656_19_307 B51_1 E CD 100.pdf
PDF 33 MB Posted
- Attached to
- Y1DA--656-19-307 Remodel of Building 51-1, Eastside at the Saint Cloud VA, Saint Cloud, MN
- Solicitation number
- 36C26325B0007
About this file
This document is a comprehensive set of architectural and engineering drawings for a renovation project at the Saint Cloud VA Medical Center. The project involves remodeling Building 51-1 East, specifically the first floor, to upgrade the Community Living Center (CLC) dementia unit. The renovation encompasses approximately 5,820 square feet and includes modifications to patient rooms, corridors, utility spaces, and support areas, with work divided into multiple construction zones and phases.
The drawings cover detailed plans for architectural, mechanical, electrical, and fire protection systems, including demolition and new construction elements. Key disciplines addressed include architectural floor plans, interior elevations, lighting and power distributions, HVAC modifications, plumbing updates, medical gas system changes, and fire alarm system integrations. The project follows VA design standards, incorporates infection control risk assessment (ICRA) protocols, and requires coordination across multiple trades to minimize disruption to the existing healthcare facility. The construction documents are dated August 23, 2024, and are part of solicitation number 36C26325B0007 for the Department of Veterans Affairs Veterans Health Administration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26325B0007 0002.docx | DOCX document | |
| 36C26325B0007 0001.docx | DOCX document | |
| SOW Revised.pdf | ||
| Bed Lift Detail 4.png | PNG image | |
| Copy of Copy of Price Breakdown blank.xlsx | XLSX spreadsheet | |
| 656_19_307 Remodel B51_1 E Bed Lifts Manual.pdf | ||
| Bed Lift Detail 2.png | PNG image | |
| Bed Lift Detail 3.png | PNG image | |
| Class Deviation from FAR CAAC 2025-01 Suppl 1 EOs 14173.14168.pdf | ||
| 656-19-307 B51-1 Staging - Parking Area.pdf | ||
| P07 WRD Stearns.pdf | ||
| 656_19_307 Specfications 1_Rev EDITED.pdf | ||
| 656_19_307 Specifications 2_Rev EDITED.pdf | ||
| Bed Lift Detail 1.png | PNG image | |
| 656_19_307 Specifications 3_Rev EDITED.pdf | ||
| 36C26325B0007_1.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
51-1E
48-1W
PLAN
NORTH
PLAN
NORTH
█ ISSUED
NOT ISSUED
ISSUED FOR REFERENCE ONLY
ISSUED AS NOTED
R
N
No DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
COVER
DATE:
APPROVED: APPROVED: PROJECTS SECTION MANAGER
APPROVED: OIT MANAGER DATE: APPROVED: ASSISTANT CHIEF ENGINEER DATE:
APPROVED: SAFETY MANAGER
APPROVED: CHIEF OF POLICE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE: APPROVED: EMS MANAGER
APPROVED: M/O MANAGER
DATE:
DATE:
DATE:DATE:
APPROVED: MEDICAL CENTER DIRECTOR
APPROVED: PROJECT COR DATE:
APPROVED: INFECTION CONTROL NURSE DATE:
APPROVED: SERVICE LINE DIRECTOR
APPROVED: GEMS COORDINATOR DATE:
DATE:
APPROVED: NURSE EXECUTIVE
APPROVED: CHIEF OF STAFF DATE:
APPROVED: DIRECTOR FMS
APPROVED: ASSOCIATE DIRECTOR
DATE:
DATE:
DATE:
DATE:APPROVED: DATE:
APPROVED: DATE:
APPROVED: DATE:
ST. CLOUD, MN 56303
4801 VETERANS DRIVE
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
CONSTRUCTION PACKAGE
C
U s e rs
\M C a m e ro n \D o c u m e n ts \1
B
L D
G s t
F lo o r_
A m c a m e ro n M
T .r v t
/2
/2
:1
:5
A
M
GI001
COVER SHEET REMODEL BUILDING 51-1
EAST FOR CLC
656-19-307
08/23/2024
MC EM
15479
REMODEL BUILDING 51, FIRST FLOOR EAST SIDE FOR CLC
VA COR:
CONTACT:
ADDRESS:
PHONE:
MICHAEL MCENIRY
4801 VETERANS DRIVE
SAINT CLOUD, MN 55303
320-252-1670
ARCHITECT:
NAME:
ADDRESS:
CONTACT:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
ED MARKFORT
PHONE: 763-412-4000
STRUCTURAL ENGINEER:
NAME:
ADDRESS:
CONTACT:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
ADAM ADAMS
PHONE: 763-412-4000
MECH/PLUMB/FIRE ENGINEER:
NAME:
ADDRESS:
CONTACT:
DUNHAM ASSOCIATES INC
50 SOUTH SIXTH STREET / SUITE 1100
MINNEAPOLIS, MN 55402-1540
JASON GOTTWALT
PHONE: 612-465-7648
ELECTRICAL ENGINEER:
NAME:
ADDRESS:
CONTACT:
DUNHAM ASSOCIATES INC
50 SOUTH SIXTH STREET / SUITE 1100
MINNEAPOLIS, MN 55402-1540
BEN ZURN
PHONE: 612-465-7626
SITE LOCATION MAP VA CAMPUS: KEY REFERENCE PLAN: VICINITY MAP SAINT CLOUD, MN:
SHEET INDEX
SHEET NO. SHEET TITLE S
D-
1 I
SS
UE
/25 /19
S D-
2 I
SS
UE
/10 /19
D D-
1 I
SS
UE
/29 /24
D D-
2 I
SS
UE
/29
C D
IS
SU
E
/3 0/2
0%
C D
/24
/24
C
ON
ST
RU
CT
IO
N
DO
CU
M
EN
TS
/23
00 GENERAL
GI001 COVER SHEET █ █ █ █ █ █ █
GI002 ABBREVIATIONS █ █ █ █ █ █
GI110 LIFE SAFETY PLANS █ █ █ █ █ █
GC110 INFECTION CONTROL & PHASING PLANS █ █ █ █ █
GC111 INFECTION CONTROL & PHASING NOTES █ █ █ █ █
GC500 ICRA DETAIL █ █ █ █ █
01 HAZARD
48-HA001 FIRST FLOOR HAZARDOUS MATERIALS PLAN - ASBESTOS / LEAD █ █ █ █ █
51-HA001 FIRST FLOOR HAZARDOUS MATERIALS PLAN - ASBESTOS █ █ █ █ █
02 DEMOLITION
48-AD111 FIRST FLOOR DEMOLITION PLAN █ █ █ █ █
51-AD111 FIRST FLOOR DEMOLITION PLAN █ █ █ █ █ █
03 ARCHITECTURAL
48-AE110 FIRST FLOOR - FLOOR PLAN AND PARTIAL REFLECTED CEILING PLAN █ █ █ █ █ █ █
51-AE110 FIRST FLOOR OVERALL PLAN █ █ █ █ █
51-AE111 FIRST FLOOR PLAN - ZONE 1 █ █ █ █ █ █ █
51-AE112 FIRST FLOOR PLAN - ZONE 2 █ █ █ █ █
51-AE113 FIRST FLOOR DIMENSION PLAN █ █ █ █ █
51-AC111 FIRST FLOOR REFLECTED CEILING PLAN █ █ █ █ █
51-AE211 INTERIOR ELEVATIONS █ █ █ █ █
51-AE212 INTERIOR ELEVATIONS █ █ █ █ █
AE550 DETAILS █ █ █ █ █
AE601 INTERIOR PARTITION TYPES AND DETAILS █ █ █ █ █
AE602 DOOR SCHEDULE AND ELEVATIONS █ █ █ █ █
AE650 MOUNTING HEIGHTS █ █ █ █ █
04 FINISHES AND FURNITURE
48-AF110 FIRST FLOOR FINISH PLAN █ █ █ █ █
51-AF110 FIRST FLOOR FINISH PLAN █ █ █ █ █
AF600 MATERIAL AND ROOM FINISH SCHEDULE █ █ █ █ █
51-AW110 FIRST FLOOR WAYFINDING PLAN █ █ █ █ █
AW600 WAYFINDING MESSAGE SCHEDULES & SIGNAGE DETAILS █ █ █ █ █
48-IF110 FIRST FLOOR FURNITURE PLAN █ █ █ █ █
51-IF110 FIRST FLOOR FURNITURE PLAN █ █ █ █ █
05 ARCHITECTURAL EQUIPMENT
51-QH110 FIRST FLOOR EQUIPMENT PLAN █ █ █ █ █
51-1E
48-1W
TRUE
NORTH
TRUE
NORTH
TRUE
NORTH
VA CAMPUS
BUILDING 1
HAZARDOUS MATERIAL:
NAME:
ADDRESS:
CONTACT:
INSTITUTE FOR ENVIRONMENTAL ASSESSMENT,
INC (IEA, INC.)
9201 WEST BROADWAY #600
BROOKLYN PARK, MN 55445
BRANDON VOIGT
PHONE: 763-315-7900
SHEET INDEX - STRUCTURAL
S101 FIRST AND SECOND FLOOR PLAN █ █ █ █ █
SHEET INDEX - MECHANICAL
M000 MECHANICAL TITLE SHEET █ █ █ █ █
48-PP101 48-0W BASEMENT - PLUMBING PLAN █ █ █ █ █
48-PP111 48-1W FIRST FLOOR - PLUMBING AND FIRE PROTECTION PLAN █ █ █ █ █
48-MHD110 48-1W FIRST FLOOR - DEMOLITION HVAC PLAN █ █ █
48-MH110 48-1E FIRST FLOOR - HVAC PLAN █ █ █
48-MP110 48-1E FIRST FLOOR - PIPING PLAN █ █ █
51-FPD110 51-1E FIRST FLOOR - DEMOLITION FIRE PROTECTION PLAN █ █ █ █ █
51-FP110 51-1E FIRST FLOOR - FIRE PROTECTION PLAN █ █ █ █ █
51-PPD100 51-0E BASEMENT - DEMOLITION PLUMBING PLAN █ █ █ █ █
51-PPD110 51-1E FIRST FLOOR - DEMOLITION PLUMBING PLAN █ █ █ █ █
51-PMD110 51-1E FIRST FLOOR - DEMOLITION MEDICAL GAS PLAN █ █ █ █ █
51-PP100 51-0E BASEMENT - PLUMBING PLAN ZONE 1 █ █ █ █ █
51-PP101 51-0E BASEMENT - PLUMBING PLAN ZONE 2 █ █ █ █ █
51-PP110 51-1E FIRST FLOOR - PLUMBNG PLAN ZONE 1 █ █ █ █ █
51-PP111 51-1E FIRST FLOOR - PLUMBNG PLAN ZONE 2 █ █ █ █ █
51-PM110 51-1E FIRST FLOOR - MEDICAL GAS PLAN █ █ █ █ █
P500 PLUMBING DETAILS AND SCHEDULES █ █ █ █ █
P501 PLUMBING RISER DIAGRAMS - WASTE AND VENT █ █ █
P502 PLUMBING RISER DIAGRAMS - DOMESTIC WATER █ █ █
51-MHD110 51-1E FIRST FLOOR - DEMOLITION HVAC PLAN █ █ █ █ █
51-MPD100 51-0E BASEMENT - DEMOLITION PIPING PLAN █ █ █ █ █
51-MPD110 51-1E FIRST FLOOR - DEMOLITION PIPING PLAN █ █ █ █ █
51-MH110 51-1E FIRST FLOOR - HVAC PLAN ZONE 1 █ █ █ █ █
51-MH111 51-1E FIRST FLOOR - HVAC PLAN ZONE 2 █ █ █ █ █
51-MP100 51-0E BASEMENT - PIPING PLAN ZONE 1 █ █ █ █ █
51-MP101 51-0E BASEMENT - PIPING PLAN ZONE 2 █ █ █ █ █
51-MP110 51-1E FIRST FLOOR - PIPING PLAN ZONE 1 █ █ █ █ █
51-MP111 51-1E FIRST FLOOR - PIPING PLAN ZONE 2 █ █ █ █ █
M500 MECHANICAL DETAILS AND SCHEDULES █ █ █ █ █
M600 SEQUENCES OF OPERATIONS █ █
SHEET INDEX - ELECTRICAL
E000 ELECTRICAL TITLE SHEET █ █ █ █ █
48-ED110 FIRST FLOOR DEMOLITION ELECTRICAL PLANS █ █ █ █ █
51-ED110 FIRST FLOOR DEMOLITION ELECTRICAL PLANS █ █ █ █ █
51-ED111 FIRST FLOOR DEMOLITION SYSTEM PLAN █ █ █ █ █
48-EL110 FIRST FLOOR LIGHTING PLAN █ █ █ █ █
48-EP110 FIRST FLOOR POWER PLAN █ █ █ █ █
48-ES110 FIRST FLOOR SYSTEMS PLAN █ █ █ █ █
48-EF110 FIRST FLOOR FIRE ALARM PLAN █ █
51-EE100 BASEMENT ELECTRICAL PLAN █ █ █
51-EL110 FIRST FLOOR LIGHTING PLAN - ZONE 1 █ █ █ █ █
51-EL111 FIRST FLOOR LIGHTING PLAN - ZONE 2 █ █ █
51-EP110 FIRST FLOOR POWER PLAN - ZONE 1 █ █ █ █ █
51-EP111 FIRST FLOOR POWER PLAN - ZONE 2 █ █ █
51-ES110 FIRST FLOOR SYSTEMS PLAN - ZONE 1 █ █ █ █ █
51-ES111 FIRST FLOOR SYSTEMS PLAN - ZONE 2 █ █ █
51-EF110 FIRST FLOOR FIRE ALARM - ZONE 1 █ █
51-EF111 FIRST FLOOR FIRE ALARM PLAN - ZONE 2 █ █
E300 ELECTRICAL RISER █ █ █ █ █
E500 ELECTRICAL DETAILS █ █ █ █ █
E501 ELECTRICAL DETAILS █ █ █ █ █
E600 ELECTRICAL SCHEDULES █ █ █ █ █
LEGEND - SHEET INDEX
ARCHITECTURAL ABBREVIATIONS
A/C
A/C UNIT
A/E
AAMA
AAP
AB
ABC
ACC
ACI
ACT
ACS DR
ACS FLR
ACS PNL
ACST
AD
ADA
ADC
ADDL
ADDN
ADH
ADJ
ADMIN
AFF
AFG
AFS
AGC
AGGR
AHJ
AHR
AHU
AIA
AISC
ALT
ALT NO
ALUM
AMT
ANOD
ANSI
ANT
AP
APA
APC
APPD
APPROX
AR
ARCH
ASB
ASI
ASKLR
ASPH
ASSN
ASTM
ATCH
ATM
AUTO
AUX
AV
AVG
AW
AWI
AWPA
AWS
B PL
BAT
BD
BD FT
BEV
BHMA
BI FLD DR
BITUM
BKG
BLD
BLDG
BM
BOT
BRCG
BRDG
BRDG JST
BRG
BRG PL
BRKT
BRZ
BSMT
BTWN
BUR
C CONC
C TO C
CAB
CAC
CB
CBB
CCD
CCTV
CCW
CD
CEM
CEM PLAS
CER
CF
CF/CI
CF/OI
CFLG
CFMF
CG
CGSFU
CH
CHEM
CHFR
CHK
CI
CIP
CIR
CIRC
CJ
CL
CLDG
CLG
CLR
CM
CMU
AIR CONDITION
AIR CONDITIONING UNIT
ARCHITECT/ENGINEER
AMERICAN ARCHITECTURAL MANUFACTURERS ASSN
ALARM ANNUNCIATOR PANEL
ANCHOR BOLT
AGGREGATE BASE COURSE
ACCESSIBLE
AMERICAN CONCRETE INSTITUTE
ACOUSTICAL CEILING TILE
ACCESS DOOR
ACCESS FLOOR
ACCESS PANEL
ACOUSTIC
AREA DRAIN
AMERICANS WITH DISABILITIES ACT
AUTOMATIC DOOR CLOSER
ADDITIONAL
ADDITION
ADHESIVE
ADJACENT, ADJOINING, OR ADJUSTABLE
ADMINISTRATION
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ABOVE FINISHED SLAB
ASSOCIATED GENERAL CONTRACTORS
AGGREGATE
AUTHORITY HAVING JURISDICTION
ANCHOR
AIR HANDLING UNIT
AMERICAN INSTITUTE OF ARCHITECTS
AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALTERNATE
ALTERNATE NUMBER
ALUMINUM
AMOUNT
ANODIZE
AMERICAN NATIONAL STANDARDS INSTITUTE
ANTENNA
ACCESS PANEL
AMERICAN PLYWOOD ASSOCIATION
ARCHITECTURAL PRECAST CONCRETE
APPROVED
APPROXIMATE
AS REQUIRED
ARCHITECT
ASBESTOS
ARCHITECT'S SUPPLEMENTAL INSTRUCTION
AUTOMATIC SPRINKLER
ASPHALT
ASSOCIATION
AMERICAN SOCIETY FOR TESTING AND MATERIALS
ATTACHMENT
AUTOMATIC TELLER MACHINE
AUTOMATIC
AUXILIARY
AUDIO VISUAL
AVERAGE
ACID WASTE
ARCHITECTURAL WOODWORKING INSTITUTE
AMERICAN WOOD PRESERVERS' ASSOCIATION
AMERICAN WELDING SOCIETY
BASE PLATE
BATTEN
BOARD
BOARD FEET (FOOT)
BEVEL
BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION
BIFOLDING DOORS
BITUMINOUS
BACKING
BUILD
BUILDING
BEAM OR BENCHMARK
BOTTOM
BRACING
BRIDGING
BRIDGING JOIST
BEARING
BEARING PLATE
BRACKET
BRONZE
BASEMENT
BETWEEN
BUILT-UP ROOFING
CAST CONCRETE
CENTER TO CENTER
CABINET
CEILING ATTENUATION CLASS
CATCH BASIN OR CORNER BEAD
CEMENTITIOUS (BACKER) BOARD
CONSTRUCTION CHANGE DIRECTIVE
CLOSED CIRCUIT TELEVISION
COUNTERCLOCKWISE
CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS
CEMENT
CEMENT PLASTER
CERAMIC
CONTRACTOR FURNISHED
CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CONTRACTOR FURNISHED/OWNER INSTALLED
COUNTERFLASHING
COLD-FORMED METAL FRAMING
CORNER GUARD
CERAMIC GLAZED STRUCTURAL FACING UNITS
COAT HOOK
CHEMICAL
CHAMFER
CHECK
CAST IRON
CAST-IN-PLACE
CIRCLE
CIRCULAR
CONSTRUCTION JOINT OR CONTROL JOINT
CENTER LINE
CLADDING
CEILING
CLEAR
CONSTRUCTION MANAGEMENT
CONCRETE MASONRY UNIT
CNR
CNTR
CRTP
CO
CO2
COL
COM
COMB
COMM
COMP
CONC
CONC FLR
COND
CONF
CONN
CONSTR
CONT
CONTR
COORD
CORR
CPM
CPRS
CR
CRS
CRSI
CSB
CSG
CSI
CSK
CSMT
CSWK
CTG
CTR
CTRL
CTV
CU FT
CU IN
CU YD
CURT
CYL
CYL L
D
DAT
DBL
DBL GLZ
DCS
DP
DEG
DEL
DEMO
DEPT
DET
DF
DIA
DIAG
DIFF
DIM
DIR
DISP
DIST
DIV
DL
DOC
DR
DR CL
DR FR
DR OPNG
DS
DSGN
DW
DWG
E
EA
EFF
EFS
EIFS
EJ
EL
ELAST
ELEC
ELEC DR OP
ELEV
EMER
EMER SHR
ENCL
ENGR
ENVIR
EO
EPA
EPDM
EPO
EPS
EQ
EQL SP
EQUIP
EQUIV
ERD
ESC
ESMT
ESP
EST
ETC
EW
EWC
EWS
EXH
EXIST
EXP
EXP BT
EXST GR
EXT
EXT GR
CORNER
COUNTER
COUNTERTOP
CARBON MONOXIDE
CARBON DIOXIDE
COLUMN
COMMON
COMBINATION, COMBINED
COMMUNICATION
COMPONENT
CONCRETE
CONCRETE FLOOR
CONDENSER OR CONDITION
CONFERENCE
CONNECT
CONSTRUCTION
CONTINUE
CONTRACTOR
COORDINATE
CORRIDOR
CRITICAL PATH METHOD
COMPRESSIBLE
CARD READER
COLD ROLLED STEEL
CONCRETE REINFORCING STEEL INSTITUTE
CONCRETE SPLASH BLOCK
CASING
CONSTRUCTION SPECIFICATIONS INSTITUTE
COUNTER SUNK
CASEMENT
CASEWORK
COATING
CENTER
CONTROL
CABLE TELEVISION
CUBIC FEET
CUBIC INCH
CUBIC YARD
CURTAIN
CYLINDER
CYLINDER LOCK
DEPTH OR PENNY (NAIL)
DATUM
DOUBLE
DOUBLE GLAZE
DIAPER CHANGING STATION
DECORATIVE PANEL
DEGREE
DELETE
DEMOLITION
DEPARTMENT
DETAIL
DRINKING FOUNTAIN
DIAMETER
DIAGONAL
DIFFERENCE OR DIFFUSER
DIMENSION
DIRECTION
DISPENSER
DISTANCE
DIVIDE OR DIVISION
DEAD LOAD
DOCUMENT
DOOR, DRAIN, DRESSING ROOM, OR DRIVE
DOOR CLOSER
DOOR FRAME
DOOR OPENING
DOWNSPOUT
DESIGN
DISHWASHER
DRAWING
EAST
EACH
EFFICIENCY
EXTERIOR FINISH SYSTEM
EXTERIOR INSULATION AND FINISH SYSTEM
EXPANSION JOINT
ELEVATION
ELASTOMERIC
ELECTRIC
ELECTRIC DOOR OPENER
ELEVATOR
EMERGENCY
EMERGENCY SHOWER
ENCLOSURE
ENGINEER
ENVIRONMENT
ELECTRICAL OUTLET
ENVIRONMENTAL PROTECTION AGENCY
ETHYLENE PROPYLENE DIENE MONOMER
EMERGENCY POWER OFF
EXPANDED POLYSTYRENE BOARD (INSULATION)
EQUAL
EQUALLY SPACED
EQUIPMENT
EQUIVALENT
EXISTING ROOF DRAIN
ESCAPE OR ESCUTCHEON
EASEMENT
ESPECIALLY
ESTIMATE
AND SO FORTH OR ET CETERA
EACH WAY
ELECTRIC WATER COOLER
EYE WASH STATION
EXHAUST
EXISTING
EXPANSION OR EXPOSED
EXPANSION BOLT
EXISTING GRADE
EXTERIOR, EXTERNAL, OR EXTINGUISHER
EXTERIOR GRADE
F
FA
FAB
FAC
FACIL
FAS
FAS BD
FCU
FCO
FCTY
FD
FDC
FDTN
FE
FEC
FF
FF EL
FF&E
FHC
FHP
FIG
FIL
FIN
FIN FLR
FIN GR
FIN WD
FIXT
FL
FLASH
FLDG
FLEX
FLG
FLR
FLR FIN
FLR SK
FLUOR
FLUOR FIX
FM
FM-G
FO
FOC
FOF
FOM
FOS
FOUNT
FOW
FP
FR
FR SNK
FREQ
FRMG
FRP
FRZ
FS
FSB
FSTNR
FT
FTG
FURG
FURN
FUT
FVC
GA
GAL
GALV
GALV STL
GB
GC
GD
GDR
GEN
GFRC
GFRG
GFRP
GI
GL
GL BLK
GLU LAM
GP
GR FL
GRAN
GRTG
GSB
GSM
GSU
GT
GUAR
GUT
GYP
GYP BD
GYP PLAS
H
HAZ MAT
HB
HC
HCWD
HDBD
HDO
HDR
HDW
HDWD
HEPA
HEX
HGR
HM
HMD
HMDF
HMF
HNDRL
HO
HORIZ
HOSP
HP
HPD
HPDL
HQ
HS
HSE
HSKPG
FAHRENHEIT OR FEMALE
FIRE ALARM
FABRIC
FACTOR
FACILITY
FASCIA
FASCIA BOARD
FAN COIL UNIT
FLOOR CLEANOUT
FACTORY
FLOOR DRAIN
FIRE DEPARTMENT CONNECTION
FOUNDATION
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FINISH FACE
FINISH FLOOR ELEVATION
FURNITURE, FIXTURE, AND EQUIPMENT
FIRE HOSE CABINET
FULL HEIGHT PARTITION
FIGURE
FILLET
FINISH
FINISH FLOOR
FINISH GRADE
FINISH WOOD
FIXTURE
FLOORLINE
FLASHING
FOLDING
FLEXIBLE
FLOORING
FLOOR
FLOOR FINISH
FLOOR SINK
FLUORESCENT
FLUORESCENT FIXTURE
FACTORY MUTUAL
FACTORY MUTUAL GLOBAL
FINISHED OPENING
FACE OF CONCRETE OR FACE OF CURB
FACE OF FINISH
FACE OF MASONRY
FACE OF SLAB OR FACE OF STUD
FOUNTAIN
FACE OF WALL
FIRE PROTECTION OR FIREPROOF
FIRE RATING, FIRE RESISTANT, OR FRAME
FLUSHING RIM SINK
FREQUENCY
FRAMING
FIBERGLASS REINFORCED PLASTIC
FREEZER
FEDERAL SPECIFICATION
FOLDING SHOWER BENCH
FASTENER
FEET OR FOOT
FOOTING
FURRING
FURNISH OR FURNITURE
FUTURE
FIRE VALVE CABINET
GAGE OR GYPSUM ASSOCIATION
GALLON
GALVANIC OR GALVANIZED
GALVANIZED STEEL
GRAB BAR
GENERAL CONTRACTOR
GUARD
GUARD RAIL
GENERAL OR GENERATOR
GLASS-FIBER-REINFORCED CONCRETE
GLASS-FIBER-REINFORCED GYPSUM
GLASS-FIBER-REINFORCED PLASTIC
GALVANIZED IRON
GLASS
GLASS BLOCK
GLUED LAMINATED WOOD
GRAB BAR
GROUND FLOOR
GRANITE
GRATING
GYPSUM SHEATHING BOARD
GALVANIZED SHEET METAL
GLAZED STRUCTURAL UNIT
GROUT
GUARANTEE
GUTTER
GYPSUM
GYPSUM BOARD
GYPSUM PLASTER
HIGH OR HUMIDISTAT
HAZARDOUS MATERIALS
HOSE BIBB
HOLLOW CORE
HOLLOW CORE WOOD DOOR
HARDBOARD
HIGH DENSITY OVERLAY
HEADER
HARDWARE
HARDWOOD
HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HEXAGON
HANGER
HOLLOW METAL
HOLLOW METAL DOOR
HOLLOW METAL DOOR AND FRAME
HOLLOW METAL FRAME
HANDRAIL
HOLD OPEN
HORIZONTAL
HOSPITAL
HIGH PRESSURE
HYGIENE PRODUCT DISPOSAL
HIGH PRESSURE DECORATIVE LAMINATE
HEADQUARTERS
HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH
HOUSE
HOUSEKEEPING
HST
HSS
HT
HVAC
HVY
HW
HYD
HYDR
IAQ
IBC
IC
ICW
ID
ID NO
ILLUM
INCL
IND
INFO
INSUL
INT
INTL
IWH
JAN
KD
KIT
KO
KPL
LAB
LAD
LAM
LAM GL
LAU
LAV
LBR
LBS
LCS
LD BRG
LDR
LED
LF
LIB
LIN
LIQ
LKR
LKR RM
LL
LMST
LRG
LRV
LS
LT
LT GA
LT WT
LTG
LTNG
LVD
LVR
LWC
LWIC
LYR
MACH
MACH RM
MAINT
MAN
MATL
MATV
MAX
MBD
MCB
MD
ME
MEAS
MECH
MECH RM
MED
MEK
MEMB
MEMO
MEZZ
MF
MFD
MFG
MFR
MFR REC
MGT
MIC
MID
MIL STD
MIN
MIR
MISC
MIT
MKR
ML
MLDG
MLWK
mm
MO
MOD
MOD BIT
MON
MOPR
MR
MS
MTD
MTG
MTL
MULL
MW
MWP
HOIST
HOLLOW STRUCTURAL STEEL
HEIGHT
HEATING, VENTILATING, AND AIR CONDITIONING
HEAVY
HOT WATER
HYDRANT
HYDRAULIC
INDOOR AIR QUALITY
INTERNATIONAL BUILDING CODE
INFECTION CONTROL
INFECTION CONTROL WALL
INSIDE DIAMETER
IDENTIFICATION NUMBER
ILLUMINATION
INCLUDED
INDEPENDENT OR INDUSTRIAL
INFORMATION
INSULATION
INTERIOR
INTERNATIONAL
INSTANTANEOUS WATER HEATER
JANITOR
KILN DRIED OR KNOCKED DOWN
KITCHEN
KNOCKOUT
KICKPLATE
ANGLE
LABORATORY
LADDER
LAMINATE
LAMINATED GLASS
LAUNDRY
LAVATORY
LUMBER
POUND
LOCKABLE CHARTING STATION/MED CABINET
LOAD-BEARING
LEADER
LIGHT EMITTING DIODE
LINEAR FEET (FOOT)
LIBRARY
LINEAR
LIQUID
LOCKER
LOCKER ROOM
LEAD LINED
LIMESTONE
LARGE
LOUVERED ROOF VENT
LIGHT SWITCH
LIGHT
LIGHT GAGE
LIGHTWEIGHT
LIGHTING
LIGHTNING
LOUVERED
LOUVER
LIGHTWEIGHT CONCRETE
LIGHTWEIGHT INSULATING CONCRETE
LAYER
MACHINE
MACHINE ROOM
MAINTENANCE
MANUAL
MATERIAL
MASTER ANTENNA TELEVISION SYSTEM
MAXIMUM
MARKER BOARD
METAL CORNER BEAD
DECK
MECHANICAL ENGINEER
MEASURE
MECHANICAL
MECHANICAL ROOM
MEDICAL, MEDIUM
METHYL ETHYL KETONE
MEMBRANE
MEMORANDUM
MEZZANINE
MILL FINISH
MANUFACTURED
MANUFACTURING
MANUFACTURER
MANUFACTURER'S RECOMMENDATION
MANAGEMENT
MICROPHONE
MIDDLE
MILITARY STANDARD
MINIMUM
MIRROR
MISCELLANEOUS
MITER
MARKER
METAL LATH
MOLDING (MOULDING)
MILLWORK
MILLIMETER
MASONRY OPENING
MODEL, MODIFY OR MODULE
MODIFIED BITUMEN
MONITOR
MOP RACK
MOISTURE RESISTANT
MOP SINK
MOUNTED
MOUNTING
METAL
MULLION
MICROWAVE
MEMBRANE WATERPROOFING
N
NA
NAT
NATL
NC
NCOMBL
NEC
NEG
NEMA
NEUT
NFC
NFPA
NIC
NO
NOM
NR
NRC
NRCA
NRP
NS
NUM
O/O O
OA
OC
OCC
OCT
OD
OD
OF/CI
OFD
OFF
OF/OI
OH
OH DR
OPH
OPNG
OPP
OPR
OPT
OR
ORD
ORG
ORIG
ORN
OSHA
OUT
OZ
P
PAR
PARA
PART
PAT
PB
PBD
PC
PCA
PCC
PCCP
PCD
PCF
PCP
PCT
PED
PEN
PEND
PERF
PERIM
PERP
PHAR
PHOTO
PKG
PL
PL GL
PLAM
PLAS
PLBG
PLYWD
PMTL
PNEU
PNL
PO
POLY
PP
PR
PRCST
PREFAB
PREFIN
PRELIM
PREP
PRESS
PREV
PRKG
PRMLD
PROJ
PROP
PSF
PSI
PT
PTD
PTN
PTS
PVC
PVG
PWR
QA
QC
QRY
QTR
QTY
QUAD
QUAL
R
RA
RAD
RBM
RBR
NORTH
NOT APPLICABLE
NATURAL
NATIONAL
NOISE CRITERIA OR NURSE CALL
NONCOMBUSTIBLE
NATIONAL ELECTRICAL CODE
NEGATIVE
NATIONAL ELECTRICAL MANUFACTURERS ASSN
NEUTRAL
NATIONAL FIRE CODE
NATIONAL FIRE PROTECTION ASSOCIATION
NOT IN CONTRACT
NUMBER
NOMINAL
NOISE REDUCTION
NOISE REDUCTION COEFFICIENT
NATIONAL ROOFING CONTRACTORS ASSOCIATION
NONREMOVABLE
NARROW STILE
NUMERAL
OUT TO OUT
OXYGEN
OUTSIDE AIR OR OVERALL
ON CENTER
OCCUPY
OCTAGON
OUTSIDE DIAMETER, OUTSIDE DIMENSION
OUTSIDE DIAMETER/OUTSIDE DIMENSION
OWNER FURNISHED/CONTRACTOR INSTALLED
OVERFLOW DRAIN
OFFICE
OWNER FURNISHED/OWNER INSTALLED
OVERHANG
OVERHEAD (COILING) DOOR
OPPOSITE HAND
OPENING
OPPOSITE
OPERABLE
OPTIONAL
OPERATING ROOM OR OUTSIDE RADIUS
ORDNANCE OR OVERFLOW ROOF DRAIN
ORGANIC
ORIGINAL
ORNAMENTAL
OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION
OUTLET
OUNCE
PAINT
PARALLEL OR PARAPET
PARAGRAPH
PARTIAL
PATTERN
PUSHBUTTON
PARTICLEBOARD
PIECE, POLYCARBONATE OR PORTLAND CEMENT
PORTLAND CEMENT ASSOCIATION
PRECAST CONCRETE
CONCRETE PAVEMENT
PAPER CUP DISPENSER
POUNDS PER CUBIC FOOT
PORTLAND CEMENT PLASTER
PRIVACY CURTAIN TRACK
PEDESTAL
PENETRATE
PENDANT
PERFORATED
PERIMETER
PERPENDICULAR
PHARMACY
PHOTOGRAPH
PACKAGE
PROPERTY LINE
PLATE GLASS
PLASTIC LAMINATE
PLASTER OR PLASTIC
PLUMBING
PLYWOOD
PAINTED METAL
PNEUMATIC
PANEL
POST OFFICE, PURCHASE ORDER
POLYETHYLENE (PLASTIC)
PUSH PLATE
PAIR
PRECAST
PREFABRICATE
PREFINISH
PRELIMINARY
PREPARATION
PRESSURE
PREVIOUS
PARKING
PREMOLDED
PROJECT
PROPERTY
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PORCELAIN TILE OR PRESSURE TREATED
PAPER TOWEL DISPENSER
PARTITION
PNEUMATIC TUBE STATION
POLYVINYL CHLORIDE (PLASTIC)
PAVING
POWER
QUALITY ASSURANCE
QUALITY CONTROL
QUARRY
QUARTER
QUANTITY
QUADRANT
QUALITY
RADIUS OR RISER
RETURN AIR
RADIATOR
REINFORCED BRICK MASONRY
RUBBER
RC
RCP
RCVR
RD
REC
RECD
RECPT
RECT
REF
REFR
REG
REINF
REP
REPL
REQ
REQD
RET
REV
RFG
RFI
RFP
RFS
RL
RLG
RM
RM LT
RND
RO
ROW
RS
RSV
RT
RV
RVS
RWL
S
SA
SALV
SAMP
SAN
SB
SBS
SBSTR
SC
SCH
SCHED
SCHEM
SCP
SCRN
SCT
SCWD
SD
SDG
SECT
SEG
SEL
SEP
SF
SFTWD
SGD
SGL
SHR
SHR HD
SHRD
SHT
SHTHG
SHV
SIM
SJ
SJI
SK
SKLT
SLDG
SLNT
SM
SMK
SND INS
SPEC
SPKLR
SPKR
SPLY
SPR
SQ
SQ IN
SQ YD
SST
ST
STC
STD
STIF
STL JST
STL LNTL
STL PL
STL RF DK
STL TB
STL TR
STNLS
STOR
STR
STRUCT
STRUCT STL
SUB
SURF
SUSP
SUSP CLG
SW
SWDR
SYM
SYNTH
SYS
REMOTE CONTROL
REFLECTED CEILING PLAN
RECEIVER
ROAD OR ROOF DRAIN
RECESSED
RECEIVED
RECEPTACLE
RECTANGLE
REFERENCE OR REFRIGERATOR
REFRACTORY, REFRIGERATION
REGISTER
REINFORCE
REPAIR
REPLACE
REQUIRE
REQUIRED
RETURN
REVISION
ROOFING
REQUEST FOR INFORMATION
REQUEST FOR PROPOSAL
ROOM FINISH SCHEDULE
ROOF LEADER
RAILING
ROOM
NURSE CALL LIGHT/ROOM LIGHT
ROUND
ROUGH OPENING
RIGHT OF WAY
ROUGH SAWN
RESILIENT SHEET VINYL
RIGHT
ROOF VENT
REVERSE
RAIN WATER LEADER
SOLID SURFACE
SUPPLY AIR
SALVAGE
SAMPLE
SANITARY
SPLASH BLOCK
STYRENE BUTADIEN STYRENE
SUBSTRATE
SHARPS CONTAINER
SCHOOL
SCHEDULE
SCHEMATIC
SCUPPER
SCREEN
SHOWER CURTAIN TRACK
SOLID CORE WOOD DOOR
SMOKE DETECTOR/SOAP DISPENSER
SIDING
SECTION
SEGMENT
SELECT
SEPARATE
SQUARE FOOT (FEET)
SOFTWOOD
SLIDING GLASS DOOR
SINGLE
SHOWER
SHOWER HEAD
SHOWER DRAIN
SHEET
SHEATHING
SHELVING
SIMILAR
SCORED JOINT
STEEL JOIST INSTITUTE
SKETCH
SKYLIGHT
SLIDING
SEALANT
SHEET METAL
SMOKE
SOUND INSULATION
SPECIFICATION
SPRINKLER
SPEAKER
SUPPLY
SINGLE PLY ROOF SYSTEM
SQUARE
SQUARE INCH
SQUARE YARD
STAINLESS STEEL
STAIRS OR STREET
SOUND TRANSMISSION CLASS
STANDARD
STIFFENER
STEEL JOIST
STEEL LINTEL
STEEL PLATE
STEEL ROOF DECK
STEEL TUBE
STEEL TRUSS
STAINLESS
STORAGE
STRINGERS
STRUCTURAL
STRUCTURAL STEEL
SUBSTITUTE
SURFACE
SUSPEND
SUSPENDED CEILING
SWITCH
SWING DOOR
SYMBOL
SYNTHETIC
SYSTEM
T T&M
TB
TBD
TECH
TEL
TEMP
THERM
THK
THRES
THRU
THRUOUT
TMPD
TMPD GL
TN
TO
TO FDN
TOB
TOM
TOP
TOS
TOW
TPD
TR
TRANS
TRTD
TS
TSTAT
TV
TYP
U
UC
UGND
UL
ULT
UNFIN
UNO
UPS
UR
UTIL
UV
VAC
VAR
VEH
VENT
VERT
VEST
VFD
VIC
VID
VIF
VNR
VOC
VOL
VR
VTR
W/ W/O
WBL
WC
WD
WDW
WF
WFR
WFS
WH
WHSE
WP
WPM
WR
WS
WSCT
WT
X BRACE
XPS
YD
TREAD OR THERMOSTAT
TIME AND MATERIALS
TOWEL BAR
TACK BOARD
TECHNICAL
TELEPHONE
TEMPERATURE OR TEMPORARY
THERMAL
THICKNESS
THRESHOLD
THROUGH
THROUGHOUT
TEMPERED
TEMPERED GLASS
TRUE NORTH
TOP OF ___
TOP OF FOUNDATION
TOP OF BEAM
TOP OF MASONRY
TOP OF PARAPET
TOP OF STEEL
TOP OF WALL
TOILET PAPER DISPENSER
TELECOM ROOM
TRANSOM
TREATED
TUBE STEEL
THERMOSTAT
TELEVISION
TYPICAL
HEAT TRANSFER COEFFICIENT
UNDERCUT
UNDERGROUND
UNDERWRITERS LABORATORIES
ULTIMATE
UNFINISH
UNLESS NOTED OTHERWISE
UNINTERRUPTIBLE POWER SUPPLY
URINAL
UTILITY
ULTRAVIOLET
VACUUM
VARIES
VEHICLE
VENTILATION
VERTICAL
VESTIBULE
VARIABLE FREQUENCY DRIVE
VICINITY
VIDEO
VERIFY IN FIELD
VENEER
VOLATILE ORGANIC COMPOUND
VOLUME
VAPOR RETARDER
VENT THROUGH ROOF
WITH
WITHOUT
WOOD BLOCKING
WATER CLOSET
WOOD
WINDOW
WIDE FLANGE
WOOD FRAME
WOOD FURRING STRIPS
WATER HEATER
WAREHOUSE
WATERPROOFING
WATERPROOF MEMBRANE
WEATHER RESISTANT
WEATHERSTRIP OR WALL SCONCE
WAINSCOT
WEIGHT OR WINDOW TREATMENT
CROSS BRACE
EXTRUDED POLYSTYRENE BOARD
YARD
No DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
CONSTRUCTION PACKAGE
C
U s e rs
\M C a m e ro n \D o c u m e n ts \1
B
L D
G s t
F lo o r_
A m c a m e ro n M
T .r v t
/2
/2
:1
:5
A
M
GI002
ABBREVIATIONS REMODEL BUILDING 51-1
EAST FOR CLC
656-19-307
08/23/2024
MC EM
15479
DN
UP
UP
FD
LIVING
ROOM
1 BED1 BED
1 BED 1 BED
TUB ROOM
LINEN
STORAGESHOWER
149 SF
48-104
CLEAN
UTILITY
SOILED
UTILITY
125 SF
48-103A
EQUIPMENT
STORAGE
TOILET
ROOM
1 BEDSTAFF
BREAK
ROOM
1 BED MEDICATION
2 BED
2 BED
DINING
ROOM
EXIT
ED
EXIT
EXIT
EA
EXAM
MED ROOM
OFFICE
TELECOM
ROOM
DINING
ROOM
KITCHEN
HAC
ELEVATOR ELEVATOR
MULTI
PURPOSE
OFFICE
STORAGE
EXAM
FILEROOM
PIPE CHASE
STORAGE
OFFICE
RoomTLTRoom
FAX/
PRINTER
NURSE
STATION
CLC OFFICE CLC OFFICE WHEELCHAIR
STORAGE STAIR HALL
MEDS
STAIR
EXERCISE
ROOM
1 BED 1 BED
1 BED
CORRIDOR
PIPE CHASE
Room
MALE/PATIENT
PIPE CHASE
LAUNDRY
DAYROOM
KITCHEN
PATIENT
DINNING
SMOKE
COMPARTMENT
SMOKE
COMPARTMENT
48-1W
5,090 SF
NO WORK THIS AREA
EA
TR
AV
EL
D
IS
TA
NC
E
'-7
TR
AV
EL
D
IS
TA
NC
E
'-9
HAC
EXIST
FEC
EXIST
FEC
LIFE SAFETY SYMBOLS
HE
TRAVEL DISTANCE
100'-10"
TRAVEL DISTANCE
EA
EDEXIT EXIT
HORIZONTAL EXIT
EXIT DISCHARGE
EXIT ACCESS
FIRE EXTINGUISHERFE
FIRE EXTINGUISHER
CABINETFEC
LIMITS OF
CONSTRUCTION
NOTE: NOT ALL SYMBOLS MY BE USED ON EACH PLAN
SHAFT
ADJACENT SYMBOLS SHOW PARTITION RATING
AND DAMPER REQUIREMENTS
SPECIAL HAZARD PROTECTION
ADJACENT SYMBOLS SHOW PARTITION RATING AND DAMPER
REQUIREMENTS
EXIT PASSAGEWAY
RATE AS STAIR
ALL OPENINGS TO BE RATED AS STAIR SHAFT
CORRIDOR
WALLS TO LIMIT THE TRANSFER OF SMOKE
HEALTHCARE SUITE
NON-PATIENT CARE
HEALTHCARE SUITE
SLEEPING SUITE PATIENT CARE
HEALTHCARE SUITE
NON-SLEEPING
PATIENT CARE
1 HOUR FIRE
BARRIER
SMOKE PARTITION
NO SYMBOL - ALL
CONTIGUOUS AREA WITHIN
SMOKE COMPARTMENT NOT
MARKED AS SLEEPING OR
NONPATIENT
1 HOUR FIRE
BARRIER AND SMOKE
PARTITION
NOYESGENERAL TYPE OF PROJECT
REMODEL
ADDITION
NEW BUILDING
PROJECT DESCRIPTION
48-1W CODE SUMMARY
MINOR UPDATES TO COMMUNITY LIVING CENTER FIRST FLOOR / WEST
OF BUILDING 48 FOR TEMPORARY USE DURING REMODEL OF BUILDING
51-1E. 5,090 SF. MAINTAINS OCCUPANCY TYPE AND EXISTING EXITS.
NOYESAUTHORITIES HAVING JURISDICTION (AHJ's)
THE JOINT COMMISSION (JC)
U.S. DEPARTMENT OF VETERANS AFFAIRS (VA)
APPLICABLE REGULATIONS
NFPA NATIONAL FIRE CODES (EXCEPTION: NFPA 5000 & 900)
2022 FGI GUIDELINES
2024 NFPA 101 (LIFE SAFETY CODE)
ABA STANDARDS (2015) (ABAAS)
2021 IBC
VA BARRIER FREE DESIGN STANDARD (PG-18-13)
OSHA STANDARDS
VA SEISMIC DESIGN REQUIREMENTS H-18-8
NATIONAL ELECTRIC CODE (NEC)
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,
AMERICAN CONCRETE INSTITUTE AND COMETARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
ENERGY POLICY ACT OF 2005 (EPAct)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS
FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE
RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL
BUILDINGS, 10 CFR PARTS 433,434 AND 435
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE
BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
EXECUTIVE ORDER 13834
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED
IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA
MASTER CONSTRUCTION SPECIFICATION
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE
STANDARD 62.1-2004
SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE
STANDARD 15 -2007
VA FIRE PROTECTION DESIGN MANUAL
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA
NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER
GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)
VA PHYSICAL SECURITY AND RESILIENCE DESIGN MANUAL (PSRDM)
NOYES
CHANGE OF OCCUPANCY?
SEPARATED OCCUPANCIES?
OCCUPANCY CLASSIFICATION(S)
OCCUPANCIES CH 19
EXIST HEALTH CARE
ADDITIONAL NOTES
1. DEAD-END CORRIDOR EXCEEDING 30 FT SHALL BE PERMITED TO
CONTINUE IN USE IF IT IS IMPRACTICAL AND UNFEASIBLE TO ALTER
THEM (19.2.5.3)
2. RELEASE OF DOOR LOCKS FOR FAIL-SAFE OPERATION SHALL BE
COORDINATED WITH THE FIRE ALARM SYSTEM.
NOYES
FIRE RESISTIVE CORRIDORS?
SMOKE TIGHT CORRIDORS (SMOKE PARTITIONS)
INCIDENTAL USE AREA RATING(S) SEE PLANS
MISCELLANEOUS
INTERIOR FINISHES CLASSIFICATION AEXITS
AEXIT ACCESS CORRIDORS
BOTHER SPACES
SEPARATED OCCUPANCIES DO NOT OCCUR WITHIN THE PROJECT.
FLOOR PROVIDES SEPARATION TO BASEMENT STORAGE
RATING (HRS)
STRUCTURAL FRAME
FIRE-RESISTIVE REQUIREMENTS
NO CHANGE
1 HR
BEARING WALLS 1 HR
NON-BEARING WALLS AND PARTITIONS 0 HR
See Life Safety Plans
FLOOR CONSTRUCTION 1 HR
ROOF CONSTRUCTION 1 HR
EXTERIOR DOORS AND WINDOWS
SHAFTS AND EXIT PASSAGEWAYS 1 HR
0 HR
(Section 8.3)FIRE BARRIER RATING(S) SEE LIFE SAFETY PLANS
AREA SEPARATIONS / FIRE WALLS
TYPE(S) OF CONSTRUCTION
CONSTRUCTION TYPE(S)
SEE LIFE SAFETY PLANS
ACTUAL AREA PER FLOOR
TOTAL
SECOND FLOOR
FIRST FLOOR
BASEMENT NO CHANGE
NO CHANGE
NO CHANGE
NO CHANGE
NO CHANGE TYPE II (111)
EGRESS NO CHANGE
OCCUPANT LOAD OF BUILDING NO CHANGE
PLUMBING FIXTURES NO CHANGE
NOYESGENERAL TYPE OF PROJECT
REMODEL
ADDITION
NEW BUILDING
PROJECT DESCRIPTION
REMODEL OF COMMUNITY LIVING CENTER DIMENTIA UNIT ON FIRST
FLOOR / EAST OF BUILDING 51. 5,820 SF WITHIN SMOKE COMPARTMENT
AND ADJACENT WORK. MAINTAINS OCCUPANT LOAD AND EXISTING
EXITS. DUE TO EXTENT OF WORK OCCUPANCY SHALL BE NEW HEALTH
CARE OCCUPANCY.
NOYESAUTHORITIES HAVING JURISDICTION (AHJ's)
THE JOINT COMMISSION (JC)
U.S. DEPARTMENT OF VETERANS AFFAIRS (VA)
NOYES
CHANGE OF OCCUPANCY?
SEPARATED OCCUPANCIES?
OCCUPANCY CLASSIFICATION(S)
OCCUPANCIES CH 18
NEW HEALTH CARE
APPLICABLE REGULATIONS
NFPA NATIONAL FIRE CODES (EXCEPTION: NFPA 5000 & 900)
2022 FGI GUIDELINES
2024 NFPA 101 (LIFE SAFETY CODE)
ABA STANDARDS (2015) (ABAAS)
2021 IBC
VA BARRIER FREE DESIGN STANDARD (PG-18-13)
OSHA STANDARDS
VA SEISMIC DESIGN REQUIREMENTS H-18-8
NATIONAL ELECTRIC CODE (NEC)
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,
AMERICAN CONCRETE INSTITUTE AND COMETARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
ENERGY POLICY ACT OF 2005 (EPAct)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS
FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE
RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL
BUILDINGS, 10 CFR PARTS 433,434 AND 435
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE
BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
EXECUTIVE ORDER 13834
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED
IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA
MASTER CONSTRUCTION SPECIFICATION
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE
STANDARD 62.1-2004
SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE
STANDARD 15 -2007
VA FIRE PROTECTION DESIGN MANUAL
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA
NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER
GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)
VA PHYSICAL SECURITY AND RESILIENCE DESIGN MANUAL (PSRDM)
CORRIDORS
18.2.5.3 DEAD END CORRIDOR - 30' ALLOWED
NOYES
FIRE RESISTIVE CORRIDORS?
SMOKE TIGHT CORRIDORS (SMOKE PARTITIONS)
INCIDENTAL USE AREA RATING(S) SEE PLANS
MISCELLANEOUS
INTERIOR FINISHES CLASSIFICATION AEXITS
AEXIT ACCESS CORRIDORS
BOTHER SPACES
51-1E CODE SUMMARY
SEPARATED OCCUPANCIES DO NOT OCCUR WITHIN THE PROJECT.
FLOOR PROVIDES SEPARATION TO BASEMENT STORAGE
(Section 8.3)FIRE BARRIER RATING(S) SEE LIFE SAFETY PLANS
RATING (HRS)
STRUCTURAL FRAME
FIRE-RESISTIVE REQUIREMENTS
NO CHANGE
1 HR
BEARING WALLS 1 HR
NON-BEARING WALLS AND PARTITIONS 0 HR
See Life Safety Plans
FLOOR CONSTRUCTION 1 HR
ROOF CONSTRUCTION 1 HR
EXTERIOR DOORS AND WINDOWS
SHAFTS AND EXIT PASSAGEWAYS 1 HR
0 HR
AREA SEPARATIONS / FIRE WALLS
TYPE(S) OF CONSTRUCTION
CONSTRUCTION TYPE(S)
SEE LIFE SAFETY PLANS
ACTUAL AREA PER FLOOR
TOTAL
SECOND FLOOR
FIRST FLOOR
BASEMENT NO CHANGE
NO CHANGE
NO CHANGE
NO CHANGE
NO CHANGE TYPE II (111)
EGRESS NO CHANGE
OCCUPANT LOAD OF BUILDING NO CHANGE
PLUMBING FIXTURES NO CHANGE
EXISTING TO NEW HEALTH CARE
CORRIDORS
18.2.5.3 DEAD END CORRIDOR - 30' ALLOWED
984 SF
PATIENT CARE SLEEPING SUITE
2951 SF
PATIENT CARE NONSLEEPING SUITE
191 SF
NON-PATIENT CARE
728 SF
PATIENT CARE SLEEPING SUITE
450 SF
PATIENT CARE SLEEPING SUITE
NO WORK THIS AREA
RESIDENT
ROOM
STAIRS
OFFICE
STAIRS
MED ROOM
C1C
CORRIDOR
RESIDENT
ROOM
RESIDENT
ROOM
121A
TOILET
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
127B
HAC
86 SF
127D
CLEAN
UTILITY
85 SF
127E
SOILED
UTILITY
126A
TOILET
ROOM
120A
TOILET
ROOM
OPEN
LOUNGE
OFFICE
BREAK/LOUNGE
90 SF
EQUIPMENT
STORAGE
CHARTING
STATION
125A
TOILET
ROOM124A
TOILET
ROOM
C1SE
CORRIDOR
C1NE1
CORRIDOR
128A
TOILET
ROOM
DINING
RESIDENT
ROOM
111A
TOILET
ROOM
RESIDENT
ROOM
113A
TOILET
ROOM
RESIDENT
ROOM
115A
TOILET
ROOM
116A
TOILET
ROOM
RESIDENT
ROOM
117A
TOILET
ROOM
RESIDENT
ROOM
127A
LINEN
LINEN
123B
WARD
SUPPLY
MED
NURSE
STATION
STAFF
CHUTE
LAUNDRY
ENTRY
ADMIN
ASSISTANT
Room
DINING
STORAGE
CLASS
CONF
E01
ELEV
BATH
OFFICE
NURSE
PRACTIONER
134C
VESTIBULE
134B
STAIR
134A
CORRIDOR
C1E
CORRIDOR
EXIT
SMOKE
COMPARTMENT
51-1E
127C
BATH
E X
IT
EXIT
TR
AV
EL
D
IS
TA
NC
E
'-1
TR
AV
EL
D
IS
TA
NC
E
'-7
E A
QUIET
ROOM
C1NE2
SHARED
SPACE
C O
R R
ID
O
R L
E N
G T
H
'-0
29'-8"
FEC
FEC
EXIT AT
GROUND
LEVEL
EXIT AT
GROUND
LEVEL
No DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
CONSTRUCTION PACKAGE
C
U s e rs
\M C a m e ro n \D o c u m e n ts \1
B
L D
G s t
F lo o r_
A m c a m e ro n M
T .r v t
/2
/2
:1
:4
P
M
GI110
LIFE SAFETY PLANS REMODEL BUILDING 51-1
EAST FOR CLC
656-19-307
08/23/2024
LA EM
15479
3/32" = 1'-0"
BUILDING 48 - FIRST FLOOR - PARTIAL LIFE SAFETY PLAN
0 10'-8" 21'-4"5'-4"
TRUE
NORTH
PLAN
NORTH
0 10'-8" 21'-4"5'-4"
TRUE
NORTH
PLAN
NORTH
SUITE AREAS
Name Area
NON-PATIENT CARE
1 STAFF BREAK TOILET 191 SF
PATIENT CARE NONSLEEPING SUITE
2 GENERAL SUITE 2951 SF
PATIENT CARE SLEEPING SUITE
3 RM 113 114 115 116 984 SF
4 RM 117 227 SF
5 RM 124 125 126 728 SF
6 RM 120 121 450 SF
7 RM 111 227 SF
Total Area 5758 SF
3/32" = 1'-0"
BUILDING 51 - FIRST FLOOR - PARTIAL LIFE SAFETY PLAN
FD
4C
STORAGE
WHEELCHAIR
4D
WASHER
WHLCHAIR
4B
OFFICE
CORR4E
CLINIC
WHEELCHAIR
LOUNGE
EMPLOYEE
STORAGE
PROSTHETICS
OFFICE
PROSTHETICS
9A
OFFICE
STAIR
10A
SERVICE ROOM
UPPER
OFFICE
LOCKER
FEMALE 1A
UTILITY
SOILED
2A
BATH
STOR 23D
EXAM
23C
INTAKE
C0C
CORRIDOR
ACTIVITIES
12A
CORRIDOR
12B
STAIR
12D
MECH
ELEV
12C
ENTRY
STORAGE 14
HAC
STAIR
OFFICECOCA
CORRIDOR
28'-13/4"
LAUNDRY
CHUTE
NO WORK THIS AREA
CONSTRUCTION ZONE: 48-1W-A
CLASS OF PRECAUTION: CLASS II
CONSTRUCTION ZONE: 48-1W-B
CLASS OF PRECAUTION: CLASS II
NO WORK THIS AREA
CONSTRUCTION ZONE: 51-1E-A
CLASS OF PRECAUTION: CLASS IV
POSSIBLE ANTE ROOM
AT GRADE LEVEL ENTRY/EXIT, CONTRACTOR
TO PRESERVE RECENTLY INSTALLED
CONCRETE FLATWORK. IF DAMAGE OCCURS
DURING CONSTRUCTION, CONTRACTOR
SHALL REPLACE PAVEMENT AT END OF
CONSTRUCTION.
CONSTRUCTION ZONE: 51-1E-B
CLASS OF PRECAUTION: CLASS IV
CONSTRUCTION ZONE: 51-1E-C
CLASS OF PRECAUTION: CLASS IV
TEMPORARY DEMOLITION DEBRIS CHUTE.
PROVIDE SUFFICIENT BARRIERS AT GRADE
INCLUDING STORMWATER PROTECTION AND
CONSTRUCTION FENCE.
TEMPORARY CONSTRUCTION BARRIER
FOR MED GAS WORK. WORK SHALL BE
COMPLETE WITHIN THREE WORKING
DAYS. TEMPORARY BARRIERS SHALL
BE INSTALLED IN ONE OVERNIGHT
SHIFT IMMEDIATELY BEFORE
BEGINNING WORK AND REMOVED IN
ONE OVERNIGHT SHIFT IMMEDIATELY
AT END OF WORK. COORDINATE WITH
COR IN ADVANCE FOR PREPARATION,
SCHEDULING, AND FINAL CLEAN.
INFECTION CONTROL RISK ASSESSMENT (ICRA) LEGEND
LIMITS OF CONSTRUCTION
1 HOUR FIRE RATED ICRA / CONSTRUCTION BARRIER
LOCATION, AND DOOR, WHERE SHOWN
TEMPORARY NON-RATED (PLASTIC SHEETING) CONSTRUCTION BARRIER
LOCATION, WHERE APPROVED BY THE VA FOR USE IN RISK TYPE C. UPGRADE
TO 1 HOUR RATED PARTITION WHEN DIRECTED BY THE VA
48-1W MODIFICATIONS
48-1W-A
CONSTRUCTION PROJECT ACTIVITY: TYPE C
INFECTION CONTROL RISK GROUP: GROUP LOW RISK
CLASS OF PRECAUTION: CLASS II
48-1W-B
CONSTRUCTION PROJECT ACTIVITY: TYPE C
INFECTION CONTROL RISK GROUP: GROUP LOW RISK
CLASS OF PRECAUTION: CLASS II
INFECTION CONTROL RISK ASSESSMENT (ICRA)
BY PROJECT AREA USE AND PHASE
51-1E REMODEL
51-0E-A
CONSTRUCTION PROJECT ACTIVITY: TYPE C
INFECTION CONTROL RISK GROUP: GROUP LOW RISK
CLASS OF PRECAUTION: CLASS II
51-0E-B
CONSTRUCTION PROJECT ACTIVITY: TYPE D
INFECTION CONTROL RISK GROUP: GROUP LOW RISK
CLASS OF PRECAUTION: CLASS II
51-1E-A
CONSTRUCTION PROJECT ACTIVITY: TYPE D
INFECTION CONTROL RISK GROUP: GROUP HIGH RISK
CLASS OF PRECAUTION: CLASS IV
51-1E-B MED GAS WORK AT EXIST NURSE STATION
CONSTRUCTION PROJECT ACTIVITY: TYPE C
INFECTION CONTROL RISK GROUP: GROUP HIGH RISK
CLASS OF PRECAUTION: CLASS IV
51-1E-C MECHANICAL WORK IN EXIST OFFICE 106
CONSTRUCTION PROJECT ACTIVITY: TYPE C
INFECTION CONTROL RISK GROUP: GROUP MEDIUM RISK
CLASS OF PRECAUTION: CLASS III
CONSTRUCTION ZONE: 51-0E-A
CLASS OF PRECAUTION: CLASS II
CONSTRUCTION ZONE: 51-0E-B
CLASS OF PRECAUTION: CLASS II
AT GRADE LEVEL ENTRY/EXIT, CONTRACTOR
TO PRESERVE RECENTLY INSTALLED
CONCRETE FLATWORK. IF DAMAGE OCCURS
DURING CONSTRUCTION, CONTRACTOR
SHALL REPLACE PAVEMENT AT END OF
CONSTRUCTION.
TEMPORARY DEMOLITION DEBRIS CHUTE.
PROVIDE SUFFICIENT BARRIERS AT GRADE
INCLUDING STORMWATER PROTECTION AND
CONSTRUCTION FENCE.
CONTINUOUS
DUCT
TAPE SEAL
EACH SIDE
AT CEILING
COMPRESSIBLE
INSULATION
CONTINUOUS DUCT
TAPE SEAL EACH
SIDE
EXISTING FINISHED
FLOOR
(1) LAYER 5/8" GYP BD EACH
SIDE. FINISH OCCUPIED SIDE
WITH GLOSS PAINT
3 5/8" STEEL STUDS @ 16"
OC WITH FULL BATT SOUND
ATTENUATING INSULATION
CLOSE OPEN DUCTS
WITH 6 MIL
POLYETHYLENE
BARRIER. SEAL
EDGES WITH
CONTINUOUS DUCT
TAPE
"WORK" SIDE OF BARRIER OCCUPIED SIDE OF BARRIER
BOTTOM OF
EXISTING
FLOOR SLAB
3 5/8" STEEL
STUDS @ 16"
OC WITH FULL
BATT SOUND
ATTENUATING
INSULATION
3 5/8" STEEL STUDS
@ 16" OC WITH FULL
BATT SOUND
ATTENUATING
INSULATION
REMOVE PORTION OF EXISTING CEILING AS
REQUIRED FOR INSTALLATION OF BARRIER
FRAME AND SEAL
BARRIER AROUND
ANY EXISTING
MECHANICAL,
ELECTRICAL,
PLUMBING,
TECHNOLOGY,
MED GAS, ETC.
SYSTEMS AS
REQUIRED.
6 MIL POLY OVER
CEILING PENETRATION
NOTES:
1. ALL CORNERS TO FORM 90 ANGLE WITH NO RADIUS
2. SEAL ALL SIDES OF POLY WITH DUCT TAPE
3. SEAL ALL CRACKS WITH DUCT TAPE.
6 MIL POLY OVER
EQUIPMENT OR
FURNISHING
6 MIL POLY OVER
WALL PROTRUSION
FLOOR
DOOR
BEYOND
WINDOW
BEYOND
CEILING
6 MIL POLY OVER
WALL OPENINGS
6 MIL POLY OVER
DOORS & WINDOWS
CEILING
No DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
CONSTRUCTION PACKAGE
C
U s e rs
\M C a m e ro n \D o c u m e n ts \1
B
L D
G s t
F lo o r_
A m c a m e ro n M
T .r v t
/2
/2
:1
:5
A
M
GC110
INFECTION CONTROL &
PHASING PLANS
REMODEL BUILDING 51-1
EAST FOR CLC
656-19-307
08/23/2024
MC EM
15479
3/32" = 1'-0"1 BUILDING 48 - FIRST FLOOR - ICRA, CONSTRUCTION BARRIER & PHASING PLAN 3/32" = 1'-0"2 BUILDING 51 - FIRST FLOOR - ICRA, CONSTRUCTION BARRIER & PHASING PLAN
0 10'-8" 21'-4"5'-4"
NORTH
3/32" = 1'-0"3 BUILDING 51 - BASEMENT - ICRA, CONSTRUCTION BARRIER & PHASING PLAN 0 10'-8" 21'-4"5'-4"
PLAN
NORTH
0 10'-8" 21'-4"5'-4"
PLAN
NORTH
1/2" = 1'-0"4 TYP DUST PROOF BARRIER
12" = 1'-0"5 CRITICAL BARRIER PREPARATION / INSTALLATION
INFECTION CONTROL &
CONSTRUCTION BARRIER
GENERAL NOTES
1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL
INFORMATION
2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND
PARTICULATE MATTER TO THE CONSTRUCTION AREA. CONSTRUCTION AREA
PERIMETER NEEDS TO BE SEALED COMPLETELY WITH SHEET PLASTIC AS
SPECIFIED AND DUCT TAPE DURING OPERATIONS, WHERE PERMITTED BY CLASS.
ICRA - CONSTRUCTION BARRIER TO BE PROVIDED AS SPECIFIED AND LISTED IN
ICRA CLASS.
3. PROVIDE NEGATIVE PRESSURE MONITORS DURING CONSTRUCTION OPERATIONS
AS SPECIFIED. MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN
CONSTRUCTION AREA AND ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA.
4. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON,
PROVIDE A REQUEST VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE
VA INFECTION CONTROL NURSE. UPON AUTHORIZATION, PROCEED TO NEXT TYPE
OF CONSTRUCTION. PROVIDE AT LEAST TEN (10) WORKING DAYS NOTICE FOR
EACH PERMIT.
5. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER(S) FROM FLOOR
TO DECK/FLOOR ABOVE. EXCEPTION. IF BARRIER IS ADJACENT TO SMOKE, FIRE,
OR EXISTING WALL CONSTRUCTION WHICH WILL NOT BE DEMOLISHED AND
TERMINATES TO FLOOR/DECK ABOVE, THEN CONSTRUCT DUST PROOF IC
BARRIER, SEE DETAIL(S). TAPE, MUD, SAND JOINTS AND PAINT ON NON-
CONSTRUCTION SIDE OF BARRIER.
6. INFECTION CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY
BEFORE 7:00 AM AND AFTER 8:00 PM OR DIRECTED BY COR
7. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA PROVIDE
NEGATIVE PRESSURE MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF,
(2) TWO MINIMUM IN AREAS BETWEEN 1000 SF AND 5000 SF, AND (3) THREE FOR
AREAS BETWEEN 5000 SF AND 10000 SF.
8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.
9. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO
COMPLETELY EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL
TIMES PER HOUR. THE COMPETENT PERSON SHALL DETERMINE THE NUMBER OF
UNITS NEEDED FOR EACH REGULATED AREA BY DIVIDING THE CUBIC FEET IN THE
REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE
ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE
NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR.
PROVIDE A STANDBY UNIT IN THE EVENT OF MACHINE FAILURE AND/OR
EMERGENCY IN AN ADJACENT AREA.
10. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED PARTITIONS,
CONSTRUCT NEW SMOKE BARRIER/APPROPRIATE FIRE RATED PARTITIONS PER
PLANS OR CONSTRUCT INFECTION CONTROL BARRIER TO ACT AS SMOKE
BARRIER.
CONSTRUCTION PHASING
GENERAL NOTES
1. THE WORK UNDER THIS CONTRACT SHALL BE DIVIDED INTO PHASES. A PHASE
CAN INVOLVE MULTIPLE LOCATION AREAS. SEE SPECIFICATIONS SECTION 01 00 00
1.6.G PHASING.
2. THE GENERAL CONTRACTOR SHALL COORDINATE ALL PHASING AND SEQUENCING
WITH ALL TRADES AND THE OWNER. THE GENERAL CONTRACTOR SHALL PROVIDE
A WRITTEN NARRATIVE TO OUTLINE CONSTRUCTION PHASING AND SEQUENCE
PLANS, VALIDATING AND ELABORATING ON THIS PHASING DESCRIPTION.
3. THE GENERAL CONTRACTOR SHALL COOPERATE FULLY WITH THE OWNER SO
WORK MAY BE CARRIED OUT SMOOTHLY, WITHOUT INTERFERING WITH OR
DELAYING WORK UNDER THIS CONTRACT, OR OTHER CONTRACTS ON THE
PROJECT SITE OR WORK BY OWNER.
4. THE GENERAL CONTRACTOR'S CONSTRUCTION SCHEDULE SHALL INDICATE THE
SEQUENCE, COMMENCEMENT AND COMPLETION DATES, OWNER INSPECTION AND
APPROVAL DATES AND MOVE-OUT AND MOVE-IN DATES OF OWNER'S PERSONNEL
FOR ALL PHASES OF THE WORK.
5. THE GENERAL CONTRACTOR SHALL PERFORM THE WORK IN EACH PHASE IN THE
SEQUENCE SHOWN ON THE PHASING PLAN DRAWING(S) AND CONSTRUCTION
PHASING DESCRIPTION.
6. THE GENERAL CONTRACTOR MUST COMPLETE ALL WORK IN EACH PHASE WITH
THE VA INSPECTING AND ACCEPTING THE WORK PRIOR TO VA OCCUPANCY AND
THE CONTRACTOR PROCEEDING TO THE NEXT SCHEDULED PHASE. UPON
COMPLETION OF A PARTICULAR PHASE, THE ENTIRE AREA COVERED BY THAT
PHASE CAN BE OCCUPIED BY THE VA PERSONNEL WITH ALL SYSTEMS
FUNCTIONING PROPERLY.
7. BEFORE COMMENCING WORK ON EACH SUCCESSIVE PHASE, THE GENERAL
CONTRACTOR SHALL SUBMIT AN UPDATED COPY OF THE SCHEDULE.
8. ANY DUST PARTITIONS OR ICRA-CONSTRUCTION BARRIERS CONSTRUCTED BY
THE CONTRACTOR PRIOR TO THE START OF DEMOLITION MUST REMAIN IN PLACE
UNTIL THE COMPLETION OF THAT PHASE OR SUBSEQUENT PHASE WHERE
REQUIRED.
9. THE CONTRACTOR SHALL PERFORM ALL WORK ADJACENT TO VA OCCUPIED
AREAS IN SUCH A MANNER TO ENSURE THE CONTINUOUS AND UNINTERRUPTED
USE OF ALL OCCUPIED AREAS, INCLUDING THE APPLICABLE MECHANICAL AND
ELECTRICAL SYSTEMS SERVING THESE AREAS.
10. FOR ADDITIONAL NOTES AND INFORMATION REFER TO INFECTION CONTROL
DRAWING(S) AND DEMOLITION PLANS.
11. ANY INFORMATION REGARDING SEQUENCING PROVIDED IN THE DOCUMENTS IS
FOR ARCHITECT-OWNER PLANNING PURPOSES ONLY.
12. THE CONTRACTOR DURING CONSTRUCTION SHALL MAINTAIN REQUIRED MEANS
OF EGRESS THROUGHOUT ALL PHASING.
13. THE CONTRACTOR SHALL PLAN FOR A MINIMUM OF 4 WEEKS' TIME BETWEEN
PHASES TO ALLOW THE VA TO OCCUPY THE NEWLY ACCEPTED SPACE AND
VACATE THE FOLLOW-ON PHASES. THE VA WILL ACCELERATE THIS TIME WHEN
POSSIBLE AND WILL NOTIFY THE CONTRACTOR IF THIS OCCURS.
VHA INFECTION CONTROL RISK ASSESSMENT FOR CONSTRUCTION,
RENOVATION AND MAINTENANCE
TABLE 5 - REQUIRED INFECTION PREVENTION AND CONTROL MEASURES, BY LEVEL OF PRECAUTIONS
CONTROLS DEFINED BELOW FOR THE LEVEL OF PRECAUTIONS IDENTIFIED FOR THE ACTIVITY MUST BE IN PLACE BEFORE THE ACTIVITY BEGINS AND MAINTAINED UNTIL WORK IS COMPLETED AND THE AREA IS ACTIVATED. CONTROL MEASURES FOR EACH PRECAUTION LEVEL MUST ALSO INCLUDE THE CONTROL MEASURES IN THE PRECEDING LEVEL(S).
AS THE ACTIVITY PROGRESSES, A FULL RE-EVALUATION OF REMAINING ACTIVITY TYPE AND PATIENT RISK IS REQUIRED PRIOR TO
DOWNGRADING THE LEVEL OF PRECAUTIONS.
LEVEL OF
PRECAUTIONS
CONTROL MEASURES
LEVEL I
1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.
2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON COMPLETION OF WORK.
ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE FREE OF CONTAMINANTS AND LOOSE
MATERIAL.
TABLE 6 - MINIMUM INFECTION PREVENTION AND CONTROL MEASURES REQUIRED UPON COMPLETION OF THE ACTIVITY
CONTROLS DEFINED BELOW SHALL BE COMPLETED UPON COMPLETION OF THE ACTIVITY AND INSPECTED PRIOR TO TERMINATING
MEASURES DEFINED IN TABLE 5.
LEVEL OF
PRECAUTIONS
MEASURES
LEVELS I - II
CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL SURFACES AND
FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER SURFACES AS
WELL AS AIR DIFFUSER SURFACES.
HVAC SYSTEMS:
1. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED. VERIFY THAT
HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
2. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN SPECIFICATIONS.
WATER SYSTEMS:
UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL CONTINUE AT LEAST TWICE PER WEEK
IN ACCORDANCE WITH VHA DIRECTIVE 1061.
LEVELS III - IV
CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR FINAL ACTIVITY/PROJECT CLOSE OUT AND REMOVAL OF INFECTION
PREVENTION AND CONTROL MEASURES.
WORK AREA CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL SURFACES AND
FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER SURFACES AS
WELL AS AIR DIFFUSER SURFACES.
REMOVAL OF CRITICAL BARRIERS:
1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN PERFORMED. ADDITIONAL CLEANING MAY BE
NEEDED AFTER REMOVAL OF BARRIER.
2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN REMOVING HARD BARRIERS:
1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.
2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA VACUUM.
3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.
4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD BARRIER.
5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.
NEGATIVE AIR REQUIREMENTS:
1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE WORK AREA.
2. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION EQUIPMENT) MUST
REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD AFTER COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM THE WORK AREA AND BEFORE REMOVAL OF
CRITICAL BARRIERS.
HVAC SYSTEMS:
1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE
WORK IS BEING PERFORMED.
2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
3. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW AND AIR
EXCHANGE DESIGN SPECIFICATIONS.
WATER SYSTEMS:
UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL CONTINUE AT LEAST TWICE PER WEEK
IN ACCORDANCE WITH VHA DIRECTIVE 1061.
LEVEL II
ALL CONTROL MEASURES IN LEVEL I AND THE FOLLOWING:
1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO OCCUPIED AREAS AND/OR WATER
MIST SURFACE TO CONTROL DUST (E.G., MOBILE DUST CONTAINMENT CART OR SOME OTHER SYSTEM).
2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE LEAVING THE WORK AREA.
3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE HVAC SYSTEM FROM DUST AND
REDUCE AIR TURBULENCE. REBALANCE SYSTEM TO ADDRESS DIFFUSER ISOLATION.
4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING STAGNATION DUE TO REDUCED
USAGE, THE PIPING SHALL BE FLUSHED TWICE A WEEK OR ISOLATED FROM THE MAIN SYSTEM.
5. SEAL DOORS TO PREVENT DUST MIGRATION.
6. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY CLEANING AND DISPOSAL OF TRASH
(COVERED) FROM WORK AREA USING AN IDENTIFIED EXIT ROUTE.
7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA MUST BE IN SEALED CONTAINERS
AND/OR CLEANED OF DUST AND DEBRIS PRIOR TO REMOVAL FROM THE AREA.
8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST BE USED TO TRANSPORT TRASH AND
DEBRIS FROM THE CONSTRUCTION AREAS. THESE CONTAINERS MUST BE DAMP-WIPED CLEANED AND FREE OF
VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.
9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK AREA BASED ON FACILITY POLICY.
STICKY MATS MUST BE CHANGED ROUTINELY AND WHEN VISIBLY SOILED.
10. MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP MOPPING OR HEPA VACUUMING
SURFACES AT LEAST DAILY.
LEVEL III
ALL CONTROL MEASURES IN LEVELS I AND II AND THE FOLLOWING:
1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.
2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241 REQUIREMENTS. BARRIERS MUST EXTEND TO
THE CEILING OR IF CEILING TILE IS REMOVED, TO THE DECK ABOVE.
3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE COMPLETED IN A MANNER THAT PREVENTS
DUST RELEASE. PLASTIC BARRIERS MUST BE EFFECTIVELY AFFIXED TO FLOOR AND CEILING (OR FLOOR/ROOF DECK
ABOVE) AND SECURE FROM MOVEMENT OR DAMAGE.
4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND CEILING, USING APPROVED
MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE FOR BARRIER TYPE).
5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE ENTIRE WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED OUTDOORS (UNLESS A WORK SPECIFIC WAIVER IS APPROVED BY VHA’S OFFICE OF HEALTHCARE ENGINEERING); THIS MUST BE MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT. EXHAUST DISCHARGED DIRECTLY TO THE OUTDOORS THAT IS 25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES AND WINDOWS IS NOT REQUIRED TO BE HEPA-FILTERED. EXHAUSTING DISCHARGED AIR INTO SHARED OR RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED EXHAUST SYSTEMS (E.G., BATHROOM EXHAUST) IS
PROHIBITED.
6. INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC, MANOMETER, OR DIGITAL MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO CONTINUALLY MONITOR AND DOCUMENT NEGATIVE PRESSURIZATION.
THE “BALL IN THE WALL” OR SIMILAR APPARATUS ARE NOT ACCEPTABLE.
LEVEL IV
ALL CONTROL MEASURES IN LEVELS I, II AND III AND THE FOLLOWING:
1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL BARRIER.
2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE CONTROL. ANTEROOM MUST BE LARGE
ENOUGH FOR EQUIPMENT STAGING, CART CLEANING, WORKERS’ PPE AND CLEANING.
3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF VISIBLE DUST BEFORE LEAVING THE
WORK AREA ANTEROOM. HEPA VACUUMING OF CLOTHING OR USE OF COVER SUITS IS ACCEPTABLE.
4. WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN ANTEROOM. SHOE COVERS MUST BE
REMOVED PRIOR TO EXITING THE ANTEROOM TO THE OCCUPIED SPACE (NON-WORK AREA). DAMAGED SHOE
COVERS MUST BE CHANGED IMMEDIATELY.
VHA INFECTION CONTROL RISK ASSESSMENT FOR CONSTRUCTION,
RENOVATION AND MAINTENANCE
TABLE 1 - CONSTRUCTION, RENOVATION, AND/OR MAINTENANCE ACTIVITY CATEGORY
Category A
INSPECTION AND/OR FACILITY UPKEEP GENERALLY DEFINED AS FOLLOWS:
• WORK CAN BE COMPLETED IN A SINGLE SHIFT, NOT TO EXCEED 10 HOURS.
• PATIENTS AND/OR EMPLOYEES MAY BE IN THE AREA DEPENDING ON THE ACTIVITY.
• WORK THAT DOES NOT CREATE DUST OR DEBRIS.
• REMOVAL OF CEILING TILE OR ACCESS TO MECHANICAL OR ELECTRICAL CHASE FOR VISUAL INSPECTION
LIMITED TO 1 TILE PER 50 SQUARE FEET WITH LIMITED EXPOSURE TIME (NOT TO EXCEED AN HOUR FOR
EACH TILE) WITHIN THE SHIFT.
• MINOR INTERIOR UPDATES (E.G., REPLACING FLOOR OR CEILING TILES, CARPENTRY WORK TO INCLUDE HANGING SIGNAGE, AND PAINTING WITHOUT SANDING) THAT DO NOT CREATE DUST OR DEBRIS.
• LIMITED BUILDING SYSTEM MAINTENANCE SUCH AS PLUMBING ON POTABLE SYSTEMS LIMITED TO FAUCET REPLACEMENT ETC. AND ELECTRICAL WORK SUCH AS REPLACEMENT OF BULBS, RECEPTACLES, OR
SWITCHES.
ACTIVITY AREA**
ACTIVITY CATEGORY
PATIENT RISK
CATEGORY A B C D
LOW RISK
MEDIUM RISK
HIGH RISK
HIGHEST RISK
I II II III
I II III IV
I II IV
II IVIII IV
IV
AN INFECTION PREVENTION AND CONTROL PERMIT IS REQUIRED FOR LEVEL III AND LEVEL IV.
CONSULT WITH INFECTION PREVENTION AND CONTROL FOR LEVEL I AND LEVEL II.
TABLE 3 - PATIENT RISK CATEGORY
Category B
GENERAL MAINTENANCE AND REPAIR WORK GENERALLY DEFINED AS FOLLOWS:
• PROLONGED INSPECTION AND WORK THAT MAY TAKE LONGER THAN A SINGLE SHIFT BUT NOT EXCEEDING A
WEEK.
• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.
• WORK THAT CREATES MINIMAL DUST AND DEBRIS.
• INTERIOR FINISH OR SURFACE REPAIRS, UPDATES, OR MODIFICATIONS SUCH AS REPAIR OF FIREWALLS AND
BARRIERS, AND NEW FLOORING THAT PRODUCES MINIMAL DUST AND DEBRIS. CONTROLLED SANDING
ACTIVITIES (E.G., WET OR DRY SANDING) THAT PRODUCE MINIMAL DUST AND DEBRIS.
• PLUMBING WORK SUCH AS INSTALLATION OR REPLACEMENT OF A SINGLE FIXTURE OR PIPING FOR A SINGLE
FIXTURE. ANY WORK ON SANITARY PLUMBING INCLUDING SNAKING OF DRAINS.
• ELECTRICAL WORK SUCH AS INSTALLATION OF CABLING/WIRING/CONDUIT FOR A SINGLE DEVICE, INSTALLATION OF NEW DEVICE SUCH AS A LIGHT FIXTURE THAT PRODUCES MINIMAL DUST AND DEBRIS.
• AIR HANDLER AND/OR FAN SHUTDOWN/STARTUP AND HVAC WORK SUCH AS REPLACEMENT OF A SINGLE DIFFUSER, SINGLE TERMINAL UNIT OR A SINGLE DEVICE THAT PRODUCES MINIMAL DUST AND DEBRIS.
Category C
SMALL-SCALE CONSTRUCTION, RENOVATION, OR MAINTENANCE GENERALLY DEFINED AS FOLLOWS:
• WORK REQUIRING LONGER THAN A SINGLE WEEK TO COMPLETE BUT NOT EXCEEDING 6 MONTHS.
• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.
• DEMOLITION/REMOVAL OF PREEXISTING FLOOR COVERING, CASEWORK, LAY-IN CEILING, OR OTHER
ARCHITECTURAL ELEMENTS.
• DEMOLITION/REMOVAL OF MORE THAN 32 FT2 OF DRYWALL/FRAMING, HARD CEILINGS, AND DOORS/FRAMING
AND MINIMAL INFRASTRUCTURE SUCH AS ELECTRICAL CIRCUITS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .