07 31 13 Asphalt Shingles-add2.pdf

PDF 54 KB Posted

Attached to
Y1DZ--Construct Adult Day Health & Extended Care Support Bldg. (Minor) - St Cloud
Solicitation number
36C77621B0002
Issued by

About this file

This document provides specifications for asphalt shingles and installation requirements for a construction project involving an Adult Day Health and Extended Care Support Building addition at the St. Cloud VA Medical Center in Minnesota. Key details include fiberglass asphalt shingles over underlayment nailed to roof sheathing, with a 30-year material warranty and wind resistance up to 160 km/h for 15 years. Self-adhering underlayment and organic felt are to be installed at eaves, rakes, valleys and other roof areas. Ridge vents, flashing and accessories are also specified.

The related federal contract opportunity is solicitation number 36C77621B0002 to construct the Adult Day Health and Extended Care Support Building addition, including general construction, site work, electrical and mechanical work. The Department of Veterans Affairs Technology Acquisition Center in Austin is the contracting agency.

View the file

Other files

File Type Posted
36C77621B0002 0006.pdf PDF
ATTACHMENT 16 - Construction Wage Rates - Stearns County - 5-28-21.pdf PDF
Drawings 22 of 37 - EP601-EP603.pdf PDF
Drawings 29 of 37 - M001-M502.pdf PDF
Drawings 2 of 37 - AE001-AE101.pdf PDF
08 71 00 Door Hardware-add2 revised.pdf PDF
Drawings 18 of 37 - EL501-EM101.pdf PDF
Drawings 24 of 37 - ES103-ET102.pdf PDF
Drawings 28 of 37 - FA501-FP102.pdf PDF
Drawings 30 of 37 - M503-M506.pdf PDF
St Cloud ADHC Lighting Cutsheets.pdf PDF
Drawings 7 of 37 - AE504-AE506.pdf PDF
Drawings 33 of 37 - MH102-MP101.pdf PDF
Drawings 13 of 37 - C1.0-C8.0.pdf PDF
Drawings 36 of 37 - S101-S104.pdf PDF
Drawings 6 of 37 - AE502-AE503.pdf PDF
Drawings 32 of 37 - M603-MH101.pdf PDF
Drawings 26 of 37 - EY502.pdf PDF
Drawings 8 of 37 - AE601-AE603.pdf PDF
Drawings 20 of 37 - EM602-EP102.pdf PDF
Drawings 25 of 37 - ET501-EY501.pdf PDF
Drawings 10 of 37 - AE607-AE609.pdf PDF
Drawings 4 of 37 - AE105-AE107.pdf PDF
Drawings 16 of 37 - E901.pdf PDF
Drawings 14 of 37 - E001-E201.pdf PDF
Drawings 27 of 37 - FA001-FA103.pdf PDF
Drawings 9 of 37 - AE604-AE606.pdf PDF
Drawings 34 of 37 - P001-PS501.pdf PDF
Drawings 1 of 37 - GI001-GI101.pdf PDF
Technical Questions - FINAL - St. Cloud Day Care 5-19-21.pdf PDF
36C77621B0002 0005.pdf PDF
22 13 33 Packaged Submersible Sewerage Pump Units-add2.pdf PDF
Drawings 31 of 37 - M507-M602.pdf PDF
Drawings 11 of 37 - AE701-AE801.pdf PDF
Drawings 15 of 37 - E501.pdf PDF
07 13 52 Modified bituminous Sheet Waterproofing-add2.pdf PDF
Drawings 17 of 37 - EL101-EL102.pdf PDF
Drawings 19 of 37 - EM102-EM601.pdf PDF
Drawings 3 of 37 - AE102-AE104.pdf PDF
Drawings 35 of 37 - S001-S002.pdf PDF
Drawings 21 of 37 - EP501-EP503.pdf PDF
08 71 13 Automatic Door Operators-add2.pdf PDF
Drawings 37 of 37 - S301-S402.pdf PDF
Drawings 12 of 37 - AI101-AI601.pdf PDF
Drawings 5 of 37 - AE301-AE501.pdf PDF
Drawings 23 of 37 - EP604-ES102.pdf PDF
36C77621B0002 0004.pdf PDF
36C77621B0002 0003.pdf PDF
36C77621B0002 0002.pdf PDF
ATTACHMENT 19 - Contractor Work Hours.pdf PDF
Show 40 more

Latest 50 of 74 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

St. Cloud VAMC

St. Cloud, MN

Adult Day Health Care Extended Care Support

VA263-15-C-0137

ASPHALT SHINGLES

07 31 13 - 1

SECTION 07 31 13

ASPHALT SHINGLES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Fiberglass asphalt shingles over underlayment nailed to roof sheathing.

1.2 RELATED REQUIREMENTS

A. Counterflashing and Flashing of Roof Projections: Section 07 60 00, FLASHING AND SHEET METAL.

B. Roof Vents: Section 07 71 00, ROOF SPECIALTIES.

C. Shingle Color: Refer to Construction Document sheet AI601 “Finish

Schedule and Legend”

1.3 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this section.

B. ASTM International (ASTM):

1. D226/D226M-09 - Asphalt-Saturated Organic Felt Used in Roofing and

Waterproofing.

2. D1970/D1970M-15a - Self-Adhering Polymer Modified Bituminous Sheet

Materials Used as Steep Roofing Underlayment for Ice Dam Protection.

3. D3018/D3018M-11 - Class A Asphalt Shingles Surfaced with Mineral

Granules.

4. D3161/D3161M-15 - Wind-Resistance of Steep Slope Roofing Products

(Fan-Induced Method).

5. D3462/D3462M-10a - Asphalt Shingles Made from Glass Felt and

Surfaced with Mineral Granules.

6. F1667-05(2011) - Driven Fasteners: Nails, Spikes, and Staples.

C. UL LLC (UL):

1. 790-14 - Fire Tests of Roof Coverings.

1.4 SUBMITTALS

A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Manufacturer's Literature and Data:

1. Description of each product.

2. Installation instructions.

3. Warranty.

07 31 13 - 2

C. Samples:

1. Shingles: Full size each type, color and texture.

D. Sustainable Construction Submittals:

1. Solar Reflectance Index (SRI) for asphalt shingles.

1.5 DELIVERY

A. Deliver products in manufacturer's original sealed packaging.

B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, color, production run number, manufacture date, and the label of

Underwriters Laboratories.

C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.

1.6 STORAGE AND HANDLING

A. Store shingles according to manufacturer's instructions. Store roll goods on end in upright position.

B. Protect products from damage during handling and construction operations.

C. Keep materials dry, covered completely and protected from weather.

1.7 WARRANTY

A. Construction Warranty: FAR clause 52.246-21, "Warranty of

Construction."

B. Manufacturer's Warranty: Warrant asphalt shingles against material and manufacturing defects.

1. Material Warranty Period: 30 years.

2. Wind-Speed Warranty Period: Resist wind speeds up to 160 km/h (100 mph) for 15 years.

3. Algae-Resistance Warranty Period: No discoloration for 20 years.

PART 2 - PRODUCTS

2.1 PRODUCTS - GENERAL

A. Basis of Design: GAF; Product: Marquis WeatherMax; Color: Charcoal

B. Provide each product from one manufacturer.

1. Provide each product exposed to view from one production run.

C. Sustainable Construction Requirements:

1. Asphalt Shingle Recycled Content: __35____percent post-consumer recycled content, minimum.

07 31 13 - 3

2.2 ASPHALT SHINGLES

A. Asphalt Shingles: Fiberglass reinforced, laminated type, square butt.

1. ASTM D3462/D3462M and ASTM D3018/D3018M, Type I, self-sealing.

2. ASTM D3161/D3161M, Class D or F wind-resistant.

3. UL 790 Class A fire resistance.

4. Minimum Weight: 10.3 kg/sq. m (210 lbs./100 sq. ft.).

2.3 ROOFING NAILS

A. ASTM F1667, Type I, Style 20, galvanized steel, deformed shanks, heads

10 mm to 11 mm (3/8 inch to 7/16 inch) diameter.

1. Nails for Shingles: 32 mm (1-1/4 inches) long.

2. Nails for Felt: 19 mm (3/4 inch) long.

2.4 ROOFING UNDERLAYMENT

A. Organic Felt: ASTM D226/D226M, Type l.

B. Self-Adhering Modified Bituminous Underlayment: ASTMD1970/D1970M.

2.5 METAL FLASHING

A. Provide metal roof flashings, including apron flashings, step flashings, valley flashings, drip edges, and vent pipe flashings specified in Section 07 60 00, FLASHING AND SHEET METAL.

2.6 RIDGE VENTS

A. Ridge Vents: Manufacturer's standard ridge vent for use under asphalt shingles.

1. Provide ridge vents with internal filters, internal baffles, or external baffles, for weather protection.

2. Free Area: Minimum 25400 sq. mm per m (12 sq. inches per foot).

PART 3 - EXECUTION

3.1 PREPARATION

A. Examine and verify substrate suitability for roofing installation.

1. Verify roof substrates are sound, within manufacturer's tolerances, and free from defects which would interfere with roofing installation.

2. Verify roof accessories, vent pipes and other projections through roof are in place and roof flashing is installed, or ready for installation, before installing shingles.

07 31 13 - 4

B. Protect existing construction and completed work from damage.

3.2 INSTALLATION - GENERAL

A. Install products according to manufacturer's instructions and approved submittal drawings.

1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.

3.3 METAL DRIP EDGE INSTALLATION

A. At eaves and rakes, install stainless steel drip edges specified in

Section 07 60 00, FLASHING AND SHEET METAL.

1. Eaves: Install metal drip edge before underlayment.

2. Rakes: Install metal drip edge after underlayment.

B. Secure metal drip edges with compatible nails spaced maximum 250 mm

(10 inches) on center along inner edges.

3.4 FLASHING INSTALLATION

A. Install metal flashings specified in Section 07 60 00, FLASHING AND

SHEET METAL at intersections of roofs, adjoining walls, or projections through deck such as chimneys and vent stacks.

B. Install metal valley flashing shown and as specified under Section

07 60 00, FLASHING AND SHEET METAL.

1. Secure valley flashing according to shingle manufacturer's instructions.

2. Expose flashing in open portion of valley 125 mm (5 inches) minimum, and lap shingles over flashing 125 mm (5 inches) minimum.

3.5 UNDERLAYMENT INSTALLATION

A. Install self-adhering sheet underlayment, working from low point to high point. Lap sides 90 mm (3-1/2 inches) minimum, and lap ends 150 mm

(6 inches) minimum. Install at the following locations:

1. Eaves and Rakes: From edge of eave and rake to 600 mm (24 inches) minimum beyond inside face of exterior wall.

a. Lap underlayment over eave metal drip edge.

2. Valleys, Hips and Roof Slope Transitions: Centered over change in slope, and extended 450 mm (18 inches) minimum on both sides.

3. Ridges: Centered on ridge, and extended 900 mm (36 inches) minimum on both sides. Do not cover ridge vent opening.

07 31 13 - 5

4. Sidewalls and Projections through Roof: Extended 450 mm (18 inches) from projection, and extended up projection 100 mm (4 inches) minimum.

5. Firmly roll underlayment to ensure adhesion to roof deck and metal flashings.

B. Install organic felt underlayment on roof deck not covered by self-adhering sheet underlayment, with 100 mm (4 inches) minimum end laps, 50 mm (2 inches) minimum head laps, and 300 mm (12 inches) minimum ridge laps. Nail felt 125 mm (5 inches) on centers along laps.

3.6 ROOF ACCESSORY INSTALLATION

A. Install roof vents, specified in Section 07 71 00, ROOF SPECIALTIES before installing shingles.

B. Lap underlayment and asphalt shingles over upslope base flanges of roof accessory flashings.

C. Install underlayment and asphalt shingles over sideslope base flanges of roof accessory flashings.

D. Install downslope base flanges of roof accessories over asphalt shingles.

3.7 ASPHALT SHINGLE INSTALLATION

A. Install shingles aligned parallel to roof eave, nailed to roof sheathing.

1. Exposure: 125 mm (5 inches) maximum.

2. Headlap: 50 mm (2 inches) minimum.

B. Install asphalt-shingle starter strip with tabs removed, and overhanging lower edge of roof 13 mm (1/2 inch).

C. Valleys: Open.

3.8 RIDGE VENT INSTALLATION

A. Install ridge vents over shingles.

1. Extent: Continuous along ridges extending to within <12”> of rakes.

3.9 HIP AND RIDGE SHINGLE INSTALLATION

A. Bend each shingle lengthwise down center to provide equal exposure on both sides of hip and ridge.

1. Begin ridge installation at leeward end of ridge. Cover ridge vents with shingles.

2. Begin hip installation at eave.

B. Install shingles with maximum 125 mm (5 inches) exposure.

07 31 13 - 6

C. Secure each shingle with one nail on both sides of hip and ridge, 215 mm (8-1/2 inches) back from exposed end and one inch up from edge.

3.10 SNOW GUARD INSTALLATION

A. Install snow guards in layout recommended by manufacturer.

1. Fasten snow guards with fasteners concealed by shingles.

- - E N D - -