Q319 - AG-050 - FINISH SCHEDULE.pdf

PDF 187 KB Posted

Attached to
Z2DA--626A4-22-700 EHRM Infrastructure Upgrades Construction Murfreesboro, TN Federal contract opportunity
Solicitation number
36C77625R0066_1
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document is a VA Form 08-6231 Room Finish Schedule for an EHRM (Enterprise Health Records Management) project in Murfreesboro, TN. The document includes a project timeline with key design milestones spanning from May 2023 to January 2024, including Schematic Design I (25%) on May 01, 2023, and Final Bid Documents (100%) on January 29, 2024. The detailed room finish schedule lists multiple buildings (MCR, 001, 002, etc.) across ground and multiple floors, specifying room numbers, names, ceiling finishes, wall finishes for each directional wall (North, East, South, West), base finishes, and floor finishes. Most rooms have consistent finish types (PT-1, INP-1) with some rooms marked as "EXISTING" or "OPEN", suggesting a renovation or mixed-use project involving both new construction and preservation of existing spaces.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--626A4-22-700 EHRM Infrastructure Upgrades Construction Murfreesboro, TN, newest first.
File Type Posted
36C77625R0066 0005.docx DOCX document
Q102 - VHA PCRA - Final Template.pdf PDF
Q102 - VHA ICRA - Final Template.pdf PDF
Indepth Murf Pkg Impr Geophysics Terracon Geo Eng Rpt 18195130.pdf PDF
20221107 VA Murfreesboro Master Planning Site Survey.pdf PDF
Q26 - 13 05 41 - SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS.pdf PDF
PSI Report 0358839 - Murfreesboro VA Hospital Murfreesboro TN.pdf PDF
36C77625R0066 0004.docx DOCX document
Q345 - 08 33 00 Coiling Doors and Grilles.pdf PDF
Q333 - Trench Details.pdf PDF
Q319 - TELECOM ROOM SUMMARY.pdf PDF
Q14 - 01 91 00 General Commissioning Requirements.pdf PDF
18-407 Murfreesboro Parking Lot Improvements Revision 1 Geotechnical Report..pdf PDF
Q319 - EHRM SCOPE OF WORK.pdf PDF
Responses to Technical Questions_Murfreesboro EHRM 8_19_2025.pdf PDF
626A4_22_700_Murfreesboro_EHRM_Geo_Report_18235020.pdf PDF
36C77625R0066 0003.docx DOCX document
Completed Site Visit Sign-in Sheet.pdf PDF
36C77625R0066 0002.docx DOCX document
Updated Price Schedule.docx DOCX document
36C77625R0066 0001.docx DOCX document
ATT 14 - Site Visit Instructions Revised.docx DOCX document
ATT 14 - Site Visit Instructions.docx DOCX document
ATT 12 - Wage Determination - Rutherford County 6-6-2025.pdf PDF
ATT 11 - Limitations on Subcontracting - Construction.docx DOCX document
ATT 7 - 626A4-22-700 - DWG VOL 3.pdf PDF
ATT 2 - 626A4-22-700 - Final Bid Docs Specs VOL 2-R1.pdf PDF
36C77625R0066_1.docx DOCX document
ATT 4 - 626A4-22-700 - Final Bid Docs Specs VOL 4-R1.pdf PDF
ATT 3 - 626A4-22-700 - Final Bid Docs Specs VOL 3-R1.pdf PDF
ATT 1 - 626A4-22-700 - Final Bid Docs Specs VOL 1-R1.pdf PDF
ATT 9 - 626A4-22-700 - ICRA-PCRA Summary.pdf PDF
ATT 8 - 626A4-22-700 - DWG VOL 4.pdf PDF
ATT 5 - 626A4-22-700 - DWG VOL 1.pdf PDF
ATT 13 - PPQ - Murf EHRM.docx DOCX document
ATT 10 - 626A4-22-700 - Asbestos-Lead Paint Survey.pdf PDF
ATT 6 - 626A4-22-700 - DWG VOL 2.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

STAMP

LOCATION

''1

SCHEMATIC DESIGN I (25%) MAY 01, 2023 CONSULTANT

GDM of Oregon

1000 W. STEUBEN ST., UNIT 3

BINGEN, WA 98605

P: 541.436.4723

ADAM GODDIN, PE

WWW.GDM-AE.COM

01-29-24

FULLY

SPRINKLED

FOR OFFICIAL USE ONLY (FOUO)

SCHEMATIC DESIGN II (35%) JULY 27, 2023

DESIGN DEVELOPMENT (65%) OCTOBER 05, 2023

CONSTRUCTION DOCUMENTS (95%) NOVEMBER 16, 2023

FINAL BID DOCUMENTS (100%) JANUARY 29, 2024

A u to d e s k D o c s /2

-0

E

H R

M M u rf re e s b o ro T

N /2

-0

E H

R M

M

U R

F R

E E

S B

O R

O S

IT

E

A rc h P ro d u c ti o n

-R

.r v t

AG-050

FINISH SCHEDULE & DETAILS

MA,ES AM,BS,VZ

ELECTRONIC HEALTH RECORD

MODERNIZATION (EHRM) INFRASTRUCTURE

UPGRADES

100% FINAL BID

DOCUMENTS

626A4-22-700

3400 LEBANON PIKE, MURFREESBORO, TN., 37129-1237

WP-1 WALL PROTECTION WHERE INDICATED FORMICA HARDSTOP WALL... 5887h-58... ORIENT... PROFILES FOR INSIDE, DIVISION BAR AND END CAP TO MATCH

TD-2 FLOOR TRANSITION RESILIENT FLOOR TO CONCRETE SHAW CONTRACT TRIMMASTER... 142CA DARK... FOR 1.5MM TO 3.5MM HEIGHTS SDT STATIC DISSIPATIVE TILE AS CALLED FOR ON SCHEDULE STATIC WORKS AMERIWORK ROX... SPRING SNOW 12" X 12"

RB-1 RUBBER BASE TYPICAL THOROUGH OUT TARKETT BASEWORKS... 63 BURNT UMBER 6" WITH TOE

PT-3 PAINT AT HM DOOR FRAMES SHERWIN... PROMAR 200 ZER... MATCH EXISITNG GLOSS FINISH - MATCH EXISITNG DOOR FRAME COLOR AND SCHEEN

PT-1 PAINT TYPICAL THOURGH OUT SHERWIN... PROMAR 200 ZER... WHITE / GLOSS

INPT-1 FIRE RETARDANT COATING AT TR AND TE PLYWOOD WALLS TYP. SHERWIN... FIRE RETARDANT EXTREME WHITE... GLOSSY SHEEN - LEAVE EXPOSED ONE FIRE RATING STAMP FOR EAC...

CONC-1 SEALED CONCRETE TYPICAL THROUGHT OUT UNLESS OTHERWISE... SEE... SEE SPECIFICATION SEE SPECIFICATION

MATER... MATERIAL TYPE APPLICATION INCLUDES BUT NOT LIMITED TO MANUFACTURE PRODUCT SYTLE /... COLOR / FINISH DIMENSIO... REMARKS

FINISH LEGEND

146 GROUND 102 TE EXISTING PT-1 INPT-1 INPT-1 INPT-1 EXISTING EXISTING

118 GROUND 3A TE EXISTING EXISTING EXISTING EXISTING INPT-1 EXISTING EXISTING

116 GROUND A121A TR OPEN INPT-1 PT-1 INPT-1 INPT-1 RB-1 SDT-1

106 GROUND 154 TR OPEN INPT-1 PT-1 INPT-1 INPT-1 RB-1 SDT-1

017 GROUND 155 TE EXISTING PT-1 PT-1 PT-1 PT-1 EXISTING EXISTING

015 GROUND 105U TE OPEN INPT-1 PT-1 INPT-1 INPT-1 RB-1 SDT-1

013 GROUND 13 TE PT-1 PT-1 PT-1 PT-1 PT-1 EXISTING EXISTING

011 SECOND 222A TR OPEN PT-1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1

011 FIRST 116C TR OPEN INPT-1 INPT-1 PT-1 INPT-1 RB-1 SDT-1

010 SECOND 213 TR OPEN PT-1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1

009 SECOND 240 TR OPEN INPT-1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1

009 FIRST 100A TR OPEN INPT-1 PT-1 INPT-1 INPT-1 RB-1 SDT-1

009 GROUND G01 TR OPEN PT-1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1

008 SECOND 200A TR OPEN INPT-1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1

008 FIRST 151A TR OPEN PT-1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1

008 GROUND G31A TR OPEN PT-1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1

007 SECOND 200A TR OPEN INPT-1 INPT-1 INPT-1 PT-1 RB-1 SDT-1

007 FIRST 147 TR OPEN INPT-1 INPT-1 INPT-1 PT-1 RB-1 SDT-1

007 GROUND G01 TR OPEN INPT-1 INPT-1 INPT-1 PT-1 RB-1 SDT-1

006 SECOND 273 TR OPEN PT-1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1

006 FIRST 171 TR OPEN PT-1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1

006 GROUND G25 TR OPEN PT-1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1

005 SECOND 212 TR OPEN PT-1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1

005 FIRST 110 TR OPEN PT-1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1

005 GROUND G28A TR OPEN EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING

004 FIRST 113E TR OPEN PT1 INPT-1 INPT-1 INPT-1 RB-1 SDT-1

003 FIRST 102 TR OPEN INPT-1 INPT-1 PT-1 INPT-1 RB-1 SDT-1

003 GROUND G01 TR OPEN INPT-1 INPT-1 PT-1 INPT-1 RB-1 SDT-1

002 FIRST 105H TR OPEN INPT-1 PT-1 INPT-1 INPT-1 RB-1 SDT-1

002 GROUND G20B TR OPEN INPT-1 PT-1 INPT-1 INPT-1 RB-1 SDT-1

001 FOURTH 411 TE PT-1 PT-1 PT-1 PT-1 EXISTING EXISTING EXISTING

001 THIRD B316 TR OPEN EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING

001 SECOND A237 TR OPEN EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING

001 FIRST 128 TR OPEN INPT-1 INPT-1 PT-1 INPT-1 RB-1 SDT-1

001 GROUND G23G TR OPEN INPT-1 INPT-1 PT-1 INPT-1 RB-1 SDT-1

MCR GROUND 11 ELECTRICAL PT-1 PT-1 PT-1 PT-1 PT-1 RB-1 CONC-1

MCR GROUND 10 FIRE ROOM PT-1 PT-1 PT-1 PT-1 PT-1 RB-1 CONC-1

MCR GROUND 09 MECHANICAL PT-1 PT-1 PT-1 PT-1 PT-1 RB-1 CONC-1

MCR GROUND 08 ELECTRICAL PT-1 PT-1 PT-1 PT-1 PT-1 RB-1 CONC-1

MCR GROUND 07 STORAGE ROOM PT-1 PT-1 PT-1 PT-1 PT-1 RB-1 CONC-1

MCR GROUND 06 CORRIODOR PT-1 PT-1 PT-1 PT-1 PT-1 RB-1 CONC-1

MCR GROUND 05 STAGING AREA PT-1 PT-1 PT-1 PT-1 PT-1 RB-1 CONC-1

MCR GROUND 04 ENTRANCE ROOM B PT-1 INPT-1 INPT-1 PT-1 INPT-1 RB-1 SDT-1

MCR GROUND 03 SMALL DATA CENTER PT-1 PT-1 PT-1 PT-1 PT-1 RB-1 SDT-1

MCR GROUND 02 ENTRANCE ROOM A PT-1 INPT-1 INPT-1 PT-1 INPT-1 RB-1 SDT-1

MCR GROUND 01 HAC PT-1 PT1/WP1 PT1 PT1/WP1 PT1/WP1 RB-1 CONC-1

BULDING LEVEL NUMBER NAME

CEILING

FINISH

WALL FINISH

NORTH

WALL FINISH

EAST

WALL FINISH

SOUTH

WALL FINISH

WEST

BASE FINISH FLOOR FINISH

ROOM FINSH SCHEDULE

Revisions: Date:

Sheets
AG-050 - FINISH SCHEDULE & DETAILS

File details come from the government source that posted it. Updated .