36C26125R0053 0001.docx
DOCX document 119 KB Posted
- Solicitation number
- 36C26125R0053
About this file
This document is an Amendment (0001) to Solicitation 36C26125R0053 for a Design-Build Roof Replacement Project at the VA San Francisco Medical Center. The amendment primarily corrects the scheduled site visit date from July 16, 2025 to July 22, 2025, with a pre-proposal meeting set for 1:00 PM (PDT) at Building 1 outside the parking lot. The project is a firm-fixed price design-build construction requirement for replacing the EPDM rubber roof of Building 5.
The procurement is a total service-disabled veteran-owned small business (SDVOSB) set-aside with a project value between $250,000 and $500,000. The project will be awarded using FAR Part 15 Trade-off Process and FAR Part 36 Two-Phase Design-Build Selection Procedures. The period of performance is 240 calendar days, and offerors must be verified in the SBA Dynamic Small Business Search (DSBS) at the time of offer submission and prior to award. The project is managed by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 (VISN 21).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26125R0053 0004.docx | DOCX document | |
| Attachment - Pre-solicitation Request for Information Response 7-30th 2025.pdf | ||
| 36C26125R0053 0003.docx | DOCX document | |
| 36C26125R0053 0002.docx | DOCX document | |
| Attachment-Site Visit Attendees 20250722.pdf | ||
| Attachment - REQUEST FOR INFORMATION (RFI) FORM.docx | DOCX document | |
| ATTACHMENT C - PHASE 2 FACTOR 4 - Offerors Key Personnel.docx | DOCX document | |
| ATTACHMENT B - PHASE 1 FACTOR 3 - Past Performance Questionnaire.docx | DOCX document | |
| ATTACHMENT D - Pre-solicitation Site Visit Presentation Modernize DB Roof.pptx | PPTX presentation | |
| ATTACHMENT A - PHASE 1 FACTOR 2 - EXPERIENCE.xlsx | XLSX spreadsheet | |
| ATTACHMENT - Specifications 662-25-111 EPDM Roof Bldg 5.pdf | ||
| PHASE I RFP 36C26125R0053_Project No. 662-25-111 Design-Build Services Roof Replacement.docx | DOCX document | |
| DBA Wage Determination CA20250018 20250711.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
07-14-2025
662-25-111
612MCP
Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) Network Contracting Office (NCO) 21
612MCP
Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) Network Contracting Office (NCO) 21
To all Offerors/Bidders
36C26125R0053 07-14-2025
X
Amendment 0001 corrects the date of the scheduled site visit from July 16, 2025 to July 22, 2025. A pre-proposal will be held on July 22, 2025 at 1:00 PM(PDT).
FAR 52.236-27 -- SITE VISIT (CONSTUCTION)(FEB 1995) ALTERNATE I (FEB 1995) has been updated to reflect the correct date.
All other terms and condition remain unchanged and in full force and effect.
Daniel Jhun Contracting Officer
A.1 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for— July 22, 2025 at 1:00 PM (PDT)
(c) Participants will meet at— Building 1, outside of the parking lot (End of Provision)