. Page 09 29 00 - 3, After Article 2.1 GYPSUM BOARD, Add the following Article:
2.2 GYPSUM SHEATHING BOARD
A. ASTM C1396, Type X, water-resistant core, 16 mm (5/8 inch) thick.
B. ASTM C1177, Type X.
B. Page 09 29 00 – 7 After Article 3.2 INSTALLING GYPSUM BOARD, Add the following Article:
3.3 INSTALLING GYPSUM SHEATHING
A. Install in accordance with ASTM C840, except as otherwise specified or shown.
B. Use screws of sufficient length to secure sheathing to framing.
C. Space screws 9 mm (3/8 inch) from ends and edges of sheathing and 200 mm (8 inches) on center. Space screws a maximum of 200 mm (8 inches) on center on intermediate framing members.
D. Apply 600 mm by 2400 mm (2 foot by 8 foot) sheathing boards horizontally with tongue edge up.
E. Apply 1200 mm by 2400 mm or 2700 mm (4 ft. by 8 ft. or 9 foot) gypsum sheathing boards vertically with edges over framing.
Addendum No. 2, Page 2 of 4
DRAWINGS
1. Sheet AD104K – THIRD FLOOR DEMOLITION PLAN
A. Removing exterior windows in training rooms
2. Sheet A105K – THIRD FLOOR AND ROOF NEW WORK PLANS
A. Infilling removed exterior windows, added detail and partition tags
3. Sheet A404K – WALL SECTIONS
A. Modifications to penthouse wall sections
4. Sheet A501K – EXTERIOR DETAILS
A. Modifications to penthouse details
5. Sheet A502K – EXTERIOR DETAILS
6. Sheet A503K – EXTERIOR DETAILS
A. Modifications to penthouse details and added fireproofing detail
7. Sheet A504K – ELECTRICAL PENTHOUSE DETAILS
A. Modifications to electrical penthouse details and wall sections
8. Sheet A601K – DOOR SCHEDULE
9. Sheet A602K – PARTITION SCHEDULE
A. Added partition to partition schedule
10. Sheet I002K – NEW ROOM FINISH SCHEDULE
A. Modifications to door schedule
11. Sheet MP103K – SECOND FLOOR PLAN – NEW WORK (PIPING)
A. HWS/R piping size changes.
12. Sheet MK301K – SECTIONS AND ENLARGED PLANS
A. HWS/R piping size changes.
Addendum No. 2, Page 3 of 4
13. Sheet MJ601K – SCHEDULES
A. Unit heater and air unit heating coil revised selections.
14. Sheet S203 – THIRD FLOOR FRAMING PLAN
A. 2/S203:
• REMOVE HSS jambs at south wall
• REVISE column locations along east wall
• REVISE roof deck note at electrical penthouse
• REVISE PARTIAL PENTHOUSE ROOF FRAMING PLAN NOTES #2 and #7
B. 4/S203:
• REMOVE HSS jambs at south wall
• REVISE column location along east wall
15. Sheet S300 – WALL REINFORCEMENT ELEVATIONS
A. Add Key Notes 3 & 4
B. 3/S300:
• REVISE wall reinforcing
C. 4/S300:
• REVICE wall reinforcing
D. 7/S300:
• REVISE jambs/headers
• ADD keynote 4
E. 8/S300:
• ADD keynote 4
F. 9/S300:
• ADD keynote 3
G. 10/S300:
H. 11/S300:
Addendum No. 2, Page 4 of 4
16. Sheet S821 – FRAMING DETAILS
A. 1/S821:
• ADD metal wall deck
B. 9/S821:
• REVISE base plate dimensions
C. 18/S821:
• REVISE CF studs
D. 21/S821:
• ADD metal wall deck
ATTACHMENTS
Re-Issued Specification Section – 09 29 00 GYPSUM BOARD Re-Issued Sheets – S203, S300, S821, A105K, A404K, A501K, A502K, A503K, A504K, A601K, A602K, AD104K, I002K, MJ601K, MK301K, MP103K
BERNERS-SCHOBER ASSOCIATES, INC.
GREEN BAY, WISCONSIN
February 6, 2025
04-01-20
Expand Pharmacy & Radiology 09 29 00 - 1
SECTION 09 29 00
GYPSUM BOARD
PART 1 - GENERAL
1.1 DESCRIPTION
A. This section specifies installation and finishing of gypsum board.
1.2 RELATED WORK
A. Installation of Steel Framing Members for Walls, Partitions, Furring, Soffits, and Ceilings: Section 05 40 00, COLD-FORMED METAL FRAMING, and Section 09 22 16, NON-STRUCTURAL METAL FRAMING.
B. Sound Deadening Board: Section 07 21 13, THERMAL INSULATION.
C. Acoustical Sealants: Section 07 92 00, JOINT SEALANTS.
E. Lead or copper lined wallboard: Section 13 49 00, RADIATION PROTECTION.
1.3 TERMINOLOGY
A. Definitions and description of terms shall be in accordance with
ASTM C11, C840, and as specified.
B. Underside of Structure Overhead: In spaces where steel trusses or bar joists are shown, the underside of structure overhead shall be the underside of the floor or roof construction supported by the trusses or bar joists.
C. "Yoked": Gypsum board cut out for opening with no joint at the opening
(along door jamb or above the door).
1.4 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES.
B. Manufacturer's Literature and Data:
1. Cornerbead and edge trim.
2. Finishing materials.
3. Laminating adhesive.
4. Gypsum board, each type.
C. Shop Drawings:
1. Typical gypsum board installation, showing corner details, edge trim details and the like.
2. Typical sound rated assembly, showing treatment at perimeter of partitions and penetrations at gypsum board.
3. Typical shaft wall assembly.
4. Typical fire rated assembly and column fireproofing, indicating details of construction same as that used in fire rating test.
Expand Pharmacy & Radiology 09 29 00 - 2
D. Samples:
1. Cornerbead.
2. Edge trim.
3. Control joints.
E. Test Results:
1. Fire rating test, each fire rating required for each assembly.
2. Sound rating test.
F. Certificates: Certify that gypsum board types, gypsum backing board types, cementitious backer units, and joint treating materials do not contain asbestos material.
1.5 DELIVERY, IDENTIFICATION, HANDLING AND STORAGE
A. In accordance with the requirements of ASTM C840.
1.6 ENVIRONMENTAL CONDITIONS
A. In accordance with the requirements of ASTM C840.
1.7 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. American Society for Testing and Materials (ASTM):
C11-15..................Terminology Relating to Gypsum and Related
Building Materials and Systems
C475-15.................Joint Compound and Joint Tape for Finishing
Gypsum Board
C840-13.................Application and Finishing of Gypsum Board
C919-12.................Sealants in Acoustical Applications
C954-15.................Steel Drill Screws for the Application of
Gypsum Board or Metal Plaster Bases to Steel
Stud from 0.033 in. (0.84mm) to 0.112 in.
(2.84mm) in thickness
C1002-14................Steel Self-Piercing Tapping Screws for the
Application of Gypsum Panel Products or Metal
Plaster Bases to Wood Studs or Steel Studs
C1047-14................Accessories for Gypsum Wallboard and Gypsum
Veneer Base
C1177-13................Glass Mat Gypsum Substrate for Use as Sheathing
C1178/C1178M-18.........Specification for Coated Glass Mat Water
Resistant Backing Panel
C1658-13................Glass Mat Gypsum Panels
C1396-14................Gypsum Board
Expand Pharmacy & Radiology 09 29 00 - 3
C. Underwriters Laboratories Inc. (UL):
Latest Edition..........Fire Resistance Directory
D. Inchcape Testing Services (ITS):
Latest Editions.........Certification Listings
PART 2 - PRODUCTS
2.1 GYPSUM BOARD
A. Gypsum Board: ASTM C1396, Type X, 16 mm (5/8 inch) thick unless shown otherwise.
B. Coreboard or Shaft Wall Liner Panels.
1. ASTM C1396, Type X.
2. ASTM C1658: Glass Mat Gypsum Panels.
3. Coreboard for shaft walls 300, 400, 600 mm (12, 16, or 24 inches) wide by required lengths 25 mm (1 inch) thick with paper faces treated to resist moisture.
C. Mold and Moisture Resistant Gypsum Board: Gypsum board with enhanced core formulated for resistance to moisture and mold; UL Classified for fire resistance (Type X). Surfaced with moisture/ mold resistant paper on front, back, and long edges. Complying with ASTM C1396.
Mold Resistance: Panel score of 10 when tested in accordance with
ASTM D3273.
D. Abuse-Resistant Gypsum Board:
1. Panels shall comply with the following:
a. Thickness: 5/8”
b. Long Edges: Tapered
c. Fire-Resistance Rated Type X Core
d. ASTM E 84: Flame Spread 15 / Smoke Developed 5
e. Mold Resistance: ASTM D 3273, score of 10
f. Surface Abrasion per ASTM C1629: Level 2 or 3
g. Surface Indentation per ASTM C1629: Level 1 or 2
h. Soft Body Impact Test per ASTM C1629: Level 1 or 2
2.2 GYPSUM SHEATHING BOARD
A. ASTM C1396, Type X, water-resistant core, 16 mm (5/8 inch) thick.
BA. ASTM C1177, Type X.
2.3 ACCESSORIES
A. ASTM C1047, except form of 0.39 mm (0.015 inch) thick zinc-coated steel sheet or rigid PVC plastic.
B. Flanges not less than 22 mm (7/8 inch) wide with punchouts or deformations as required to provide compound bond.
Expand Pharmacy & Radiology 09 29 00 - 4
2.4 FASTENERS
A. ASTM C1002 and ASTM C840, except as otherwise specified.
B. ASTM C954, for steel studs thicker than 0.04 mm (0.33 inch).
C. Select screws of size and type recommended by the manufacturer of the material being fastened.
D. For fire rated construction, type and size same as used in fire rating test.
E. Clips: Zinc-coated (galvanized) steel; gypsum board manufacturer's standard items.
2.5 FINISHING MATERIALS AND LAMINATING ADHESIVE
A. ASTM C475 and ASTM C840. Free of antifreeze, vinyl adhesives, preservatives, biocides and other VOC. Adhesive shall contain a maximum
VOC content of 50 g/l.
PART 3 - EXECUTION
3.1 GYPSUM BOARD HEIGHTS
A. Extend all layers of gypsum board from floor to underside of structure overhead on following partitions and furring:
1. Two Sides of Partitions:
a. Fire rated partitions.
b. Smoke partitions.
c. Sound rated partitions.
d. Full height partitions shown (FHP).
e. Corridor partitions.
2. One Side of Partitions or Furring:
a. Inside of exterior wall furring or stud construction.
b. Room side of room without suspended ceilings.
c. Furring for pipes and duct shafts, except where fire rated shaft wall construction is shown.
3. Extend all layers of gypsum board construction used for fireproofing of columns from floor to underside of structure overhead, unless shown otherwise.
B. In locations other than those specified, extend gypsum board from floor to heights as follows:
1. Not less than 100 mm (4 inches) above suspended acoustical ceilings.
2. At ceiling of suspended gypsum board ceilings.
3. At existing ceilings.
Expand Pharmacy & Radiology 09 29 00 - 5
3.2 INSTALLING GYPSUM BOARD
A. Coordinate installation of gypsum board with other trades and related work.
B. Install gypsum board in accordance with ASTM C840, except as otherwise specified.
C. Moisture and Mold–Resistant Assemblies: Provide and install moisture and mold-resistant glass mat gypsum wallboard products with moisture-resistant surfaces complying with ASTM C1658 where shown and in locations which might be subject to moisture exposure during construction.
D. Use gypsum boards in maximum practical lengths to minimize number of end joints.
E. Bring gypsum board into contact, but do not force into place.
F. Ceilings:
1. For single-ply construction, use perpendicular application.
2. For two-ply assemblies:
a. Use perpendicular application.
b. Apply face ply of gypsum board so that joints of face ply do not occur at joints of base ply with joints over framing members.
G. Walls (Except Shaft Walls):
1. When gypsum board is installed parallel to framing members, space fasteners 300 mm (12 inches) on center in field of the board, and
200 mm (8 inches) on center along edges.
2. When gypsum board is installed perpendicular to framing members, space fasteners 300 mm (12 inches) on center in field and along edges.
3. Stagger screws on abutting edges or ends.
4. For single-ply construction, apply gypsum board with long dimension either parallel or perpendicular to framing members as required to minimize number of joints except gypsum board shall be applied vertically over "Z" furring channels.
5. For two-ply gypsum board assemblies, apply base ply of gypsum board to assure minimum number of joints in face layer. Apply face ply of wallboard to base ply so that joints of face ply do not occur at joints of base ply with joints over framing members.
6. No offset in exposed face of walls and partitions will be permitted because of single-ply and two-ply or three-ply application requirements.
Expand Pharmacy & Radiology 09 29 00 - 6
7. Control Joints ASTM C840 and as follows:
a. Locate at both side jambs of openings if gypsum board is not
"yoked". Use one system throughout.
b. Not required for wall lengths less than 9000 mm (30 feet).
c. Extend control joints the full height of the wall or length of soffit/ceiling membrane.
H. Acoustical or Sound Rated Partitions, Fire and Smoke Partitions:
1. Cut gypsum board for a space approximately 3 mm to 6 mm (1/8 inch to 1/4 inch) wide around partition perimeter.
2. Coordinate for application of caulking or sealants to space prior to taping and finishing.
3. For sound rated partitions, use sealing compound (ASTM C919) to fill the annular spaces between all receptacle boxes and the partition finish material through which the boxes protrude to seal all holes and/or openings on the back and sides of the boxes. STC minimum values as shown.
I. Electrical and Telecommunications Boxes:
1. Seal annular spaces between electrical and telecommunications receptacle boxes and gypsum board partitions.
J. Accessories:
1. Set accessories plumb, level and true to line, neatly mitered at corners and intersections, and securely attach to supporting surfaces as specified.
2. Install in one piece, without the limits of the longest commercially available lengths.
3. Corner Beads:
a. Install at all vertical and horizontal external corners and where shown.
b. Use screws only. Do not use crimping tool.
4. Edge Trim (Casings Beads):
a. At both sides of expansion and control joints unless shown otherwise.
b. Where gypsum board terminates against dissimilar materials and at perimeter of openings, except where covered by flanges, casings or permanently built-in equipment.
c. Where gypsum board surfaces of non-load bearing assemblies abut load bearing members.
d. Where shown.
Expand Pharmacy & Radiology 09 29 00 - 7
3.3 INSTALLING GYPSUM SHEATHING
A. Install in accordance with ASTM C840, except as otherwise specified or shown.
B. Use screws of sufficient length to secure sheathing to framing.
C. Space screws 9 mm (3/8 inch) from ends and edges of sheathing and
200 mm (8 inches) on center. Space screws a maximum of 200 mm
(8 inches) on center on intermediate framing members.
D. Apply 600 mm by 2400 mm (2 foot by 8 foot) sheathing boards horizontally with tongue edge up.
E. Apply 1200 mm by 2400 mm or 2700 mm (4 ft. by 8 ft. or 9 foot) gypsum sheathing boards vertically with edges over framing.
3.4 CAVITY SHAFT WALL
A. Coordinate assembly with Section 09 22 16, NON-STRUCTURAL METAL
FRAMING, for erection of framing and gypsum board.
B. Conform to UL Design No. U438 or FM WALL CONSTRUCTION 12-2/HR
(Nonbearing for two-hour fire rating. Conform to FM WALL CONSTRUCTION
25-1/HR (Non-loadbearing) for one-hour fire rating where shown.
C. Cut coreboard (liner) panels 25 mm (1 inch) less than floor-to-ceiling height and erect vertically between J-runners on shaft side.
1. Where shaft walls exceed 4300 mm (14 feet) in height, position panel end joints within upper and lower third points of wall.
2. Stagger joints top and bottom in adjacent panels.
3. After erection of J-struts of opening frames, fasten panels to
J-struts with screws of sufficient length to secure to framing staggered from those in base, spaced 300 mm (12 inches) on center.
D. Gypsum Board:
1. Two Hour Wall:
a. Erect base layer (backing board) vertically on finish side of wall with end joints staggered. Fasten base layer panels to studs with 25 mm (one inch) long screws, spaced 600 mm
(24 inches) on center.
b. Use laminating adhesive between plies in accordance with
UL or FM if required by fire test.
c. Apply face layer of gypsum board required by fire test vertically over base layer with joints staggered and attach with screws of sufficient length to secure to framing staggered from those in base, spaced 300 mm (12 inches) on center.
Expand Pharmacy & Radiology 09 29 00 - 8
2. One Hour Wall With One Layer on Finish Side of Wall: Apply face layer of gypsum board vertically. Attach to studs with screws of sufficient length to secure to framing, spaced 300 mm (12 inches) on center in field and along edges.
3. Where coreboard is covered with face layer of gypsum board, stagger joints of face layer from those in the coreboard base.
E. Treat joints, corners, and fasteners in face layer as specified for finishing of gypsum board.
3.5 FINISHING OF GYPSUM BOARD
A. Finish joints, edges, corners, and fastener heads in accordance with
ASTM C840. Use Level 4 finish for al finished areas open to public view.
B. Before proceeding with installation of finishing materials, assure the following:
1. Gypsum board is fastened and held close to framing or furring.
2. Fastening heads in gypsum board are slightly below surface in dimple formed by driving tool.
C. Finish joints, fasteners, and all openings, including openings around penetrations, on that part of the gypsum board extending above suspended ceilings to seal surface of non-decorated smoke barrier, fire rated and sound rated gypsum board construction. After the installation of hanger rods, hanger wires, supports, equipment, conduits, piping and similar work, seal remaining openings and maintain the integrity of the smoke barrier, fire rated and sound rated construction. Sanding is not required of non-decorated surfaces.
3.6 REPAIRS
A. After taping and finishing has been completed and before decoration, repair all damaged and defective work, including non-decorated surfaces.
B. Patch holes or openings 13 mm (1/2 inch) or less in diameter, or equivalent size, with a setting type finishing compound or patching plaster.
C. Repair holes or openings over 13 mm (1/2 inch) diameter, or equivalent size, with 16 mm (5/8 inch) thick gypsum board secured in such a manner as to provide solid substrate equivalent to undamaged surface.
D. Tape and refinish scratched, abraded or damaged finish surfaces including cracks and joints in non-decorated surface to provide smoke
Expand Pharmacy & Radiology 09 29 00 - 9 tight construction, fire protection equivalent to the fire rated construction and STC equivalent to the sound rated construction.
- - - E N D - - -
F F
G
H
J
L
N
P
NURSE
EDUCATION
OFFICE
NURSING
TRAINING
ROOM
STAIR 3
CONTROL
3228A
X-RAY
OPERATORY
OPERATORY
CHIEF,
DENTAL
PASSAGE
PASSAGE
3237A
WAITING
ROOM
A
B-E
C-E
D-E
E-E
F-E
1-E
1-E
2-E
2-E
3-E
3-E
4-E
4-E7-E8-E
6-E
F6 A504K--------------
ELEVATOR
LOBBY
NURSE
EDUCATION
TRAINING
ROOM
NURSE
EDUCATION
TRAINING
ROOM
TOILET
3250A
TOILET
3246A
PASSAGEWAY
MECH.
3244A
B
C
C
D
D
F6 A404K--------------
F4 A404K--------------
B
A A
DEMOLITION NOTES
GENERAL DEMOLITION NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
A.
B.
9.
10.
11.
12.
13.
REMOVE ALL PARTITIONS, DOORS, FRAMES, PLUMBING FIXTURES,
EQUIPMENT, AND CASEWORK IN THEIR ENTIRETY SHOWN DASHED
ON THIS PLAN. COORDINATE WITH OWNER ITEMS TO BE SALVAGED.
REMOVE ALL SUSPENDED ACOUSTICAL TILE AND PLASTER CEILINGS
FROM ROOMS WITH NEW CEILINGS SCHEDULED (SEE REFLECTED
CEILING PLAN FOR LOCATIONS OF NEW CEILINGS). REMOVE CEILING
GRID, HANGER WIRES, FURRING CHANNELS, ETC., ALL AS REQUIRED
FOR FULL ACCESS TO STRUCTURE ABOVE AND TO CONFIRM
CONTINUITY OF ALL PARTITIONS TO REMAIN.
WHERE EXISTING CONSTRUCTION IS SCHEDULED TO REMAIN,
REPAIR/ PATCH OPENINGS (I.E. AFTER REMOVAL OF ADJACENT
WALLS, OUTLETS, GASES, LIGHTING FIXTURES, HANDRAILS,
GUARDRAILS, WALL PROTECTION, ETC.) IN WALLS, CEILINGS, AND
FLOORS THAT ARE NOT SCHEDULED TO RECEIVE NEW FINISHES,
PROVIDE SMOOTH AND INVISIBLE TRANSITIONS. MAINTAIN EXISTING
CODE AND FIRE RATING REQUIREMENTS.
WHERE EXISTING PARTITIONS ARE SHOWN TO REMAIN, THE
EXISTING PARTITION GYPSUM BOARD/PLASTER HEIGHT MAY NOT
EXTEND TO NEW SOFFIT/CEILING HEIGHT. EXTEND GYPSUM
BOARD/PLASTER AS REQUIRED TO ACCOMMODATE NEW
SOFFIT/CEILING HEIGHT.
REMOVE OR PREP EXISTING FINISHES WHERE NEW FINISHES ARE
SCHEDULED IN THE NEW FINISH SCHEDULE.
UNLESS NOTED OTHERWISE, EXISTING PARTITIONS ARE
CONSTRUCTED OF METAL STUDS WITH GYPSUM BOARD ON BOTH
SIDES. PARTITIONS WERE CONSTRUCTED AFTER THE INSTALLATION
OF TOPPING.
REMOVE TOPPING TO STRUCTURAL SLAB (IN AREAS SHOWN AS
THUS ) FOR INSTALLATION OF NEW PORCELAIN TILE.
WHERE DEMOLITION OF CHASES OCCUR AND THE
PIPES/MECHANICAL PENETRATIONS IN THE CHASE ARE TO REMAIN.
CONFIRM THAT THE PIPES HAVE CONCRETE INFILLED AROUND
THEM FOR REQUIRED FIRE RATING. IF OPENING AROUND PIPES
EXIST, INFILL OPENING AROUND PIPES WITH CONCRETE TO
ACHIEVE REQUIRED RATING.
FIRESTOP PIPES THROUGH FLOOR ABOVE AS REQUIRED TO
ACHIEVE TWO HOUR FIRE RATING.
REMOVE FLOOR TILE TO STRUCTURAL SLAB. INFILL TOPPING AS
REQUIRED FOR NEW FLOOR FINISH.
WHERE FLOOR OR WALL TILE IS SCHEDULED IN NEW FINISH
SCHEDULE, REMOVE FLOOR TOPPING AND WALL FINISHES AS
REQUIRED TO PROVIDE INSTALLATION METHOD. DETAILS INDICATED
IN SPECIFIED TCNA SYSTEM.
WHERE ADJACENT PARTITIONS AT COLUMNS ARE SCHEDULED TO
BE REMOVED, REMOVE FINISHES AT COLUMNS DOWN TO
STRUCTURE.
REMOVAL OF ALL NON-PERMANENT ITEMS (FURNITURE, WALL
HANGINGS, DESKS, ETC.) TO BE COMPLETED BY OWNER PRIOR TO
DEMOLITION BEING STARTED
REMOVAL OF ALL PERMANENT ITEMS (SINK ACCESSORIES,
EQUIPMENT SUPPORTS, TV'S, ETC.) TO BE DONE BY CONTRACTOR.
COORDINATE WITH OWNER WHAT IS TO BE SALVAGED OR RE-
INSTALLED
DEMOLITION KEYED NOTES:
A REMOVE WINDOW SYSTEM, TREATMENTS AND SILL. REMOVE
INTERIOR HEAD AND JAMBS. PREPARE OPENING TO BE INFILLED.
SEE NEW WORK PLAN FOR EXTENT
B REMOVE BRICK AND INSULATION. SEE NEW WORK PLANS
C REMOVE / PULL BACK EXISTING ROOFING MATERIALS AS REQUIRED
FOR NEW ADDITION
D REMOVE ROOF WALKING PADS SHOWN DASHED. SALVAGE FOR
RE-LOCATION. SEE NEW WORK PLANS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
EXPAND PHARMACY AND RADIOLOGY
OSCAR G. JOHNSON VA MEDICAL CENTER
325 H STREET,
IRON MOUNTAIN, MI 49801
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED
KEY PLAN:
Comm. Number: 6163.03
FEBRUARY 5, 2025
585-337
U.S. Department of Veterans Affairs
BID DOCUMENTS
Revisions: Date:
CONSTRUCTION SET 05/08/2023
95% DESIGN SUBMITTAL - REDESIGN 08/23/2024
BID DOCUMENTS 10/11/2024
ADDENDUM 02 02/05/2025
Au to de sk
D oc s:
//O sc ar
G J oh ns on V
A M ed ic al C en te r/O G
JA
R
C H
.rv t
2/ 5/
0:
:1
AM
Checker Author
AD104K
THIRD FLOOR DEMOLITION PLAN
DWG. 16 OF 134
N
1/8" = 1'-0"AD104K
THIRD FLOOR DEMOLITION PLANF5
4'0 8' 12'2'
A
C
E
F
F
G
H
J
L
N
P
19 20
B
D
F9 A301K--------------
F6 A301K--------------
F3 A301K--------------
D6 A301K--------------
NURSE
EDUCATION
OFFICE
NURSE
TRAINING
ROOM
STAIR 3
CONTROL
3228A
X-RAY
OPERATORY
OPERATORY
OPERATORY
SOILED
CLEAN
STORAGE
STERILE
LAB
OPERATORY
OPERATORY
OPERATORY
CHIEF,
DENTAL
PASSAGE
PASSAGE
3237A
WAITING
ROOM
CLERK/
WORK
MEN
WOMEN
29.5
S3A
FIRST FLOOR
ROOF BELOW
FIRST FLOOR
ROOF BELOW
17.3 19.1 20.2 21.2 28.8 29.4 30.5 30.9
A.5
C.3
E.02
E.9
C.2
C.4
E.01
E.85
RD
+5"
+8"+8"
+8"
+8"
RD
+5.5"
+8"+8"
+8"
D8 A502K-------------- D8
A502K--------------
B6 A502K--------------
D6 A502K--------------
D6 A502K--------------
D6 A502K--------------
D1 A301K--------------
A.1
B6
A502K-------------- SIM.
+8"
+8" D6 A502K--------------
B-E
C-E
D-E
E-E
F-E
G-E
1-E
1-E
2-E
2-E
3-E
3-E
4-E
4-E7-E8-E
6-E
B8 A502K--------------
A504K
C5
-------------- C7
A501KTYP.
4 4 4
OVERFLOW
SCUPPER
EQ EQ
OVERFLOW
SCUPPER
EQ EQ
C7
A504KC3F3
A504K--------------
F5 A504K--------------
13'-4" 33'-0"
'-4
9 9
4'-8"
ELECTRICAL
PENTHOUSE
A504K
B3------------ A504K
B3
9 9
EXISTING ROOF
NORMAL
POWER
EMERGENCY
POWER (FUTURE)
5' -0
36"
3334-1 36"
36" 3334-2
36"
HALL
3334-3 36"
ELEVATOR
LOBBY
NURSE
EDUCATION
TRAINING
ROOM
NURSE
EDUCATION
TRAINING
ROOM
TOILET
3250A
TOILET
3246A
PASSAGEWAY
MECH.
3244A
NURSE ED.
STOR.
TOILET
3225A
MECHANICAL
ROOM
A201K
B5
8" 6'-0"
BR
IC
K 6'
-0 " F
R O
M
B7
B9 A301K--------------
3244A 36"13
A503K
F7
A503K
F5
C
LE
AR
3'
-6
CLEAR
4'-5"
3'-0"
S6A
S6A 110S6-
M4-
M4-
S3-
S3-
A503K
F2
NEW WORK PLAN NOTES
GENERAL NOTES:
1.
A.
B.
C.
2.
3.
4.
A.
5.
6.
7.
SEE ARCHITECTURAL DEMOLITION PLAN FOR NEW WORK INCLUDING
BUT NOT LIMITED TO:
CONCRETE TOPPING INFILLS AT; REMOVED MASONRY WALLS
THAT EXTEND TO STRUCTURE, REMOVED TERRAZZO BASE,
MODIFIED FLOOR EXPANSION JOINT COVERS, REMOVED
CERAMIC TILE FLOORS.
WALL PATCHING AT; REMOVED TERRAZZO BASE, REMOVED
CERAMIC WALL TILE, CEILINGS THAT CHANGE HEIGHT,
REMOVED AND INFILLED DOORS/FRAMES.
PATCHING OR PREP WORK OF EXISTING FINISHES AS REQUIRED
FOR NEW ROOM FINISHES.
SEE MECHANICAL TRADES DRAWINGS FOR LOCATIONS OF NEW CUT
IN DEVICES INTO EXISTING PARTITIONS THAT WILL RESULT IN
PATCHING OF EXISTING WALLS, FLOORS, AND CEILINGS.
SEE MECHANICAL TRADE DRAWINGS FOR AREAS OUTSIDE OF THE
MAIN ARCHITECTURAL SCOPE OF WORK AREA THAT MAY REQUIRE
TEMPORARY REMOVAL AND REINSTALLATION OF CEILINGS AND
SUPPORT OF CEILING MOUNTED EQUIPMENT FOR MECHANICAL
TRADE WORK.
TRADES SHALL CAREFULLY COORDINATE WALL MOUNTED DEVICE
COVERPLATES TO FIT WITH SCHEDULED CASEWORK AS INDICATED
ON THESE DRAWINGS. COORDINATE HEIGHTS OF DEVICES TO
CLEAR COUNTERTOP BACKSPLASHES, CASEWORK, AND WALL
PROTECTION SHEETING AND CERAMIC WALL TILE WAINSCOTS.
SEE ACCESSORY SCHEDULE FOR CLEARANCE REQUIREMENTS
OF ELECTRICAL DEVICES WHERE ALCOHOL AND HAND WASH
DISPENSERS ARE BEING PROVIDED. CAREFULLY COORDINATE
INSTALLATION OF ELECTRICAL DEVICES TO LEAVE SPACE TO
INSTALL THESE WALL MOUNTED DISPENSERS.
WHERE EXISTING DOOR/ BORROWED LITE FRAMES ARE SCHEDULED
TO REMAIN IN NEW WORK AREAS, FRAMES SHALL BE REPAINTED
PER SCHEDULED FRAME COLOR AS LISTED IN THE INTERIOR FINISH
SCHEDULE.
U.N.O., FOR INTERIOR WALL EXPANSION JOINTS, SEE
FOR STEEL COLUMN FIREPROOFING DETAIL SEE
-------------- E7 A506K
-------------- E5 A506K
NEW WORK KEYED NOTES:
1 ALIGN NEW WALL WITH EXISTING WALL
2 INFILL OPENING. SEE SECTION -------------- B3
A404K
3 ROOF PENETRATION. ROOF CURB PROVIDED BY MECHANICAL
TRADE, INSTALLED BY GENERAL CONTRACTOR.
SEE MECHANICAL FOR MORE INFORMATION.
4 ROOF PENETRATION BY PLUMBING TRADE
5 ROOF ANCHORS ATTACHED TO STEEL ROOF DECK WITH
MANUFACTURER'S SPECIFIED FASTENERS. PROVIDE PIPE BOOT
FLASHING AND SEALANT AT ROOF ANCHORS. ANCHORS TO BE
TYPICALLY 7'-0" FROM ROOF EDGE AND 10'-0" O.C.
6 4" HIGH EQUIPMENT PAD. COORDINATE SIZE WITH EQUIPMENT
REQUIRING PAD. SEE
-------------- B5 A506K
7 PROVIDE (2) STEP, TREADED STEPS SIMILAR TO WHATS PROVIDED
AT EXISTING PENTHOUSE
8 PROVIDE (1) STEP, TREADED STEPS ON ROOF WALKING PADS.
SIMILAR TO WHATS PROVIDED AT EXISTING PENTHOUSE
9 PROVIDE (2) HOUR SPRAY FIREPROOFING ON COLUMNS. FORM
PROTECTIVE COVER OVER BOTTOM 4'-0" OF COLUMN
FIREPROOFING WITH 1/2" TRADE SIZE FLATTENED EXPANDED
METAL, GALVANIZED FINISH. BEND 3" WIDE FLANGES AT WALL AND
FASTEN INTO STUDS OR BLOCKING. GRIND SMOOTH EXPOSED
EDGES AND TOUCH UP WITH ZINC RICH PAINT. MATCH COVERS IN
EXISTING PENTHOUSES
10 CONTINUE ROOF WALKING PADS FROM EXISTING. RE-LOCATE
EXISTING OR PROVIDE NEW AS REQUIRED. MATCH EXISTING PADS
11 BEND IN DOWNSPOUT AND SPLASH BLOCK THAT IS COMPATIBLE
WITH EXISTING ROOFING
12 ABOVE CEILING ACCESS IS REQUIRED BELOW, BUT NOT LIMITED
TO, THE FOLLOWING ROOMS FOR STEEL SUPPORT INSTALL:
CORRIDOR C2-5, FAMILY RESTROOM 2338A, CHEMOTHERAPY 2335
AND MENTAL HEALTH EXAM 2330. COORDINATE WITH G.C.
13 MODIFY EXISTING OR PROVIDE NEW STEPS FOR NEW DOOR
ELEVATION HEIGHT
ROOF SCUPPER, CLEAR ANODIZED ALUMINUM CONDUCTOR HEAD
AND DOWNSPOUT. SEE
-------------- A3 A504K
15 ABOVE CEILING ACCESS IS REQUIRED BELOW, BUT NOT LIMITED
TO, THE FOLLOWING ROOMS FOR STEEL SUPPORT AND HVAC
INSTALL: MECHANICAL 2307 AND EYE INSTRUMENTS 2337.
COORDINATE WITH G.C.
16 NON-RATED 24" X 24" WALL ACCESS PANEL, 12" ABOVE FLOOR
LEVEL, CENTERED ON DUCTWORK IN CHASE. VERIFY FINAL
LOCATIONS WITH DUCT LAYOUT
17 (1) HOUR RATED UL Des X528 FIRE PROOFING ASSEMBLY TYPICAL
AT COLUMNS
L
30 31
B-E
C-E
D-E
2-E3-E4-E7-E
F3 A504K--------------
+5"
+5"
+7.75"
+7.75"
F5 A504K--------------
CRICKETS
B9 A301K--------------
RD
+5" +8.5"+8.5"
+8.5"
+8.5"
SECOND FLOOR
ROOF BELOW
OVERFLOW
SCUPPER
EQ EQ
3 D9 A503K--------------
D9 A503K--------------
E1 A504K--------------
D7 A503K--------------
D5 A503K--------------
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
EXPAND PHARMACY AND RADIOLOGY
OSCAR G. JOHNSON VA MEDICAL CENTER
325 H STREET,
IRON MOUNTAIN, MI 49801
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED
KEY PLAN:
Comm. Number: 6163.03
FEBRUARY 5, 2025
585-337
U.S. Department of Veterans Affairs
BID DOCUMENTS
Revisions: Date:
CONSTRUCTION SET 05/08/2023
95% DESIGN SUBMITTAL - REDESIGN 08/23/2024
BID DOCUMENTS 10/11/2024
ADDENDUM 02 02/05/2025
Au to de sk
D oc s:
//O sc ar
G J oh ns on V
A M ed ic al C en te r/O G
JA
R
C H
.rv t
2/ 5/
0:
:3
AM
DPD JAP
A105K
THIRD FLOOR AND ROOF NEW WORK
PLANS
DWG. 21 OF 134
N 1/8" = 1'-0"A105K
THIRD FLOOR NEW WORK PLANF6
4'0 8' 12'2'
N 1/8" = 1'-0"A105K
ELECTRICAL ROOF PLANSF1
4'0 8' 12'2'
FIRST FLOOR
1148' - 0"
SECOND FLOOR
1161' - 0"
THIRD FLOOR
1172' - 1 1/2"
REMOVE WINDOW
SYSTEM AND SILL
REMOVE MASONRY,
INSULATION, VAPOR
BARRIER AND
EXTERIOR SHEATHING
REMOVE BLOCKING
DOWN TO STUDS
REMOVE MASONRY,
INSULATION AND
EXTERIOR SHEATHING
REMOVE BRICK LINTEL
FROM STEEL CHANNELS
REMOVE GYPSUM
AND BLOCKING
DOWN TO STUDS
BRICK LINTEL TO
REMAIN, REMOVE
FLASHING
1' -4
/2
'-1
/2
'-0
REMOVE MASONRY,
INSULATION, VAPOR
BARRIER AND
EXTERIOR SHEATHING
REMOVE WINDOW
SYSTEM AND SILL
REMOVE BLOCKING
DOWN TO STUDS
REMOVE GYPSUM
DOWN TO STEEL
REMOVE MASONRY,
INSULATION AND
EXTERIOR SHEATHING
CUT STEEL PLATE
FLUSH WITH TUBE
BRICK LINTEL TO
REMAIN, REMOVE
FLASHING
6-E
T.O. CONCRETE
1173' - 6"
REMOVE MASONRY
AND INSULATION
REMOVE PANELS FROM
SOUTH INSIDE CORNER
TO NORTH SIDE OF
WINDOW PANEL JOINT.
SALVAGE FOR RE-USE
REMOVE PARAPET CAP
AND BLOCKING AS
REQUIRED FOR PANEL
FIRST FLOOR
1148' - 0"
SECOND FLOOR
1161' - 0"
THIRD FLOOR
1172' - 1 1/2"
30.9
5/8" GYPSUM BOARD
ON 6" METAL STUDS AT
WINDOW INFILL
CEILING - SEE REFLECTED
CEILING PLANS
INFILL VOID WITH
CONCRETE, SEE
STRUCTURAL
FLOOR SLAB, SEE
STRUCTURAL
ADD ACOUSTICAL
INSULATION INTO
EXISTING STUD WALLS
1' -4
/2
'-1
/2
'-0
FLOOR SLAB, SEE
STRUCTURAL
1' -3
ROOF DECK, SEE
STRUCTURAL
MEMBRANE ROOFING ON
TAPERED INSULATION
5/8" GYPSUM BOARD
ON 6" METAL STUDS AT
WINDOW INFILL
5/8" GYPSUM BOARD
OVER EXISTING STUDS
EXISTING SPRAYED IN
PLACE FOAM INSULATION
6-E
A506K
B6
A502K
B8
5/8" GYPSUM BOARD
OVER EXISTING STUDS
2 HOUR RATED FLOOR
FIRE ASSEMBLY IN 1"
EXPANSION JOINT
1 HOUR RATED ROOF
FIRE ASSEMBLY IN 1"
EXPANSION JOINT
VAPOR BARRIER
T.O. CONCRETE
1173' - 6"
CUT BOTTOM OF
EXISTING PANELS TO
ALIGN WITH FLASHING
AND RE-INSTALL
2" POLYISOCYANURATE
INSULATION
RE-INSTALL EXISTING
PARAPET CAP
SECOND FLOOR
1161' - 0"
THIRD FLOOR
1172' - 1 1/2"
E.01
FACE BRICK AND
COURSING TO
MATCH EXISTING
5/8" EXTERIOR
GYPSUM SHEATHING
AIR AND VAPOR
BARRIER
3" POLYISOCYANURATE
INSULATION
8" BLAST RESISTANT
COLD FORMED STUDS
AT 12" O.C.
CONCRETE CURB,
SEE STRUCTURAL
MEMBRANE ROOFING ON
TAPERED INSULATION
MEMBRANE ROOFING ON
TAPERED INSULATION
5/8" GYPSUM BOARD
SPRAY FIRE
PROOFING
SPRAY FIRE
PROOFING
1' -3
'-1
/2
A502K
F8
A502K
D8
SPRAY FIRE
PROOFING
ROD AND PINTLE
ANCHOR 16" O.C.
AIR SPACE
1'-2"
9/16" METAL DECK OVER
COLD FORMED STUDS
F E.9
FACE BRICK AND
COURSING TO
MATCH EXISTING
WALL PARTITION, SEE
FLOOR PLAN FOR TYPE
8" CONCRETE
BLOCK INFILL
4" CONCRETE
BLOCK INFILL UP
TO ROOF LINE
MEMBRANE ROOFING ON
TAPERED INSULATION
2 HOUR SPRAY FIRE
PROOFING ABOVE 2
HOUR WALL, TYP.
A502K
D6
SIM.
MORTAR CAVITY
FULL TO MATCH
EXISTING
THIRD FLOOR
1172' - 1 1/2"
FOURTH FLOOR
1183' - 3"
T.O. CONCRETE
1173' - 6"
REMOVE EXTERIOR
WALL FROM LINTEL
DOWN TO STRUCTURE
RATED PANEL TO
REMAIN. PATCH AS
REQUIRED AFTER
STUD REMOVAL
REMOVE ROOFING
AND INSULATION
DOWN TO SLAB
REMOVE FLASHING AND
COUNTERFLASHING
BRICK LINTEL AND
FLASHING TO REMAIN,
REMOVE BRICK AND
INSULATION BELOW
THIRD FLOOR
1172' - 1 1/2"
FOURTH FLOOR
1183' - 3"
T.O. CONCRETE
1173' - 6"
REMOVE MASONRY
AND INSULATION
DOWN TO STRUCTURE
REMOVE ROOFING
AND INSULATION
DOWN TO SLAB
REMOVE FLASHING AND
COUNTERFLASHING
BRICK LINTEL AND
FLASHING TO REMAIN,
REMOVE BRICK AND
INSULATION BELOW
FOURTH FLOOR
1183' - 3"
T.O. CONCRETE
1173' - 6"
A503K
F9
A503K
D9
FACE BRICK AND
COURSING TO
MATCH EXISTING
5/8" EXTERIOR
GYPSUM SHEATHING
AIR AND VAPOR
BARRIER
2" POLYISOCYANURATE
INSULATION
6" BLAST RESISTANT
COLD FORMED STUDS
AT 24" O.C.
CONCRETE CURB,
SEE STRUCTURAL
MEMBRANE ROOFING ON
TAPERED INSULATION
MEMBRANE ROOFING ON
TAPERED INSULATION
5/8" GYPSUM BOARD
SPRAY FIRE
PROOFING
SPRAY FIRE
PROOFING
ROD AND PINTLE
ANCHOR 16" O.C.
AIR SPACE
5"
9/16" METAL DECK OVER
COLD FORMED STUDS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
EXPAND PHARMACY AND RADIOLOGY
OSCAR G. JOHNSON VA MEDICAL CENTER
325 H STREET,
IRON MOUNTAIN, MI 49801
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED
Comm. Number: 6163.03
FEBRUARY 5, 2025
585-337
U.S. Department of Veterans Affairs
BID DOCUMENTS
Revisions: Date:
CONSTRUCTION SET 05/08/2023
95% DESIGN SUBMITTAL - REDESIGN 08/23/2024
BID DOCUMENTS 10/11/2024
ADDENDUM 02 02/05/2025
Au to de sk
D oc s:
//O sc ar
G J oh ns on V
A M ed ic al C en te r/O G
JA
R
C H
.rv t
2/ 5/
0:
:0
AM
DPD JAP
A404K
WALL SECTIONS
DWG. 29 OF 134
1/2" = 1'-0"A404K
E9 DEMO WALL SECTION
0 1' 2' 3'6" 1/2" = 1'-0"A404K
E7 NEW WALL SECTION
1/2" = 1'-0"A404K
C5 NEW WALL SECTION
0 1' 2' 3'6"
0 1' 2' 3'6"
1/2" = 1'-0"A404K
B3 STAIR WALL INFILL
0 1' 2' 3'6"
1/2" = 1'-0"A404K
F6 DEMO WALL SECTION
0 1' 2' 3'6" 1/2" = 1'-0"A404K
F4 DEMO WALL SECTION
0 1' 2' 3'6" 1/2" = 1'-0"A404K
F3 NEW WALL SECTION
0 1' 2' 3'6"
1"
MEMBRANE EXPANSION
FLASHING WITH STAINLESS
STEEL FLANGES
AIR AND VAPOR
BARRIER
3" POLYISOCYANURATE
INSULATION
SAWCUT PRECAST
SILL AT 45 DEGREES
SILICONE SEALANT
AND BACKER ROD
SAWCUT BRICK/PRECAST,
REMOVE UP TO LINTEL
ABOVE. ABOVE LINTEL,
REMOVE AND PATCH
BRICK IN AS REQUIRED
TAPE SEAM BETWEEN NEW
AND EXISTING INSULATION
8" CONCRETE BLOCK
BACKER UP TO LINTEL
COMPRESSIBLE
INSULATION
TRANSITION MEMBRANE,
LAP ONTO EXISTING
VAPOR BARRIER
1"
FACE BRICK
PRECAST SILL BELOW
10" CONCRETE WALL,
SEE STRUCTURAL
SET 4" LEGS IN CONT. BEAD
OF SILICONE SEALANT.
FASTEN TO BACKER 32"
O.C. MAXIMUM
REMOVE MASONRY,
INSULATION AND
EXTERIOR SHEATHING
SEALANT AND BACKER ROD.
THIS JOINT SHALL PROVIDE
1/2" OF COMPRESSION OR
EXTENSION MOVEMENT
1' -3
/8
1 1/2" MIN.
REMOVE EXISTING
VAPOR BARRIER
TO CORNER
1"
1"
SILICONE SEALANT
AND BACKER ROD
10" CONCRETE WALL,
SEE STRUCTURAL
AIR AND VAPOR
BARRIER
3" POLYISOCYANURATE
INSULATION
FACE BRICK
CHIP AWAY OR SAWCUT
PRECAST HEADER FLUSH
WITH BRICK
SET 4" LEG IN CONT. BEAD
OF SILICONE SEALANT.
FASTEN TO BACKER 32"
O.C. MAXIMUM
MEMBRANE EXPANSION
FLASHING WITH STAINLESS
STEEL FLANGES
COMPRESSIBLE
INSULATION
EXISTING PRECAST
HEADER BELOW
SEE FOR
DETAIL BELOW
-------------- F5 A501K
SEALANT AND BACKER ROD.
THIS JOINT SHALL PROVIDE
1/2" OF COMPRESSION OR
EXTENSION MOVEMENT
SAWCUT EXISTING MASONRY
1 1/2" DEEP. WEDGE AND
CAULK LEG OF FLASHING
WITH SILICONE SEALANT
1" 8"
1"
PEEL AND STICK AIR
AND VAPOR BARRIER
WRAP OVER PLATE
CHIP AWAY OR SAWCUT
PRECAST SILL FLUSH
WITH BRICK
EXISTING PRECAST
SILL BELOW
SEE FOR
DETAIL ABOVE
-------------- F7 A501K
REMOVE EXISTING
EXTERIOR WALL
BELOW, STARTING AT
INSIDE FACE OF NEW
CONCRETE BLOCK
WALL. SEE DEMO
PLANS
8" CONCRETE BLOCK
IN SAME PLANE AS
EXISTING. ENSURE
EXISTING WALL
BELOW CAN SUPPORT
FACE BRICK IN
SAME PLANE AS
EXISTING, BRICK
AND COURSING TO
MATCH EXISTING
SAWCUT PRECAST
SILL AT 45 DEGREES
5/8" MOLD AND
MOISTURE RESISTANT
GYPSUM BOARD ON
1/2" MOISTURE
RESISTANT PLYWOOD
30% COMPRESSED
FRICTION FIT, MINERAL
WOOL, MIN. 5" LENGTH
SEE FLOOR PLANS
M.O.
REMOVE EXISTING
WINDOW SYSTEM
SEALANT AND BACKER ROD.
THIS JOINT SHALL PROVIDE
1/2" OF COMPRESSION OR
EXTENSION MOVEMENT
STEEL PLATE WITH
FLUID APPLIED
INSULATION COATING,
SEE STRUCTURAL
1/4" BACKER ROD,
CASING BEAD AND
SEALANT
7/8" HAT CHANNELS ON
SHIMS AS REQUIRED
SET 4" LEGS IN
CONT. BEAD OF
SILICONE SEALANT.
FASTEN TO BACKER
32" O.C. MAXIMUM
MEMBRANE
EXPANSION FLASHING
WITH STAINLESS
STEEL FLANGES
MORTAR CAVITY
FULL TO MATCH
EXISTING
5/8" GYPSUM BOARD,
SET FLUSH WITH
EXISTING WALL
1" 8"
1"
PEEL AND STICK AIR
AND VAPOR BARRIER
WRAP OVER STEEL
REMOVE EXISTING SILL
PANEL BELOW TO NORTH
JAMB OF EXISTING
WINDOW. SALVAGE FOR
RE-INSTALLATION
RE-INSTALLED
PRECAST SILL BELOW.
TERMINATE AT 45
DEGREE CUT
SEE FOR DETAIL
ABOVE WINDOW AND
ADDITIONAL NOTES
-------------- F7 A501K
REMOVE EXISTING
EXTERIOR WALL BELOW
TO NORTH JAMB OF
EXISTING WINDOW. SEE
DEMO PLANS
8" NORMAL WEIGHT
CMU IN SAME PLANE
AS EXISTING, SEE
STRUCTURAL
FACE BRICK IN SAME
PLANE AS EXISTING. RUN
TO FOUNDATION AFTER
PRECAST TERMINATION
SAWCUT PRECAST
SILL AT 45 DEGREES
5/8" MOLD AND
MOISTURE RESISTANT
GYPSUM BOARD ON
1/2" MOISTURE
RESISTANT PLYWOOD
5/8" MOLD AND
MOISTURE RESISTANT
GYPSUM BOARD ON
1/2" MOISTURE
RESISTANT PLYWOOD
30% COMPRESSED
FRICTION FIT, MINERAL
WOOL, MIN. 5" LENGTH
SEE FLOOR PLANS
M.O.
M .O
S
EE
W
IN
D
O W
EL
EV
AT
IO
N
S
REMOVE EXISTING
WINDOW SYSTEM
SIM.
SEALANT AND BACKER ROD.
THIS JOINT SHALL PROVIDE
1/2" OF COMPRESSION OR
EXTENSION MOVEMENT
STEEL PLATE WITH
FLUID APPLIED
INSULATION COATING,
SEE STRUCTURAL
1/4" BACKER ROD,
CASING BEAD AND
SEALANT
SLUSH JAMBS FULL
WITH MORTAR
6"
MATCH EXISTING
STEEL TUBE WITH FLUID
APPLIED INSULATION
COATING, SEE STRUCTURAL
1/4" BACKER ROD, CASING
BEAD AND SEALANT
3"
MORTAR CAVITY
FULL TO MATCH
EXISTING
SET 4" LEGS IN
CONT. BEAD OF
SILICONE SEALANT.
FASTEN TO BACKER
32" O.C. MAXIMUM
5/8" EXTERIOR
GYPSUM SHEATHING
8" BLAST RESISTANT
COLD FORMED STUDS
AT 12" O.C.
AIR AND VAPOR
BARRIER
3" POLYISOCYANURATE
INSULATION
9/16" METAL DECK
1"
SET 4" LEG IN CONT. BEAD
OF SILICONE SEALANT.
FASTEN TO BACKER 32"
O.C. MAXIMUM
MEMBRANE EXPANSION
FLASHING WITH STAINLESS
STEEL FLANGES
CLOSE CAVITY WITH
COMPRESSIBLE INSULATION
EXISTING PRECAST HEADER
ABOVE, REMOVE AT NEW
WALL. SEE DEMO PLAN
EXISTING PRECAST SILL
BELOW, REMOVE AT NEW
WALL. SEE DEMO PLAN
SILICONE SEALANT
AND BACKER ROD
SAWCUT EXISTING MASONRY
1 1/2" DEEP. WEDGE AND
CAULK LEG OF FLASHING
WITH SILICONE SEALANT
SEALANT AND BACKER ROD.
THIS JOINT SHALL PROVIDE
1/2" OF COMPRESSION OR
EXTENSION MOVEMENT
1"
1"
FACE BRICK
CASING BEAD
SAWCUT PRECAST SILL
FLUSH WITH FACE BRICK
AIR AND VAPOR
BARRIER
3" POLYISOCYANURATE
INSULATION
FACE BRICK
MEMBRANE EXPANSION
FLASHING WITH STAINLESS
STEEL FLANGES
COMPRESSIBLE
INSULATION
SILICONE SEALANT
AND BACKER ROD
1"
SEALANT AND BACKER ROD.
THIS JOINT SHALL PROVIDE
1/2" OF COMPRESSION OR
EXTENSION MOVEMENT
REMOVE EXISTING
EXTERIOR WALL.
SEE DEMO PLANS
4" CONCRETE BLOCK WITH
TRIANGULAR WALL TIE
10" CONCRETE WALL,
SEE STRUCTURAL
SET 4" LEGS IN CONT. BEAD
OF SILICONE SEALANT.
FASTEN TO BACKER
32" O.C. MAXIMUM
PEEL AND STICK AIR
AND VAPOR BARRIER
(2) HOUR COLUMN
ENCLOSURE. SEE
-------------- E5 A506K
AIR AND VAPOR
BARRIER
3" POLYISOCYANURATE
INSULATION
REMOVE PRECAST SILL
BELOW. SEE DEMO PLANREMOVE PRECAST HEADER
ABOVE. SEE DEMO PLAN
REMOVE BRICK AS
REQUIRED, TOOTH
BACK IN TO MATCH
5/8" EXTERIOR
GYPSUM SHEATHING
8" BLAST RESISTANT
COLD FORMED STUDS
AT 12" O.C.
BACKER ROD AND
SEALANT BOTH SIDES
4" CONCRETE BLOCK
PEEL AND STICK AIR
AND VAPOR BARRIER
SET 4" LEGS IN CONT. BEAD
OF SILICONE SEALANT.
FASTEN TO BACKER 32"
O.C. MAXIMUM
MEMBRANE EXPANSION
FLASHING WITH STAINLESS
STEEL FLANGES
CLOSE CAVITY WITH
COMPRESSIBLE INSULATION
REMOVE EXISTING
WINDOW SYSTEM
9/16" METAL DECK
5/8" GYPSUM BOARD
ON 7/8" HAT CHANNELS
SILICONE SEALANT AND
BACKER ROD, THIS JOINT
SHALL PROVIDE 1/2" OF
COMPRESSION OR
EXTENSION MOVEMENT
FACE BRICK
1"
1"
TERMINATE AGAINST FACE OF WALL.
SEAL TOP EDGE OF FLASHING WITH
TERMINATION MASTIC AND CONTINUOUS
ANCHOR BAR AS SPECIFIED
MEMBRANE FLASHING
EXTEND
MEMBRANE
FLASHING TO FACE
OF MASONRY
INTERLOCKING METAL
FLASHING (STAINLESS
STEEL)
METAL COUNTERFLASHING
(STAINLESS STEEL)
FACE OF MASONRY
5"
4 1/2"
M
IN
IM
U
M A
BO
VE
T O
P O
F C
AV
IT
Y M
ES
H
EX
TE
N D
M
EM
BR
AN
E
FL
AS
H
IN
G
1 3/8"
4 1/2"
5"
1"
RECEIVER AT SAWCUT JOINTS
1/4" BEND AT 45°
INTERLOCKING METAL
IN-WALL RECEIVER
PROVIDE DIMPLE OR
DEFORMED SURFACE
WHERE MASONRY
OCCURS ABOVE
METAL
COUNTERFLASHING
ROOF DRAIN
4'-0" x 4'-0" DRAIN SUMP
1/2" PROTECTION
BOARD
TAPERED
EDGE STRIPS
VAPOR RETARDER5/8" GYPSUM UNDERLAYMENT
AT METAL DECK
INSULATION AT DRAIN SUMP
5" M
IN
IM
U M
1/4" PER FOOT
TAPERED INSULATION
MEMBRANE
FLASHINGAIR AND VAPOR
BARRIER (SHOWN
DASHED)
3" POLYISOCYANURATE
INSULATION
FACE BRICK
WEEP 24" O.C.
CAVITY MESH
-------------- B9 A501K
STAINLESS STEEL
FLASHING WITH
HEMMED EDGE
5/8" GYPSUM BOARD
TERMINATION BAR AND
SEALANT BY MEMBRANE
FLASHING MANUFACTURER
LOOSE LINTEL,
SEE STRUCTURAL
COLD FORMED STUD
OR STEEL TUBE, SEE
STRUCTURAL
CLOSE CAVITY WITH 30%
COMPRESSED FRICTION
FIT MINERAL WOOL
1/4" BACKER ROD AND
SILICONE SEALANT,
BOTH SIDES
AIR AND VAPOR
BARRIER (SHOWN
DASHED)
SILL TRIM WITH HOLD
DOWN CLIP BY METAL
PANEL MANUFACTURER
2"
LOUVER
6" ALUM.
PEEL AND STICK AIR
AND VAPOR BARRIER
5/8" TEAR AWAY BEAD,
MUDDED IN AND PAINTED
5/8" TEAR AWAY BEAD,
MUDDED IN AND PAINTED
COLD FORMED STUD
OR STEEL TUBE, SEE
STRUCTURAL
BIRD SCREEN
2"X1"X1/8" ALUMINUM ANGLE
AT HEAD, JAMB AND SILL
CLOSE CAVITY WITH 30%
COMPRESSED FRICTION
FIT MINERAL WOOL
PEEL AND STICK AIR
AND VAPOR BARRIER
SHIM, 1/4" BACKER ROD
AND SILICONE SEALANT
COLD FORMED STUD
OR STEEL TUBE, SEE
STRUCTURAL
FILL IN STEEL TUBE WITH
FOAM INSULATION PRIOR
TO INSTALLATION OF
TUBE FRAMING, TYP.
AIR AND VAPOR
BARRIER (SHOWN
DASHED)
CLOSE CAVITY WITH 30%
COMPRESSED FRICTION
FIT MINERAL WOOL
5/8" TEAR AWAY BEAD,
MUDDED IN AND PAINTED
2"X1"X1/8" ALUMINUM ANGLE
AT HEAD, JAMB AND SILL
PENTHOUSE SILL AND HEAD
PENTHOUSE JAMB
9/16" METAL DECK
EXTRUDED TRIM
BIRD SCREEN
METAL SILL BY
WALL PANEL
MANUFACTURER
FOUNDATION
WALL, SEE
STRUCTURAL
1/4" BACKER ROD AND
SILICONE SEALANT,
BOTH SIDES
2" PERIMETER INSULATION
WEEP HOLES, 32" O.C.
CLOSED CELL FOAM IN
PLACE INSULATION
ALUMINUM FLUSH PANEL
VERTICAL JOINTS
FLASHING
DRIP EDGE
20 GA. CONTINUOUS
ALUMINUM PROTECTION
PANEL TO MATCH
FLUSH PANEL COLOR
CONCRETE SILL
CONCRETE JAMB
CONCRETE HEAD
LOUVER
6" ALUM.
1/4" BACKER ROD AND
SILICONE SEALANT,
BOTH SIDES
CONCRETE ANCHORS
AND CONTINUOUS
BEAD OF SEALANT
2" PERIMETER
INSULATION BETWEEN
16 GAUGE Z-CLIPS.
COORDINATE WITH
PANEL MANUFACTURER
SEAL JOINT AT
FOLDED END
DAM
DISTANCE PAST OPENING
SHALL MATCH END BEARING
OF LINTEL
2" MINIMUM
2" MIN.
METAL DRIP EDGE
MEMBRANE
FLASHING
SUBSTRATE VARIES,
SEE DETAILS.
CONCRETE SHOWN
THIS DETAIL IS TYPICAL FOR ALL END DAM CONDITIONS. PROVIDE
AT ALL OPENING HEADS AND SILLS WHERE APPLICABLE
4"
NTS
8'-0" MAX.
1' -6
1'
-8
1 1/2" I.D. STEEL PIPE WITH
WELDED CONNECTIONS
VERTICALS TO BE SPACED
EQUAL AND CENTERED ON
WALL BELOW
2 1/2" x 6" DEEP PIPE
SLEEVE AND ALCOVE
COLLAR WITH
2 SET SCREWS
W
AL
L
PRECAST
ARCHITECTURAL
CONCRETE
PRECAST
ARCHITECTURAL
CONCRETE WITH
DRIP EDGE
4" 1"
DOVETAIL SPLIT BEND
STONE ANCHOR AT 48" O.C.
(2 MIN. PER PANEL) SET IN
EPOXY FILLED SLOT
2"
FACE BRICK AND
COURSING TO
MATCH EXISTING
DOVETAIL TRAINGULAR
ANCHOR 16" O.C.
DOVETAIL INSERTS
AT 16" O.C.
8"
1/2"
ROD AND SEALANT
EXTEND JOINT
FILLER TO
CLOSE CAVITY
SEE WALL SECTION
FOR LOCATION OF
INSULATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
EXPAND PHARMACY AND RADIOLOGY
OSCAR G. JOHNSON VA MEDICAL CENTER
325 H STREET,
IRON MOUNTAIN, MI 49801
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED
Comm. Number: 6163.03
FEBRUARY 5, 2025
585-337
U.S. Department of Veterans Affairs
BID DOCUMENTS
Revisions: Date:
CONSTRUCTION SET 05/08/2023
95% DESIGN SUBMITTAL - REDESIGN 08/23/2024
BID DOCUMENTS 10/11/2024
ADDENDUM 02 02/05/2025
Au to de sk
D oc s:
//O sc ar
G J oh ns on V
A M ed ic al C en te r/O G
JA
R
C H
.rv t
2/ 5/
0:
:1
AM
DPD JAP
A501K
EXTERIOR DETAILS
DWG. 34 OF 134
1 1/2" = 1'-0"A501K
F8 NEW TO EXISTING DETAIL - AT CORNER
0 2" 4" 8" 12" 1 1/2" = 1'-0"A501K
F7 NEW TO EXISTING DETAIL - ABOVE WINDOW
0 2" 4" 8" 12" 1 1/2" = 1'-0"A501K
F5 NEW TO EXISTING DETAIL - AT WINDOW
0 2" 4" 8" 12" 1 1/2" = 1'-0"A501K
F3 NEW TO EXISTING DETAIL - AT WINDOW
0 2" 4" 8" 12"
1 1/2" = 1'-0"A501K
D6 NEW TO EXISTING DETAIL - AT PENTHOUSE
0 2" 4" 8" 12"
1 1/2" = 1'-0"A501K
F1 NEW TO EXISTING DETAIL - AT CORNER
0 2" 4" 8" 12"
0 2" 4" 8" 12"
1 1/2" = 1'-0"A501K
D9 NEW TO EXISTING DETAIL - AT PENTHOUSE
0 2" 4" 8" 12"
3" = 1'-0"A501K
B9 MEMBRANE FLASHING
0 1" 2" 4" 6"
1 1/2" = 1'-0"A501K
B8 FLASHING - ISO
0 2" 4" 8" 12"
1 1/2" = 1'-0"A501K
C7 TYPICAL ROOFING AT DRAIN SUMP
0 2" 4" 8" 12"
1 1/2" = 1'-0"A501K
C1 LOUVER IN BRICK WALL
0 2" 4" 8" 12"
1 1/2" = 1'-0"A501K
C2 LOUVER IN CONCRETE WALL
0 2" 4" 8" 12"
ATTACHMENT OF LOUVERS,
WINDOWS AND DOORS TO
SUPPORTING ELEMENTS SHALL
BE DESIGNED TO MEET BLAST,
BULLET RESISTANT, AND
FORCED ENTRY REQUIREMENTS
AS OUTLINED IN PROJECT
SPECIFICATIONS.
WHERE "FLUID APPLIED INSULATION COATING" IS
LISTED BELOW, ALL PARTS OF THE STEEL LINTEL
AND STEEL SUPPORT STRUCTURE SHALL BE
COATED ON ALL FACES WITH FLUID APPLIED
INSULATION COATING. SECTIONS OF THE LINTEL
SYSTEM EXPOSED TO VIEW UPON COMPLETION OF
ASSEMBLY SHALL RECEIVE TOP COAT AS SPECIFIED
UNDER FLUID APPLIED INSULATION COATING
1 1/2" = 1'-0"A501K
B5 FLASHING END DAM
1/2" = 1'-0"A501K
D1 TYPICAL AREAWAY RAIL
1 1/2" = 1'-0"A501K
D2 TYPICAL PRECAST BASE / SILL DETAIL
0 2" 4" 8" 12"0 1' 2' 3'6"
0 2" 4" 8" 12"
1 1/2" = 1'-0"A501K
B7 CONTROL JOINT
SECOND FLOOR
1161'-0"
GRID
VAPOR RETARDER
(SHOWN DASHED)
SPRAY
FIREPROOFING
CONCRETE CURB,
SEE STRUCTURAL
RESINOUS FLOORING
SYSTEM WITH SEALANT
SPOON COVES, TYP.
FILL VOID WITH
POLYISO INSULATION
CAVITY MESH
MEMBRANE FLASHING,
SEE
WEEP 24" O.C.
5/8" EXTERIOR
GYPSUM SHEATHING
-------------- B9 A501K
COUNTER FLASHING AND
RECEIVER WITH
INTERLOCKING SEAM
4" CONCRETE BLOCK
INFILL (2) COURSES
8" M
IN
1'-2"
FACE BRICK
3" POLYISOCYANURATE
INSULATION AIR AND VAPOR
BARRIER (SHOWN
DASHED)
MEMBRANE ROOFING
6" REINFORCED
TERMINATION STRIP WITH
SINGLE PLY MEMBRANE
ANCHOR DISCS AT 12" O.C.
TAPERED ROOFING
INSULATION
5/8" GYPSUM
BOARD
8" BLAST RESISTANT
COLD FORMED
STUDS AT 12" O.C.
9/16" METAL DECK
T.O. DECK
1173'-4 1/2"
2 10
GRID
8" BLAST RESISTANT
COLD FORMED
STUDS AT 12" O.C.
CLEAR ANODIZED
ALUMINUM FASCIA
WITH 8" FACE HEIGHT
MINERAL WOOL INSULATION
VERTICAL SLIDE CLIP
AT EACH STUD
1/2" TREATED PLYWOOD
VAPOR RETARDER
ON 5/8" GYPSUM
UNDERLAYMENT
MEMBRANE ROOFING
TAPERED ROOF
INSULATION
TAPERED EDGE STRIP
SELF-TAPPING
SCREWS AT 24" O.C.
SECURE MINERAL WOOL IN
PLACE WITH POULTRY NETTING
OR OTHER SIMILAR MATERIALS
VE
R
IF
Y
7/
8"
5/8" GYPSUM BOARD
1/2" PLYWOOD ON 2 1/2"
GALVANIZED STUDS
AND STUD RUNNER
1"
1/
2"
1'-2"
3" POLYISOCYANURATE
INSULATION
5/8" EXTERIOR
GYPSUM SHEATHING
AIR AND VAPOR BARRIER
(SHOWN DASHED)
TRANSITION MEMBRANE
OVER CONT. 4" X 4" X 12
GAUGE BENT PLATE
POLYPROPYLENE
ROD
6 MIL. POLYTHEYLENE VAPOR
BARRIER BAG. FILL WITH
COMPRESSIBLE INSULATION,
PROVIDE SLACK FOR MOVEMENT
1"CAVITY VENT 24" O.C.
9/16" METAL DECK
8" M
IN
THIRD FLOOR
1172'-1 1/2"
COUNTER FLASHING AND
RECEIVER WITH INTERLOCKING
SEAM AND UPTURNED LEG
2" DIAMETER
POLYPROPYLENE ROD
6 MIL. POLYTHEYLENE VAPOR
BARRIER BAG. SECURE TO WALL
WITH TERM. BAR AND SEALANT.
LAP ONTO BLOCKING 2"
ROOF MEMBRANE
SAWCUT EXISTING MASONRY
1 1/2" DEEP. WEDGE AND
CAULK LEG OF FLASHING
WITH SILICONE SEALANT
ENSURE STONE SILL REMAINS
SECURELY IN PLACE
T.O. DECK
1173'-4 1/2"
1"
SEE
(2) HOUR FIRESTOPPING
IN DECK FLUTES
FIRESTOPPING, SEE
FOR TYPICAL NOTE -------------- C6
A506K
MINIMUM 5" DEEP
CONCRETE INFILL
-------------- C7
AR102K
(1) HOUR SPRAY
FIREPROOFING
ON ROOF BEAMS
FILL BAG WITH
COMPRESSIBLE INSULATION
TAPERED ROOF INSULATION
VAPOR RETARDER
5/8" GYPSUM
UNDERLAYMENT
1"
3/4" PLYWOOD
AND BLOCKING
AS REQUIRED
8" M
IN
SURFACE MOUNTED STAINLESS
STEEL FLASHING
2" DIAMETER
POLYPROPYLENE ROD
6 MIL. POLYTHEYLENE VAPOR
BARRIER BAG. SECURE TO WALL
WITH TERM. BAR AND SEALANT.
LAP ONTO BLOCKING 2"
ROOF MEMBRANE
CONTINUOUS SILICONE SEALANT
FILL BAG WITH COMPRESSIBLE
INSULATION
TAPERED ROOF INSULATION
VAPOR RETARDER
SECOND FLOOR
1161'-0"
SPRAY FIRE PROOFING
1"
MINIMUM 5" DEEP
CONCRETE INFILL
2 HOUR RATED FLOOR
FIRE ASSEMBLY IN 1"
EXPANSION JOINT. THIS
JOINT SHALL PROVIDE 1/2"
OF COMPRESSION OR
EXTENSION MOVEMENT
3/4" PLYWOOD,
BLOCKING AND CLIP
ANGLE AS REQUIRED
8" M
IN
SECOND FLOOR
1161'-0"
SURFACE MOUNTED STAINLESS
STEEL FLASHING
2" DIAMETER
POLYPROPYLENE ROD
6 MIL. POLYTHEYLENE VAPOR
BARRIER BAG. SECURE TO WALL
WITH TERM. BAR AND SEALANT.
LAP ONTO BLOCKING 2"
ROOF MEMBRANE
REMOVE FACE BRICK AS REQUIRED
TO INSTALL NEW FLASHING. RETAIN
FACE BRICK TO BE REINSTALLED
UPON COMPLETED INSTALLATION
OF FLASHING. REINSTALL SALVAGED
FACE BRICK TO MATCH ADJACENT
CAVITY MESH
MEMBRANE FLASHING
LAP EXISTING VAPOR BARRIER
OVER LAP MEMBRANE
PATCH RIGID INSULATION. TAPE
SEAM TO ENSURE CONTINUITY
OF INSULATION
WEEP 24" O.C.
FILL BAG WITH COMPRESSIBLE
INSULATION
TAPERED ROOF INSULATION
VAPOR RETARDER
LEAVE (3) BRICK COURSES
OUT FOR NEW CONCRETE
NEW CONCRETE EDGE
ON EXISTING ANGLE
2 HOUR RATED FLOOR
FIRE ASSEMBLY IN 1"
EXPANSION JOINT. THIS
JOINT SHALL PROVIDE 1/2"
OF COMPRESSION OR
EXTENSION MOVEMENT
TEMPORARILY SUPPORT MASONRY
ABOVE DURING REMOVAL AND
REPLACEMENT OF MASONRY BELOW
TOP TO BE AT
UNDERSIDE OF NEXT
BRICK COURSE
SPRAY FIRE PROOFING
4" CONCRETE BLOCK
INFILL UP TO ROOF LINE
1"
SPRAY FIRE PROOFING
1' -0
FILL VOID WITH
POLYISO INSULATION
3/4" PLYWOOD,
BLOCKING AND CLIP
ANGLE AS REQUIRED
FIRST FLOOR
1148'-0"
STAINLESS STEEL
FLASHING WITH
HEMMED EDGE
USE 1/4" DOWEL SHIM TO
CREATE WEEP 24" O.C.
CAVITY MESH
MEMBRANE
FLASHING
PRECAST
ARCHITECTURAL
CONCRETE
3" POLYISOCYANURATE
INSULATION
GRADE
5" CONCRETE
STUB WALL, SEE
STRUCTURAL
FOR REMAINDER OF
NOTES, SEE
3" POLYISOCYANURATE
INSULATION
2' -0
AIR AND VAPOR
BARRIER (SHOWN
DASHED) LAP ONTO
MEMBRANE FLASHING
FOUNDATION WALL,
SEE STRUCTURAL
FLOOR SLAB, SEE
STRUCTURAL
-------------- D2 A502K
VAPOR BARRIER
1/2" X 4" LONG STAINLESS
STEEL DOWELS AT 48" O.C.
(2 MIN. PER PANEL) SET IN
EPOXY FILLED FIELD
DRILLED HOLES - SEAL
AROUND PENETRATIONS
THROUGH FLASHING
-------------- B9 A501K
SECOND FLOOR
1161'-0"
3" POLYISOCYANURATE
INSULATION
AIR AND VAPOR
BARRIER (SHOWN
DASHED)
CLEAR ANODIZED
ALUMINUM FASCIA
WITH 8" FACE HEIGHT
CAVITY VENT 24" O.C.
MEMBRANE ROOFING
TAPERED ROOF INSULATION
6" REINFORCED TERMINATION STRIP WITH SINGLE
PLY MEMBRANE ANCHOR DISCS AT 12" O.C.
FACE BRICK
VAPOR RETARDER
WALL TIES
AT 16" O.C.
10" CONCRETE WALL,
SEE STRUCTURAL
DOVETAIL INSERTS
AT 16" O.C.SPRAY FIREPROOFING
1/2" TREATED PLYWOOD
ON CUT 2 X 4 FRAMING
TOP OF ROOF BEYOND
VE
R
7"
TRANSITION MEMBRANE
STAINLESS STEEL FLASHING WITH 1/2"
HEMMED EDGE, SET ONTO CONCRETE
STUB WALL WITH 1/2" DEEP SILICONE
SEALANT JOINT AND GROUT BED TO
CREATE A POSITIVE DRAINAGE
2" PERIMETER INSULATION
WITHIN 2" OF GRADE TO TOP
OF FOOTING. MIN. 8"
INSULATION OVERLAP
5" CONCRETE STUB
WALL, SEE STRUCTURAL
3" POLYISOCYANURATE
INSULATION
SHEET WATERPROOFING,
FROM TOP OF INSULATION
TO OVER THE TOP OF THE
FOOTING
MIN. 12" WIDE DRAINAGE FILL
FROM 6" BELOW GRADE TO
FOOTING. PROVIDE 4"
TOPSOIL COVER.
8" 10"
MEMBRANE FLASHING
STAINLESS STEEL TERMINATION
BAR AND SILICONE SEALANT
8" L
AP
M
IN
IM
U M
1/4" DOWEL SHIM AT 24" O.C. TO CREATE
WEEP. PROVIDE MORTAR BED, SET
STONE AND STRIKE JOINT. REMOVE
DOWEL SHIM TO CREATE WEEP
RUB OUT FLAWS IN CONCRETE
LARGER THAN 1/4" AT EXPOSED FACES
MORTAR WASH
2" DIAMETER
POLYPROPYLENE ROD
6 MIL. POLYTHEYLENE VAPOR
BARRIER BAG. SECURE TO WALL
WITH TERM.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .