This document is an Updated Price Schedule for a construction project at the Murfreesboro Veterans Affairs facility. The project involves infrastructure upgrades with three primary line items: (1) General Construction encompassing architectural modifications, fire protection, plumbing, mechanical, electrical, telecommunication systems, and related finishes, (2) Standard Density Work Area Outlets (WAOs), and (3) High Density Work Area Outlets. The total project duration is 720 calendar days from the Notice to Proceed, with contractors required to provide pricing for all three line items to be considered for award.

Key specifications include contractor responsibilities for providing all necessary tools, labor, materials, equipment, and supervision to complete the work according to attached specifications and drawings. Pricing must be submitted in whole dollar values, and contractors must include their Unique Entity Identifier from SAM.gov. The solicitation is issued by the Department of Veterans Affairs Technology Acquisition Center in Austin, with the specific project located in Murfreesboro, Tennessee (Solicitation Number: 36C77625R0066_1). Contractors are also obligated to attend a potential post-award conference in accordance with federal acquisition regulations.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--626A4-22-700 EHRM Infrastructure Upgrades Construction Murfreesboro, TN, newest first.
File Type Posted
36C77625R0066 0005.docx DOCX document
Q319 - EHRM SCOPE OF WORK.pdf PDF
Q319 - AG-050 - FINISH SCHEDULE.pdf PDF
Q102 - VHA PCRA - Final Template.pdf PDF
Q102 - VHA ICRA - Final Template.pdf PDF
Indepth Murf Pkg Impr Geophysics Terracon Geo Eng Rpt 18195130.pdf PDF
20221107 VA Murfreesboro Master Planning Site Survey.pdf PDF
Q26 - 13 05 41 - SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS.pdf PDF
PSI Report 0358839 - Murfreesboro VA Hospital Murfreesboro TN.pdf PDF
36C77625R0066 0004.docx DOCX document
Q345 - 08 33 00 Coiling Doors and Grilles.pdf PDF
Q333 - Trench Details.pdf PDF
Q319 - TELECOM ROOM SUMMARY.pdf PDF
Q14 - 01 91 00 General Commissioning Requirements.pdf PDF
18-407 Murfreesboro Parking Lot Improvements Revision 1 Geotechnical Report..pdf PDF
36C77625R0066 0003.docx DOCX document
Responses to Technical Questions_Murfreesboro EHRM 8_19_2025.pdf PDF
626A4_22_700_Murfreesboro_EHRM_Geo_Report_18235020.pdf PDF
Completed Site Visit Sign-in Sheet.pdf PDF
36C77625R0066 0002.docx DOCX document
ATT 14 - Site Visit Instructions Revised.docx DOCX document
36C77625R0066 0001.docx DOCX document
ATT 13 - PPQ - Murf EHRM.docx DOCX document
ATT 10 - 626A4-22-700 - Asbestos-Lead Paint Survey.pdf PDF
ATT 6 - 626A4-22-700 - DWG VOL 2.pdf PDF
ATT 14 - Site Visit Instructions.docx DOCX document
ATT 12 - Wage Determination - Rutherford County 6-6-2025.pdf PDF
ATT 11 - Limitations on Subcontracting - Construction.docx DOCX document
ATT 7 - 626A4-22-700 - DWG VOL 3.pdf PDF
ATT 2 - 626A4-22-700 - Final Bid Docs Specs VOL 2-R1.pdf PDF
36C77625R0066_1.docx DOCX document
ATT 4 - 626A4-22-700 - Final Bid Docs Specs VOL 4-R1.pdf PDF
ATT 3 - 626A4-22-700 - Final Bid Docs Specs VOL 3-R1.pdf PDF
ATT 1 - 626A4-22-700 - Final Bid Docs Specs VOL 1-R1.pdf PDF
ATT 9 - 626A4-22-700 - ICRA-PCRA Summary.pdf PDF
ATT 8 - 626A4-22-700 - DWG VOL 4.pdf PDF
ATT 5 - 626A4-22-700 - DWG VOL 1.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
JB
__________________
__________________

ITEM 1: GENERAL CONSTRUCTION: All work except for items 0002 and 0003. Work includes selective demolition, general construction, alterations, walks, necessary removal of existing structures and construction and certain other items. The contractor shall provide all tools, labor, material, equipment, and supervision necessary to perform all work as required by the contract bid documents including:

Architectural Modifications Fire Protection Systems Plumbing Systems Mechanical systems Electrical Systems Telecommunication Systems Fire Alarm Equipment, Fixtures, and Finishes

All work shall be completed in accordance with the attached specifications and drawings. The contractor shall complete the entire project no later than 720 calendar days after the contractor receives the NOTICE TO PROCEED.

2,395.00
EA
__________________
__________________

ITEM NO. 2: STANDARD DENSITY WORK AREA OUTLETS (WAO): The contractor shall provide all tools, labor, material, equipment, and supervision necessary to perform all work as required by the contract bid documents to install standard density WAOs. Locations of all WAOs shall be approved by the COR.

All work shall be completed in accordance with the attached specifications and drawings. The contractor shall complete the entire project no later than 720 calendar days after the contractor receives the NOTICE TO PROCEED.

270.00
EA
__________________
__________________

ITEM NO. 3: HIGH DENSITY WORK AREA OUTLETS (WAO): The contractor shall provide all tools, labor, material, equipment, and supervision necessary to perform all work as required by the contract bid documents to install standard density WAOs. Locations of all WAOs shall be approved by the COR.

All work shall be completed in accordance with the attached specifications and drawings. The contractor shall complete the entire project no later than 720 calendar days after the contractor receives the NOTICE TO PROCEED.

GRAND TOTAL
__________________

NOTICE

1. Line Items 0001, 0002, and 0003 contain all the work for this project.

1. Offerors must provide a price for Line Item 0001, 0002, and 0003. Failure to do so may render their offer unacceptable.

1. Award will be made on Grand Total (Line Item 0001-0003).

1. Pricing shall be submitted in whole dollar values. Please do NOT include pricing in cents.

1. Contractor is required to fill in their Unique Entity Identifier number associate with SAM.gov in Block No. 14 on Standard Form (SF) 1442.

1. PLEASE NOTE: The Contractor agrees to attend any Post Award conference convened by the contracting activity or contract administration in accordance with Federal Acquisition Regulation subpart 42.5.