36C26118B0235-016.pdf

PDF 104 KB Posted

Attached to
Emergency Department Safe Room| 662-18-1-6451-0005 | NRM Project #662-17-016
Solicitation number
36C26118B0235
Issued by

About this file

36C26118B0235 S02. ID-103 - Saferoom Floor Plan.pdf

View the file

Other files

File Type Posted
36C26118C0065-000.docx DOCX document
36C26118B0235-00003000.docx DOCX document
36C26118B0235-00003001.docx DOCX document
36C26118B0235-00003002.pdf PDF
36C26118B0235-00002002.pdf PDF
36C26118B0235-00002004.pdf PDF
36C26118B0235-00002003.pdf PDF
36C26118B0235-00002001.pdf PDF
36C26118B0235-00002000.docx DOCX document
36C26118B0235-00001000.docx DOCX document
36C26118B0235-00001001.pdf PDF
36C26118B0235-00001002.pdf PDF
36C26118B0235-019.docx DOCX document
36C26118B0235-010.docx DOCX document
36C26118B0235-011.pdf PDF
36C26118B0235-017.pdf PDF
36C26118B0235-022.docx DOCX document
36C26118B0235-021.docx DOCX document
36C26118B0235-026.pdf PDF
36C26118B0235-025.docx DOCX document
36C26118B0235-004.doc DOC document
36C26118B0235-013.docx DOCX document
36C26118B0235-006.docx DOCX document
36C26118B0235-012.pdf PDF
36C26118B0235-001.docx DOCX document
36C26118B0235-007.docx DOCX document
36C26118B0235-009.docx DOCX document
36C26118B0235-002.docx DOCX document
36C26118B0235-008.docx DOCX document
36C26118B0235-003.docx DOCX document
36C26118B0235-015.pdf PDF
36C26118B0235-023.docx DOCX document
36C26118B0235-020.docx DOCX document
36C26118B0235-014.pdf PDF
36C26118B0235-024.docx DOCX document
36C26118B0235-018.docx DOCX document
36C26118B0235-005.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES

1. DEMOLISH EXISTING SINK.

2. INSTALL NEW SINK ACCORDING TO

MANUFACTURERS INSTALLATION.

3. CONTRACTOR TO INSTALL NEW GYPSUM

WALLBOARD CEILING WITHIN THE MENTAL

HEALTH STANDARDS.

4. FLOORS TO BE STRIPPED AND RE-

SEALED.

5. REMOVE ALL ITEMS FROM WALL.

6. WALLS TO BE PATCHED AND PAINTED

ACCORDING TO VA STANDARD COLORS.

7. INSTALL NEW HEADWALL IN LOCATIONS

INDICATED ON DRAWINGS.

8. INSTALL NEW DOOR ACCORDING TO

MANUFACTURERS SPECIFICATIONS.

9. INSTALL BED BUMPER GUARDS ALONG

BED WALL.

10. CONTRACTOR TO PAINT PAINT SECTION

OF WALL WITH DRY ERASE PAINT AT

PROVIDED LOCATION AND ELEVATION, PER

DRAWINGS.

ID-103 4

ID-103 -3

4' - 0"

DRY ERASE PAINT

0' - 10"

0'

6" 3'

0"

4'

0" 0'

6"

8'

0"

P-1

B-2

0'

6" 3'

0"

4'

0" 0'

6"

8'

0"

4' - 0" 0' - 10"

DRY ERASE PAINT

P-1

B-2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

Y:

\E ng in ee rin g\

IN

TE

R

IO

R

D

ES

IG

N

\D es ig ne r F ol de rs

\G ia nn a\

N ur si ng

BL

D G

G A-

- B at hr oo m R em od el a nd P oi nt o f C ar e\

BL

D

G

R

M G

A-

R em od el .rv t 5/

/2

1:

:5

PM

ID-103

SAFE ROOM FLOOR PLAN EMERGENCY DEPARTMENT SAFE ROOM

BLDG 200

GCM5/19/2017

SAN FRANCISCO VA MEDICAL CENTER

Revisions: Date:

# 662-17-0016

1/2" = 1'-0"1 ROOM GC-105 (EXAM #8)

1/2" = 1'-0"2 ROOM GC-114 (EXAM #3)

1/2" = 1'-0"3 SAFE ROOM SPECIALTY PAINT

1/2" = 1'-0"4

SAFE ROOM SPECIALTY PAINT

ELEVATION

5 SAFE ROOM

6 SAFE ROOM 2

Sheets
ID-101 - BATHROOM REMODEL
ID-102 - NEW ANCILLARY TEST STATION
ID-103 - SAFE ROOM FLOOR PLAN

File details come from the government source that posted it.