Attachment - Data Report - T6611-1-1.pdf
PDF 3 MB Posted
- Solicitation number
- 36C26125Q0949
About this file
This document is a comprehensive set of manufacturing and inspection records for a Cleaver Brooks packaged boiler manufactured for the VA Hospital in Fresno, California. The boiler is a 3WI 200-300-200ST model with a maximum working pressure of 200 PSI, gross output of 10,043,000 BTU/HR, and designed for natural gas fuel. Key specifications include a 2018 build year, 15 HP blower motor, 5 HP air compressor motor, 0.75 HP oil pump motor, and electrical requirements of 460 volts, 3-phase, 60 Hz.
The documentation includes multiple detailed inspection and verification checklists covering various stages of manufacturing, such as shell and tube fabrication, welding, piping hydro tests, control panel wiring, paint application, and final assembly. The boiler underwent rigorous quality control processes, including material traceability, dimensional checks, non-destructive testing, electrical system verification, and paint thickness measurements. The final paint thickness was recorded at 3.05 mils, and the boiler was manufactured with ASME Section I certification, indicating compliance with high-pressure boiler manufacturing standards.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .