36C77621B0002 0005.pdf
PDF 126 KB Posted
- Solicitation number
- 36C77621B0002
About this file
This document is an amendment to a federal solicitation providing additional details and extending the bid due date. The solicitation is for the construction of a new building to house an Adult Day Health Care operation adjacent to an existing Veterans Affairs facility. The amendment provides revised drawings that are now the official construction plans of record and answers technical questions from prospective offerors. It extends the bid due date to June 8, 2021 at 1:00 PM Eastern Time and includes updated wage rates, specifications for asphalt shingles and door hardware, and equipment cut sheets. The Department of Veterans Affairs Technology Acquisition Center in Austin is the contracting agency for this project to support the Extended Care Service Line at the St. Cloud facility.
View the file
Other files
Show 40 more
Latest 50 of 74 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
0005 05-20-2021
656-343
36C776
Thomas Council Department of Veterans Affairs Program Contracting Activity Central 6150 Oak Tree Blvd, Suite 300 Independence OH 44131
00076
Department of Veterans Affairs Program Contracting Activity Central 6150 Oak Tree Blvd, Suite 300 Independence OH 44131
To all Offerors/Bidders
36C77621B0002
05-20-2021
X
X X
June 8, 2021 @ 1:00 PM (ET)
X 1 (one)
The purpose of this amendment is to extend the bid due date, provide answers to Technical Questions, updated version of construction Wage Rates, updated solicitation documentation, and a new set of solicitation drawings, which will now become the official drawings of record.
1) See BLOCK 11 of this Amendment for revised bid due date.
2) Attachments 2 - 10 and 12 - 14, which contained solicitation drawings, have been removed from the beta.sam website.
Drawings 1 - 37, which have been posted with this amendment, are now the official drawings of record concerning this solicitation.
Donald A. Marsh III Contracting Officer
PCAC15L3-1697
See attached document: Drawings 1 of 37 - GI001-GI101.
See attached document: Drawings 2 of 37 - AE001-AE101.
See attached document: Drawings 3 of 37 - AE102-AE104.
See attached document: Drawings 4 of 37 - AE105-AE107.
See attached document: Drawings 5 of 37 - AE301-AE501.
See attached document: Drawings 6 of 37 - AE502-AE503.
See attached document: Drawings 7 of 37 - AE504-AE506.
See attached document: Drawings 8 of 37 - AE601-AE603.
See attached document: Drawings 9 of 37 - AE604-AE606.
See attached document: Drawings 10 of 37 - AE607-AE609.
See attached document: Drawings 11 of 37 - AE701-AE801.
See attached document: Drawings 12 of 37 - AI101-AI601.
See attached document: Drawings 13 of 37 - C1.0-C8.0.
See attached document: Drawings 14 of 37 - E001-E201.
See attached document: Drawings 15 of 37 - E501.
See attached document: Drawings 16 of 37 - E901.
See attached document: Drawings 17 of 37 - EL101-EL102.
See attached document: Drawings 18 of 37 - EL501-EM101.
See attached document: Drawings 19 of 37 - EM102-EM601.
See attached document: Drawings 20 of 37 - EM602-EP102.
See attached document: Drawings 21 of 37 - EP501-EP503.
See attached document: Drawings 22 of 37 - EP601-EP603.
See attached document: Drawings 23 of 37 - EP604-ES102.
See attached document: Drawings 24 of 37 - ES103-ET102.
See attached document: Drawings 25 of 37 - ET501-EY501.
See attached document: Drawings 26 of 37 - EY502.
See attached document: Drawings 27 of 37 - FA001-FA103.
See attached document: Drawings 28 of 37 - FA501-FP102.
See attached document: Drawings 29 of 37 - M001-M502.
See attached document: Drawings 30 of 37 - M503-M506.
See attached document: Drawings 31 of 37 - M507-M602.
See attached document: Drawings 32 of 37 - M603-MH101.
See attached document: Drawings 33 of 37 - MH102-MP101.
See attached document: Drawings 34 of 37 - P001-PS501.
See attached document: Drawings 35 of 37 - S001-S002.
See attached document: Drawings 36 of 37 - S101-S104.
See attached document: Drawings 37 of 37 - S301-S402.
See attached document: Technical Questions - FINAL - St. Cloud Day Care 5-19-21.
See attached document: ATTACHMENT 16 - Construction Wage Rates - Stearns County - 4-23-21.
See attached document: 07 13 52 Modified bituminous Sheet Waterproofing-add2.
See attached document: 07 31 13 Asphalt Shingles-add2.
See attached document: 08 71 00 Door Hardware-add2 revised.
See attached document: 08 71 13 Automatic Door Operators-add2.
See attached document: 22 13 33 Packaged, Submersible Sewerage Pump Units-add2.
See attached document: St Cloud ADHC Lighting Cutsheets.
End of Document
File details come from the government source that posted it. Updated .