This document is a detailed site plan for staging areas and contractor parking for a VA building remodel project at the Saint Cloud VA facility in Minnesota. The file outlines two specific staging areas: a primary staging area located in the southeast corner of the contractor parking lot, measuring 36 ft x 48 ft, where one temporary construction office trailer is permitted, and a secondary staging area southeast of Building 51, measuring 60 ft x 24 ft x 48 ft x 20 ft, which allows for one 40-yard dumpster and one motorized vehicle. Both staging areas have strict requirements for grass restoration, sod maintenance, and access gate locations.

The document also specifies contractor parking in a designated gravel lot in the northeast area of the campus and explicitly prohibits contractor parking in spaces adjacent to Building 51. Additional requirements include maintaining pedestrian sidewalks and egress routes, implementing a Stormwater Pollution Prevention Plan (SWPP), and ensuring that any damaged grass is restored to its pre-existing grade, sodded, and maintained until firmly rooted. These detailed instructions are part of the solicitation for the 36C26325B0007 project to remodel Building 51-1 at the Saint Cloud VA facility.

View the file

Other files

File Type Posted
36C26325B0007 0002.docx DOCX document
36C26325B0007 0001.docx DOCX document
656_19_307 B51_1 E CD 100.pdf PDF
SOW Revised.pdf PDF
Bed Lift Detail 4.png PNG image
Copy of Copy of Price Breakdown blank.xlsx XLSX spreadsheet
656_19_307 Remodel B51_1 E Bed Lifts Manual.pdf PDF
Bed Lift Detail 2.png PNG image
Bed Lift Detail 3.png PNG image
Class Deviation from FAR CAAC 2025-01 Suppl 1 EOs 14173.14168.pdf PDF
P07 WRD Stearns.pdf PDF
656_19_307 Specfications 1_Rev EDITED.pdf PDF
656_19_307 Specifications 2_Rev EDITED.pdf PDF
Bed Lift Detail 1.png PNG image
656_19_307 Specifications 3_Rev EDITED.pdf PDF
36C26325B0007_1.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Primary Staging Area:

Location south east corner of contractor parking. Located within the gravel and along the eastern vegetation line, area identified by red rectangle 36 ft x 48 ft. Gate shall be located on the west side. One temporary con-struction office trailer permitted. Any grass that is damaged during construction will have the pre-existing grade restored, be sodded and maintained until the sod is firmly rooted as determined by the COR. Sod will be wa-tered by contractor and may not exceed 4 inches while the contractor is responsible for the sod.

36 FT

48 FT

60 FT

24 FT

48 FT

20 FT

Secondary Staging Area:

Location southeast of Building 51, area identified below by red trapezoid. Egress and pedestrian sidewalks shall not be blocked by vehicles, materials or any other obstruction. Gate shall be lo-cated on the east side with access from the parking lot. Permitted one (1) 40 yard dumpster at a time. Permitted parking for one (1) motorized vehicle (truck, car, side-by-side, ATV, POV, etc.)

at a time. No temporary construction office trailer permitted. Multiple vehicles parked in sec-ondary staging area is a failure to comply with contractual requirements. SWPPP required. Any grass that is damaged during construction will have the pre-existing grade restored, be sodded and maintained until the sod is firmly rooted as determined by the COR. Sod will be watered by con-tractor and may not exceed 4 inches while the contractor is responsible for the sod.

Contractor Parking:

Location northeast area of campus in designated gravel lot.

Contractor Parking