08 71 13 Automatic Door Operators-add2.pdf

PDF 56 KB Posted

Attached to
Y1DZ--Construct Adult Day Health & Extended Care Support Bldg. (Minor) - St Cloud
Solicitation number
36C77621B0002
Issued by

About this file

This document provides specifications for automatic door operators for a construction project involving the Adult Day Health Care operation of the Extended Care Service Line at the St. Cloud VA Medical Center in Minnesota. The specifications require automatic operators for swinging doors that move doors from fully closed to fully opened in five seconds or less. Equipment must conform to UL 325 standards and include key operated power disconnect switches. Operators must be institutional grade aluminum alloy and include enclosed gear drive transmissions, mechanical springs, and microprocessor controls. Motion detectors, push plate wall switches, and safety devices are also specified.

The related federal contract opportunity is a solicitation to construct the new Adult Day Health Care and Extended Care Support building adjacent to Building 116 at the St. Cloud VAMC. The project scope includes general construction, alterations, walks, grading, drainage, necessary removal of existing structures, and both general and technical construction work. The solicitation is issued by the VA Technology Acquisition Center in Austin, Texas.

View the file

Other files

File Type Posted
36C77621B0002 0006.pdf PDF
ATTACHMENT 16 - Construction Wage Rates - Stearns County - 5-28-21.pdf PDF
Drawings 22 of 37 - EP601-EP603.pdf PDF
Drawings 29 of 37 - M001-M502.pdf PDF
Drawings 2 of 37 - AE001-AE101.pdf PDF
08 71 00 Door Hardware-add2 revised.pdf PDF
Drawings 18 of 37 - EL501-EM101.pdf PDF
Drawings 24 of 37 - ES103-ET102.pdf PDF
Drawings 28 of 37 - FA501-FP102.pdf PDF
Drawings 30 of 37 - M503-M506.pdf PDF
St Cloud ADHC Lighting Cutsheets.pdf PDF
Drawings 7 of 37 - AE504-AE506.pdf PDF
Drawings 33 of 37 - MH102-MP101.pdf PDF
Drawings 13 of 37 - C1.0-C8.0.pdf PDF
Drawings 36 of 37 - S101-S104.pdf PDF
Drawings 6 of 37 - AE502-AE503.pdf PDF
Drawings 32 of 37 - M603-MH101.pdf PDF
Drawings 26 of 37 - EY502.pdf PDF
Drawings 8 of 37 - AE601-AE603.pdf PDF
Drawings 20 of 37 - EM602-EP102.pdf PDF
Drawings 25 of 37 - ET501-EY501.pdf PDF
Drawings 10 of 37 - AE607-AE609.pdf PDF
Drawings 4 of 37 - AE105-AE107.pdf PDF
Drawings 16 of 37 - E901.pdf PDF
Drawings 14 of 37 - E001-E201.pdf PDF
Drawings 27 of 37 - FA001-FA103.pdf PDF
Drawings 9 of 37 - AE604-AE606.pdf PDF
Drawings 34 of 37 - P001-PS501.pdf PDF
Drawings 1 of 37 - GI001-GI101.pdf PDF
Technical Questions - FINAL - St. Cloud Day Care 5-19-21.pdf PDF
36C77621B0002 0005.pdf PDF
22 13 33 Packaged Submersible Sewerage Pump Units-add2.pdf PDF
Drawings 31 of 37 - M507-M602.pdf PDF
Drawings 11 of 37 - AE701-AE801.pdf PDF
Drawings 15 of 37 - E501.pdf PDF
07 13 52 Modified bituminous Sheet Waterproofing-add2.pdf PDF
Drawings 17 of 37 - EL101-EL102.pdf PDF
Drawings 19 of 37 - EM102-EM601.pdf PDF
Drawings 3 of 37 - AE102-AE104.pdf PDF
Drawings 35 of 37 - S001-S002.pdf PDF
Drawings 21 of 37 - EP501-EP503.pdf PDF
07 31 13 Asphalt Shingles-add2.pdf PDF
Drawings 37 of 37 - S301-S402.pdf PDF
Drawings 12 of 37 - AI101-AI601.pdf PDF
Drawings 5 of 37 - AE301-AE501.pdf PDF
Drawings 23 of 37 - EP604-ES102.pdf PDF
36C77621B0002 0004.pdf PDF
36C77621B0002 0003.pdf PDF
36C77621B0002 0002.pdf PDF
ATTACHMENT 19 - Contractor Work Hours.pdf PDF
Show 40 more

Latest 50 of 74 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

St. Cloud VAMC

St. Cloud, MN

Adult Day Health Care Extended Care Support

VA263-15-C-0137

08 71 13 - 1

SECTION 08 71 13

AUTOMATIC DOOR OPERATORS

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Automatic operators for swinging.

1.2 RELATED WORK

A. Section 08 411 13, HOLLOW METAL DOORS AND FRAMES

B. Section 08 71 00, DOOR HARDWARE: Door Hardware.

C. Division 26, ELECTRICAL Electric General Wiring, Connections and

Equipment Requirements.

D. Division 28, ELECTRONIC SAFETY AND SECURITY: Access Control Devices:.

1.3 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this section.

B. ASTM International (ASTM):

1. B209-14 - Aluminum and Aluminum-Alloy Sheet and Plate.

2. A1008/A1008M-20 - Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved

Formability, Solution Hardened, and Baked Hardenable.

C. Builders Hardware Manufacturers Association (BHMA):

1. BHMA A156.10-11 - Power Operated Pedestrian Doors.

D. National Fire Protection Association (NFPA):

1. 101-15 - Life Safety Code.

E. Underwriters Laboratories (UL):

1. 325-13 - Standard for Doors, Drapery, Gate, Louver, and Window

Operators and Systems.

1.4 SUBMITTALS

A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Submittal Drawings:

1. Show size, configuration, and fabrication and installation details.

C. Manufacturer's Literature and Data:

1. Description of each product.

2. Installation instructions.

3. Warranty.

D. Sustainable Construction Submittals:

08 71 13 - 2

1. Recycled Content: Identify post-consumer and pre-consumer recycled content percentage by weight.

E. Test reports: Certify each product complies with specifications.

F. Qualifications: Substantiate qualifications comply with specifications.

1. Manufacturer with project experience list.

2. Installer with project experience list.

G. Operation and Maintenance Data:

1. Care instructions for each exposed finish product.

2. Start-up, maintenance, troubleshooting, emergency, and shut-down instructions for each operational product.

1.5 QUALITY ASSURANCE

A. Manufacturer’s Qualifications:

1. Regularly manufactures specified products.

2. Manufactured specified products with satisfactory service on five similar installations for minimum five years.

a. Provide contact names and addresses for completed projects when requested by Contracting Officer's Representative.

B. Installer’s Qualifications: Experienced installer, approved by the manufacturer.

1.6 WARRANTY

A. Construction Warranty: FAR clause 52.246-21, "Warranty of

Construction."

B. Manufacturer's Warranty: Warrant automatic door operators against material and manufacturing defects.

1. Warranty Period: Two years.

PART 2 - PRODUCTS

2.1 SYSTEM PERFORMANCE

A. Comply with requirements of BHMA A156.10. Unless otherwise indicated on

Drawings, provide operators that move doors from fully closed to fully opened position in five seconds maximum time interval, when speed adjustment is at maximum setting.

B. Equipment: Conforming to UL 325. Provide key operated power disconnect wall switch for each door installation.

C. Electrical Wiring, Connections and Equipment: Motors, starters, controls, associated devices, and interconnecting wiring required for

08 71 13 - 3 installation. Equipment and wiring as specified in Division 26, ELECTRICAL.

2.2 PRODUCTS - GENERAL

A. Basis of Design: Manufacturer: LCN;

Actuator: 8310-810 Series

Closer: 9500/2800 Series

B. Provide door operators from one manufacturer.

C. Provide one type of operator throughout project.

D. Sustainable Construction Requirements:

1. Steel Recycled Content: 30 percent total recycled content, minimum.

2. Aluminum Recycled Content: 80 percent total recycled content, minimum.

2.3 SWING DOOR OPERATORS

A. General:

1. Type: Institutional type.

2. Size: As recommended by manufacturer for door weight and sizes.

B. Function:

1. Provide operators, enclosed in housing, permitting opening of door by energizing motor and stopped by electrically reducing Voltage and stalling motor against mechanical stop.

2. Door to close by means of spring energy, and closing force controlled by gear system and motor being used as dynamic brake without power, or controlled by hydraulic closer in electro-hydraulic operators.

3. Opening and Closing Speeds: Field adjustable.

4. Operators with checking mechanism providing cushioning action at last part of door travel, in both opening and closing cycle.

5. Operators capable of recycling doors instantaneously to full open position from any point in closing cycle when control switch is activated.

6. When automatic power is interrupted or shut-off, permit doors to easily open manually without damage to automatic operator system.

C. Connect hardware with drive arm attached to door with pin linkage rotating in a self-lubricating bearing. Prevent doors from pivoting on shaft of operator.

D. Operator Housing:

08 71 13 - 4

1. ASTM B209, Type 6063-T5 aluminum alloy, 112 mm (4-1/2 inches) wide by 140 mm (5.5 inches) high by 3.2 mm (0.125 inch) thick, aluminum extrusions with enclosed end caps for application to 100 mm

(4 inches) and larger frame systems.

E. Power Operator:

1. Completely assembled and sealed unit including gear drive transmission, mechanical spring and bearings, located in aluminum case and filled with special lubricant for extreme temperature conditions. Rubber mounted units with provisions for easy maintenance and replacement, without removing door from pivots or frame.

F. Motors:

1. Provide with interlock to prevent operation when doors are electrically locked from opening.

G. Electrical Control:

1. Self-contained electrical control unit, including necessary transformers, relays, rectifiers, and other electronic components for proper operation and switching of power operator.

2. Connecting Harnesses: Interlocking plugs.

H. Accessories:

1. Metal mounting supports, brackets and other accessories necessary for installation of operators at head of door frames.

I. Microprocessor Controls:

1. Multi-function microprocessor control providing adjustable hold open time (1-30 seconds) with fully adjustable opening speed, LED indications for sensor input signals and operator status and power assist close options. Control capable of receiving activation signals from any device with normally open dry contact output.

2. Hold doors held open by low Voltage applied to the continuous duty motor.

3. Controls:

a. Adjustable safety circuit that monitors door operation and stops opening direction of door if obstruction is sensed.

b. Recycle feature that reopens door if obstruction is sensed at any point during closing cycle.

08 71 13 - 5

c. Standard three position key switch with functions for ON, OFF, and HOLD OPEN, mounted on operator enclosure, door frame, or wall, as indicated on drawings.

2.4 NOT USED

2.5 NOT USED

2.6 POWER UNITS

A. Self-contained, electric operated and independent of door operator.

1. Capacity and size of power circuits according to automatic door operator manufacturer's specifications and Division 26 - ELECTRICAL.

2.7 DOOR CONTROLS

A. Control Devices: BHMA A156.10; control opening and closing functions.

B. Open doors when control device is actuated; hold doors in open positions; then, close doors after a adjustable time period, unless safety device or reactivated control interrupts operation.

C. Manual Controls:

1. Push Plate Wall Switch: Recessed type, stainless steel push plate minimum 100 mm by 100 mm (4 inch by 4 inch), with 13 mm (l/2 inch) high letters "To Operate Door-Push" engraved on face of plate.

D. Motion Detector:

1. Mounting: Surface or concealed.

2. Detection Area: 1500 mm (60 inches) deep and 1500 mm (60 inches) across, plus or minus 150 mm (6 inches).

3. Response Time: 25 milliseconds, maximum.

4. Control Power: 24 Volt DC.

5. Design units to be unaffected by cleaning material, solvents, dust, dirt and outdoor weather conditions.

2.8 SAFETY DEVICES

A. Swing Doors: Install presence sensor on pull side of door to detect any person standing in door swing path and prevent door from opening.

1. Time delay Switches: Adjustable between 3 to 60 seconds and control closing cycle of doors.

PART 3 - EXECUTION

3.1 PREPARATION

A. Examine and verify substrate suitability for product installation.

1. Verify door opening is correctly sized and within acceptable tolerances.

B. Protect existing construction and completed work from damage.

08 71 13 - 6

3.2 INSTALLATION

A. Install products according to manufacturer's instructions and approved submittal drawings.

1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.

B. Coordinate door installation with other related work.

C. Install manual controls and power disconnect switches recessed or semi-flush mounted in partitions.

D. Secure operator components to adjacent construction with suitable fastenings.

E. Conceal conduits, piping, and electric equipment, in finish work.

F. Install power units in locations shown.

1. Where units are mounted on walls, provide metal supports or shelves for units.

2. Ensure equipment, including time delay switches, are accessible for maintenance and adjustment.

G. Ensure operators are adjusted and function properly for type of expected traffic.

H. Synchronize each leaf of pair doors to open and close simultaneously.

Permit each door leaf to be opened manually, independent of other door leaf.

I. Install controls at positions shown and ensuring convenience for expected traffic.

J. Push Plate Wall Switches Mounting Height: 1000 mm (40 inches) maximum, unless otherwise approved by Contracting Officer's Representative.

3.3 DEMONSTRATION AND TRAINING

A. Instruct VA personnel in proper automatic door operator operation and maintenance.

1. Trainer: Manufacturer approved instructor.

2. Training Time: 2 hours minimum.

B. Coordinate instruction to VA personnel with VA Contracting Officer's

Representative.

- - E N D - -

File details come from the government source that posted it. Updated .