Drawings 28 of 37 - FA501-FP102.pdf
PDF 12 MB Posted
- Solicitation number
- 36C77621B0002
About this file
This document provides details for a federal construction contract opportunity with the Department of Veterans Affairs. The solicitation involves building construction services to construct a new Adult Day Health and Extended Care Support Building adjacent to an existing facility at the St. Cloud VA Medical Center. The project scope includes general construction, site work, utilities infrastructure, and mechanical and electrical systems installation for the new building, which will house operations for the VA's Extended Care Service Line. Responses were due by the date listed on the solicitation, with award anticipated at a future date. Services are to be provided according to standard federal construction terms and requirements.
View the file
Other files
Show 40 more
Latest 50 of 74 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1033' - 8"
EXISTING
SPRINKLER
SYSTEM
EXISTING
SPRINKLER
SYSTEM
EXISTING
SPRINKLER
SYSTEM
NEW SPRINKLER SYSTEM FEED MAIN
NEW SPRINKLER
SYSTEM FEED MAIN
EXISTING VALVE HEADER
SEE DETAILS 1 AND 2 THIS
DRAWING
EXIST. PIPE STAND
CO
NT
IN
UE
F
EE
D
MA
IN
ON
S
HE
ET
F
P1
2" BALL DRIP
4" x 4'-9" FT
4" x 1'-9" GALV. TT
4" x 4'-8" TT
4 3
NOTES:
1. USE THE EXISTING VALVE HEADER IN BUILDING 116 TO FEED
THE SYSTEM FOR THE ADULT DAYCARE CENTER. USE THE
EXISTING 4" CAPPED OUTLET FOR THE NEW SYSTEM.
2. AN ADDITIONAL FIRE DEPARTMENT STORZ CONNECTION IS TO
BE PROVIDED AS SHOWN.
3. NITROGEN WET INERTING SYSTEM
3.1. SUPPLY AND INSTALL:
3.1.1. NITROGEN TANK
3.1.2. POTTER NITROGEN CYLINDER PRESSURE
REGULATOR WITH HOSE
3.1.3. POTTER WET PIPE SYSTEM INERTING KIT
3.1.3. INSTALL NITROGEN INJECTION MANIFOLD ON
HEADER BELOW FLOW SWITCH
3.1.3. INSTALL QUICK-X-HAUST VENT IN REMOTE
ACCESSIBLE AREA
3.1.4. POTTER PAAR-B AUTOMATIC FLOAT TYPE AIR VENT
EXISTING 4" CAPPED OUTLET
EXISTING 4" CAPPED OUTLET
NOTE:
TIE NEW DRAIN INTO EXISTING
DRAIN RISER.
FOR STORZ FIRE DEPARTMENT
CONNECTION SEE DETAIL 5
EL: 93'-0"
EL: 88'-0"
EL: 93'-0"
'-3
1/ 2"
1'- 4 3
/8"
'-9
'-0 1/
2"
3.2
1.1
1'- 4 3
/8"
A D E F G JB
5'-8" 13'-10 1/2" 21'-3" 32'-9 3/4" 13'-10 1/2" 5'-8"
2'- 8"
'-6
1'- 4 3
/8"
2.1
'-8
'-0 1/
2"
3.7
4.4
'-1
3.1
1/
2"
C H
5.8
15'-9" 15'-9"
5.9
2'- 0"
5.5
05/14/202
REVISION
FOR STORZ FIRE DEPARTMENT
CONNECTION SEE DETAIL 5/FP100
3" RISER TO
MAIN FLOOR
B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1B1B1B1B1B1B1B1
B1
B1
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B1B1 B1 B1 B1 B1 B1
B1 B1 B1B1 B1 B1 B1
B1
B
B1
B1 B1
B1
B1
B1
B
B1 B1
B1 B1B1 B1
B1
B
B1B1
B1
B
B1 B1
B1
B1 B1 B1B1 B1 B1
B1
B
B
B
B
B
B
B1
E
E
E
E
E
E
E
E
E
E
E
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
E
D
D
E
E
E
E
E
E
D
DD
D
D
D
B1
B
B
B
TYP.
B1
B1
AREA OF
FUTURE STAIR #2
'-3
1/ 2"
1'- 4 3
/8"
'-9
'-0 1/
2" 1'-
4 3 /8"
A D E F G JB
5'-8" 13'-10 1/2" 21'-3" 32'-9 3/4" 29'-7 1/2" 5'-8"
2'- 8"
'-6
'-8
'-0
1/ 2"
'-1
1/
2"
C H
15'-9" 15'-9"
2'- 0"
B1
B
D
B1 B1 B1
E
E
B
B1
B1
B1
B1
B
B
B
B
B1
B
B
B1B1
D
B
B
B
B
B
B
B
B1
B1
B
B
B
B
B
B
D
FOR FIRE DEPARTMENT CONNECTION
SEE DETAIL 5/FP100
3" RISER
FROM
BSMNT
34 32
31 32
NOTE:
CONNECT POTTER PAAR-B
NITROGEN RELEASE
ASSEMBLY HERE.
NOTE:
CONNECT POTTER QUICK
X-HAUST MANIFOLD HERE.
NOTE:
INSTALL NITROGEN EXHAUST
ARRANGEMENT IN CLOSET.
SEE DETAIL 2
| FA501 |
| FA502 |
| FP100 |
| FP101 |
| FP102 |
File details come from the government source that posted it. Updated .