Copy of Copy of Price Breakdown blank.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Y1DA--656-19-307 Remodel of Building 51-1, Eastside at the Saint Cloud VA, Saint Cloud, MN
Solicitation number
36C26325B0007
Issued by

About this file

The file is a blank Price Breakdown Excel spreadsheet for a construction project at the Saint Cloud VA Medical Center in Minnesota. The pricing template provides a comprehensive cost breakdown across multiple construction divisions, including general building construction, mechanical and electrical systems, and site improvements. The detailed breakdown covers 14 primary construction divisions such as general requirements, concrete, masonry, metals, thermal and moisture protection, electrical, and communications, with sections for subtotals, profit, overhead, and a grand total proposal price. The solicitation is associated with Department of Veterans Affairs Veterans Health Administration, specifically Veterans Integrated Service Network 23, with the solicitation number 36C26325B0007, focusing on a remodel of Building 51-1 on the Eastside of the Saint Cloud VA facility.

View the file

Other files

File Type Posted
36C26325B0007 0002.docx DOCX document
36C26325B0007 0001.docx DOCX document
656_19_307 B51_1 E CD 100.pdf PDF
SOW Revised.pdf PDF
Bed Lift Detail 4.png PNG image
656_19_307 Remodel B51_1 E Bed Lifts Manual.pdf PDF
Bed Lift Detail 2.png PNG image
Bed Lift Detail 3.png PNG image
Class Deviation from FAR CAAC 2025-01 Suppl 1 EOs 14173.14168.pdf PDF
656-19-307 B51-1 Staging - Parking Area.pdf PDF
P07 WRD Stearns.pdf PDF
656_19_307 Specfications 1_Rev EDITED.pdf PDF
656_19_307 Specifications 2_Rev EDITED.pdf PDF
Bed Lift Detail 1.png PNG image
656_19_307 Specifications 3_Rev EDITED.pdf PDF
36C26325B0007_1.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Price Schedule Breakdown Sheet
Project Title:
Project Number:
Contractor:
Division #Division TitleBase Project
1General Requirements
2Existing Conditions
3Concrete
4Masonry
5Metals
6Wood, Plastics and Composites
7Thermal and Moisture Protection
8Openings
9Finishes
10Specialties
11Equipment
12Furnishings
14Conveying Equipment
Subtotal General Building Construction
21Fire Suppression
22Plumbing
23Heating, Ventilating and Air Conditioning
25Integrated Automation
26Electrical
27Communications
28Electronic Safety and Security
Subtotal Mechanical and Electrical
31Earthwork
32Exterior Improvements
33Utilities
34Transportation
Subtotal Site Improvements

Miscellaneous (Contractor shall identify any costs included)

Subtotal All Divisions & Miscellaneous (if any)
Profit
Overhead
Proposal Grand Total

File details come from the government source that posted it. Updated .