36C26325Q0777 A0001.pdf
PDF 198 KB Posted
- Solicitation number
- 36C26325Q0777
About this file
This document is a Standard Form 30 (SF-30) Amendment to a Request for Quote (RFQ) for the Department of Veterans Affairs. The amendment (A0001) extends the proposal deadline for solicitation 36C26325Q0777 to July 3, 2025, at 4:00 PM CDT and includes responses to vendor questions regarding a surgical lights, booms, and video integration equipment procurement. Key clarifications include confirmation of Sync Easy port requirements, foot switch needs, monitor mounting, room dimensions, medical gas and electrical services, on-site equipment storage, and verification of in-light "camera ready" capabilities. The procurement is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside for the Biological Health and Healthcare Systems (BHVAHCS), using FAR 13.5 procedures with a comparative evaluation approach.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| D.9 Room dimensions.pdf | ||
| 36C26325Q0777 A0001_1.docx | DOCX document | |
| 36C26325Q0777_1.docx | DOCX document | |
| 36C26325Q0777.pdf | ||
| D.1 Evaluated Salient Characteristics.xlsx | XLSX spreadsheet | |
| D.5 ICRA Introductory Information and Instruction.docx | DOCX document | |
| D.2 Supply Line Item Template.xlsx | XLSX spreadsheet | |
| D.4 Surgery structure.pdf | ||
| D.3 Floor plans.pdf | ||
| D.8 BUSINESS ASSOCIATE AGREEMENT.docx | DOCX document | |
| D.7 VA Directive 6550 App A Fillable.pdf | ||
| D.6 PCRA Introductory Information and Instructions.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
A0001 06-25-2025 unchanged
Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
1303 5th St Suite 300 Coralville IA 52241
Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
1303 5th St, Suite 300 Coralville IA 52241
To all Offerors/Bidders
36C26325Q0777
06-06-2025
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 07-03-2025 16:00 CDT unchanged x 1
The purpose of this amendment is to:
1. Respond to vendor questions. See page 2.
2. Extend the close date of this RFQ to 7/3/2025 at 4pm CDT.
3. Include attachment D.9 Room dimensions.
4. All other terms and conditions remain unchanged.
Joshua Imdacha Contracting Officer
Q&A
# Question VA Response
1 During the walkthrough the OR Manager requested Sync Easy ports on (3) walls with a 4N1 and a 2N1 on each boom. The requirement calls for a total of 9 plates. Are additional plates required?
If the easy ports are part of the 9 plates no additional are needed. If they are not, we need an additional 3 easy ports for each room (9 total).
2 Can you please confirm that you would like the foot switch added?
Yes, we need the foot switch for each room.
3 Under - Evaluated Salient Characteristics – Booms – Item 7a – this requirement calls for the Monitor Bracket as a Boom Accessory; however, the previous Q&A response with the sources sought, Question 26, indicated the current Boom Mounted Monitor will be moved to an independent arm, eliminating the need for a Monitor Brack as a Boom Accessory. Can you verify?
Yes, if the independent arm has the hardware to mount the monitor
4 Can drawings of the current room dimensions and mounting locations be provided?
Yes, attached to this amendment.
5 Please confirm if the quantity and type of medgas and electrical services on booms will be kept the same as what is currently being used?
Yes, that is correct
6 Due to the location of the site, can equipment be shipped and stored in its entirety on site, at the start of the project?
Currently we have 1, 40 Foot Connex that is empty (depending on when the equipment would come in it may be full) and we have room for 5 other pallets at this time. Storage space can change as this is an active warehouse.
7 To verify, the site does not want in-light cameras BUT rather (3) in-light “camera ready” capabilities ?
Yes, this is correct
8 I respectfully request a week extension from 6/27 to 7/3.
Granted. Proposal deadline extended to 7/3/2025.
File details come from the government source that posted it. Updated .