RFI001 2019 Air Test Report _B113-B114-B115-B117-Research.pdf
PDF 103 KB Posted
- Solicitation number
- 36C26220Q1012
About this file
This federal solicitation requests quotes for preventative maintenance and repair services for HVAC-R systems at buildings on the North Campus of the VA Greater Los Angeles Healthcare System. The services include proactive preventative maintenance to keep HVAC-R systems fully functional and operating optimally 24/7/365. The contractor will maintain systems and address all tasks related to maintaining optimal functionality. The base period of performance is one year with four optional one-year extensions. This procurement is set aside 100% for Veteran-Owned Small Businesses. Quotes are due by July 15, 2020. Offerors must hold specific California contractor licenses and meet other standards of responsibility to be eligible for award. The contract will be awarded to the lowest priced offeror meeting all requirements.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Air Balancing Report (B-113, B-114, B-115 & B-117) TestDate 12/30/2019
Air Volume
(CFM)
Air Change (Per/Hour)
Air Volume
(CFM)
Air Change (Per/Hour)
B-113 #105 Clean cage storage
73 F N/A 920 29.6 997 32.0 NEG
B-113 #106 VMU cat housing 73 F 60-88 (alert)
58-90 (critical alarm)
659 20.4 1270 39.3 NEG
B-113 #106A VMU rodent housing 73 F
60-82 (alert) 62-85 (critical alarm)
306 23.3 406 30.9 NEG
B-113 #109 VMU rodent housing 73 F
68-82 (alert) 62-85 (critical alarm)
2707 14.1 5300 27.6 NEG
B-113 #110 VMU rodent housing 73 F
68-82 (alert) 62-85 (critical alarm)
760 14.3 1100 20.7 NEG
B-113 #111 VMU rodent housing 73 F
68-82 (alert) 62-85 (critical alarm)
303 23.0 345 26.1 NEG
B-113 #112B ABSL-2 rodent housing 73 F
68-82 (alert) 62-85 (critical alarm)
480 18.7 678 26.4 NEG
B-113 #112C ABSL-2 rodent housing 73 F
68-82 (alert) 62-85 (critical alarm)
258 10.0 294 11.3 NEG
B-113 #112D ABSL-2 rodent procedure room
73 F N/A 309 20.6 328 21.9 NEG
B-113 #112E ABSL-2 rodent housing 73 F
68-82 (alert) 62-85 (critical alarm)
173 6.7 298 11.5 NEG
B-113 #113A Procedure room 73 F N/A 173 6.7 298 11.5 NEG
B-113 #113 ABSL-2 rodent housing 73 F
68-82 (alert) 62-85 (critical alarm)
187 9.6 267 13.8 NEG
B-113 #114 VMU rodent housing 73 F
68-82 (alert) 62-85 (critical alarm)
247 10.0 458 18.6 NEG
B-113 #114A 437 25.4 536 31.2 NEG
B-113 #120 Kennels 73 F 60-88 (alert)
58-90 (critical alarm)
1802 5.8 4576 14.7 NEG
B-113 #121 Kennels 73 F 60-88 (alert)
58-90 (critical alarm)
1871 5.1 4020 10.9 NEG
Temp set point
Alert/Alarm Temperature
Range
Exhaust
Room PressureBldg. Room
Supply
Specific use
Air Volume
(CFM)
Air Change (Per/Hour)
Air Volume
(CFM)
Air Change (Per/Hour)
Temp set point
Alert/Alarm Temperature
Range
Exhaust
Room PressureBldg. Room
Supply
Specific use
B-113 #128 necropsy 73 F N/A 552 16.5 1078 32.3 NEG
B-113 #130 post-op 73 F 60-88 (alert)
58-90 (critical alarm)
902 24.0 665 17.7 POS
B-113 #131 pre-op/radiology 73 F N/A 244 14.9 223 13.6 POS
B-113 #132B OR 73 F N/A 807 21.5 717 19.1 POS
B-113 #132C OR 73 F N/A 736 22.5 664 20.3 POS
B-113 #136 VMU rodent housing 73 F
68-82 (alert) 62-85 (critical alarm)
790 12.0 1085 16.5 NEG
B-113 #137A immunodeficient procedure room
73 F N/A 380 22.6 232 13.8 POS
B-113 #137B immunodeficient mouse housing
73 F 68-82 (alert)
62-85 (critical alarm)
675 13.1 595 11.6 POS
B-113 #137C VMU rodent housing 73 F
68-82 (alert) 62-85 (critical alarm)
194 12.0 370 22.9 NEG
B-113 #331 satellite housing rat or mouse 72 F
19.1 C - 26.9 C
(alert)
110 7.5 140 9.5 NEG
B-114 #136 satellite housing rat 72 F
19.1 C - 26.9 C
(alert)
600 5.3 911 8.1 NEG
B-114 #312 satellite housing mouse 72 F
19.1 C - 26.9 C
(alert)
295 8.9 314 9.4 NEG
B-114 #116-2 satellite housing mouse
72 F N/A 160 25.3 386 60.9 NEG
B-114 #116-3 satellite housing rat
72 F N/A 95 15.8 210 35.0 NEG
Air Volume
(CFM)
Air Change (Per/Hour)
Air Volume
(CFM)
Air Change (Per/Hour)
Temp set point
Alert/Alarm Temperature
Range
Exhaust
Room PressureBldg. Room
Supply
Specific use
B-115 #109B satellite housing rat 72 F
19.1 C - 26.9 C
(alert)
269 15.1 300 16.8 NEG
B-115 #113B satellite housing mouse 72 F
19.1 C - 26.9 C
(alert)
312 19.3 338 20.9 NEG
#114B satellite housing rat 72 F
19.1 C - 26.9 C
(alert)
382 12.5 620 20.4 NEG
#125A satellite housing rat 72 F
19.1 C - 26.9 C
(alert)
193 8.3 342 14.6 NEG
B-115 #128C satellite housing mouse 72 F
19.1 C - 26.9 C
(alert)
120 4.3 356 12.7 NEG
B-115 #325D satellite housing rat 72 F
19.1 C - 26.9 C
(alert)
134 4.8 332 11.9 NEG
B-117 #2 VMU rodent housing 73 F
68-82 (alert) 62-85 (critical alarm)
964 10.6 1089 12.0 NEG
B-117 #3 VMU rodent housing 73 F
68-82 (alert) 62-85 (critical alarm)
880 16.4 1282 23.8 NEG
B-117 #7 procedure room 73 F N/A 516 12.4 600 14.5 NEG
B-117 #7A procedure room 73 F N/A 280 15.8 298 16.9 NEG
B-117 #14 VMU rodent housing 73 F
68-82 (alert) 62-85 (critical alarm)
955 15.0 612 9.6 POS
B-117 #18 VMU rodent housing 73 F
68-82 (alert) 62-85 (critical alarm)
1087 15.5 854 12.2 POS
B-117 #21 VMU rodent housing 73 F
68-82 (alert) 62-85 (critical alarm)
645 15.4 0 0.0 POS
B-117 #21a procedure room 73 F N/A 342 23.4 363 24.9 NEG
B-115
B-115
12302019
File details come from the government source that posted it. Updated .