This document is a VA Form 08-6231 Room Finish Schedule for an EHRM (Enterprise Health Records Management) project in Murfreesboro, TN. The document includes a project timeline with key design milestones spanning from May 2023 to January 2024, including Schematic Design I (25%) on May 01, 2023, and Final Bid Documents (100%) on January 29, 2024. The detailed room finish schedule lists multiple buildings (MCR, 001, 002, etc.) across ground and multiple floors, specifying room numbers, names, ceiling finishes, wall finishes for each directional wall (North, East, South, West), base finishes, and floor finishes. Most rooms have consistent finish types (PT-1, INP-1) with some rooms marked as "EXISTING" or "OPEN", suggesting a renovation or mixed-use project involving both new construction and preservation of existing spaces.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
STAMP
LOCATION
''1
SCHEMATIC DESIGN I (25%) MAY 01, 2023 CONSULTANT
GDM of Oregon
1000 W. STEUBEN ST., UNIT 3
BINGEN, WA 98605
P: 541.436.4723
ADAM GODDIN, PE
WWW.GDM-AE.COM
01-29-24
FULLY
SPRINKLED
FOR OFFICIAL USE ONLY (FOUO)
SCHEMATIC DESIGN II (35%) JULY 27, 2023
DESIGN DEVELOPMENT (65%) OCTOBER 05, 2023
CONSTRUCTION DOCUMENTS (95%) NOVEMBER 16, 2023
FINAL BID DOCUMENTS (100%) JANUARY 29, 2024
A u to d e s k D o c s /2
-0
E
H R
M M u rf re e s b o ro T
N /2
-0
E H
R M
M
U R
F R
E E
S B
O R
O S
IT
E
A rc h P ro d u c ti o n
-R
.r v t
AG-050
FINISH SCHEDULE & DETAILS
MA,ES AM,BS,VZ
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM) INFRASTRUCTURE
UPGRADES
100% FINAL BID
DOCUMENTS
626A4-22-700
3400 LEBANON PIKE, MURFREESBORO, TN., 37129-1237
WP-1 WALL PROTECTION WHERE INDICATED FORMICA HARDSTOP WALL... 5887h-58... ORIENT... PROFILES FOR INSIDE, DIVISION BAR AND END CAP TO MATCH
TD-2 FLOOR TRANSITION RESILIENT FLOOR TO CONCRETE SHAW CONTRACT TRIMMASTER... 142CA DARK... FOR 1.5MM TO 3.5MM HEIGHTS SDT STATIC DISSIPATIVE TILE AS CALLED FOR ON SCHEDULE STATIC WORKS AMERIWORK ROX... SPRING SNOW 12" X 12"
RB-1 RUBBER BASE TYPICAL THOROUGH OUT TARKETT BASEWORKS... 63 BURNT UMBER 6" WITH TOE
PT-3 PAINT AT HM DOOR FRAMES SHERWIN... PROMAR 200 ZER... MATCH EXISITNG GLOSS FINISH - MATCH EXISITNG DOOR FRAME COLOR AND SCHEEN
PT-1 PAINT TYPICAL THOURGH OUT SHERWIN... PROMAR 200 ZER... WHITE / GLOSS
INPT-1 FIRE RETARDANT COATING AT TR AND TE PLYWOOD WALLS TYP. SHERWIN... FIRE RETARDANT EXTREME WHITE... GLOSSY SHEEN - LEAVE EXPOSED ONE FIRE RATING STAMP FOR EAC...
CONC-1 SEALED CONCRETE TYPICAL THROUGHT OUT UNLESS OTHERWISE... SEE... SEE SPECIFICATION SEE SPECIFICATION
MATER... MATERIAL TYPE APPLICATION INCLUDES BUT NOT LIMITED TO MANUFACTURE PRODUCT SYTLE /... COLOR / FINISH DIMENSIO... REMARKS
FINISH LEGEND
146 GROUND 102 TE EXISTING PT-1 INPT-1 INPT-1 INPT-1 EXISTING EXISTING
118 GROUND 3A TE EXISTING EXISTING EXISTING EXISTING INPT-1 EXISTING EXISTING
116 GROUND A121A TR OPEN INPT-1 PT-1 INPT-1 INPT-1 RB-1 SDT-1
106 GROUND 154 TR OPEN INPT-1 PT-1 INPT-1 INPT-1 RB-1 SDT-1
017 GROUND 155 TE EXISTING PT-1 PT-1 PT-1 PT-1 EXISTING EXISTING
015 GROUND 105U TE OPEN INPT-1 PT-1 INPT-1 INPT-1 RB-1 SDT-1
013 GROUND 13 TE PT-1 PT-1 PT-1 PT-1 PT-1 EXISTING EXISTING
011 SECOND 222A TR OPEN PT-1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1
011 FIRST 116C TR OPEN INPT-1 INPT-1 PT-1 INPT-1 RB-1 SDT-1
010 SECOND 213 TR OPEN PT-1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1
009 SECOND 240 TR OPEN INPT-1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1
009 FIRST 100A TR OPEN INPT-1 PT-1 INPT-1 INPT-1 RB-1 SDT-1
009 GROUND G01 TR OPEN PT-1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1
008 SECOND 200A TR OPEN INPT-1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1
008 FIRST 151A TR OPEN PT-1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1
008 GROUND G31A TR OPEN PT-1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1
007 SECOND 200A TR OPEN INPT-1 INPT-1 INPT-1 PT-1 RB-1 SDT-1
007 FIRST 147 TR OPEN INPT-1 INPT-1 INPT-1 PT-1 RB-1 SDT-1
007 GROUND G01 TR OPEN INPT-1 INPT-1 INPT-1 PT-1 RB-1 SDT-1
006 SECOND 273 TR OPEN PT-1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1
006 FIRST 171 TR OPEN PT-1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1
006 GROUND G25 TR OPEN PT-1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1
005 SECOND 212 TR OPEN PT-1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1
005 FIRST 110 TR OPEN PT-1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1
005 GROUND G28A TR OPEN EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING
004 FIRST 113E TR OPEN PT1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1
003 FIRST 102 TR OPEN INPT-1 INPT-1 PT-1 INPT-1 RB-1 SDT-1
003 GROUND G01 TR OPEN INPT-1 INPT-1 PT-1 INPT-1 RB-1 SDT-1
002 FIRST 105H TR OPEN INPT-1 PT-1 INPT-1 INPT-1 RB-1 SDT-1
002 GROUND G20B TR OPEN INPT-1 PT-1 INPT-1 INPT-1 RB-1 SDT-1
001 FOURTH 411 TE PT-1 PT-1 PT-1 PT-1 EXISTING EXISTING EXISTING
001 THIRD B316 TR OPEN EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING
001 SECOND A237 TR OPEN EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING
001 FIRST 128 TR OPEN INPT-1 INPT-1 PT-1 INPT-1 RB-1 SDT-1
001 GROUND G23G TR OPEN INPT-1 INPT-1 PT-1 INPT-1 RB-1 SDT-1
MCR GROUND 11 ELECTRICAL PT-1 PT-1 PT-1 PT-1 PT-1 RB-1 CONC-1
MCR GROUND 10 FIRE ROOM PT-1 PT-1 PT-1 PT-1 PT-1 RB-1 CONC-1
MCR GROUND 09 MECHANICAL PT-1 PT-1 PT-1 PT-1 PT-1 RB-1 CONC-1
MCR GROUND 08 ELECTRICAL PT-1 PT-1 PT-1 PT-1 PT-1 RB-1 CONC-1
MCR GROUND 07 STORAGE ROOM PT-1 PT-1 PT-1 PT-1 PT-1 RB-1 CONC-1
MCR GROUND 06 CORRIODOR PT-1 PT-1 PT-1 PT-1 PT-1 RB-1 CONC-1
MCR GROUND 05 STAGING AREA PT-1 PT-1 PT-1 PT-1 PT-1 RB-1 CONC-1
MCR GROUND 04 ENTRANCE ROOM B PT-1 INPT-1 INPT-1 PT-1 INPT-1 RB-1 SDT-1
MCR GROUND 03 SMALL DATA CENTER PT-1 PT-1 PT-1 PT-1 PT-1 RB-1 SDT-1
MCR GROUND 02 ENTRANCE ROOM A PT-1 INPT-1 INPT-1 PT-1 INPT-1 RB-1 SDT-1
MCR GROUND 01 HAC PT-1 PT1/WP1 PT1 PT1/WP1 PT1/WP1 RB-1 CONC-1
BULDING LEVEL NUMBER NAME
CEILING
FINISH
WALL FINISH
NORTH
WALL FINISH
EAST
WALL FINISH
SOUTH
WALL FINISH
WEST
BASE FINISH FLOOR FINISH
ROOM FINSH SCHEDULE
Revisions: Date:
| Sheets |
| AG-050 - FINISH SCHEDULE & DETAILS |
File details come from the government source that posted it. Updated .