36C26118B0235-015.pdf
PDF 109 KB Posted
- Solicitation number
- 36C26118B0235
About this file
36C26118B0235 S02. ID-101 - Bathroom Remodel.pdf
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T ectonic Cop yright 2007
ID-1016 5
RR-9
RR-7
D-1
ID-1016 5
RR-3
3'
0"
2'
0"
0'
6"
P-1
RR-1
RR-2
8'
6"
3'
6" 4'
6"
MIRROR
0'
6" 4'
6"
P-1
RR-1
RR-2
8'
6"
3'
6"
3'
0"
0'
6" 4'
6"
P-1
RR-1
RR-2
3'
6"
8'
6"
0'
6" 4'
6"
P-1
RR-1
RR-2
3'
6"
8'
6"
GENERAL NOTES
1. INSTALL NEW DOOR WITH NEW LOCKSET
AND CLEAR FINISH. REUSE EXISTING
HINGES.
2. REFER TO APPENDIX 4 FOR DEMOLITION
INSTRUCTIONS.
3. DEMOLISH ALL PADDING FROM WALLS.
4. INSTALL NEW FLOOR MOUNTED TOILET
TO BATHROOM.
5. INSTALL NEW WALL MOUNTED SINK WITH
COVERS OVER PLUMBING FOR
ACCESSIBILITY REQUIREMENTS.
6. INSTALL GRAB BARS.
7. REMOVE CAMERA AND TURN OVER TO
GOVERNMENT.
8. INSTALL CODE REQUIRED SIGNAGE.
9. INSTALL TILE IN ACCORDANCE TO
MAUFACTURER'S SPECIFICATION. USE
RECOMMENDED ADHESIVE. TILE WALLS TO
FOUR FEET A.F.F. WITH EPOXY GROUT.
10. USE RECOMMENDED EPOXT GROUT IN
ACCORDANCE TO MANUFACTURER'S
SPECIFICATION, TO BE NO MORE THAN 1/8"
GROUT LINE.
11. PRIME AND PAINT ALL WALLS AS SHOWN
ON DRAWINGS.
12. DEMOLISH CURRENT FLOORING IN
PREPARATION OF NEW FLOORING
INSTALLATION.
13. ALL ANCILLARY PRODUCT ACCESSORIES
TO BE PROVIDED BY THE AND INSTALLED
BY THE CONTRACTOR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
Y:
\E ng in ee rin g\
IN
TE
R
IO
R
D
ES
IG
N
\D es ig ne r F ol de rs
\G ia nn a\
N ur si ng
BL
D G
G A-
- B at hr oo m R em od el a nd P oi nt o f C ar e\
BL
D
G
R
M G
A-
R em od el .rv t 5/
/2
1:
:4
PM
ID-101
BATHROOM REMODEL EMERGENCY DEPARTMENT SAFE ROOM
BLDG 200
SAN FRANCISCO VA MEDICAL CENTER
5/19/2017
3/4" = 1'-0"1 FLOOR PLAN
3/4" = 1'-0"2 FLOOR FINISH PLAN
1/2" = 1'-0"3 NORTH ELEVATION
1/2" = 1'-0"4 SOUTH ELEVATION
1/2" = 1'-0"5 EAST ELEVATION
1/2" = 1'-0"6 WEST ELEVATION 7 BATHROOM PERSPECTIVE
GCMRevisions: Date:
# 662-17-0016
| Sheets |
| ID-101 - BATHROOM REMODEL |
| ID-102 - NEW ANCILLARY TEST STATION |
| ID-103 - SAFE ROOM FLOOR PLAN |
File details come from the government source that posted it.