About this file

This document is a comprehensive set of architectural and engineering drawings for a renovation project at the Saint Cloud VA Medical Center. The project involves remodeling Building 51-1 East, specifically the first floor, to upgrade the Community Living Center (CLC) dementia unit. The renovation encompasses approximately 5,820 square feet and includes modifications to patient rooms, corridors, utility spaces, and support areas, with work divided into multiple construction zones and phases.

The drawings cover detailed plans for architectural, mechanical, electrical, and fire protection systems, including demolition and new construction elements. Key disciplines addressed include architectural floor plans, interior elevations, lighting and power distributions, HVAC modifications, plumbing updates, medical gas system changes, and fire alarm system integrations. The project follows VA design standards, incorporates infection control risk assessment (ICRA) protocols, and requires coordination across multiple trades to minimize disruption to the existing healthcare facility. The construction documents are dated August 23, 2024, and are part of solicitation number 36C26325B0007 for the Department of Veterans Affairs Veterans Health Administration.

View the file

Other files

File Type Posted
36C26325B0007 0002.docx DOCX document
36C26325B0007 0001.docx DOCX document
SOW Revised.pdf PDF
Bed Lift Detail 4.png PNG image
Copy of Copy of Price Breakdown blank.xlsx XLSX spreadsheet
656_19_307 Remodel B51_1 E Bed Lifts Manual.pdf PDF
Bed Lift Detail 2.png PNG image
Bed Lift Detail 3.png PNG image
Class Deviation from FAR CAAC 2025-01 Suppl 1 EOs 14173.14168.pdf PDF
656-19-307 B51-1 Staging - Parking Area.pdf PDF
P07 WRD Stearns.pdf PDF
656_19_307 Specfications 1_Rev EDITED.pdf PDF
656_19_307 Specifications 2_Rev EDITED.pdf PDF
Bed Lift Detail 1.png PNG image
656_19_307 Specifications 3_Rev EDITED.pdf PDF
36C26325B0007_1.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

51-1E

48-1W

PLAN

NORTH

PLAN

NORTH

█ ISSUED

NOT ISSUED

ISSUED FOR REFERENCE ONLY

ISSUED AS NOTED

R

N

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

COVER

DATE:

APPROVED: APPROVED: PROJECTS SECTION MANAGER

APPROVED: OIT MANAGER DATE: APPROVED: ASSISTANT CHIEF ENGINEER DATE:

APPROVED: SAFETY MANAGER

APPROVED: CHIEF OF POLICE

APPROVED: PATIENT SAFETY

DATE:

DATE:

DATE: APPROVED: EMS MANAGER

APPROVED: M/O MANAGER

DATE:

DATE:

DATE:DATE:

APPROVED: MEDICAL CENTER DIRECTOR

APPROVED: PROJECT COR DATE:

APPROVED: INFECTION CONTROL NURSE DATE:

APPROVED: SERVICE LINE DIRECTOR

APPROVED: GEMS COORDINATOR DATE:

DATE:

APPROVED: NURSE EXECUTIVE

APPROVED: CHIEF OF STAFF DATE:

APPROVED: DIRECTOR FMS

APPROVED: ASSOCIATE DIRECTOR

DATE:

DATE:

DATE:

DATE:APPROVED: DATE:

APPROVED: DATE:

APPROVED: DATE:

ST. CLOUD, MN 56303

4801 VETERANS DRIVE

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

CONSTRUCTION PACKAGE

C

U s e rs

\M C a m e ro n \D o c u m e n ts \1

B

L D

G s t

F lo o r_

A m c a m e ro n M

T .r v t

/2

/2

:1

:5

A

M

GI001

COVER SHEET REMODEL BUILDING 51-1

EAST FOR CLC

656-19-307

08/23/2024

MC EM

15479

REMODEL BUILDING 51, FIRST FLOOR EAST SIDE FOR CLC

VA COR:

CONTACT:

ADDRESS:

PHONE:

MICHAEL MCENIRY

4801 VETERANS DRIVE

SAINT CLOUD, MN 55303

320-252-1670

ARCHITECT:

NAME:

ADDRESS:

CONTACT:

ANDERSON ENGINEERING OF MN, LLC

13605 1ST AVE NORTH, SUITE 100

PLYMOUTH, MN 55441

ED MARKFORT

PHONE: 763-412-4000

STRUCTURAL ENGINEER:

NAME:

ADDRESS:

CONTACT:

ANDERSON ENGINEERING OF MN, LLC

13605 1ST AVE NORTH, SUITE 100

PLYMOUTH, MN 55441

ADAM ADAMS

PHONE: 763-412-4000

MECH/PLUMB/FIRE ENGINEER:

NAME:

ADDRESS:

CONTACT:

DUNHAM ASSOCIATES INC

50 SOUTH SIXTH STREET / SUITE 1100

MINNEAPOLIS, MN 55402-1540

JASON GOTTWALT

PHONE: 612-465-7648

ELECTRICAL ENGINEER:

NAME:

ADDRESS:

CONTACT:

DUNHAM ASSOCIATES INC

50 SOUTH SIXTH STREET / SUITE 1100

MINNEAPOLIS, MN 55402-1540

BEN ZURN

PHONE: 612-465-7626

SITE LOCATION MAP VA CAMPUS: KEY REFERENCE PLAN: VICINITY MAP SAINT CLOUD, MN:

SHEET INDEX

SHEET NO. SHEET TITLE S

D-

1 I

SS

UE

/25 /19

S D-

2 I

SS

UE

/10 /19

D D-

1 I

SS

UE

/29 /24

D D-

2 I

SS

UE

/29

C D

IS

SU

E

/3 0/2

0%

C D

/24

/24

C

ON

ST

RU

CT

IO

N

DO

CU

M

EN

TS

/23

00 GENERAL

GI001 COVER SHEET █ █ █ █ █ █ █

GI002 ABBREVIATIONS █ █ █ █ █ █

GI110 LIFE SAFETY PLANS █ █ █ █ █ █

GC110 INFECTION CONTROL & PHASING PLANS █ █ █ █ █

GC111 INFECTION CONTROL & PHASING NOTES █ █ █ █ █

GC500 ICRA DETAIL █ █ █ █ █

01 HAZARD

48-HA001 FIRST FLOOR HAZARDOUS MATERIALS PLAN - ASBESTOS / LEAD █ █ █ █ █

51-HA001 FIRST FLOOR HAZARDOUS MATERIALS PLAN - ASBESTOS █ █ █ █ █

02 DEMOLITION

48-AD111 FIRST FLOOR DEMOLITION PLAN █ █ █ █ █

51-AD111 FIRST FLOOR DEMOLITION PLAN █ █ █ █ █ █

03 ARCHITECTURAL

48-AE110 FIRST FLOOR - FLOOR PLAN AND PARTIAL REFLECTED CEILING PLAN █ █ █ █ █ █ █

51-AE110 FIRST FLOOR OVERALL PLAN █ █ █ █ █

51-AE111 FIRST FLOOR PLAN - ZONE 1 █ █ █ █ █ █ █

51-AE112 FIRST FLOOR PLAN - ZONE 2 █ █ █ █ █

51-AE113 FIRST FLOOR DIMENSION PLAN █ █ █ █ █

51-AC111 FIRST FLOOR REFLECTED CEILING PLAN █ █ █ █ █

51-AE211 INTERIOR ELEVATIONS █ █ █ █ █

51-AE212 INTERIOR ELEVATIONS █ █ █ █ █

AE550 DETAILS █ █ █ █ █

AE601 INTERIOR PARTITION TYPES AND DETAILS █ █ █ █ █

AE602 DOOR SCHEDULE AND ELEVATIONS █ █ █ █ █

AE650 MOUNTING HEIGHTS █ █ █ █ █

04 FINISHES AND FURNITURE

48-AF110 FIRST FLOOR FINISH PLAN █ █ █ █ █

51-AF110 FIRST FLOOR FINISH PLAN █ █ █ █ █

AF600 MATERIAL AND ROOM FINISH SCHEDULE █ █ █ █ █

51-AW110 FIRST FLOOR WAYFINDING PLAN █ █ █ █ █

AW600 WAYFINDING MESSAGE SCHEDULES & SIGNAGE DETAILS █ █ █ █ █

48-IF110 FIRST FLOOR FURNITURE PLAN █ █ █ █ █

51-IF110 FIRST FLOOR FURNITURE PLAN █ █ █ █ █

05 ARCHITECTURAL EQUIPMENT

51-QH110 FIRST FLOOR EQUIPMENT PLAN █ █ █ █ █

51-1E

48-1W

TRUE

NORTH

TRUE

NORTH

TRUE

NORTH

VA CAMPUS

BUILDING 1

HAZARDOUS MATERIAL:

NAME:

ADDRESS:

CONTACT:

INSTITUTE FOR ENVIRONMENTAL ASSESSMENT,

INC (IEA, INC.)

9201 WEST BROADWAY #600

BROOKLYN PARK, MN 55445

BRANDON VOIGT

PHONE: 763-315-7900

SHEET INDEX - STRUCTURAL

S101 FIRST AND SECOND FLOOR PLAN █ █ █ █ █

SHEET INDEX - MECHANICAL

M000 MECHANICAL TITLE SHEET █ █ █ █ █

48-PP101 48-0W BASEMENT - PLUMBING PLAN █ █ █ █ █

48-PP111 48-1W FIRST FLOOR - PLUMBING AND FIRE PROTECTION PLAN █ █ █ █ █

48-MHD110 48-1W FIRST FLOOR - DEMOLITION HVAC PLAN █ █ █

48-MH110 48-1E FIRST FLOOR - HVAC PLAN █ █ █

48-MP110 48-1E FIRST FLOOR - PIPING PLAN █ █ █

51-FPD110 51-1E FIRST FLOOR - DEMOLITION FIRE PROTECTION PLAN █ █ █ █ █

51-FP110 51-1E FIRST FLOOR - FIRE PROTECTION PLAN █ █ █ █ █

51-PPD100 51-0E BASEMENT - DEMOLITION PLUMBING PLAN █ █ █ █ █

51-PPD110 51-1E FIRST FLOOR - DEMOLITION PLUMBING PLAN █ █ █ █ █

51-PMD110 51-1E FIRST FLOOR - DEMOLITION MEDICAL GAS PLAN █ █ █ █ █

51-PP100 51-0E BASEMENT - PLUMBING PLAN ZONE 1 █ █ █ █ █

51-PP101 51-0E BASEMENT - PLUMBING PLAN ZONE 2 █ █ █ █ █

51-PP110 51-1E FIRST FLOOR - PLUMBNG PLAN ZONE 1 █ █ █ █ █

51-PP111 51-1E FIRST FLOOR - PLUMBNG PLAN ZONE 2 █ █ █ █ █

51-PM110 51-1E FIRST FLOOR - MEDICAL GAS PLAN █ █ █ █ █

P500 PLUMBING DETAILS AND SCHEDULES █ █ █ █ █

P501 PLUMBING RISER DIAGRAMS - WASTE AND VENT █ █ █

P502 PLUMBING RISER DIAGRAMS - DOMESTIC WATER █ █ █

51-MHD110 51-1E FIRST FLOOR - DEMOLITION HVAC PLAN █ █ █ █ █

51-MPD100 51-0E BASEMENT - DEMOLITION PIPING PLAN █ █ █ █ █

51-MPD110 51-1E FIRST FLOOR - DEMOLITION PIPING PLAN █ █ █ █ █

51-MH110 51-1E FIRST FLOOR - HVAC PLAN ZONE 1 █ █ █ █ █

51-MH111 51-1E FIRST FLOOR - HVAC PLAN ZONE 2 █ █ █ █ █

51-MP100 51-0E BASEMENT - PIPING PLAN ZONE 1 █ █ █ █ █

51-MP101 51-0E BASEMENT - PIPING PLAN ZONE 2 █ █ █ █ █

51-MP110 51-1E FIRST FLOOR - PIPING PLAN ZONE 1 █ █ █ █ █

51-MP111 51-1E FIRST FLOOR - PIPING PLAN ZONE 2 █ █ █ █ █

M500 MECHANICAL DETAILS AND SCHEDULES █ █ █ █ █

M600 SEQUENCES OF OPERATIONS █ █

SHEET INDEX - ELECTRICAL

E000 ELECTRICAL TITLE SHEET █ █ █ █ █

48-ED110 FIRST FLOOR DEMOLITION ELECTRICAL PLANS █ █ █ █ █

51-ED110 FIRST FLOOR DEMOLITION ELECTRICAL PLANS █ █ █ █ █

51-ED111 FIRST FLOOR DEMOLITION SYSTEM PLAN █ █ █ █ █

48-EL110 FIRST FLOOR LIGHTING PLAN █ █ █ █ █

48-EP110 FIRST FLOOR POWER PLAN █ █ █ █ █

48-ES110 FIRST FLOOR SYSTEMS PLAN █ █ █ █ █

48-EF110 FIRST FLOOR FIRE ALARM PLAN █ █

51-EE100 BASEMENT ELECTRICAL PLAN █ █ █

51-EL110 FIRST FLOOR LIGHTING PLAN - ZONE 1 █ █ █ █ █

51-EL111 FIRST FLOOR LIGHTING PLAN - ZONE 2 █ █ █

51-EP110 FIRST FLOOR POWER PLAN - ZONE 1 █ █ █ █ █

51-EP111 FIRST FLOOR POWER PLAN - ZONE 2 █ █ █

51-ES110 FIRST FLOOR SYSTEMS PLAN - ZONE 1 █ █ █ █ █

51-ES111 FIRST FLOOR SYSTEMS PLAN - ZONE 2 █ █ █

51-EF110 FIRST FLOOR FIRE ALARM - ZONE 1 █ █

51-EF111 FIRST FLOOR FIRE ALARM PLAN - ZONE 2 █ █

E300 ELECTRICAL RISER █ █ █ █ █

E500 ELECTRICAL DETAILS █ █ █ █ █

E501 ELECTRICAL DETAILS █ █ █ █ █

E600 ELECTRICAL SCHEDULES █ █ █ █ █

LEGEND - SHEET INDEX

ARCHITECTURAL ABBREVIATIONS

A/C

A/C UNIT

A/E

AAMA

AAP

AB

ABC

ACC

ACI

ACT

ACS DR

ACS FLR

ACS PNL

ACST

AD

ADA

ADC

ADDL

ADDN

ADH

ADJ

ADMIN

AFF

AFG

AFS

AGC

AGGR

AHJ

AHR

AHU

AIA

AISC

ALT

ALT NO

ALUM

AMT

ANOD

ANSI

ANT

AP

APA

APC

APPD

APPROX

AR

ARCH

ASB

ASI

ASKLR

ASPH

ASSN

ASTM

ATCH

ATM

AUTO

AUX

AV

AVG

AW

AWI

AWPA

AWS

B PL

BAT

BD

BD FT

BEV

BHMA

BI FLD DR

BITUM

BKG

BLD

BLDG

BM

BOT

BRCG

BRDG

BRDG JST

BRG

BRG PL

BRKT

BRZ

BSMT

BTWN

BUR

C CONC

C TO C

CAB

CAC

CB

CBB

CCD

CCTV

CCW

CD

CEM

CEM PLAS

CER

CF

CF/CI

CF/OI

CFLG

CFMF

CG

CGSFU

CH

CHEM

CHFR

CHK

CI

CIP

CIR

CIRC

CJ

CL

CLDG

CLG

CLR

CM

CMU

AIR CONDITION

AIR CONDITIONING UNIT

ARCHITECT/ENGINEER

AMERICAN ARCHITECTURAL MANUFACTURERS ASSN

ALARM ANNUNCIATOR PANEL

ANCHOR BOLT

AGGREGATE BASE COURSE

ACCESSIBLE

AMERICAN CONCRETE INSTITUTE

ACOUSTICAL CEILING TILE

ACCESS DOOR

ACCESS FLOOR

ACCESS PANEL

ACOUSTIC

AREA DRAIN

AMERICANS WITH DISABILITIES ACT

AUTOMATIC DOOR CLOSER

ADDITIONAL

ADDITION

ADHESIVE

ADJACENT, ADJOINING, OR ADJUSTABLE

ADMINISTRATION

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

ABOVE FINISHED SLAB

ASSOCIATED GENERAL CONTRACTORS

AGGREGATE

AUTHORITY HAVING JURISDICTION

ANCHOR

AIR HANDLING UNIT

AMERICAN INSTITUTE OF ARCHITECTS

AMERICAN INSTITUTE OF STEEL CONSTRUCTION

ALTERNATE

ALTERNATE NUMBER

ALUMINUM

AMOUNT

ANODIZE

AMERICAN NATIONAL STANDARDS INSTITUTE

ANTENNA

ACCESS PANEL

AMERICAN PLYWOOD ASSOCIATION

ARCHITECTURAL PRECAST CONCRETE

APPROVED

APPROXIMATE

AS REQUIRED

ARCHITECT

ASBESTOS

ARCHITECT'S SUPPLEMENTAL INSTRUCTION

AUTOMATIC SPRINKLER

ASPHALT

ASSOCIATION

AMERICAN SOCIETY FOR TESTING AND MATERIALS

ATTACHMENT

AUTOMATIC TELLER MACHINE

AUTOMATIC

AUXILIARY

AUDIO VISUAL

AVERAGE

ACID WASTE

ARCHITECTURAL WOODWORKING INSTITUTE

AMERICAN WOOD PRESERVERS' ASSOCIATION

AMERICAN WELDING SOCIETY

BASE PLATE

BATTEN

BOARD

BOARD FEET (FOOT)

BEVEL

BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION

BIFOLDING DOORS

BITUMINOUS

BACKING

BUILD

BUILDING

BEAM OR BENCHMARK

BOTTOM

BRACING

BRIDGING

BRIDGING JOIST

BEARING

BEARING PLATE

BRACKET

BRONZE

BASEMENT

BETWEEN

BUILT-UP ROOFING

CAST CONCRETE

CENTER TO CENTER

CABINET

CEILING ATTENUATION CLASS

CATCH BASIN OR CORNER BEAD

CEMENTITIOUS (BACKER) BOARD

CONSTRUCTION CHANGE DIRECTIVE

CLOSED CIRCUIT TELEVISION

COUNTERCLOCKWISE

CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS

CEMENT

CEMENT PLASTER

CERAMIC

CONTRACTOR FURNISHED

CONTRACTOR FURNISHED/CONTRACTOR INSTALLED

CONTRACTOR FURNISHED/OWNER INSTALLED

COUNTERFLASHING

COLD-FORMED METAL FRAMING

CORNER GUARD

CERAMIC GLAZED STRUCTURAL FACING UNITS

COAT HOOK

CHEMICAL

CHAMFER

CHECK

CAST IRON

CAST-IN-PLACE

CIRCLE

CIRCULAR

CONSTRUCTION JOINT OR CONTROL JOINT

CENTER LINE

CLADDING

CEILING

CLEAR

CONSTRUCTION MANAGEMENT

CONCRETE MASONRY UNIT

CNR

CNTR

CRTP

CO

CO2

COL

COM

COMB

COMM

COMP

CONC

CONC FLR

COND

CONF

CONN

CONSTR

CONT

CONTR

COORD

CORR

CPM

CPRS

CR

CRS

CRSI

CSB

CSG

CSI

CSK

CSMT

CSWK

CTG

CTR

CTRL

CTV

CU FT

CU IN

CU YD

CURT

CYL

CYL L

D

DAT

DBL

DBL GLZ

DCS

DP

DEG

DEL

DEMO

DEPT

DET

DF

DIA

DIAG

DIFF

DIM

DIR

DISP

DIST

DIV

DL

DOC

DR

DR CL

DR FR

DR OPNG

DS

DSGN

DW

DWG

E

EA

EFF

EFS

EIFS

EJ

EL

ELAST

ELEC

ELEC DR OP

ELEV

EMER

EMER SHR

ENCL

ENGR

ENVIR

EO

EPA

EPDM

EPO

EPS

EQ

EQL SP

EQUIP

EQUIV

ERD

ESC

ESMT

ESP

EST

ETC

EW

EWC

EWS

EXH

EXIST

EXP

EXP BT

EXST GR

EXT

EXT GR

CORNER

COUNTER

COUNTERTOP

CARBON MONOXIDE

CARBON DIOXIDE

COLUMN

COMMON

COMBINATION, COMBINED

COMMUNICATION

COMPONENT

CONCRETE

CONCRETE FLOOR

CONDENSER OR CONDITION

CONFERENCE

CONNECT

CONSTRUCTION

CONTINUE

CONTRACTOR

COORDINATE

CORRIDOR

CRITICAL PATH METHOD

COMPRESSIBLE

CARD READER

COLD ROLLED STEEL

CONCRETE REINFORCING STEEL INSTITUTE

CONCRETE SPLASH BLOCK

CASING

CONSTRUCTION SPECIFICATIONS INSTITUTE

COUNTER SUNK

CASEMENT

CASEWORK

COATING

CENTER

CONTROL

CABLE TELEVISION

CUBIC FEET

CUBIC INCH

CUBIC YARD

CURTAIN

CYLINDER

CYLINDER LOCK

DEPTH OR PENNY (NAIL)

DATUM

DOUBLE

DOUBLE GLAZE

DIAPER CHANGING STATION

DECORATIVE PANEL

DEGREE

DELETE

DEMOLITION

DEPARTMENT

DETAIL

DRINKING FOUNTAIN

DIAMETER

DIAGONAL

DIFFERENCE OR DIFFUSER

DIMENSION

DIRECTION

DISPENSER

DISTANCE

DIVIDE OR DIVISION

DEAD LOAD

DOCUMENT

DOOR, DRAIN, DRESSING ROOM, OR DRIVE

DOOR CLOSER

DOOR FRAME

DOOR OPENING

DOWNSPOUT

DESIGN

DISHWASHER

DRAWING

EAST

EACH

EFFICIENCY

EXTERIOR FINISH SYSTEM

EXTERIOR INSULATION AND FINISH SYSTEM

EXPANSION JOINT

ELEVATION

ELASTOMERIC

ELECTRIC

ELECTRIC DOOR OPENER

ELEVATOR

EMERGENCY

EMERGENCY SHOWER

ENCLOSURE

ENGINEER

ENVIRONMENT

ELECTRICAL OUTLET

ENVIRONMENTAL PROTECTION AGENCY

ETHYLENE PROPYLENE DIENE MONOMER

EMERGENCY POWER OFF

EXPANDED POLYSTYRENE BOARD (INSULATION)

EQUAL

EQUALLY SPACED

EQUIPMENT

EQUIVALENT

EXISTING ROOF DRAIN

ESCAPE OR ESCUTCHEON

EASEMENT

ESPECIALLY

ESTIMATE

AND SO FORTH OR ET CETERA

EACH WAY

ELECTRIC WATER COOLER

EYE WASH STATION

EXHAUST

EXISTING

EXPANSION OR EXPOSED

EXPANSION BOLT

EXISTING GRADE

EXTERIOR, EXTERNAL, OR EXTINGUISHER

EXTERIOR GRADE

F

FA

FAB

FAC

FACIL

FAS

FAS BD

FCU

FCO

FCTY

FD

FDC

FDTN

FE

FEC

FF

FF EL

FF&E

FHC

FHP

FIG

FIL

FIN

FIN FLR

FIN GR

FIN WD

FIXT

FL

FLASH

FLDG

FLEX

FLG

FLR

FLR FIN

FLR SK

FLUOR

FLUOR FIX

FM

FM-G

FO

FOC

FOF

FOM

FOS

FOUNT

FOW

FP

FR

FR SNK

FREQ

FRMG

FRP

FRZ

FS

FSB

FSTNR

FT

FTG

FURG

FURN

FUT

FVC

GA

GAL

GALV

GALV STL

GB

GC

GD

GDR

GEN

GFRC

GFRG

GFRP

GI

GL

GL BLK

GLU LAM

GP

GR FL

GRAN

GRTG

GSB

GSM

GSU

GT

GUAR

GUT

GYP

GYP BD

GYP PLAS

H

HAZ MAT

HB

HC

HCWD

HDBD

HDO

HDR

HDW

HDWD

HEPA

HEX

HGR

HM

HMD

HMDF

HMF

HNDRL

HO

HORIZ

HOSP

HP

HPD

HPDL

HQ

HS

HSE

HSKPG

FAHRENHEIT OR FEMALE

FIRE ALARM

FABRIC

FACTOR

FACILITY

FASCIA

FASCIA BOARD

FAN COIL UNIT

FLOOR CLEANOUT

FACTORY

FLOOR DRAIN

FIRE DEPARTMENT CONNECTION

FOUNDATION

FIRE EXTINGUISHER

FIRE EXTINGUISHER CABINET

FINISH FACE

FINISH FLOOR ELEVATION

FURNITURE, FIXTURE, AND EQUIPMENT

FIRE HOSE CABINET

FULL HEIGHT PARTITION

FIGURE

FILLET

FINISH

FINISH FLOOR

FINISH GRADE

FINISH WOOD

FIXTURE

FLOORLINE

FLASHING

FOLDING

FLEXIBLE

FLOORING

FLOOR

FLOOR FINISH

FLOOR SINK

FLUORESCENT

FLUORESCENT FIXTURE

FACTORY MUTUAL

FACTORY MUTUAL GLOBAL

FINISHED OPENING

FACE OF CONCRETE OR FACE OF CURB

FACE OF FINISH

FACE OF MASONRY

FACE OF SLAB OR FACE OF STUD

FOUNTAIN

FACE OF WALL

FIRE PROTECTION OR FIREPROOF

FIRE RATING, FIRE RESISTANT, OR FRAME

FLUSHING RIM SINK

FREQUENCY

FRAMING

FIBERGLASS REINFORCED PLASTIC

FREEZER

FEDERAL SPECIFICATION

FOLDING SHOWER BENCH

FASTENER

FEET OR FOOT

FOOTING

FURRING

FURNISH OR FURNITURE

FUTURE

FIRE VALVE CABINET

GAGE OR GYPSUM ASSOCIATION

GALLON

GALVANIC OR GALVANIZED

GALVANIZED STEEL

GRAB BAR

GENERAL CONTRACTOR

GUARD

GUARD RAIL

GENERAL OR GENERATOR

GLASS-FIBER-REINFORCED CONCRETE

GLASS-FIBER-REINFORCED GYPSUM

GLASS-FIBER-REINFORCED PLASTIC

GALVANIZED IRON

GLASS

GLASS BLOCK

GLUED LAMINATED WOOD

GRAB BAR

GROUND FLOOR

GRANITE

GRATING

GYPSUM SHEATHING BOARD

GALVANIZED SHEET METAL

GLAZED STRUCTURAL UNIT

GROUT

GUARANTEE

GUTTER

GYPSUM

GYPSUM BOARD

GYPSUM PLASTER

HIGH OR HUMIDISTAT

HAZARDOUS MATERIALS

HOSE BIBB

HOLLOW CORE

HOLLOW CORE WOOD DOOR

HARDBOARD

HIGH DENSITY OVERLAY

HEADER

HARDWARE

HARDWOOD

HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HEXAGON

HANGER

HOLLOW METAL

HOLLOW METAL DOOR

HOLLOW METAL DOOR AND FRAME

HOLLOW METAL FRAME

HANDRAIL

HOLD OPEN

HORIZONTAL

HOSPITAL

HIGH PRESSURE

HYGIENE PRODUCT DISPOSAL

HIGH PRESSURE DECORATIVE LAMINATE

HEADQUARTERS

HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH

HOUSE

HOUSEKEEPING

HST

HSS

HT

HVAC

HVY

HW

HYD

HYDR

IAQ

IBC

IC

ICW

ID

ID NO

ILLUM

INCL

IND

INFO

INSUL

INT

INTL

IWH

JAN

KD

KIT

KO

KPL

LAB

LAD

LAM

LAM GL

LAU

LAV

LBR

LBS

LCS

LD BRG

LDR

LED

LF

LIB

LIN

LIQ

LKR

LKR RM

LL

LMST

LRG

LRV

LS

LT

LT GA

LT WT

LTG

LTNG

LVD

LVR

LWC

LWIC

LYR

MACH

MACH RM

MAINT

MAN

MATL

MATV

MAX

MBD

MCB

MD

ME

MEAS

MECH

MECH RM

MED

MEK

MEMB

MEMO

MEZZ

MF

MFD

MFG

MFR

MFR REC

MGT

MIC

MID

MIL STD

MIN

MIR

MISC

MIT

MKR

ML

MLDG

MLWK

mm

MO

MOD

MOD BIT

MON

MOPR

MR

MS

MTD

MTG

MTL

MULL

MW

MWP

HOIST

HOLLOW STRUCTURAL STEEL

HEIGHT

HEATING, VENTILATING, AND AIR CONDITIONING

HEAVY

HOT WATER

HYDRANT

HYDRAULIC

INDOOR AIR QUALITY

INTERNATIONAL BUILDING CODE

INFECTION CONTROL

INFECTION CONTROL WALL

INSIDE DIAMETER

IDENTIFICATION NUMBER

ILLUMINATION

INCLUDED

INDEPENDENT OR INDUSTRIAL

INFORMATION

INSULATION

INTERIOR

INTERNATIONAL

INSTANTANEOUS WATER HEATER

JANITOR

KILN DRIED OR KNOCKED DOWN

KITCHEN

KNOCKOUT

KICKPLATE

ANGLE

LABORATORY

LADDER

LAMINATE

LAMINATED GLASS

LAUNDRY

LAVATORY

LUMBER

POUND

LOCKABLE CHARTING STATION/MED CABINET

LOAD-BEARING

LEADER

LIGHT EMITTING DIODE

LINEAR FEET (FOOT)

LIBRARY

LINEAR

LIQUID

LOCKER

LOCKER ROOM

LEAD LINED

LIMESTONE

LARGE

LOUVERED ROOF VENT

LIGHT SWITCH

LIGHT

LIGHT GAGE

LIGHTWEIGHT

LIGHTING

LIGHTNING

LOUVERED

LOUVER

LIGHTWEIGHT CONCRETE

LIGHTWEIGHT INSULATING CONCRETE

LAYER

MACHINE

MACHINE ROOM

MAINTENANCE

MANUAL

MATERIAL

MASTER ANTENNA TELEVISION SYSTEM

MAXIMUM

MARKER BOARD

METAL CORNER BEAD

DECK

MECHANICAL ENGINEER

MEASURE

MECHANICAL

MECHANICAL ROOM

MEDICAL, MEDIUM

METHYL ETHYL KETONE

MEMBRANE

MEMORANDUM

MEZZANINE

MILL FINISH

MANUFACTURED

MANUFACTURING

MANUFACTURER

MANUFACTURER'S RECOMMENDATION

MANAGEMENT

MICROPHONE

MIDDLE

MILITARY STANDARD

MINIMUM

MIRROR

MISCELLANEOUS

MITER

MARKER

METAL LATH

MOLDING (MOULDING)

MILLWORK

MILLIMETER

MASONRY OPENING

MODEL, MODIFY OR MODULE

MODIFIED BITUMEN

MONITOR

MOP RACK

MOISTURE RESISTANT

MOP SINK

MOUNTED

MOUNTING

METAL

MULLION

MICROWAVE

MEMBRANE WATERPROOFING

N

NA

NAT

NATL

NC

NCOMBL

NEC

NEG

NEMA

NEUT

NFC

NFPA

NIC

NO

NOM

NR

NRC

NRCA

NRP

NS

NUM

O/O O

OA

OC

OCC

OCT

OD

OD

OF/CI

OFD

OFF

OF/OI

OH

OH DR

OPH

OPNG

OPP

OPR

OPT

OR

ORD

ORG

ORIG

ORN

OSHA

OUT

OZ

P

PAR

PARA

PART

PAT

PB

PBD

PC

PCA

PCC

PCCP

PCD

PCF

PCP

PCT

PED

PEN

PEND

PERF

PERIM

PERP

PHAR

PHOTO

PKG

PL

PL GL

PLAM

PLAS

PLBG

PLYWD

PMTL

PNEU

PNL

PO

POLY

PP

PR

PRCST

PREFAB

PREFIN

PRELIM

PREP

PRESS

PREV

PRKG

PRMLD

PROJ

PROP

PSF

PSI

PT

PTD

PTN

PTS

PVC

PVG

PWR

QA

QC

QRY

QTR

QTY

QUAD

QUAL

R

RA

RAD

RBM

RBR

NORTH

NOT APPLICABLE

NATURAL

NATIONAL

NOISE CRITERIA OR NURSE CALL

NONCOMBUSTIBLE

NATIONAL ELECTRICAL CODE

NEGATIVE

NATIONAL ELECTRICAL MANUFACTURERS ASSN

NEUTRAL

NATIONAL FIRE CODE

NATIONAL FIRE PROTECTION ASSOCIATION

NOT IN CONTRACT

NUMBER

NOMINAL

NOISE REDUCTION

NOISE REDUCTION COEFFICIENT

NATIONAL ROOFING CONTRACTORS ASSOCIATION

NONREMOVABLE

NARROW STILE

NUMERAL

OUT TO OUT

OXYGEN

OUTSIDE AIR OR OVERALL

ON CENTER

OCCUPY

OCTAGON

OUTSIDE DIAMETER, OUTSIDE DIMENSION

OUTSIDE DIAMETER/OUTSIDE DIMENSION

OWNER FURNISHED/CONTRACTOR INSTALLED

OVERFLOW DRAIN

OFFICE

OWNER FURNISHED/OWNER INSTALLED

OVERHANG

OVERHEAD (COILING) DOOR

OPPOSITE HAND

OPENING

OPPOSITE

OPERABLE

OPTIONAL

OPERATING ROOM OR OUTSIDE RADIUS

ORDNANCE OR OVERFLOW ROOF DRAIN

ORGANIC

ORIGINAL

ORNAMENTAL

OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION

OUTLET

OUNCE

PAINT

PARALLEL OR PARAPET

PARAGRAPH

PARTIAL

PATTERN

PUSHBUTTON

PARTICLEBOARD

PIECE, POLYCARBONATE OR PORTLAND CEMENT

PORTLAND CEMENT ASSOCIATION

PRECAST CONCRETE

CONCRETE PAVEMENT

PAPER CUP DISPENSER

POUNDS PER CUBIC FOOT

PORTLAND CEMENT PLASTER

PRIVACY CURTAIN TRACK

PEDESTAL

PENETRATE

PENDANT

PERFORATED

PERIMETER

PERPENDICULAR

PHARMACY

PHOTOGRAPH

PACKAGE

PROPERTY LINE

PLATE GLASS

PLASTIC LAMINATE

PLASTER OR PLASTIC

PLUMBING

PLYWOOD

PAINTED METAL

PNEUMATIC

PANEL

POST OFFICE, PURCHASE ORDER

POLYETHYLENE (PLASTIC)

PUSH PLATE

PAIR

PRECAST

PREFABRICATE

PREFINISH

PRELIMINARY

PREPARATION

PRESSURE

PREVIOUS

PARKING

PREMOLDED

PROJECT

PROPERTY

POUNDS PER SQUARE FOOT

POUNDS PER SQUARE INCH

PORCELAIN TILE OR PRESSURE TREATED

PAPER TOWEL DISPENSER

PARTITION

PNEUMATIC TUBE STATION

POLYVINYL CHLORIDE (PLASTIC)

PAVING

POWER

QUALITY ASSURANCE

QUALITY CONTROL

QUARRY

QUARTER

QUANTITY

QUADRANT

QUALITY

RADIUS OR RISER

RETURN AIR

RADIATOR

REINFORCED BRICK MASONRY

RUBBER

RC

RCP

RCVR

RD

REC

RECD

RECPT

RECT

REF

REFR

REG

REINF

REP

REPL

REQ

REQD

RET

REV

RFG

RFI

RFP

RFS

RL

RLG

RM

RM LT

RND

RO

ROW

RS

RSV

RT

RV

RVS

RWL

S

SA

SALV

SAMP

SAN

SB

SBS

SBSTR

SC

SCH

SCHED

SCHEM

SCP

SCRN

SCT

SCWD

SD

SDG

SECT

SEG

SEL

SEP

SF

SFTWD

SGD

SGL

SHR

SHR HD

SHRD

SHT

SHTHG

SHV

SIM

SJ

SJI

SK

SKLT

SLDG

SLNT

SM

SMK

SND INS

SPEC

SPKLR

SPKR

SPLY

SPR

SQ

SQ IN

SQ YD

SST

ST

STC

STD

STIF

STL JST

STL LNTL

STL PL

STL RF DK

STL TB

STL TR

STNLS

STOR

STR

STRUCT

STRUCT STL

SUB

SURF

SUSP

SUSP CLG

SW

SWDR

SYM

SYNTH

SYS

REMOTE CONTROL

REFLECTED CEILING PLAN

RECEIVER

ROAD OR ROOF DRAIN

RECESSED

RECEIVED

RECEPTACLE

RECTANGLE

REFERENCE OR REFRIGERATOR

REFRACTORY, REFRIGERATION

REGISTER

REINFORCE

REPAIR

REPLACE

REQUIRE

REQUIRED

RETURN

REVISION

ROOFING

REQUEST FOR INFORMATION

REQUEST FOR PROPOSAL

ROOM FINISH SCHEDULE

ROOF LEADER

RAILING

ROOM

NURSE CALL LIGHT/ROOM LIGHT

ROUND

ROUGH OPENING

RIGHT OF WAY

ROUGH SAWN

RESILIENT SHEET VINYL

RIGHT

ROOF VENT

REVERSE

RAIN WATER LEADER

SOLID SURFACE

SUPPLY AIR

SALVAGE

SAMPLE

SANITARY

SPLASH BLOCK

STYRENE BUTADIEN STYRENE

SUBSTRATE

SHARPS CONTAINER

SCHOOL

SCHEDULE

SCHEMATIC

SCUPPER

SCREEN

SHOWER CURTAIN TRACK

SOLID CORE WOOD DOOR

SMOKE DETECTOR/SOAP DISPENSER

SIDING

SECTION

SEGMENT

SELECT

SEPARATE

SQUARE FOOT (FEET)

SOFTWOOD

SLIDING GLASS DOOR

SINGLE

SHOWER

SHOWER HEAD

SHOWER DRAIN

SHEET

SHEATHING

SHELVING

SIMILAR

SCORED JOINT

STEEL JOIST INSTITUTE

SKETCH

SKYLIGHT

SLIDING

SEALANT

SHEET METAL

SMOKE

SOUND INSULATION

SPECIFICATION

SPRINKLER

SPEAKER

SUPPLY

SINGLE PLY ROOF SYSTEM

SQUARE

SQUARE INCH

SQUARE YARD

STAINLESS STEEL

STAIRS OR STREET

SOUND TRANSMISSION CLASS

STANDARD

STIFFENER

STEEL JOIST

STEEL LINTEL

STEEL PLATE

STEEL ROOF DECK

STEEL TUBE

STEEL TRUSS

STAINLESS

STORAGE

STRINGERS

STRUCTURAL

STRUCTURAL STEEL

SUBSTITUTE

SURFACE

SUSPEND

SUSPENDED CEILING

SWITCH

SWING DOOR

SYMBOL

SYNTHETIC

SYSTEM

T T&M

TB

TBD

TECH

TEL

TEMP

THERM

THK

THRES

THRU

THRUOUT

TMPD

TMPD GL

TN

TO

TO FDN

TOB

TOM

TOP

TOS

TOW

TPD

TR

TRANS

TRTD

TS

TSTAT

TV

TYP

U

UC

UGND

UL

ULT

UNFIN

UNO

UPS

UR

UTIL

UV

VAC

VAR

VEH

VENT

VERT

VEST

VFD

VIC

VID

VIF

VNR

VOC

VOL

VR

VTR

W/ W/O

WBL

WC

WD

WDW

WF

WFR

WFS

WH

WHSE

WP

WPM

WR

WS

WSCT

WT

X BRACE

XPS

YD

TREAD OR THERMOSTAT

TIME AND MATERIALS

TOWEL BAR

TACK BOARD

TECHNICAL

TELEPHONE

TEMPERATURE OR TEMPORARY

THERMAL

THICKNESS

THRESHOLD

THROUGH

THROUGHOUT

TEMPERED

TEMPERED GLASS

TRUE NORTH

TOP OF ___

TOP OF FOUNDATION

TOP OF BEAM

TOP OF MASONRY

TOP OF PARAPET

TOP OF STEEL

TOP OF WALL

TOILET PAPER DISPENSER

TELECOM ROOM

TRANSOM

TREATED

TUBE STEEL

THERMOSTAT

TELEVISION

TYPICAL

HEAT TRANSFER COEFFICIENT

UNDERCUT

UNDERGROUND

UNDERWRITERS LABORATORIES

ULTIMATE

UNFINISH

UNLESS NOTED OTHERWISE

UNINTERRUPTIBLE POWER SUPPLY

URINAL

UTILITY

ULTRAVIOLET

VACUUM

VARIES

VEHICLE

VENTILATION

VERTICAL

VESTIBULE

VARIABLE FREQUENCY DRIVE

VICINITY

VIDEO

VERIFY IN FIELD

VENEER

VOLATILE ORGANIC COMPOUND

VOLUME

VAPOR RETARDER

VENT THROUGH ROOF

WITH

WITHOUT

WOOD BLOCKING

WATER CLOSET

WOOD

WINDOW

WIDE FLANGE

WOOD FRAME

WOOD FURRING STRIPS

WATER HEATER

WAREHOUSE

WATERPROOFING

WATERPROOF MEMBRANE

WEATHER RESISTANT

WEATHERSTRIP OR WALL SCONCE

WAINSCOT

WEIGHT OR WINDOW TREATMENT

CROSS BRACE

EXTRUDED POLYSTYRENE BOARD

YARD

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

CONSTRUCTION PACKAGE

C

U s e rs

\M C a m e ro n \D o c u m e n ts \1

B

L D

G s t

F lo o r_

A m c a m e ro n M

T .r v t

/2

/2

:1

:5

A

M

GI002

ABBREVIATIONS REMODEL BUILDING 51-1

EAST FOR CLC

656-19-307

08/23/2024

MC EM

15479

DN

UP

UP

FD

LIVING

ROOM

1 BED1 BED

1 BED 1 BED

TUB ROOM

LINEN

STORAGESHOWER

149 SF

48-104

CLEAN

UTILITY

SOILED

UTILITY

125 SF

48-103A

EQUIPMENT

STORAGE

TOILET

ROOM

1 BEDSTAFF

BREAK

ROOM

1 BED MEDICATION

2 BED

2 BED

DINING

ROOM

EXIT

ED

EXIT

EXIT

EA

EXAM

MED ROOM

OFFICE

TELECOM

ROOM

DINING

ROOM

KITCHEN

HAC

ELEVATOR ELEVATOR

MULTI

PURPOSE

OFFICE

STORAGE

EXAM

FILEROOM

PIPE CHASE

STORAGE

OFFICE

RoomTLTRoom

FAX/

PRINTER

NURSE

STATION

CLC OFFICE CLC OFFICE WHEELCHAIR

STORAGE STAIR HALL

MEDS

STAIR

EXERCISE

ROOM

1 BED 1 BED

1 BED

CORRIDOR

PIPE CHASE

Room

MALE/PATIENT

PIPE CHASE

LAUNDRY

DAYROOM

KITCHEN

PATIENT

DINNING

SMOKE

COMPARTMENT

SMOKE

COMPARTMENT

48-1W

5,090 SF

NO WORK THIS AREA

EA

TR

AV

EL

D

IS

TA

NC

E

'-7

TR

AV

EL

D

IS

TA

NC

E

'-9

HAC

EXIST

FEC

EXIST

FEC

LIFE SAFETY SYMBOLS

HE

TRAVEL DISTANCE

100'-10"

TRAVEL DISTANCE

EA

EDEXIT EXIT

HORIZONTAL EXIT

EXIT DISCHARGE

EXIT ACCESS

FIRE EXTINGUISHERFE

FIRE EXTINGUISHER

CABINETFEC

LIMITS OF

CONSTRUCTION

NOTE: NOT ALL SYMBOLS MY BE USED ON EACH PLAN

SHAFT

ADJACENT SYMBOLS SHOW PARTITION RATING

AND DAMPER REQUIREMENTS

SPECIAL HAZARD PROTECTION

ADJACENT SYMBOLS SHOW PARTITION RATING AND DAMPER

REQUIREMENTS

EXIT PASSAGEWAY

RATE AS STAIR

ALL OPENINGS TO BE RATED AS STAIR SHAFT

CORRIDOR

WALLS TO LIMIT THE TRANSFER OF SMOKE

HEALTHCARE SUITE

NON-PATIENT CARE

HEALTHCARE SUITE

SLEEPING SUITE PATIENT CARE

HEALTHCARE SUITE

NON-SLEEPING

PATIENT CARE

1 HOUR FIRE

BARRIER

SMOKE PARTITION

NO SYMBOL - ALL

CONTIGUOUS AREA WITHIN

SMOKE COMPARTMENT NOT

MARKED AS SLEEPING OR

NONPATIENT

1 HOUR FIRE

BARRIER AND SMOKE

PARTITION

NOYESGENERAL TYPE OF PROJECT

REMODEL

ADDITION

NEW BUILDING

PROJECT DESCRIPTION

48-1W CODE SUMMARY

MINOR UPDATES TO COMMUNITY LIVING CENTER FIRST FLOOR / WEST

OF BUILDING 48 FOR TEMPORARY USE DURING REMODEL OF BUILDING

51-1E. 5,090 SF. MAINTAINS OCCUPANCY TYPE AND EXISTING EXITS.

NOYESAUTHORITIES HAVING JURISDICTION (AHJ's)

THE JOINT COMMISSION (JC)

U.S. DEPARTMENT OF VETERANS AFFAIRS (VA)

APPLICABLE REGULATIONS

NFPA NATIONAL FIRE CODES (EXCEPTION: NFPA 5000 & 900)

2022 FGI GUIDELINES

2024 NFPA 101 (LIFE SAFETY CODE)

ABA STANDARDS (2015) (ABAAS)

2021 IBC

VA BARRIER FREE DESIGN STANDARD (PG-18-13)

OSHA STANDARDS

VA SEISMIC DESIGN REQUIREMENTS H-18-8

NATIONAL ELECTRIC CODE (NEC)

ASME BOILER AND PRESSURE VESSEL CODE

ASME CODE FOR PRESSURE PIPING

BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,

AMERICAN CONCRETE INSTITUTE AND COMETARY (ACI 318)

MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE

FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL

BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

ENERGY POLICY ACT OF 2005 (EPAct)

DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS

FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE

RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL

BUILDINGS, 10 CFR PARTS 433,434 AND 435

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE

BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)

EXECUTIVE ORDER 13834

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED

IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA

MASTER CONSTRUCTION SPECIFICATION

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE

STANDARD 62.1-2004

SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE

STANDARD 15 -2007

VA FIRE PROTECTION DESIGN MANUAL

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA

NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER

GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)

VA PHYSICAL SECURITY AND RESILIENCE DESIGN MANUAL (PSRDM)

NOYES

CHANGE OF OCCUPANCY?

SEPARATED OCCUPANCIES?

OCCUPANCY CLASSIFICATION(S)

OCCUPANCIES CH 19

EXIST HEALTH CARE

ADDITIONAL NOTES

1. DEAD-END CORRIDOR EXCEEDING 30 FT SHALL BE PERMITED TO

CONTINUE IN USE IF IT IS IMPRACTICAL AND UNFEASIBLE TO ALTER

THEM (19.2.5.3)

2. RELEASE OF DOOR LOCKS FOR FAIL-SAFE OPERATION SHALL BE

COORDINATED WITH THE FIRE ALARM SYSTEM.

NOYES

FIRE RESISTIVE CORRIDORS?

SMOKE TIGHT CORRIDORS (SMOKE PARTITIONS)

INCIDENTAL USE AREA RATING(S) SEE PLANS

MISCELLANEOUS

INTERIOR FINISHES CLASSIFICATION AEXITS

AEXIT ACCESS CORRIDORS

BOTHER SPACES

SEPARATED OCCUPANCIES DO NOT OCCUR WITHIN THE PROJECT.

FLOOR PROVIDES SEPARATION TO BASEMENT STORAGE

RATING (HRS)

STRUCTURAL FRAME

FIRE-RESISTIVE REQUIREMENTS

NO CHANGE

1 HR

BEARING WALLS 1 HR

NON-BEARING WALLS AND PARTITIONS 0 HR

See Life Safety Plans

FLOOR CONSTRUCTION 1 HR

ROOF CONSTRUCTION 1 HR

EXTERIOR DOORS AND WINDOWS

SHAFTS AND EXIT PASSAGEWAYS 1 HR

0 HR

(Section 8.3)FIRE BARRIER RATING(S) SEE LIFE SAFETY PLANS

AREA SEPARATIONS / FIRE WALLS

TYPE(S) OF CONSTRUCTION

CONSTRUCTION TYPE(S)

SEE LIFE SAFETY PLANS

ACTUAL AREA PER FLOOR

TOTAL

SECOND FLOOR

FIRST FLOOR

BASEMENT NO CHANGE

NO CHANGE

NO CHANGE

NO CHANGE

NO CHANGE TYPE II (111)

EGRESS NO CHANGE

OCCUPANT LOAD OF BUILDING NO CHANGE

PLUMBING FIXTURES NO CHANGE

NOYESGENERAL TYPE OF PROJECT

REMODEL

ADDITION

NEW BUILDING

PROJECT DESCRIPTION

REMODEL OF COMMUNITY LIVING CENTER DIMENTIA UNIT ON FIRST

FLOOR / EAST OF BUILDING 51. 5,820 SF WITHIN SMOKE COMPARTMENT

AND ADJACENT WORK. MAINTAINS OCCUPANT LOAD AND EXISTING

EXITS. DUE TO EXTENT OF WORK OCCUPANCY SHALL BE NEW HEALTH

CARE OCCUPANCY.

NOYESAUTHORITIES HAVING JURISDICTION (AHJ's)

THE JOINT COMMISSION (JC)

U.S. DEPARTMENT OF VETERANS AFFAIRS (VA)

NOYES

CHANGE OF OCCUPANCY?

SEPARATED OCCUPANCIES?

OCCUPANCY CLASSIFICATION(S)

OCCUPANCIES CH 18

NEW HEALTH CARE

APPLICABLE REGULATIONS

NFPA NATIONAL FIRE CODES (EXCEPTION: NFPA 5000 & 900)

2022 FGI GUIDELINES

2024 NFPA 101 (LIFE SAFETY CODE)

ABA STANDARDS (2015) (ABAAS)

2021 IBC

VA BARRIER FREE DESIGN STANDARD (PG-18-13)

OSHA STANDARDS

VA SEISMIC DESIGN REQUIREMENTS H-18-8

NATIONAL ELECTRIC CODE (NEC)

ASME BOILER AND PRESSURE VESSEL CODE

ASME CODE FOR PRESSURE PIPING

BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,

AMERICAN CONCRETE INSTITUTE AND COMETARY (ACI 318)

MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE

FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL

BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

ENERGY POLICY ACT OF 2005 (EPAct)

DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS

FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE

RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL

BUILDINGS, 10 CFR PARTS 433,434 AND 435

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE

BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)

EXECUTIVE ORDER 13834

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED

IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA

MASTER CONSTRUCTION SPECIFICATION

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE

STANDARD 62.1-2004

SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE

STANDARD 15 -2007

VA FIRE PROTECTION DESIGN MANUAL

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA

NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER

GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)

VA PHYSICAL SECURITY AND RESILIENCE DESIGN MANUAL (PSRDM)

CORRIDORS

18.2.5.3 DEAD END CORRIDOR - 30' ALLOWED

NOYES

FIRE RESISTIVE CORRIDORS?

SMOKE TIGHT CORRIDORS (SMOKE PARTITIONS)

INCIDENTAL USE AREA RATING(S) SEE PLANS

MISCELLANEOUS

INTERIOR FINISHES CLASSIFICATION AEXITS

AEXIT ACCESS CORRIDORS

BOTHER SPACES

51-1E CODE SUMMARY

SEPARATED OCCUPANCIES DO NOT OCCUR WITHIN THE PROJECT.

FLOOR PROVIDES SEPARATION TO BASEMENT STORAGE

(Section 8.3)FIRE BARRIER RATING(S) SEE LIFE SAFETY PLANS

RATING (HRS)

STRUCTURAL FRAME

FIRE-RESISTIVE REQUIREMENTS

NO CHANGE

1 HR

BEARING WALLS 1 HR

NON-BEARING WALLS AND PARTITIONS 0 HR

See Life Safety Plans

FLOOR CONSTRUCTION 1 HR

ROOF CONSTRUCTION 1 HR

EXTERIOR DOORS AND WINDOWS

SHAFTS AND EXIT PASSAGEWAYS 1 HR

0 HR

AREA SEPARATIONS / FIRE WALLS

TYPE(S) OF CONSTRUCTION

CONSTRUCTION TYPE(S)

SEE LIFE SAFETY PLANS

ACTUAL AREA PER FLOOR

TOTAL

SECOND FLOOR

FIRST FLOOR

BASEMENT NO CHANGE

NO CHANGE

NO CHANGE

NO CHANGE

NO CHANGE TYPE II (111)

EGRESS NO CHANGE

OCCUPANT LOAD OF BUILDING NO CHANGE

PLUMBING FIXTURES NO CHANGE

EXISTING TO NEW HEALTH CARE

CORRIDORS

18.2.5.3 DEAD END CORRIDOR - 30' ALLOWED

984 SF

PATIENT CARE SLEEPING SUITE

2951 SF

PATIENT CARE NONSLEEPING SUITE

191 SF

NON-PATIENT CARE

728 SF

PATIENT CARE SLEEPING SUITE

450 SF

PATIENT CARE SLEEPING SUITE

NO WORK THIS AREA

RESIDENT

ROOM

STAIRS

OFFICE

STAIRS

MED ROOM

C1C

CORRIDOR

RESIDENT

ROOM

RESIDENT

ROOM

121A

TOILET

ROOM

RESIDENT

ROOM

RESIDENT

ROOM

127B

HAC

86 SF

127D

CLEAN

UTILITY

85 SF

127E

SOILED

UTILITY

126A

TOILET

ROOM

120A

TOILET

ROOM

OPEN

LOUNGE

OFFICE

BREAK/LOUNGE

90 SF

EQUIPMENT

STORAGE

CHARTING

STATION

125A

TOILET

ROOM124A

TOILET

ROOM

C1SE

CORRIDOR

C1NE1

CORRIDOR

128A

TOILET

ROOM

DINING

RESIDENT

ROOM

111A

TOILET

ROOM

RESIDENT

ROOM

113A

TOILET

ROOM

RESIDENT

ROOM

115A

TOILET

ROOM

116A

TOILET

ROOM

RESIDENT

ROOM

117A

TOILET

ROOM

RESIDENT

ROOM

127A

LINEN

LINEN

123B

WARD

SUPPLY

MED

NURSE

STATION

STAFF

CHUTE

LAUNDRY

ENTRY

ADMIN

ASSISTANT

Room

DINING

STORAGE

CLASS

CONF

E01

ELEV

BATH

OFFICE

NURSE

PRACTIONER

134C

VESTIBULE

134B

STAIR

134A

CORRIDOR

C1E

CORRIDOR

EXIT

SMOKE

COMPARTMENT

51-1E

127C

BATH

E X

IT

EXIT

TR

AV

EL

D

IS

TA

NC

E

'-1

TR

AV

EL

D

IS

TA

NC

E

'-7

E A

QUIET

ROOM

C1NE2

SHARED

SPACE

C O

R R

ID

O

R L

E N

G T

H

'-0

29'-8"

FEC

FEC

EXIT AT

GROUND

LEVEL

EXIT AT

GROUND

LEVEL

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

CONSTRUCTION PACKAGE

C

U s e rs

\M C a m e ro n \D o c u m e n ts \1

B

L D

G s t

F lo o r_

A m c a m e ro n M

T .r v t

/2

/2

:1

:4

P

M

GI110

LIFE SAFETY PLANS REMODEL BUILDING 51-1

EAST FOR CLC

656-19-307

08/23/2024

LA EM

15479

3/32" = 1'-0"

BUILDING 48 - FIRST FLOOR - PARTIAL LIFE SAFETY PLAN

0 10'-8" 21'-4"5'-4"

TRUE

NORTH

PLAN

NORTH

0 10'-8" 21'-4"5'-4"

TRUE

NORTH

PLAN

NORTH

SUITE AREAS

Name Area

NON-PATIENT CARE

1 STAFF BREAK TOILET 191 SF

PATIENT CARE NONSLEEPING SUITE

2 GENERAL SUITE 2951 SF

PATIENT CARE SLEEPING SUITE

3 RM 113 114 115 116 984 SF

4 RM 117 227 SF

5 RM 124 125 126 728 SF

6 RM 120 121 450 SF

7 RM 111 227 SF

Total Area 5758 SF

3/32" = 1'-0"

BUILDING 51 - FIRST FLOOR - PARTIAL LIFE SAFETY PLAN

FD

4C

STORAGE

WHEELCHAIR

4D

WASHER

WHLCHAIR

4B

OFFICE

CORR4E

CLINIC

WHEELCHAIR

LOUNGE

EMPLOYEE

STORAGE

PROSTHETICS

OFFICE

PROSTHETICS

9A

OFFICE

STAIR

10A

SERVICE ROOM

UPPER

OFFICE

LOCKER

FEMALE 1A

UTILITY

SOILED

2A

BATH

STOR 23D

EXAM

23C

INTAKE

C0C

CORRIDOR

ACTIVITIES

12A

CORRIDOR

12B

STAIR

12D

MECH

ELEV

12C

ENTRY

STORAGE 14

HAC

STAIR

OFFICECOCA

CORRIDOR

28'-13/4"

LAUNDRY

CHUTE

NO WORK THIS AREA

CONSTRUCTION ZONE: 48-1W-A

CLASS OF PRECAUTION: CLASS II

CONSTRUCTION ZONE: 48-1W-B

CLASS OF PRECAUTION: CLASS II

NO WORK THIS AREA

CONSTRUCTION ZONE: 51-1E-A

CLASS OF PRECAUTION: CLASS IV

POSSIBLE ANTE ROOM

AT GRADE LEVEL ENTRY/EXIT, CONTRACTOR

TO PRESERVE RECENTLY INSTALLED

CONCRETE FLATWORK. IF DAMAGE OCCURS

DURING CONSTRUCTION, CONTRACTOR

SHALL REPLACE PAVEMENT AT END OF

CONSTRUCTION.

CONSTRUCTION ZONE: 51-1E-B

CLASS OF PRECAUTION: CLASS IV

CONSTRUCTION ZONE: 51-1E-C

CLASS OF PRECAUTION: CLASS IV

TEMPORARY DEMOLITION DEBRIS CHUTE.

PROVIDE SUFFICIENT BARRIERS AT GRADE

INCLUDING STORMWATER PROTECTION AND

CONSTRUCTION FENCE.

TEMPORARY CONSTRUCTION BARRIER

FOR MED GAS WORK. WORK SHALL BE

COMPLETE WITHIN THREE WORKING

DAYS. TEMPORARY BARRIERS SHALL

BE INSTALLED IN ONE OVERNIGHT

SHIFT IMMEDIATELY BEFORE

BEGINNING WORK AND REMOVED IN

ONE OVERNIGHT SHIFT IMMEDIATELY

AT END OF WORK. COORDINATE WITH

COR IN ADVANCE FOR PREPARATION,

SCHEDULING, AND FINAL CLEAN.

INFECTION CONTROL RISK ASSESSMENT (ICRA) LEGEND

LIMITS OF CONSTRUCTION

1 HOUR FIRE RATED ICRA / CONSTRUCTION BARRIER

LOCATION, AND DOOR, WHERE SHOWN

TEMPORARY NON-RATED (PLASTIC SHEETING) CONSTRUCTION BARRIER

LOCATION, WHERE APPROVED BY THE VA FOR USE IN RISK TYPE C. UPGRADE

TO 1 HOUR RATED PARTITION WHEN DIRECTED BY THE VA

48-1W MODIFICATIONS

48-1W-A

CONSTRUCTION PROJECT ACTIVITY: TYPE C

INFECTION CONTROL RISK GROUP: GROUP LOW RISK

CLASS OF PRECAUTION: CLASS II

48-1W-B

CONSTRUCTION PROJECT ACTIVITY: TYPE C

INFECTION CONTROL RISK GROUP: GROUP LOW RISK

CLASS OF PRECAUTION: CLASS II

INFECTION CONTROL RISK ASSESSMENT (ICRA)

BY PROJECT AREA USE AND PHASE

51-1E REMODEL

51-0E-A

CONSTRUCTION PROJECT ACTIVITY: TYPE C

INFECTION CONTROL RISK GROUP: GROUP LOW RISK

CLASS OF PRECAUTION: CLASS II

51-0E-B

CONSTRUCTION PROJECT ACTIVITY: TYPE D

INFECTION CONTROL RISK GROUP: GROUP LOW RISK

CLASS OF PRECAUTION: CLASS II

51-1E-A

CONSTRUCTION PROJECT ACTIVITY: TYPE D

INFECTION CONTROL RISK GROUP: GROUP HIGH RISK

CLASS OF PRECAUTION: CLASS IV

51-1E-B MED GAS WORK AT EXIST NURSE STATION

CONSTRUCTION PROJECT ACTIVITY: TYPE C

INFECTION CONTROL RISK GROUP: GROUP HIGH RISK

CLASS OF PRECAUTION: CLASS IV

51-1E-C MECHANICAL WORK IN EXIST OFFICE 106

CONSTRUCTION PROJECT ACTIVITY: TYPE C

INFECTION CONTROL RISK GROUP: GROUP MEDIUM RISK

CLASS OF PRECAUTION: CLASS III

CONSTRUCTION ZONE: 51-0E-A

CLASS OF PRECAUTION: CLASS II

CONSTRUCTION ZONE: 51-0E-B

CLASS OF PRECAUTION: CLASS II

AT GRADE LEVEL ENTRY/EXIT, CONTRACTOR

TO PRESERVE RECENTLY INSTALLED

CONCRETE FLATWORK. IF DAMAGE OCCURS

DURING CONSTRUCTION, CONTRACTOR

SHALL REPLACE PAVEMENT AT END OF

CONSTRUCTION.

TEMPORARY DEMOLITION DEBRIS CHUTE.

PROVIDE SUFFICIENT BARRIERS AT GRADE

INCLUDING STORMWATER PROTECTION AND

CONSTRUCTION FENCE.

CONTINUOUS

DUCT

TAPE SEAL

EACH SIDE

AT CEILING

COMPRESSIBLE

INSULATION

CONTINUOUS DUCT

TAPE SEAL EACH

SIDE

EXISTING FINISHED

FLOOR

(1) LAYER 5/8" GYP BD EACH

SIDE. FINISH OCCUPIED SIDE

WITH GLOSS PAINT

3 5/8" STEEL STUDS @ 16"

OC WITH FULL BATT SOUND

ATTENUATING INSULATION

CLOSE OPEN DUCTS

WITH 6 MIL

POLYETHYLENE

BARRIER. SEAL

EDGES WITH

CONTINUOUS DUCT

TAPE

"WORK" SIDE OF BARRIER OCCUPIED SIDE OF BARRIER

BOTTOM OF

EXISTING

FLOOR SLAB

3 5/8" STEEL

STUDS @ 16"

OC WITH FULL

BATT SOUND

ATTENUATING

INSULATION

3 5/8" STEEL STUDS

@ 16" OC WITH FULL

BATT SOUND

ATTENUATING

INSULATION

REMOVE PORTION OF EXISTING CEILING AS

REQUIRED FOR INSTALLATION OF BARRIER

FRAME AND SEAL

BARRIER AROUND

ANY EXISTING

MECHANICAL,

ELECTRICAL,

PLUMBING,

TECHNOLOGY,

MED GAS, ETC.

SYSTEMS AS

REQUIRED.

6 MIL POLY OVER

CEILING PENETRATION

NOTES:

1. ALL CORNERS TO FORM 90 ANGLE WITH NO RADIUS

2. SEAL ALL SIDES OF POLY WITH DUCT TAPE

3. SEAL ALL CRACKS WITH DUCT TAPE.

6 MIL POLY OVER

EQUIPMENT OR

FURNISHING

6 MIL POLY OVER

WALL PROTRUSION

FLOOR

DOOR

BEYOND

WINDOW

BEYOND

CEILING

6 MIL POLY OVER

WALL OPENINGS

6 MIL POLY OVER

DOORS & WINDOWS

CEILING

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

CONSTRUCTION PACKAGE

C

U s e rs

\M C a m e ro n \D o c u m e n ts \1

B

L D

G s t

F lo o r_

A m c a m e ro n M

T .r v t

/2

/2

:1

:5

A

M

GC110

INFECTION CONTROL &

PHASING PLANS

REMODEL BUILDING 51-1

EAST FOR CLC

656-19-307

08/23/2024

MC EM

15479

3/32" = 1'-0"1 BUILDING 48 - FIRST FLOOR - ICRA, CONSTRUCTION BARRIER & PHASING PLAN 3/32" = 1'-0"2 BUILDING 51 - FIRST FLOOR - ICRA, CONSTRUCTION BARRIER & PHASING PLAN

0 10'-8" 21'-4"5'-4"

NORTH

3/32" = 1'-0"3 BUILDING 51 - BASEMENT - ICRA, CONSTRUCTION BARRIER & PHASING PLAN 0 10'-8" 21'-4"5'-4"

PLAN

NORTH

0 10'-8" 21'-4"5'-4"

PLAN

NORTH

1/2" = 1'-0"4 TYP DUST PROOF BARRIER

12" = 1'-0"5 CRITICAL BARRIER PREPARATION / INSTALLATION

INFECTION CONTROL &

CONSTRUCTION BARRIER

GENERAL NOTES

1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL

INFORMATION

2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND

PARTICULATE MATTER TO THE CONSTRUCTION AREA. CONSTRUCTION AREA

PERIMETER NEEDS TO BE SEALED COMPLETELY WITH SHEET PLASTIC AS

SPECIFIED AND DUCT TAPE DURING OPERATIONS, WHERE PERMITTED BY CLASS.

ICRA - CONSTRUCTION BARRIER TO BE PROVIDED AS SPECIFIED AND LISTED IN

ICRA CLASS.

3. PROVIDE NEGATIVE PRESSURE MONITORS DURING CONSTRUCTION OPERATIONS

AS SPECIFIED. MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN

CONSTRUCTION AREA AND ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA.

4. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON,

PROVIDE A REQUEST VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE

VA INFECTION CONTROL NURSE. UPON AUTHORIZATION, PROCEED TO NEXT TYPE

OF CONSTRUCTION. PROVIDE AT LEAST TEN (10) WORKING DAYS NOTICE FOR

EACH PERMIT.

5. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER(S) FROM FLOOR

TO DECK/FLOOR ABOVE. EXCEPTION. IF BARRIER IS ADJACENT TO SMOKE, FIRE,

OR EXISTING WALL CONSTRUCTION WHICH WILL NOT BE DEMOLISHED AND

TERMINATES TO FLOOR/DECK ABOVE, THEN CONSTRUCT DUST PROOF IC

BARRIER, SEE DETAIL(S). TAPE, MUD, SAND JOINTS AND PAINT ON NON-

CONSTRUCTION SIDE OF BARRIER.

6. INFECTION CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY

BEFORE 7:00 AM AND AFTER 8:00 PM OR DIRECTED BY COR

7. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA PROVIDE

NEGATIVE PRESSURE MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF,

(2) TWO MINIMUM IN AREAS BETWEEN 1000 SF AND 5000 SF, AND (3) THREE FOR

AREAS BETWEEN 5000 SF AND 10000 SF.

8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.

9. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO

COMPLETELY EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL

TIMES PER HOUR. THE COMPETENT PERSON SHALL DETERMINE THE NUMBER OF

UNITS NEEDED FOR EACH REGULATED AREA BY DIVIDING THE CUBIC FEET IN THE

REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE

ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE

NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR.

PROVIDE A STANDBY UNIT IN THE EVENT OF MACHINE FAILURE AND/OR

EMERGENCY IN AN ADJACENT AREA.

10. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED PARTITIONS,

CONSTRUCT NEW SMOKE BARRIER/APPROPRIATE FIRE RATED PARTITIONS PER

PLANS OR CONSTRUCT INFECTION CONTROL BARRIER TO ACT AS SMOKE

BARRIER.

CONSTRUCTION PHASING

GENERAL NOTES

1. THE WORK UNDER THIS CONTRACT SHALL BE DIVIDED INTO PHASES. A PHASE

CAN INVOLVE MULTIPLE LOCATION AREAS. SEE SPECIFICATIONS SECTION 01 00 00

1.6.G PHASING.

2. THE GENERAL CONTRACTOR SHALL COORDINATE ALL PHASING AND SEQUENCING

WITH ALL TRADES AND THE OWNER. THE GENERAL CONTRACTOR SHALL PROVIDE

A WRITTEN NARRATIVE TO OUTLINE CONSTRUCTION PHASING AND SEQUENCE

PLANS, VALIDATING AND ELABORATING ON THIS PHASING DESCRIPTION.

3. THE GENERAL CONTRACTOR SHALL COOPERATE FULLY WITH THE OWNER SO

WORK MAY BE CARRIED OUT SMOOTHLY, WITHOUT INTERFERING WITH OR

DELAYING WORK UNDER THIS CONTRACT, OR OTHER CONTRACTS ON THE

PROJECT SITE OR WORK BY OWNER.

4. THE GENERAL CONTRACTOR'S CONSTRUCTION SCHEDULE SHALL INDICATE THE

SEQUENCE, COMMENCEMENT AND COMPLETION DATES, OWNER INSPECTION AND

APPROVAL DATES AND MOVE-OUT AND MOVE-IN DATES OF OWNER'S PERSONNEL

FOR ALL PHASES OF THE WORK.

5. THE GENERAL CONTRACTOR SHALL PERFORM THE WORK IN EACH PHASE IN THE

SEQUENCE SHOWN ON THE PHASING PLAN DRAWING(S) AND CONSTRUCTION

PHASING DESCRIPTION.

6. THE GENERAL CONTRACTOR MUST COMPLETE ALL WORK IN EACH PHASE WITH

THE VA INSPECTING AND ACCEPTING THE WORK PRIOR TO VA OCCUPANCY AND

THE CONTRACTOR PROCEEDING TO THE NEXT SCHEDULED PHASE. UPON

COMPLETION OF A PARTICULAR PHASE, THE ENTIRE AREA COVERED BY THAT

PHASE CAN BE OCCUPIED BY THE VA PERSONNEL WITH ALL SYSTEMS

FUNCTIONING PROPERLY.

7. BEFORE COMMENCING WORK ON EACH SUCCESSIVE PHASE, THE GENERAL

CONTRACTOR SHALL SUBMIT AN UPDATED COPY OF THE SCHEDULE.

8. ANY DUST PARTITIONS OR ICRA-CONSTRUCTION BARRIERS CONSTRUCTED BY

THE CONTRACTOR PRIOR TO THE START OF DEMOLITION MUST REMAIN IN PLACE

UNTIL THE COMPLETION OF THAT PHASE OR SUBSEQUENT PHASE WHERE

REQUIRED.

9. THE CONTRACTOR SHALL PERFORM ALL WORK ADJACENT TO VA OCCUPIED

AREAS IN SUCH A MANNER TO ENSURE THE CONTINUOUS AND UNINTERRUPTED

USE OF ALL OCCUPIED AREAS, INCLUDING THE APPLICABLE MECHANICAL AND

ELECTRICAL SYSTEMS SERVING THESE AREAS.

10. FOR ADDITIONAL NOTES AND INFORMATION REFER TO INFECTION CONTROL

DRAWING(S) AND DEMOLITION PLANS.

11. ANY INFORMATION REGARDING SEQUENCING PROVIDED IN THE DOCUMENTS IS

FOR ARCHITECT-OWNER PLANNING PURPOSES ONLY.

12. THE CONTRACTOR DURING CONSTRUCTION SHALL MAINTAIN REQUIRED MEANS

OF EGRESS THROUGHOUT ALL PHASING.

13. THE CONTRACTOR SHALL PLAN FOR A MINIMUM OF 4 WEEKS' TIME BETWEEN

PHASES TO ALLOW THE VA TO OCCUPY THE NEWLY ACCEPTED SPACE AND

VACATE THE FOLLOW-ON PHASES. THE VA WILL ACCELERATE THIS TIME WHEN

POSSIBLE AND WILL NOTIFY THE CONTRACTOR IF THIS OCCURS.

VHA INFECTION CONTROL RISK ASSESSMENT FOR CONSTRUCTION,

RENOVATION AND MAINTENANCE

TABLE 5 - REQUIRED INFECTION PREVENTION AND CONTROL MEASURES, BY LEVEL OF PRECAUTIONS

CONTROLS DEFINED BELOW FOR THE LEVEL OF PRECAUTIONS IDENTIFIED FOR THE ACTIVITY MUST BE IN PLACE BEFORE THE ACTIVITY BEGINS AND MAINTAINED UNTIL WORK IS COMPLETED AND THE AREA IS ACTIVATED. CONTROL MEASURES FOR EACH PRECAUTION LEVEL MUST ALSO INCLUDE THE CONTROL MEASURES IN THE PRECEDING LEVEL(S).

AS THE ACTIVITY PROGRESSES, A FULL RE-EVALUATION OF REMAINING ACTIVITY TYPE AND PATIENT RISK IS REQUIRED PRIOR TO

DOWNGRADING THE LEVEL OF PRECAUTIONS.

LEVEL OF

PRECAUTIONS

CONTROL MEASURES

LEVEL I

1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.

2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON COMPLETION OF WORK.

ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE FREE OF CONTAMINANTS AND LOOSE

MATERIAL.

TABLE 6 - MINIMUM INFECTION PREVENTION AND CONTROL MEASURES REQUIRED UPON COMPLETION OF THE ACTIVITY

CONTROLS DEFINED BELOW SHALL BE COMPLETED UPON COMPLETION OF THE ACTIVITY AND INSPECTED PRIOR TO TERMINATING

MEASURES DEFINED IN TABLE 5.

LEVEL OF

PRECAUTIONS

MEASURES

LEVELS I - II

CLEANING:

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL SURFACES AND

FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER SURFACES AS

WELL AS AIR DIFFUSER SURFACES.

HVAC SYSTEMS:

1. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED. VERIFY THAT

HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

2. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN SPECIFICATIONS.

WATER SYSTEMS:

UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL CONTINUE AT LEAST TWICE PER WEEK

IN ACCORDANCE WITH VHA DIRECTIVE 1061.

LEVELS III - IV

CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR FINAL ACTIVITY/PROJECT CLOSE OUT AND REMOVAL OF INFECTION

PREVENTION AND CONTROL MEASURES.

WORK AREA CLEANING:

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL SURFACES AND

FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER SURFACES AS

WELL AS AIR DIFFUSER SURFACES.

REMOVAL OF CRITICAL BARRIERS:

1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN PERFORMED. ADDITIONAL CLEANING MAY BE

NEEDED AFTER REMOVAL OF BARRIER.

2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN REMOVING HARD BARRIERS:

1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.

2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA VACUUM.

3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.

4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD BARRIER.

5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.

NEGATIVE AIR REQUIREMENTS:

1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE WORK AREA.

2. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION EQUIPMENT) MUST

REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD AFTER COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM THE WORK AREA AND BEFORE REMOVAL OF

CRITICAL BARRIERS.

HVAC SYSTEMS:

1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE

WORK IS BEING PERFORMED.

2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

3. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW AND AIR

EXCHANGE DESIGN SPECIFICATIONS.

WATER SYSTEMS:

UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL CONTINUE AT LEAST TWICE PER WEEK

IN ACCORDANCE WITH VHA DIRECTIVE 1061.

LEVEL II

ALL CONTROL MEASURES IN LEVEL I AND THE FOLLOWING:

1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO OCCUPIED AREAS AND/OR WATER

MIST SURFACE TO CONTROL DUST (E.G., MOBILE DUST CONTAINMENT CART OR SOME OTHER SYSTEM).

2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE LEAVING THE WORK AREA.

3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE HVAC SYSTEM FROM DUST AND

REDUCE AIR TURBULENCE. REBALANCE SYSTEM TO ADDRESS DIFFUSER ISOLATION.

4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING STAGNATION DUE TO REDUCED

USAGE, THE PIPING SHALL BE FLUSHED TWICE A WEEK OR ISOLATED FROM THE MAIN SYSTEM.

5. SEAL DOORS TO PREVENT DUST MIGRATION.

6. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY CLEANING AND DISPOSAL OF TRASH

(COVERED) FROM WORK AREA USING AN IDENTIFIED EXIT ROUTE.

7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA MUST BE IN SEALED CONTAINERS

AND/OR CLEANED OF DUST AND DEBRIS PRIOR TO REMOVAL FROM THE AREA.

8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST BE USED TO TRANSPORT TRASH AND

DEBRIS FROM THE CONSTRUCTION AREAS. THESE CONTAINERS MUST BE DAMP-WIPED CLEANED AND FREE OF

VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.

9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK AREA BASED ON FACILITY POLICY.

STICKY MATS MUST BE CHANGED ROUTINELY AND WHEN VISIBLY SOILED.

10. MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP MOPPING OR HEPA VACUUMING

SURFACES AT LEAST DAILY.

LEVEL III

ALL CONTROL MEASURES IN LEVELS I AND II AND THE FOLLOWING:

1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.

2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241 REQUIREMENTS. BARRIERS MUST EXTEND TO

THE CEILING OR IF CEILING TILE IS REMOVED, TO THE DECK ABOVE.

3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE COMPLETED IN A MANNER THAT PREVENTS

DUST RELEASE. PLASTIC BARRIERS MUST BE EFFECTIVELY AFFIXED TO FLOOR AND CEILING (OR FLOOR/ROOF DECK

ABOVE) AND SECURE FROM MOVEMENT OR DAMAGE.

4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND CEILING, USING APPROVED

MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE FOR BARRIER TYPE).

5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE ENTIRE WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED OUTDOORS (UNLESS A WORK SPECIFIC WAIVER IS APPROVED BY VHA’S OFFICE OF HEALTHCARE ENGINEERING); THIS MUST BE MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT. EXHAUST DISCHARGED DIRECTLY TO THE OUTDOORS THAT IS 25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES AND WINDOWS IS NOT REQUIRED TO BE HEPA-FILTERED. EXHAUSTING DISCHARGED AIR INTO SHARED OR RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED EXHAUST SYSTEMS (E.G., BATHROOM EXHAUST) IS

PROHIBITED.

6. INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC, MANOMETER, OR DIGITAL MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO CONTINUALLY MONITOR AND DOCUMENT NEGATIVE PRESSURIZATION.

THE “BALL IN THE WALL” OR SIMILAR APPARATUS ARE NOT ACCEPTABLE.

LEVEL IV

ALL CONTROL MEASURES IN LEVELS I, II AND III AND THE FOLLOWING:

1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL BARRIER.

2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE CONTROL. ANTEROOM MUST BE LARGE

ENOUGH FOR EQUIPMENT STAGING, CART CLEANING, WORKERS’ PPE AND CLEANING.

3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF VISIBLE DUST BEFORE LEAVING THE

WORK AREA ANTEROOM. HEPA VACUUMING OF CLOTHING OR USE OF COVER SUITS IS ACCEPTABLE.

4. WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN ANTEROOM. SHOE COVERS MUST BE

REMOVED PRIOR TO EXITING THE ANTEROOM TO THE OCCUPIED SPACE (NON-WORK AREA). DAMAGED SHOE

COVERS MUST BE CHANGED IMMEDIATELY.

VHA INFECTION CONTROL RISK ASSESSMENT FOR CONSTRUCTION,

RENOVATION AND MAINTENANCE

TABLE 1 - CONSTRUCTION, RENOVATION, AND/OR MAINTENANCE ACTIVITY CATEGORY

Category A

INSPECTION AND/OR FACILITY UPKEEP GENERALLY DEFINED AS FOLLOWS:

• WORK CAN BE COMPLETED IN A SINGLE SHIFT, NOT TO EXCEED 10 HOURS.

• PATIENTS AND/OR EMPLOYEES MAY BE IN THE AREA DEPENDING ON THE ACTIVITY.

• WORK THAT DOES NOT CREATE DUST OR DEBRIS.

• REMOVAL OF CEILING TILE OR ACCESS TO MECHANICAL OR ELECTRICAL CHASE FOR VISUAL INSPECTION

LIMITED TO 1 TILE PER 50 SQUARE FEET WITH LIMITED EXPOSURE TIME (NOT TO EXCEED AN HOUR FOR

EACH TILE) WITHIN THE SHIFT.

• MINOR INTERIOR UPDATES (E.G., REPLACING FLOOR OR CEILING TILES, CARPENTRY WORK TO INCLUDE HANGING SIGNAGE, AND PAINTING WITHOUT SANDING) THAT DO NOT CREATE DUST OR DEBRIS.

• LIMITED BUILDING SYSTEM MAINTENANCE SUCH AS PLUMBING ON POTABLE SYSTEMS LIMITED TO FAUCET REPLACEMENT ETC. AND ELECTRICAL WORK SUCH AS REPLACEMENT OF BULBS, RECEPTACLES, OR

SWITCHES.

ACTIVITY AREA**

ACTIVITY CATEGORY

PATIENT RISK

CATEGORY A B C D

LOW RISK

MEDIUM RISK

HIGH RISK

HIGHEST RISK

I II II III

I II III IV

I II IV

II IVIII IV

IV

AN INFECTION PREVENTION AND CONTROL PERMIT IS REQUIRED FOR LEVEL III AND LEVEL IV.

CONSULT WITH INFECTION PREVENTION AND CONTROL FOR LEVEL I AND LEVEL II.

TABLE 3 - PATIENT RISK CATEGORY

Category B

GENERAL MAINTENANCE AND REPAIR WORK GENERALLY DEFINED AS FOLLOWS:

• PROLONGED INSPECTION AND WORK THAT MAY TAKE LONGER THAN A SINGLE SHIFT BUT NOT EXCEEDING A

WEEK.

• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.

• WORK THAT CREATES MINIMAL DUST AND DEBRIS.

• INTERIOR FINISH OR SURFACE REPAIRS, UPDATES, OR MODIFICATIONS SUCH AS REPAIR OF FIREWALLS AND

BARRIERS, AND NEW FLOORING THAT PRODUCES MINIMAL DUST AND DEBRIS. CONTROLLED SANDING

ACTIVITIES (E.G., WET OR DRY SANDING) THAT PRODUCE MINIMAL DUST AND DEBRIS.

• PLUMBING WORK SUCH AS INSTALLATION OR REPLACEMENT OF A SINGLE FIXTURE OR PIPING FOR A SINGLE

FIXTURE. ANY WORK ON SANITARY PLUMBING INCLUDING SNAKING OF DRAINS.

• ELECTRICAL WORK SUCH AS INSTALLATION OF CABLING/WIRING/CONDUIT FOR A SINGLE DEVICE, INSTALLATION OF NEW DEVICE SUCH AS A LIGHT FIXTURE THAT PRODUCES MINIMAL DUST AND DEBRIS.

• AIR HANDLER AND/OR FAN SHUTDOWN/STARTUP AND HVAC WORK SUCH AS REPLACEMENT OF A SINGLE DIFFUSER, SINGLE TERMINAL UNIT OR A SINGLE DEVICE THAT PRODUCES MINIMAL DUST AND DEBRIS.

Category C

SMALL-SCALE CONSTRUCTION, RENOVATION, OR MAINTENANCE GENERALLY DEFINED AS FOLLOWS:

• WORK REQUIRING LONGER THAN A SINGLE WEEK TO COMPLETE BUT NOT EXCEEDING 6 MONTHS.

• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.

• DEMOLITION/REMOVAL OF PREEXISTING FLOOR COVERING, CASEWORK, LAY-IN CEILING, OR OTHER

ARCHITECTURAL ELEMENTS.

• DEMOLITION/REMOVAL OF MORE THAN 32 FT2 OF DRYWALL/FRAMING, HARD CEILINGS, AND DOORS/FRAMING

AND MINIMAL INFRASTRUCTURE SUCH AS ELECTRICAL CIRCUITS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .